@PL TOPICAL UALITYASSURANCE REPORT ORGANIZATION R933 TQR 1.0 Rev.

29 Draft A Date 03/24/97 Pa e 1

Or 20 1.1 GENERAL RE UIREMENTS The Florida Power &Light (FPL) organizational structure shall be defined. such that the responsibilities for establishment and implementation of the Quality Assurance Program are clearly.identified.

The authority and duties of individuals and organizations performing quality assurance and quality control functions shall be described, and shall illustrate the organizational independence and authority necessary to identify problems; to initiate, recommend, or provide solutions; and to verify implementation of solutions.

In addition, the description shall illustrate that persons or groups responsible for verifying the correct performance of an activity are independent of the person or groups responsible for,performing the activity.

1.2 IMPLEMENTATION The FPL Chairman of the Board and Chief Executive Officer is ultimately responsible for the execution of the Quality Assurance Program for FPL nuclear power plants.

The authority for developing and verifying execution of the program is delegated to the President Nuclear Division and the Director Nuclear Assurance.

The reporting relationship of each department involved with the Quality Assurance Program is shown in Appendix A.

To provide for a review and evaluation of Quality Assurance Program policies and activities, the President Nuclear Division has established the Company Nuclear Review Board (CNRB). This organization's responsibilities are defined in Section 1.3.1.

9'70b250272 970b12 PDR ADOCK 05000250 (p

PDR

0 II d

S ii

TOPICAL QUALITYASSURANCE REPORT ORGANIZATION R933 TQR 1.0 Rev.

29 Draft A Date 03/24/97 Pa e 2

of 20 In addition, a Quality.Assurance Program Review Committee (QAPRC) has been established,to review changes to the Quality Assurance Program and to provide an interface for quality matters in each department affecting quality.

The QAPRC is an interdepartmental organization with the responsibility to review and resolve recommended changes to the Quality Assurance Program.

This committee is administered by the Quality Assurance Performance Assessment group.

Quality Assurance Program changes reviewed by the QAPRC are reviewed and signed by the affected department heads.

A Quality Assurance Program Review Committee (QAPRC) Member shall be designated by the head of each department or organization.

The QAPRC Member is the prime interface for coordination of quality matters within the member's department, with the Quality Assurance Department, and with other departments.

The head of each department or organization performing activities affecting quality is responsible for:

a) identifying those activities within the organization, which affect quality as defined by the Quality Assurance Program; b) establishing and clearly defining the duties and responsibilities of personnel within his organization who execute those activities affecting quality; and c) planning, selecting, and training personnel to meet the requirements of the Quality Assurance Program.

The responsibility,.authority, and organizational relationship for performing activities affecting quality within each organization shall be established and delineated in organizational charts and written job or functional descriptions.

II

TOPICAL UALITYASSURANCE REPORT ORGANIZATION R933 TQR 1.0 Rev.

29 Draft A Date 03/24/97 Pa e 3't 20 Activities affecting quality may be performed by FPL or be contracted. Should any of these functions be contracted, the contractor may perform the activities under. his own Quality Assurance Program, which, must have prior approval by FPL Quality Assurance, or the contractor-may directly adopt the requirements of the FPL Quality Assurance Manual. Ifthe contractor implements the Quality Control function directly to the FPL Quality Assurance Manual requirements, the contractor's Quality Control Supervisor shall have the authority and freedom to administer the Quality Control program.

1.3 RESPONSIBILITIES The organization charts in Appendix A illustrate the lines of authority and areas of responsibility for each of the organizations that are involved in activities affecting quality.

Below are listed the departments and organizations that have quality assurance responsibilities.

Organizational responsibilities for implementation of the Quality Assurance Program are described in the Topical Quality Requirements (TQRs).

1.3.1 Nuclear Division 1.3.2 Su ort De artments 1.3.1.1 Plant Vice Presidents 1.3.2.1 Corporate Records 1.3.1.2 Licensing and Special Programs 1.3.2.2 Environmental Services 1.3.1.3 Nuclear Engineering 1.3.1.4 Nuclear Assurance 1.3.1.5 Nuclear Business Services 1.3.2.3 Protection 8~, Control Systems 1.3.2.4 Information Management 1.3.1 Nuclear Division Throughout plant life,.the Nuclear Division maintains control of and responsibility for nuclear power plant design, preoperational and start-up testing, operation, maintenance, refueling, and modification of the plant in accordance with written and approved procedures.

