ML17328A180: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:TABLE  4.3-1  Continued NOTATION
          - With the reactor trip system breakers closed and the control rod drive system capable of rod withdrawal.
(1)  - If not  performed  in previous  7 days.
(2)  - Heat balance only, above 15% of RATED THERMAL POWER.        Adjust channel if absolute difference greater than 2 percent.
(3)  - Compare incore to excore    axial imbalance  above 15't of RATED THERMAL POWER. Recalibrate  if absolute  difference greater than or equal to              3 percent.
(4)  - Manual ESF  functional input check every    18 months.
(5)  - Each  train tested  every other month.
(6)  - Neutron detectors may be excluded from      CHANNEL CALIBRATION.
(7)  - Below P-6  (BLOCK OF SOURCE RANGE REACTOR TRIP)    setpoint.
(8)  - The provisions  of Specification 4.0.4 are not applicable.
(9)  - The provisions  of Specification 4.0.4 are not applicable for f (delta I)  and f2 (delta I) penalties, or for measurement of de ta              T.
(See also Table 2.2-1)  ~
(10) - The  CHANNEL FUNCTIONAL TEST    shall independently verify the OPERABILITY  of the undervoltage and shunt trip circuits for the Manual Reactor Trip Function, The test shall also verify the OPERABILITY of the Bypass Breaker trip circuit(s).
(11) - The  CHANNEL FUNCTIONAL TEST    shall independently verify the OPERABILITY  of the undervoltage and shunt trip attachments of the Reactor Trip Breakers.
  ~
(12) - Local manual shunt    trip prior to  placing breaker in service.
(13) - Automatic Undervoltage Trip.
(14) - The provisions of Specification 4.0.4 are not applicable when leaving MODE 1. In such an event, the calibration and/or functional test shall be performed within 24 hours after leaving MODE 1.
COOK NUCLEAR PLANT    - UNIT 1              3/4 3-14              AMENDMENT NO.'910040212 890922 PDR    ADOCK  05000315 P                    PNU
 
TABLE 4.3-1    Continued NOTATION
*    - With the reactor trip system breakers closed and the control rod drive system capable of rod withdrawal.
(1)  - If not  performed    in previous  7  days.
(2)  - Heat balance only, above      15% of RATED THERMAL POWER.      Adjust channel if absolute    difference greater than 2 percent.
(3)  - Compare incore to excore axial offset above 15t of RATED THERMAL POWER. Recalibrate    if absolute difference greater than or equal to      3 percent.
(4)  - Manual  ESF  functional input check every      18 months.
(5)  - Each  train tested every other      month, (6)  - Neutron detectors may be excluded from        CHANNEL CALIBRATION.
(7)  - Below P-6 (BLOCK    OF SOURCE RANGE REACTOR    TRIP) setpoint.
(8)  - The provisions of Specification 4.0.4 are not applicable.
(9)  - The provisions of Specification 4.0.4 are not applicable          for f (delta  I)  and f2 (delta I) penalties, or for      measurement  of de ta T.
(See  also Table 2.2-1).
(10) - The  CHANNEL FUNCTIONAL TEST    shall independently verify the OPERABILITY    of the undervoltage and shunt trip circuits for the Manual Reactor Trip Function. The test shall also verify the OPERABILITY of the Bypass Breaker trip circuit(s).
(ll) - The CHANNEL FUNCTIONAL TEST shall independently verify the OPERABILITY of the undervoltage and shunt        trip attachments  of the Reactor Trip Breakers.
(12) - Local manual shunt    trip prior to    placing breaker in service.
(13) - Automatic Undervoltage Trip.
(14) - The provisions of Specification 4.0.4 are not applicable when leaving MODE 1. In such an event, the calibration and/or functional test shall be performed within 24 hours after leaving MODE 1.
COOK NUCLEAR PLANT    - UNIT  2              3/4 3-13            AMENDMENT NO.
 
