| =Text= | | =Text= |
| {{#Wiki_filter:CATEGORY 1 REGULATOR INFORMATION DISTRIBUTION ZEM (RIDS)ACCESSION NBR:9706250265 DOC.DATE: 97/06/12 NOTARIZED: | | {{#Wiki_filter:CATEGORY 1 REGULATOR INFORMATION DISTRIBUTION ZEM (RIDS) |
| NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 50-335 St.Lucie Plant, Unit.1, Florida Power s Light Co.50-389 St.Lucie Plant,,Unit 2, Florida Power!;Light Co.AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F. | | ACCESSION NBR:9706250265 DOC.DATE: 97/06/12 NOTARIZED: NO DOCKET I FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 50-335 St. Lucie Plant, Unit .1, Florida Power s Light Co. 05000335 50-389 St. Lucie Plant,,Unit 2, Florida Power !; Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION PLUNKETT,T.F. Florida Power & Light Co. |
| Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET I 05000250 05000251 05000335 05000389 | | RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Forwards annual update of FPL Topical QA Rept (TQAR).Summary of changes made to TQAR, also encl.DISTRIBUTION CODE, Q004D COPIES RECEIVED,LTR I ENCL I SIZE,+TITLE: QA Topical Report, Change, Amendment, or Correspondence (Docket NOTES: Ut 11 E RECIPIENT ID CODE/NAME CROTEAU,R INTERNAL: ACRS LE, CENT~04 RR~DRCH/HQMB OC/LFDCB EXTERNAL: DMB/OSS NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NIENS Ii.DRS/RGN.... | | Forwards annual update of FPL Topical QA Rept (TQAR).Summary to TQAR, also encl. |
| NRR/DISP/PIMB NUDOCS-ABSTRACT RGN2 FILE IHS COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 D'NOTE TO ALL"RIDS" RECIPIENTS: | | of changes DISTRIBUTION CODE, Q004D TITLE: QA made COPIES RECEIVED,LTR Topical Report, Change, Amendment, I ENCL I or Correspondence SIZE, + |
| PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD"S(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES'REQUIRED: | | (Docket Ut 11 E NOTES: |
| LTTR 13 ENCL 13 I | | RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL CROTEAU,R 1 1 NIENS Ii. 1 1 INTERNAL: ACRS 1 1 DRS/RGN.... 1 1 LE, CENT ~04 1 1 NRR/DISP/PIMB 1 1 RR~DRCH/HQMB 1 1 NUDOCS-ABSTRACT 1 1 OC/LFDCB 1 1 RGN2 FILE 1 1 EXTERNAL: DMB/OSS 1 1 IHS 1 1 NRC PDR 1 1 |
| Florida Power&Light Company, P.O.Box 14000, Juno Beach, FL 33408-0420 JUN 1 2 1997 L-97-148 10 CFR 50.54(a)(3)
| | ' |
| ~10 CFR 50.4 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 To ical ualit Assurance Re ort FPLT AR 1-76A Pursuant to 10 CFR 50.54(a)(3), attached is the annual update of the Florida Power and Light Company (FPL)Topical Quality Assurance Report (TQAR).Enclosure I includes a summary of the changes made to the TQAR since June 1996.Enclosure II contains marked up versions of the TQAR showing all changes that have been made since the last annual submittal.
| | D NOTE TO ALL "RIDS" RECIPIENTS: |
| Enclosure III is the current TQAR including all revisions issued through Revision 52 dated April 30, 1997.All changes have been reviewed by the FPL Nuclear Assurance Department and it has been concluded that these changes do not reduce the commitments in our program description which has been previously accepted by the NRC.The enclosed information accurately presents changes made since the previous FPL annual TQAR submittal.
| | PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD"S(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! |
| Please note that this submittal does not include the proposed changes to the Florida Power 8c Light TQAR (TQR 1.0, Organization) submitted to the NRC on April 29, 1997 (FPL letter L-97-115).Should there be any questions, please contact us.Very truly yours, T.F.Plunkett President Nuclear Division QUA 970b2502b5 970bi2'DR ADOCK 05000250 P PDR A an FPL Group company llllllllilill!illllillllllllllllllllllll g K 1 K'A I TFP/R JA/spt Enclosures CC: Regional Administrator, Region H, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St.Lucie Plant Frank Jape, Region II, USNRC Florida Power A Light Topical Quality Assurance Report Change Summary June, 1997 (Page 1 of 5)ENCLOSURE I Summary of changes to the Florida Power&Light Topical Quality Assurance Report (FPL TQAR 1-76A)since June, 1996.1.Table of Contents (Each Revision)The Table of Contents has been revised at each revision of a portion of the TQAR to reflect the most recent revision of all documents within the TQAR.2.T R 1.0: ORGANIZATION (Rev.28 to Rev.29)Revisions to reflect organizational change and restructuring.
| | TOTAL NUMBER OF COPIES'REQUIRED: LTTR 13 ENCL 13 |
| Changes made in the realignment of Nuclear Engineering organization.
| |
| 4.T R 2.0: UALITY ASSURANCE PROGRAM (Rev.14 to Rev.15)One title change and relocation of a required review from TQR 1.0.5.T R 3.0: DESIGN CONTROL (Rcv.12 to Rev.13)This revision eliminates outdated examples of safety related item databases; removes the description of design change reviews for CNRB, PNSC, and FRG from the IMPLEMENTATION section (specifics remain in the RESPONSIBILITIES section);clarifies software requirements; corrects several titles resulting from organizational changes;and relocates a required review from TQR 1.0.
| |
| Florida Power R Light Topical Quality Assurance Report Change Summary June, 1997 (Page 2 of 5)ENCLOSURE I 6.T R 4.0: PROCUREMENT DOCUMENT CONTROL (Rev.8 to Rev.9)This revision corrects titles resulting from organizational changes;clarifies Nuclear Engineering's role in procurement activities; and corrects typographical errors.7.T R 5.0: INSTRUCTIONS PROCEDURES A DRAWINGS (Rev.11 to Rev.12)To correct titles as a result of reorganization.
| |
| 8.T R 6.0: DOCUMENT CONTROL (Rev.10 to Rev.11)To correct titles as a result of reorganization.
| |
| 9.T R 7.0: CONTROL OF PURCHASED ITEMS A SERVICES (Rev.8 to Rev.9)To correct titles as a result of reorganization.
| |
| 10.TQR 8.0: IDENTIFICATION AND CONTROL OF MATERIALS PARTS AND COMPONENTS (Rev.3 to Rev.4)To correct references to M&S numbers and correct titles as a result of reorganization.
| |
| 11.T R9.0: CONTROL OF SPECIAL PROCESSES (Rev.12 to Rev.13)To correct titles as a result of reorganization.
| |
| 0 Florida Power 4 Light Topical Quality Assurance Report Change Summary June, 1997 (Page 3 of 5)ENCLOSURE I 12.T R 11.0: TEST CONTROL (Rev.5 to Rev.6)To correct titles as a result of reorganization.
| |
| 13.TQR 13.0: HANDLING STORAGE SHIPPING CLEANNESS CONTROL 8c HOUSEKEEPING (Rev.9 to Rev.10)To correct titles as a result of reorganization.
| |
| t 14.TQR 15.0: NONCONFORMING MATERIALS PARTS OR COMPONENTS (Rev.11 to Rev.12)To correct titles as a result of reorganization and clarify the wording relative to providing dispositions for nonconforming items.15.T R 16.0: CORRECTIVE ACTION (Rev.9 to Rev.10)The requirements for tracking corrective actions and commitments are relocated and consolidated from TQR 1.0.16.T R 17.0: UALITY ASSURANCE RECORDS (Rev.4 to Rev.5)This revision clarifies specific record retention requirements and the responsibilities of the Records Official;corrects titles resulting from organizational changes;and specifies requirements for temporary storage of records.
| |
| Florida Power 4 Light Topical Quality Assurance Report Change Summary June, 1997 (Page 4 of 5)ENCLOSURE I 17.A endix A Fi ure 1-1: ORGANIZATION
| |
| &FIGURES (Rev.22 to Rev.23)Revised to reflect organizational change and restructuring.