0 0

TOPICAL QUALITYASSURANCE REPORT TQR 1.0 FPL ORGANIZATION

'R933 Rev.

29 Draft A Date 03/24/97 Pa e

4 af 20 The President Nuclear Division has overall responsibility for the Nuclear Division's activities including corporate responsibility for=overall plant nuclear safety.

Reporting to the President Nuclear Division-are: the Vice President - Turkey Point Plant, Vice President - St. Lucie Plant, Director Nuclear Assurance, Vice President Nuclear Engineering, Manager ofLicensing and Special Programs, and the Director Nuclear Business Services.

The Company Nuclear Review Board (CNRB), reporting to the President Nuclear

Division, is comprised of executive level members of management with responsibilities for the execution of the Quality Assurance Program. The CNRB
reviews, or directs the performance of reviews of, activities concerning the technical aspects of the operating nuclear power plant insofar as they impact plant safety, the health and safety of the public, and laws, regulations and licensing commitments.

In addition, audits of these areas are performed under the cognizance of the CNRB.

The CNRB composition is described in Section 6.0 of each facility's Technical Specifications.

Subjects within the purview of the CNRB are listed in the appropriate plant Technical Specifications. The CNRB has the authority to carry out its responsibilities by way of written action letters, verbal directions, meeting minutes or appointed subcommittees.

Where necessary, the CNRB may use consulting services to perform requiredi reviews.

The CNRB is responsible for reviewing,and evaluating Quality Assurance Program policies and activities.

Quality Assurance Program status reports shall be periodically given by the Quality.Assurance Department.

II ik

APL TOPICAL UALITYASSURANCE REPORT ORGANIZATION R933 TQR 1.0 Rev.

29 Draft A Date 03/24/97 Pa e 5

of 20 CNRB meetings shall be held by the Chairman to keep members apprised of conditions including significant problems that require management attention.

Periodic audits of the Quality Assurance. Department. shall be performed by a team independent of the Quality Assurance Department.

The results of this audit are presented to the Director Nuclear Assurance and'the CNRB.

1.3.1.1 Plant Vice Presidents The Vice President - St. Lucie Plant and Vice President - Turkey Point Plant are accountable for the operation, maintenance, and modification of their respective nuclear plant, as well as the selection, development and direction of the assigned staff. They will act as liaison between:the plants and corporate headquarters, and are accountable for ensuring that company policies and procedures are properly implemented and continued at the nuclear site, including procurement and control of material.

The Plant Vice President has overall responsibility for implementation of the Environmental Protection Plans at their respective sites.

Other responsibilities of the site Vice President include, the following:

Nuclear Services o

Configuration management.

Nuclear Trainin Preparation of policy documents regarding nuclear training; Support to secure the necessary'resources to ensure that site personnel are adequately trained. They must have adequate technical and job related skills to provide safe and efficient operation while complying with NRC requirements.

0 0

0 (f

FPL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION R933 TQR 1.0 Rev.

29 Draft A Date 03/24/97 Pa e 6

of 20 o,Coordinate with the opposite plant site for overall development and implementation of the FPL Nuclear Security program.

Nuclear Business S stems o

Coordinating contract activities.

o Reviewing contracts to assure that technical and quality requirements developed by others are incorporated into the procurement documents which it authorizes.

o Ensuring that site-based information management programs are in compliance with FPL software QA commitments.

o Business Systems Departments at PSL and Fl'N are accountable for directing the identification,

design, development, implementation, on-going maintenance, and control of all nuclear site specific data processing information management systems (excluding process applications),

and identifying applicable site specific software in a Computer Software Index (CSI).

Nuclear Licensin o

Maintenance of the operating license; o

Interface with the NRC; o

Resolution of NRC safety and regulatory issues; o

Administering the Operating Experience and Feedback System.

Nuclear Materials Mana ement o

Negotiation, generation, issuance of procurement documents for. required items and services supporting the operation, licensing, maintenance, notification, and inspection of FPL nuclear plants, and for materials and equipment to support Nuclear Division staff;

0 4

0

TOPICAL UALITYASSURANCE REPORT T R 1.0 CPL ORGANIZATION R933 Rev.

29 Draft A Date 03/24/97 Pa e

7 of 20 o

Reviewing procurement documents to assure that technical and quality requirements developed by others are incorporated into the procurement documents which it authorizes.