ATTACHMENT 3 TO AEP:NRC:1102 DONALD C. COOK NUCLEAR PLANT UNIT 2 LICENSEE EVENT REPORT NO. 89-10}}

Latest revision as of 06:10, 29 October 2019

Proposed Tech Spec 4.0.4,reflecting Exemptions to 18-month Measurement of Hot Leg/Cold Leg Delta T
ML17328A180
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/22/1989
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17328A179 List:
References
NUDOCS 8910040212
Download: ML17328A180 (3)


Text

TABLE 4.3-1 Continued NOTATION

- With the reactor trip system breakers closed and the control rod drive system capable of rod withdrawal.

(1) - If not performed in previous 7 days.

(2) - Heat balance only, above 15% of RATED THERMAL POWER. Adjust channel if absolute difference greater than 2 percent.

(3) - Compare incore to excore axial imbalance above 15't of RATED THERMAL POWER. Recalibrate if absolute difference greater than or equal to 3 percent.

(4) - Manual ESF functional input check every 18 months.

(5) - Each train tested every other month.

(6) - Neutron detectors may be excluded from CHANNEL CALIBRATION.

(7) - Below P-6 (BLOCK OF SOURCE RANGE REACTOR TRIP) setpoint.

(8) - The provisions of Specification 4.0.4 are not applicable.

(9) - The provisions of Specification 4.0.4 are not applicable for f (delta I) and f2 (delta I) penalties, or for measurement of de ta T.

(See also Table 2.2-1) ~

(10) - The CHANNEL FUNCTIONAL TEST shall independently verify the OPERABILITY of the undervoltage and shunt trip circuits for the Manual Reactor Trip Function, The test shall also verify the OPERABILITY of the Bypass Breaker trip circuit(s).

(11) - The CHANNEL FUNCTIONAL TEST shall independently verify the OPERABILITY of the undervoltage and shunt trip attachments of the Reactor Trip Breakers.

~

(12) - Local manual shunt trip prior to placing breaker in service.

(13) - Automatic Undervoltage Trip.

(14) - The provisions of Specification 4.0.4 are not applicable when leaving MODE 1. In such an event, the calibration and/or functional test shall be performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after leaving MODE 1.

COOK NUCLEAR PLANT - UNIT 1 3/4 3-14 AMENDMENT NO.'910040212 890922 PDR ADOCK 05000315 P PNU

TABLE 4.3-1 Continued NOTATION

(1) - If not performed in previous 7 days.

(2) - Heat balance only, above 15% of RATED THERMAL POWER. Adjust channel if absolute difference greater than 2 percent.

(3) - Compare incore to excore axial offset above 15t of RATED THERMAL POWER. Recalibrate if absolute difference greater than or equal to 3 percent.

(4) - Manual ESF functional input check every 18 months.

(5) - Each train tested every other month, (6) - Neutron detectors may be excluded from CHANNEL CALIBRATION.

(7) - Below P-6 (BLOCK OF SOURCE RANGE REACTOR TRIP) setpoint.

(8) - The provisions of Specification 4.0.4 are not applicable.

(9) - The provisions of Specification 4.0.4 are not applicable for f (delta I) and f2 (delta I) penalties, or for measurement of de ta T.

(See also Table 2.2-1).

(10) - The CHANNEL FUNCTIONAL TEST shall independently verify the OPERABILITY of the undervoltage and shunt trip circuits for the Manual Reactor Trip Function. The test shall also verify the OPERABILITY of the Bypass Breaker trip circuit(s).

(ll) - The CHANNEL FUNCTIONAL TEST shall independently verify the OPERABILITY of the undervoltage and shunt trip attachments of the Reactor Trip Breakers.

(12) - Local manual shunt trip prior to placing breaker in service.

(13) - Automatic Undervoltage Trip.

(14) - The provisions of Specification 4.0.4 are not applicable when leaving MODE 1. In such an event, the calibration and/or functional test shall be performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after leaving MODE 1.

COOK NUCLEAR PLANT - UNIT 2 3/4 3-13 AMENDMENT NO.

ATTACHMENT 3 TO AEP:NRC:1102 DONALD C. COOK NUCLEAR PLANT UNIT 2 LICENSEE EVENT REPORT NO. 89-10