| |
| 18.A endix A Fi ure 1-1: ORGANIZATION
| |
| &FIGURES (Rev.23 to Rev.24)Changes adding three additional functions under Vice President Nuclear Engineering.
| |
| Change Fuels to Fuel.19.A endix A Fi ure 1-1: ORGANIZATION
| |
| &FIGURES (Rev.24 to Rev.25)Correct QA department titles.20.A endix A Fi ure 1-2: ORGANIZATION
| |
| &FIGURES (Rev.7 to Rev.8)Reflects current Turkey Point Plant organization.
| |
| 21.A endix A Fi ure 1-2: ORGANIZATION
| |
| &FIGURES (Rev.8 to Rev.9)Reflects current Turkey Point Plant organization.
| |
| 22.A endix A Fi ure 1-2: ORGANIZATION
| |
| &FIGURES (Rev.9 to Rev.10)Reflects current Turkey Point Plant organization.
| |
| 23.A endix A Fi ure 1-2: ORGANIZATION
| |
| &FIGURES (Rev.10 to Rev.11)To change"Outage Manager" to"Work Control Manager".
| |
|
| |
|
| e Florida Power&Light Topical Quality Assurance Report Change Summary June, 1997 (Page 5 of 5)ENCLOSURE I 24.A endix A Fi ure 1-2: ORGANIZATION 8r, FIGURES (Rev.11 to Rev.12)Change and clarification of organization to a direct line of communication between the Health Physics Supervisor and the Plant General Manager for matters relating to the radiological health and safety of employees and the public.Change Engineering Department titles to: Administrative Systems Engineering Plant Engineering Operations Support Engineering 25.A endix A Fi ure 1-3: ORGANIZATION K FIGURES (Rev.7 to Rev.8)Reflects current St.Lucie Plant organization 26.A endix A Fi ure 1-3: ORGANIZATION
| | I Florida Power & Light Company, P.O. Box 14000, Juno Beach, FL 33408-0420 JUN 1 2 1997 L-97-148 10 CFR 50.54(a)(3) |
| &FIGURES (Rev.8 to Rev.9)Change Engineering Department titles to: Administrative Systems Engineering Plant Engineering Operations Support Engineering 27.A endix C: BASELINE DOCUMENT MATRIX (Rev.14 to Rev.15)This revision clarifies FPL's addressing of ANSI N18.7-1976, Section 5.2;corrects organizational titles;eliminates the clarification of ANSI N18.7-1976, Paragraph 5.3.5(4)so that FPL reverts to the text in the ANSI N18.7-1976; clarifies temporary storage of records at FPL in the section addressing ANSI N45.2.9-1974; and eliminates the definition of commercial grade items from the section addressing ANSI N45.2.13-1976-this definition is in the Glossary.}} | | ~ 10 CFR 50.4 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 To ical ualit Assurance Re ort FPLT AR 1-76A Pursuant to 10 CFR 50.54(a)(3), attached is the annual update of the Florida Power and Light Company (FPL) Topical Quality Assurance Report (TQAR). |
| | Enclosure I includes a summary of the changes made to the TQAR since June 1996. Enclosure II contains marked up versions of the TQAR showing all changes that have been made since the last annual submittal. Enclosure III is the current TQAR including all revisions issued through Revision 52 dated April 30, 1997. |
| | All changes have been reviewed by the FPL Nuclear Assurance Department and it has been concluded that these changes do not reduce the commitments in our program description which has been previously accepted by the NRC. The enclosed information accurately presents changes made since the previous FPL annual TQAR submittal. |
| | Please note that this submittal does not include the proposed changes to the Florida Power 8c Light TQAR (TQR 1.0, Organization) submitted to the NRC on April 29, 1997 (FPL letter L 115). |
| | Should there be any questions, please contact us. |