The-organization of Turkey Point Plant and St. Lucie Plant is shown in Appendix The Plant General Manager - PSL and Plant General Manager - PTN, through the respective Plant Vice President, are responsible for the safe operation of the nuclear plant. The Plant General Managers have control of the onsite resources necessary for the safe-operation and'maintenance regardless of organizational reporting.

The Plant Nuclear Safety Committee (PNSC) at Turkey'Point Plant and the Facility Review Group,(FRG) at the St.

Lucie Plant are comprised of key plant management and staff personnel as described in the plant Technical. Specifications.

The PNSC/FRG serves the plant manager in a technical advisory capacity for the review of all safety-related procedures and activities that impact plant safety and the facility operating license.

1.3.1.2 Licensing and Special Programs The Manager Licensing and Special Programs is responsible for selected licensing support activities at the Juno Beach Office. This includes:

o Advising senior Nuclear Division management on a regular basis of important developments in licensing areas which could significantly affect the Nuclear Division; o

Coordinating with the Law Department for Nuclear Division licensing hearings and legal services;

TOPICAL UALITYASSURANCE REPORT T R 1.0 FPL ORGANIZATION R933 Rev.

29 Draft A Date 03/24/97 Pa e 8

or 20 o

Administering special programs, such as:

o Plant license renewal, o

Environmental issues, o

Self assessment, o

INPO coordination, o

Serving as FPL liaison in matters of high level waste disposal.

1.3.1.3 Nuclear Engineering The Vice President Nuclear Engineering is responsible for nuclear plant design and. engineering support.

The Nuclear Engineering organization is shown in Appendix A.

a.

Nuclear Engineering Nuclear Engineering includes personnel located at both nuclear sites and at the corporate office.

Nuclear Engineering performs design-related activities and delegates design-related activities to qualified contractors.

For activities performed by, Nuclear Engineering, the work is governed by FPL's Quality Assurance

Program, and Nuclear Engineering is responsible for approval of the design output.

Delegated activities are performed in accordance with an FPL approved Quality Assurance Program and the contractor is responsible for approval of design output.

Nuclear Engineering is responsible for defining the scope of delegated activities and the responsibilities of the contractor.

Prior to the release of design outputs by contractor organizations, Nuclear Engineering ensures that the contractor is technically qualified to perform the design-related activity.

TOPICAL QUALITYASSURANCE REPORT ORGANIZATION R933 TQR 1.0 Rev.

29 Draft A

, Date 03/24/97 Pa e 9

or 20 The Manager - Turkey Point Engineering and the Manager - St. Lucie Engineering provide on-site engineering support and direct the engineering aspects of all FPL nuclear power plant projects during construction and operation to assure efficient, economical and reliable power plant design, conformance withengineering schedules and budgets and compliance with regulatory requirements.

Nuclear Engineering is responsible for:

o power plant design related aspects of the FPL Quality Assurance Program throughout all phases of plant life; o

development and maintenance of the design control program governing design-related activities performed by Nuclear Engineering and for providing technical support to the Quality Assurance Department for assessing the

adequacy, implementation and effectiveness of contractor design control programs; o

the preparation, revision, approval and distribution of plant design records that are identified to be maintained as "as constructed" drawings during plant operation; o

the development, control, and performance ofcertain aspects ofitems and services procurement, including establishment of procurement standards, the technical. evaluation, equivalency evaluation, and commercial grade dedication of replacement parts/components for nuclear plants; o

review of the technical",and quality requirements in procurement requisitioning documents-and changes thereto for safety related and quality related items and services, as well as configuration control activities for controlled design documentation associated with procurement.

The review shall be performed by individuals other than the document originator;

Jl I

il ll g C

FPL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION R933 TQR 1.0 Rev.

29 Draft A Date 03/24/97 Pa e 10 of 20 Aspects of the above activities are performed by the Juno Beach Engineering organization as determined by, the Vice President Nuclear Engineering.

b.

Nuclear Sech Fuel The Manager Nuclear Feeh Fuel is responsible for nuclear fuel engineering and procurement activities including the following:

o assuring that technical and quality requirements (including inputs from other FPL departments) are incorporated in fuel contracts and letters of authorization; o

administering and managing contracts for nuclear fuel and related services to assure that technical and quality obligations are met, and serving as FPL liaison in all matters of nuclear fuel and fuel-related contracts; o

administering and'anaging spent fuel disposal contracts with Department of Energy and serving as FPL liaison in matters of nuclear. fuel o

all fuel related. design,. analyses, reviews, and technical assistance necessary to ensure the safe, reliable, and economic operation of the nuclear plants; o

the development and/or review of fuel and nuclear physics. design; o

implementing and maintaining the FPL corporate nuclear material accountability program as outlined in the FPL Special Nuclear Material Control Manual; o providing support to the Quality Assurance Department for their auditing of nuclear fuel design and fuel assembly manufacturing;

4

'4 C

1" '4+0 j

FPL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION R933 T R 1.0 Rev.

