ML17334B016: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:\e~tTABLE3.3-12RADIOACTIVE LIUIDEFFLUENTMONITORING INSTRUMENTATION Instrument MinimumChannel's
{{#Wiki_filter:\ e
~0etableAlicabilit Action1.GrossRadioactivity MonitorsProviding Automatic ReleaseTermination a.LiquidRadwasteEffluentLine(12-RRS-1001)
~ t TABLE  3.3-12 RADIOACTIVE  LI UID EFFLUENT MONITORING INSTRUMENTATION Minimum Channel's Instrument                              ~0  etable    A  licabilit            Action
(1)Attimesofrelease23b.SteamGenerator BlowdownLine(1-R-19)Attimesofrelease24c.SteamGenerator BlowdownTreatment Effluent(1-R-24)Attimesofrelease242.GrossRadioactivity MonitorsNotProviding Automatic ReleaseTermination a.ServiceWaterSystemEffluentLine(1-R-20,1-R-28)(1)perAtalltimestrain253.Continuous Composite SamplerFlowMonitora.TurbineBuildingSumpEffluentLineAtalltimes254.FlowRateMeasurement Devicesa.LiquidRadwasteLine(RFI-285) b.Discharge Pipes*c.SteamGenerator BlowdownTreatment Effluent'(1-DFI-352)
: 1. Gross  Radioactivity Monitors Providing Automatic Release Termination
Attimesofrelease26AtalltimesNAAttimesofrelease26*Pumpcurvesandvalvesettingsmaybeutilizedtoestimateflow;insuchcases,ActionStatement 26isnotapplicable.
: a. Liquid Radwaste Effluent Line  (12-RRS-1001)         (1)       At times of release        23
+Monitor1-R-18maybeuseduntilmonitor12-RRS-1001 isdeclaredOPERABLEfollowing initialinstallation.
: b. Steam Generator Blowdown Line (1-R-19)                         At times of release        24
eD.C.COOK-UNIT18612120328 8b1208~!PDRADOCK0500031'5 PPDP3/43-58Amendment No.
: c. Steam Generator Blowdown Treatment Effluent (1-R-24)                               At times of release        24
TABLE3.3-12RADIOACTIVE LIUIDEFFLUENTMONITORING INSTRUMENTATION Instrument MinimumChannels~0arableAlicabilit Action1.GrossRadioactivity MonitorsProviding Automatic ReleaseTermination a.LiquidRadwasteEffluentLine(12-RRS-1001)
: 2. Gross  Radioactivity Monitors Not Providing Automatic Release Termination
+Attimesofrelease23b.SteamGenerator BlowdownLine(2-R-19)Attimesofrelease24c.SteamGenerator BlowdownTreatment Effluent(2-R-24)Attimesofrelease242.GrossRadioactivity MonitorsNotProviding Automatic ReleaseTermination a.ServiceWaterSystemEffluentLine(2-R-20,2-R-28)(1)perAtalltimestrain253.Continuous Composite SamplerFlowMonitora.TurbineBuildingSumpEffluentLineAtalltimes4.FlowRateMeasurement Devicesa.LiquidRadwaste,Line(RFI-285) b.Discharge Pipes*c.SteamGenerator BlowdownTreatment Effluent(2-DFI-352)
: a. Service Water System Effluent Line                        (1)per    At all times              25 (1-R-20, 1-R-28)                         train
Attimesofrelease26AtalltimesNAAttimesofrelease26*Pumpcurvesandvalvesettingsmaybeutilizedtoestimateflow;insuchcases,ActionStatement 26isnotapplicable.
: 3. Continuous Composite Sampler Flow Monitor
+Monitor2-R-18maybeuseduntilmonitor12-RRS-1001 isdeclaredOPERABLEfollowing initialinstallation.
: a. Turbine Building    Sump Effluent Line                                  At all times              25
D.C.COOK-UNIT23/43-54Amendment No.
: 4. Flow Rate Measurement Devices
14I11}}
: a. Liquid Radwaste Line(RFI-285)                   At times of release        26
: b. Discharge Pipes*                                 At all times              NA
: c. Steam Generator Blowdown Treatment Effluent                             At times of release        26
            '(1-DFI-352)
* Pump  curves and valve settings may be utilized to estimate flow; in such cases,   Action Statement 26 is not applicable.
      + Monitor 1-R-18    may be used  until monitor 12-RRS-1001 is declared    OPERABLE following    initial installation.                           e D. C. COOK - UNIT 1                      3/4 3-58                Amendment No.
8612120328 8b1208~!
PDR    ADOCK 0500031'5 P                    PDP
 