| | Very truly yours, llllllllilill!illllillllllllllllllllllll T. F. Plunkett President Nuclear Division QUA 970b2502b5 970bi2 ADOCK 05000250 'DR P PDR A |
| | an FPL Group company |
| | |
| | g K 1 K 'A I |
| | |
| | TFP/R JA/spt Enclosures CC: Regional Administrator, Region H, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant Frank Jape, Region II, USNRC |
| | |
| | Florida Power A Light Topical Quality Assurance Report Change Summary June, 1997 (Page 1 of 5) |
| | ENCLOSURE I Summary of changes to the Florida Power & Light Topical Quality Assurance Report (FPL TQAR 1-76A) since June, 1996. |
| | : 1. Table of Contents (Each Revision) |
| | The Table of Contents has been revised at each revision of a portion of the TQAR to reflect the most recent revision of all documents within the TQAR. |
| | : 2. T R 1.0: ORGANIZATION (Rev. 28 to Rev. 29) |
| | Revisions to reflect organizational change and restructuring. |
| | Changes made in the realignment of Nuclear Engineering organization. |
| | : 4. T R 2.0: UALITYASSURANCE PROGRAM (Rev. 14 to Rev. 15) |
| | One title change and relocation of a required review from TQR 1.0. |
| | : 5. T R 3.0: DESIGN CONTROL (Rcv. 12 to Rev. 13) |
| | This revision eliminates outdated examples of safety related item databases; removes the description of design change reviews for CNRB, PNSC, and FRG from the IMPLEMENTATION section (specifics remain in the RESPONSIBILITIES section); |
| | clarifies software requirements; corrects several titles resulting from organizational changes; and relocates a required review from TQR 1.0. |
| | |
| | Florida Power R Light Topical Quality Assurance Report Change Summary June, 1997 (Page 2 of 5) |
| | ENCLOSURE I |
| | : 6. T R 4.0: PROCUREMENT DOCUMENT CONTROL (Rev. 8 to Rev. 9) |
| | This revision corrects titles resulting from organizational changes; clarifies Nuclear Engineering's role in procurement activities; and corrects typographical errors. |
| | : 7. T R 5.0: INSTRUCTIONS PROCEDURES A DRAWINGS (Rev. 11 to Rev. 12) |
| | To correct titles as a result of reorganization. |
| | : 8. T R 6.0: DOCUMENT CONTROL (Rev. 10 to Rev. 11) |
| | To correct titles as a result of reorganization. |
| | : 9. T R 7.0: CONTROL OF PURCHASED ITEMS A SERVICES (Rev. 8 to Rev. 9) |
| | To correct titles as a result of reorganization. |
| | : 10. TQR 8.0: |
| | IDENTIFICATIONAND CONTROL OF MATERIALS PARTS AND COMPONENTS (Rev. 3 to Rev. 4) |
| | To correct references to M&S numbers and correct titles as a result of reorganization. |
| | : 11. T R9.0: CONTROL OF SPECIAL PROCESSES (Rev. 12 to Rev. 13) |
| | To correct titles as a result of reorganization. |
| | |
| | 0 Florida Power 4 Light Topical Quality Assurance Report Change Summary June, 1997 (Page 3 of 5) |
| | ENCLOSURE I |
| | : 12. T R 11.0: TEST CONTROL (Rev. 5 to Rev. 6) |
| | To correct titles as a result of reorganization. |
| | : 13. TQR 13.0: |
| | HANDLING STORAGE SHIPPING CLEANNESS CONTROL 8c HOUSEKEEPING (Rev. 9 to Rev. 10) |
| | To correct titles result of reorganization. |
| | t as a |
| | : 14. TQR 15.0: |
| | NONCONFORMING MATERIALS PARTS OR COMPONENTS (Rev. 11 to Rev. 12) |
| | To correct titles as a result of reorganization and clarify the wording relative to providing dispositions for nonconforming items. |
| | : 15. T R 16.0: CORRECTIVE ACTION (Rev. 9 to Rev. 10) |
| | The requirements for tracking corrective actions and commitments are relocated and consolidated from TQR 1.0. |