29 Draft A Date 03/24/97 Pa e

11 or 20 o

performing audits and coordinating accountability reporting on all nuclear fuel.

c.

Component Support and Inspections The Manager Component Support and Inspections is responsible, for providing support to the plants as follows:

o providing technical support of activities associated with component reliability, materials evaluations, inspections, corrosion protection, non-destructive examination, and ASME Section XI implementation/problem resolution for nuclear plant components; o

providing specific component expertise, metallurgical support, and non-destructive examination and inspections; o

establishing the FPL Welding Program to meet the requirements of the Quality Assurance Program and applicable codes and standards; o

developing, maintaining, and controlling the procedures and instructions to implement the FPL Welding Program; and o

originating and qualifying welding procedure, specifications; and d.

Reliability and Risk Assessment The Supervisor of Reliability and Risk Assessment is responsible for providing support to the plants as follows:

o prepare and maintain Probabilistic Safety Assessment (PSA) for each plant; o

perform Risk Assessments in support of Maintenance activities; o

perform Risk Assessments. in support of the NRC Maintenance Rule.

l t %,I'

TOPICAL QUALITYASSURANCE REPORT'RGANIZATION R933 Rev.

29 Draft A Date 03/24/97 Pa e 12 Of 20 1.3.1.4 Nuclear Assurance The Director Nuclear Assurance. is responsible for the selection, technical direction, administrative control (e.g. performance appraisal, salary review, hire/fire, position assignment) staffing, training and development ofpersonnel required for supervisory and operating continuity of the Quality Assurance Department, Nuclear Safety Speakout, and the CNRB Subcommittee.

The Director Nuclear Assurance serves as the CNRB Chairman.

The Director Nuclear Assurance also initiates QAProgram policy changes when necessary.

In addition, the Director Nuclear Assurance is responsible for selecting a

team independent of the-Quality Assurance Department to perform periodic audits of the Quality Assurance Department.

The results of these audits are presented to the Director Nuclear Assurance and the Company Nuclear Review Board (CNRB).

The Nuclear Assurance organization is shown in Appendix A.

a.

Nuclear Safety Speakout The Nuclear Safety Speakout Program provides a forum for employees and contractors to communicate their concerns to FPL.

Concerns are documented, investigated and corrective actions are taken when necessary.

The program offers confidentiality.

b.

Quality Assurance Department The Quality Assurance Department "is responsible for administering the FPL Quality Assurance Program. This includes developing and verifying implementation of corporate

policies, plans, requirements, and procedures affecting quality. The Quality Assurance Department retains responsibility for delegated portions of the Quality Assurance Program

0

'1 I

FPL TOPICAL QUALITYASSURANCE REPORT ORGANIZATION R933 TQR 1.0 Rev.

29 Draft A Date 03/24/97 Pa e 13 or 20 by performing initial evaluation and subsequent periodic audits of the contractors'uality Assurance Programs.

The Quality Assurance Program responsibility further extends to the performance of audits within the Company to assure management that the established requirements and procedures are being implemented, and that the Program complies with the baseline document requirements.

The organizational freedom of the Quality Assurance function is accomplished through the corporate structure, illustrated in Appendix A, which provides independence from those departments responsible for

design, procurement, engineering, construction and operation.

With quality assurance as its sole function the Quality Assurance Department, both on-site and.off-site, is completely'free from the cost and scheduling pressures of design, procurement, construction and operation.

The Quality Assurance Department has the freedom and authority to:

a) identify quality problems; b) initiate, recommend or provide corrective action; c) verify implementation of the corrective action; and d) recommend the stoppage of work or operations adverse to quality, when necessary.

The QA Supervisor Performance Assessment, QA Supervisor Procurement Quality, Site Quality Manager - St. Lucie, and Site Quality Manager - Turkey Point report administratively and functionally to the Director Nuclear Assurance. These reporting relationships assure that. the Quality Assurance Department has direct access to the levels of management necessary to assure effective implementation of the Quality Assurance Program.