TABLE  3.3-12 RADIOACTIVE  LI UID EFFLUENT MONITORING INSTRUMENTATION Minimum Channels Instrument                                 ~0 arable  A  licabilit          Action
: 1. Gross  Radioactivity Monitors Providing Automatic Release Termination
: a. Liquid Radwaste                +
Effluent Line    (12-RRS-1001)                 At times of release      23
: b. Steam Generator Blowdown Line (2-R-19)                         At times of release      24
: c. Steam Generator Blowdown Treatment Effluent (2-R-24)                               At times of release      24
: 2. Gross  Radioactivity Monitors Not Providing Automatic Release Termination
: a. Service Water System Effluent Line                          (1)per  At  all times            25 (2-R-20, 2-R-28)                         train
: 3. Continuous Composite Sampler Flow Monitor
: a. Turbine    Building  Sump Effluent Line                                  At  all times
: 4. Flow Rate Measurement Devices
: a. Liquid Radwaste,Line(RFI-285)                   At times of release      26
: b. Discharge Pipes*                                 At all times            NA
: c. Steam Generator Blowdown Treatment Effluent                             At times of release      26 (2-DFI-352)
* Pump  curves and valve settings may be utilized to estimate flow; in such cases,   Action Statement 26 is not applicable.
+ Monitor 2-R-18    may be used  until  monitor 12-RRS-1001 is declared  OPERABLE following    initial installation.
D. C. COOK - UNIT 2                        3/4 3-54            Amendment No.
 
1 4I 1
1}}

Latest revision as of 12:43, 22 October 2019

Proposed Tech Spec 3.3.3.9,revising Table 3.3-12 to Reflect Replacement of Liquid Radwaste Effluent Line Monitor
ML17334B016
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/08/1986
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17334B015 List:
References
NUDOCS 8612120328
Download: ML17334B016 (3)


Text

\ e

~ t TABLE 3.3-12 RADIOACTIVE LI UID EFFLUENT MONITORING INSTRUMENTATION Minimum Channel's Instrument ~0 etable A licabilit Action

1. Gross Radioactivity Monitors Providing Automatic Release Termination
a. Liquid Radwaste Effluent Line (12-RRS-1001) (1) At times of release 23
b. Steam Generator Blowdown Line (1-R-19) At times of release 24
c. Steam Generator Blowdown Treatment Effluent (1-R-24) At times of release 24
2. Gross Radioactivity Monitors Not Providing Automatic Release Termination
a. Service Water System Effluent Line (1)per At all times 25 (1-R-20, 1-R-28) train
3. Continuous Composite Sampler Flow Monitor
a. Turbine Building Sump Effluent Line At all times 25
4. Flow Rate Measurement Devices
a. Liquid Radwaste Line(RFI-285) At times of release 26
b. Discharge Pipes* At all times NA
c. Steam Generator Blowdown Treatment Effluent At times of release 26

'(1-DFI-352)

  • Pump curves and valve settings may be utilized to estimate flow; in such cases, Action Statement 26 is not applicable.

+ Monitor 1-R-18 may be used until monitor 12-RRS-1001 is declared OPERABLE following initial installation. e D. C. COOK - UNIT 1 3/4 3-58 Amendment No.

8612120328 8b1208~!

PDR ADOCK 0500031'5 P PDP

TABLE 3.3-12 RADIOACTIVE LI UID EFFLUENT MONITORING INSTRUMENTATION Minimum Channels Instrument ~0 arable A licabilit Action

1. Gross Radioactivity Monitors Providing Automatic Release Termination
a. Liquid Radwaste +

Effluent Line (12-RRS-1001) At times of release 23

b. Steam Generator Blowdown Line (2-R-19) At times of release 24
c. Steam Generator Blowdown Treatment Effluent (2-R-24) At times of release 24
2. Gross Radioactivity Monitors Not Providing Automatic Release Termination
a. Service Water System Effluent Line (1)per At all times 25 (2-R-20, 2-R-28) train
3. Continuous Composite Sampler Flow Monitor
a. Turbine Building Sump Effluent Line At all times
4. Flow Rate Measurement Devices
a. Liquid Radwaste,Line(RFI-285) At times of release 26
b. Discharge Pipes* At all times NA
c. Steam Generator Blowdown Treatment Effluent At times of release 26 (2-DFI-352)
  • Pump curves and valve settings may be utilized to estimate flow; in such cases, Action Statement 26 is not applicable.

+ Monitor 2-R-18 may be used until monitor 12-RRS-1001 is declared OPERABLE following initial installation.

D. C. COOK - UNIT 2 3/4 3-54 Amendment No.