| | : 16. T R 17.0: UALITYASSURANCE RECORDS (Rev. 4 to Rev. 5) |
| | This revision clarifies specific record retention requirements and the responsibilities of the Records Official; corrects titles resulting from organizational changes; and specifies requirements for temporary storage of records. |
| | |
| | Florida Power 4 Light Topical Quality Assurance Report Change Summary June, 1997 (Page 4 of 5) |
| | ENCLOSURE I |
| | : 17. A endix A Fi ure 1-1: ORGANIZATION & FIGURES (Rev. 22 to Rev. 23) |
| | Revised to reflect organizational change and restructuring. |
| | : 18. A endix A Fi ure 1-1: ORGANIZATION & FIGURES (Rev. 23 to Rev. 24) |
| | Changes adding three additional functions under Vice President Nuclear Engineering. |
| | Change Fuels to Fuel. |
| | : 19. A endix A Fi ure 1-1: ORGANIZATION & FIGURES (Rev. 24 to Rev. 25) |
| | Correct QA department titles. |
| | : 20. A endix A Fi ure 1-2: ORGANIZATION & FIGURES (Rev. 7 to Rev. 8) |
| | Reflects current Turkey Point Plant organization. |
| | : 21. A endix A Fi ure 1-2: ORGANIZATION & FIGURES (Rev. 8 to Rev. 9) |
| | Reflects current Turkey Point Plant organization. |
| | : 22. A endix A Fi ure 1-2: ORGANIZATION & FIGURES (Rev. 9 to Rev. 10) |
| | Reflects current Turkey Point Plant organization. |
| | : 23. A endix A Fi ure 1-2: ORGANIZATION & FIGURES (Rev. 10 to Rev. 11) |
| | To change "Outage Manager" to "Work Control Manager". |
| | |
| | Florida Power & Light e Topical Quality Assurance Report Change Summary June, 1997 (Page 5 of 5) |
| | ENCLOSURE I |
| | : 24. A endix A Fi ure 1-2: ORGANIZATION 8r, FIGURES (Rev. 11 to Rev. 12) |
| | Change and clarification of organization to a direct line of communication between the Health Physics Supervisor and the Plant General Manager for matters relating to the radiological health and safety of employees and the public. |
| | Change Engineering Department titles to: Administrative Systems Engineering Plant Engineering Operations Support Engineering |
| | : 25. A endix A Fi ure 1-3: ORGANIZATION K FIGURES (Rev. 7 to Rev. 8) |
| | Reflects current St. Lucie Plant organization |
| | : 26. A endix A Fi ure 1-3: ORGANIZATION & FIGURES (Rev. 8 to Rev. 9) |
| | Change Engineering Department titles to: Administrative Systems Engineering Plant Engineering Operations Support Engineering |
| | : 27. A endix C: BASELINE DOCUMENT MATRIX (Rev. 14 to Rev. 15) |
| | This revision clarifies FPL's addressing of ANSI N18.7-1976, Section 5.2; corrects organizational titles; eliminates the clarification of ANSI N18.7-1976, Paragraph 5.3.5(4) so that FPL reverts to the text in the ANSI N18.7-1976; clarifies temporary storage of records at FPL in the section addressing ANSI N45.2.9-1974; and eliminates the definition of commercial grade items from the section addressing ANSI N45.2.13-1976-this definition is in the Glossary.}} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. 1999-09-09
[Table view] |
Text
CATEGORY 1 REGULATOR INFORMATION DISTRIBUTION ZEM (RIDS)
ACCESSION NBR:9706250265 DOC.DATE: 97/06/12 NOTARIZED: NO DOCKET I FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 50-335 St. Lucie Plant, Unit .1, Florida Power s Light Co. 05000335 50-389 St. Lucie Plant,,Unit 2, Florida Power !; Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION PLUNKETT,T.F. Florida Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards annual update of FPL Topical QA Rept (TQAR).Summary to TQAR, also encl.