The duties, responsibilities, and authorities of each Quality Assurance group. are described in the sections. which follow.

A 4

b C

p 0

I!

il 4

0

TOPICAL QUALITYASSURANCE REPORT T R 1.0 FPL ORGANIZATION R933 Rev.

29 Draft A Date 03/24/97 Pa e

14 of 20

1) Performance Assessment The QA Supervisor-Performance Assessment directs and administers the Corporate Quality Assurance Program assuring compliance with the baseline documents listed in Appendix C of this Topical Quality Assurance Report. Quality Performance Assessment activities include the following:

o develop and,maintain the corporate Quality Assurance Manual, including the administration of the Quality Assurance Program Review Committee (QAPRC);

o develop and implement a Quality Assurance indoctrination program for FPL personnel; o

prepare reports on Quality Assurance Program activities for review by the CNRB; o

plan, coordinate and implement a comprehensive system of periodic internal audits with support from the other Quality Assurance groups, when necessary; o

perform.periodic activity audits of FPL procurement and associated documents and changes to these documents to assure that the necessary quality requirements are imposed; o

provide NDE Level IIIservices including technical direction and monitoring of NDE activities performed by Quality Control at the plant sites. (PTN and PSL).

2) Procurement Quality The QA Supervisor Procurement Quality directs and administers the Procurement Quality program in support of both nuclear plants.

Procurement Quality activities include. the following:

cw c,

TOPICAL UALITYASSURANCE REPORT ORGANIZATION R933 TQR 1.0 Rev.

29 Draft A Date 03/24/97 Pa e

15 of 20 o

perform appropriate surveillance of hardware during manufacture; o

develop and implement a program for auditing of-.supplier Quality Assurance/Quality Control programs including Architect Engineer/Nuclear Steam Supply System Suppliers; o

assist other FPL departments in the identification of quality problems associated with procurement and, storage;

initiate, recommend, or provide solution; and verify implementation of solutions; o

maintain the Quality Assurance Department list of approved suppliers; For purchased items and

services, the responsibility of this group extends through receipt of shipment or performance of contract.
3) Site Quality Assurance Turkey Point Nuclear (PTN) and St. Lucie (PSL)

Quality Assurance activities at the plant sites (PTN and PSL) are accomplished by the respective site Quality Assurance

groups, reporting to the Site Quality Manager.

The Site Quality Manager has responsibility for on-site'.development and implementation of the Quality Assurance Program, including the following:

o coordinate the development and implementation of quality assurance policies, plans, requirements, and procedures at the plant site; o

perform audits, assessments and other observations as specified in procedures and instructions to verify compliance with Quality Assurance Program commitments;

0 I g 0

TOPICAL UALITYASSURANCE REPORT T R 1.0 ORGANIZATION R933 Rev.

29 Draft A Date 03/24/97 Pa e 16 or 20 o

perform periodic activity audits of site generated FPL procurement and associated documents and changes to these documents to assure that the necessary quality requirements are imposed; o

recommend stoppage ofwork or operations adverse to quality at the plant site in accordance with the appropriate instructions; o

review and comment on Quality Instructions or equivalent quality administrative procedures prior to issue, with respect to the requirements of the FPL Quality Assurance Program, the applicable Final Safety Analysis Report, and the applicable Technical Specifications; o

perform audits of the architect engineer and Nuclear Steam Supply System suppliers both on-site and off-site, in conjunction with the Procurement Quality group.

The interface with the Procurement Quality group ends with the receipt of a shipment of nuclear safety-related equipment at the plant site.

The Quality Assurance program for the shipment is then within the purview of the Site Quality Assurance group.

The Quality Manager - Turkey Point and Quality Manager - St. Lucie are additionally responsible for the establishment and implementation of quality control aspects of the Quality Assurance Program at the plant site.

Reporting directly to the Site Quality Manager are the Quality Control Supervisors who have the authority and freedom to administer the Quality Control program and, when necessary, to stop activities adverse to quality. The Quality Control Supervisors and

l -I ~

~ II

'C

FPL TOPICAL UALITYASSURANCE REPORT ORGANIZATION R933 TQR 1.0 Rev.

29 Draft A Date 03/24/97 Pa e

17 of 20 personnel performing Quality Control inspection functions are required to be independent of groups or persons performing activities that they may be required to verify or inspect.

Quality Control responsibilities include:

o inspection, monitoring, surveillance, and review of plant activities to verify compliance with the provision of the facility operating license and the Quality Assurance Manual; o

acceptance of.the installed items; 1.3.1.5 Nuclear Business Services The Director Business Services is responsible for Nuclear Division business and financial planning and analysis and nuclear plant support in the areas of document control and QA records management, division-based and staff computer

systems, security, emergency preparedness, and radiological services.

Nuclear Business Services is shown in Appendix A.

"Accountabilities related to division-based and staff computer systems encompass:

o directing the identification, design, development, implementation, on-going maintenance, and control of division-based information management systems; o

identifying applicable division-based software in a Computer Software Index (CSI);

o Coordinating. and directing computer hardware and telecommunication planning and control;

0 k

1A Ci

@PL TOPICAL UALITYASSURANCE REPORT ORGANIZATION R933 TQR 1.0 Rev.

29 Draft A Date 03/24/97 Pa e 18 ot 20 o

ensuring that the information management programs are in compliance with FPL software QA commitments.

1.3.2 Su ort De artments Providing support activities for the Nuclear Division are Corporate

Records, Environmental
Affairs, Protection A

Control

Systems, and Information Management.

The reporting relationship of each department is described in the following sections and is shown in Appendix A.

1.3.2.1 Corporate Records The Supervisor Corporate Records is responsible for:

o storage, retrieval and control of Quality Assurance records received from other departments; o

assisting with the development and implementation of records and micrographics programs; o

maintaining a QARSET approved. storage facility; o

serving as the'Records Official.

1.3.2.1.a The Records Official, reporting to the General Counsel and Secretary is responsible for:

ensuring the Quality Assurance records program activities are managed in accordance with applicable recordkeeping requirements; locating acceptable record storage areas when requested; leading the evaluation of specially designated QARSET approved storage facilities, maintaining records of this evaluation, and establishing schedules to assure that re-evaluations are performed every two (2) years.

S L

J 1

V h

TOPICAL QUALITYASSURANCE REPORT TQR 1.0 FPL ORGANIZATION R933 Rev.

29 Draft A Date 03/24/97 Pa e 19 ot 20 1.3.2.2 Environmental Services Environmental Services is responsible for obtaining the federal and state environmental permits required for H'L facilities and operations.

Environmental Services is also responsible for providing, technical support on environmental regulatory requirements, including regulatory development, enforcement

actions, compliance with environmental requirements and environmental assessments and clean-ups at all company facilities, as well as. technical support and/or advice on non-radiological environmental monitoring (federal and state) programs at the nuclear power plant sites.

The Site Vice President has overall responsibility for implementation of the Environmental Protection Plans (EPPs) at nuclear power plant sites.

The Environmental Services Department through its functional areas is responsible for providing technical support and/or advice on non-radiological environmental monitoring programs and oversight of other requirements related to the Environmental Protection Plans.

The Department provides review of proposed changes to the Environmental Protection Plans, review of plant changes, tests or experiments and review of other plant activities which may be subject to environmental regulations to ensure their compliance.

The Department provides information as necessary to the CNRB Chairman on environmental matters for which requirements are included in Environmental Protection Plans."..

1.3.2.3 Protection 8t; Control Systems The Director of Protection Ec Control Systems reports to the Vice President of Power Delivery.

~,

FPL TOPICAL QVALITYASSVRANCE REPORT ORGANIZATION R933 TQR 1.0 Rev.

29 Draft A Date 03/24/97 Pa e 20 of 20 Protection & Control Systems is responsible for:

o

test, calibration and maintenance of certain high voltage electrical protective relays for safety-related systems of the nuclear plant; o

final wiring.connection checks; o

preoperational check-out and test of system protection devices; o

providing inspection of equipment under their cognizance; o

providing certain setpoint and checkpoint values for protective devices.

1.3.2;4 Information Management The Corporate Information Management organization is shown in Appendix Information Management is responsible for ensuring the integrity of the operating environment and the applications used by the Nuclear Division.

The Director of IT Operations and the Director of'Business Systems report to the Vice President of Information-Management.

1.3.2.4.a The Director of IT Operations is responsible for:

o the installation and maintenance of operating system software and the operation of computer hardware -for FPL's corporate computer system;,-.

o executing software production release and change control activities.

1.3.2.4.b The Director of; Business Systems is responsible for administering physical databases and providing on-going technical support.

4

'