of changes DISTRIBUTION CODE, Q004D TITLE: QA made COPIES RECEIVED,LTR Topical Report, Change, Amendment, I ENCL I or Correspondence SIZE, +
(Docket Ut 11 E NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL CROTEAU,R 1 1 NIENS Ii. 1 1 INTERNAL: ACRS 1 1 DRS/RGN.... 1 1 LE, CENT ~04 1 1 NRR/DISP/PIMB 1 1 RR~DRCH/HQMB 1 1 NUDOCS-ABSTRACT 1 1 OC/LFDCB 1 1 RGN2 FILE 1 1 EXTERNAL: DMB/OSS 1 1 IHS 1 1 NRC PDR 1 1
'
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD"S(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES'REQUIRED: LTTR 13 ENCL 13
I Florida Power & Light Company, P.O. Box 14000, Juno Beach, FL 33408-0420 JUN 1 2 1997 L-97-148 10 CFR 50.54(a)(3)
~ 10 CFR 50.4 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 To ical ualit Assurance Re ort FPLT AR 1-76A Pursuant to 10 CFR 50.54(a)(3), attached is the annual update of the Florida Power and Light Company (FPL) Topical Quality Assurance Report (TQAR).
Enclosure I includes a summary of the changes made to the TQAR since June 1996. Enclosure II contains marked up versions of the TQAR showing all changes that have been made since the last annual submittal. Enclosure III is the current TQAR including all revisions issued through Revision 52 dated April 30, 1997.
All changes have been reviewed by the FPL Nuclear Assurance Department and it has been concluded that these changes do not reduce the commitments in our program description which has been previously accepted by the NRC. The enclosed information accurately presents changes made since the previous FPL annual TQAR submittal.
Please note that this submittal does not include the proposed changes to the Florida Power 8c Light TQAR (TQR 1.0, Organization) submitted to the NRC on April 29, 1997 (FPL letter L 115).
Should there be any questions, please contact us.
Very truly yours, llllllllilill!illllillllllllllllllllllll T. F. Plunkett President Nuclear Division QUA 970b2502b5 970bi2 ADOCK 05000250 'DR P PDR A
an FPL Group company
g K 1 K 'A I
TFP/R JA/spt Enclosures CC: Regional Administrator, Region H, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant Frank Jape, Region II, USNRC
Florida Power A Light Topical Quality Assurance Report Change Summary June, 1997 (Page 1 of 5)
ENCLOSURE I Summary of changes to the Florida Power & Light Topical Quality Assurance Report (FPL TQAR 1-76A) since June, 1996.
- 1. Table of Contents (Each Revision)
The Table of Contents has been revised at each revision of a portion of the TQAR to reflect the most recent revision of all documents within the TQAR.
- 2. T R 1.0: ORGANIZATION (Rev. 28 to Rev. 29)
Revisions to reflect organizational change and restructuring.
Changes made in the realignment of Nuclear Engineering organization.
- 4. T R 2.0: UALITYASSURANCE PROGRAM (Rev. 14 to Rev. 15)
One title change and relocation of a required review from TQR 1.0.
- 5. T R 3.0: DESIGN CONTROL (Rcv. 12 to Rev. 13)
This revision eliminates outdated examples of safety related item databases; removes the description of design change reviews for CNRB, PNSC, and FRG from the IMPLEMENTATION section (specifics remain in the RESPONSIBILITIES section);
clarifies software requirements; corrects several titles resulting from organizational changes; and relocates a required review from TQR 1.0.
Florida Power R Light Topical Quality Assurance Report Change Summary June, 1997 (Page 2 of 5)
ENCLOSURE I
- 6. T R 4.0: PROCUREMENT DOCUMENT CONTROL (Rev. 8 to Rev. 9)
This revision corrects titles resulting from organizational changes; clarifies Nuclear Engineering's role in procurement activities; and corrects typographical errors.
- 7. T R 5.0: INSTRUCTIONS PROCEDURES A DRAWINGS (Rev. 11 to Rev. 12)
To correct titles as a result of reorganization.
- 8. T R 6.0: DOCUMENT CONTROL (Rev. 10 to Rev. 11)
To correct titles as a result of reorganization.
- 9. T R 7.0: CONTROL OF PURCHASED ITEMS A SERVICES (Rev. 8 to Rev. 9)
To correct titles as a result of reorganization.
- 10. TQR 8.0:
IDENTIFICATIONAND CONTROL OF MATERIALS PARTS AND COMPONENTS (Rev. 3 to Rev. 4)
To correct references to M&S numbers and correct titles as a result of reorganization.
- 11. T R9.0: CONTROL OF SPECIAL PROCESSES (Rev. 12 to Rev. 13)
To correct titles as a result of reorganization.
0 Florida Power 4 Light Topical Quality Assurance Report Change Summary June, 1997 (Page 3 of 5)
ENCLOSURE I
- 12. T R 11.0: TEST CONTROL (Rev. 5 to Rev. 6)
To correct titles as a result of reorganization.
- 13. TQR 13.0:
HANDLING STORAGE SHIPPING CLEANNESS CONTROL 8c HOUSEKEEPING (Rev. 9 to Rev. 10)
To correct titles result of reorganization.
t as a
- 14. TQR 15.0:
NONCONFORMING MATERIALS PARTS OR COMPONENTS (Rev. 11 to Rev. 12)
To correct titles as a result of reorganization and clarify the wording relative to providing dispositions for nonconforming items.
- 15. T R 16.0: CORRECTIVE ACTION (Rev. 9 to Rev. 10)
The requirements for tracking corrective actions and commitments are relocated and consolidated from TQR 1.0.
- 16. T R 17.0: UALITYASSURANCE RECORDS (Rev. 4 to Rev. 5)
This revision clarifies specific record retention requirements and the responsibilities of the Records Official; corrects titles resulting from organizational changes; and specifies requirements for temporary storage of records.
Florida Power 4 Light Topical Quality Assurance Report Change Summary June, 1997 (Page 4 of 5)
ENCLOSURE I
- 17. A endix A Fi ure 1-1: ORGANIZATION & FIGURES (Rev. 22 to Rev. 23)
Revised to reflect organizational change and restructuring.
- 18. A endix A Fi ure 1-1: ORGANIZATION & FIGURES (Rev. 23 to Rev. 24)
Changes adding three additional functions under Vice President Nuclear Engineering.
Change Fuels to Fuel.
- 19. A endix A Fi ure 1-1: ORGANIZATION & FIGURES (Rev. 24 to Rev. 25)
Correct QA department titles.
- 20. A endix A Fi ure 1-2: ORGANIZATION & FIGURES (Rev. 7 to Rev. 8)
Reflects current Turkey Point Plant organization.
- 21. A endix A Fi ure 1-2: ORGANIZATION & FIGURES (Rev. 8 to Rev. 9)
Reflects current Turkey Point Plant organization.
- 22. A endix A Fi ure 1-2: ORGANIZATION & FIGURES (Rev. 9 to Rev. 10)
Reflects current Turkey Point Plant organization.
- 23. A endix A Fi ure 1-2: ORGANIZATION & FIGURES (Rev. 10 to Rev. 11)
To change "Outage Manager" to "Work Control Manager".
Florida Power & Light e Topical Quality Assurance Report Change Summary June, 1997 (Page 5 of 5)
ENCLOSURE I
- 24. A endix A Fi ure 1-2: ORGANIZATION 8r, FIGURES (Rev. 11 to Rev. 12)
Change and clarification of organization to a direct line of communication between the Health Physics Supervisor and the Plant General Manager for matters relating to the radiological health and safety of employees and the public.
Change Engineering Department titles to: Administrative Systems Engineering Plant Engineering Operations Support Engineering
- 25. A endix A Fi ure 1-3: ORGANIZATION K FIGURES (Rev. 7 to Rev. 8)
Reflects current St. Lucie Plant organization
- 26. A endix A Fi ure 1-3: ORGANIZATION & FIGURES (Rev. 8 to Rev. 9)
Change Engineering Department titles to: Administrative Systems Engineering Plant Engineering Operations Support Engineering
- 27. A endix C: BASELINE DOCUMENT MATRIX (Rev. 14 to Rev. 15)
This revision clarifies FPL's addressing of ANSI N18.7-1976, Section 5.2; corrects organizational titles; eliminates the clarification of ANSI N18.7-1976, Paragraph 5.3.5(4) so that FPL reverts to the text in the ANSI N18.7-1976; clarifies temporary storage of records at FPL in the section addressing ANSI N45.2.9-1974; and eliminates the definition of commercial grade items from the section addressing ANSI N45.2.13-1976-this definition is in the Glossary.