L-97-148, Forwards Annual Update of FPL Topical QA Rept (Tqar).Summary of Changes Made to Tqar,Also Encl
| ML17354A532 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, Saint Lucie |
| Issue date: | 06/12/1997 |
| From: | Plunkett T FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17354A533 | List: |
| References | |
| L-97-148, NUDOCS 9706250265 | |
| Download: ML17354A532 (12) | |
Text
CATEGORY 1 REGULATOR INFORMATION DISTRIBUTION ZEM (RIDS)
ACCESSION NBR:9706250265 DOC.DATE: 97/06/12 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C
50-335 St. Lucie Plant, Unit.1, Florida Power s Light Co.
50-389 St. Lucie Plant,,Unit 2, Florida Power
!; Light Co.
AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET I 05000250 05000251 05000335 05000389
SUBJECT:
Forwards annual update of FPL Topical QA Rept (TQAR).Summary of changes made to TQAR, also encl.
DISTRIBUTION CODE, Q004D COPIES RECEIVED,LTR I
ENCLI
- SIZE,
+
TITLE: QA Topical Report,
- Change, Amendment, or Correspondence (Docket NOTES:
Ut 11 E
RECIPIENT ID CODE/NAME CROTEAU,R INTERNAL: ACRS LE, CENT ~04 RR~DRCH/HQMB OC/LFDCB EXTERNAL: DMB/OSS NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME NIENSIi.
DRS/RGN....
NRR/DISP/PIMB NUDOCS-ABSTRACT RGN2 FILE IHS COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD"S(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES'REQUIRED:
LTTR 13 ENCL 13
I
Florida Power & Light Company, P.O. Box 14000, Juno Beach, FL 33408-0420 JUN 1 2 1997 L-97-148 10 CFR 50.54(a)(3)
~10 CFR 50.4 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 To ical ualit Assurance Re ort FPLT AR 1-76A Pursuant to 10 CFR 50.54(a)(3), attached is the annual update of the Florida Power and Light Company (FPL) Topical Quality Assurance Report (TQAR).
Enclosure I includes a summary of the changes made to the TQAR since June 1996.
Enclosure IIcontains marked up versions of the TQAR showing all changes that have been made since the last annual submittal.
Enclosure IIIis the current TQAR including all revisions issued through Revision 52 dated April 30, 1997.
All changes have been reviewed by the FPL Nuclear Assurance Department and it has been concluded that these changes do not reduce the commitments in our program description which has been previously accepted by the NRC. The enclosed information accurately presents changes made since the previous FPL annual TQAR submittal.
Please note that this submittal does not include the proposed changes to the Florida Power 8c Light TQAR (TQR 1.0, Organization) submitted to the NRC on April29, 1997 (FPL letter L 115).
Should there be any questions, please contact us.
Very truly yours, T. F. Plunkett President Nuclear Division QUA 970b2502b5 970bi2
'DR ADOCK 05000250 P
PDR A
an FPL Group company llllllllilill!illllillllllllllllllllllll
g K
1 K
'A I
TFP/RJA/spt Enclosures CC:
Regional Administrator, Region H, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant Frank Jape, Region II, USNRC
Florida Power A Light Topical Quality Assurance Report Change Summary June, 1997 (Page 1 of 5)
ENCLOSURE I Summary of changes to the Florida Power & Light Topical Quality Assurance Report (FPL TQAR 1-76A) since June, 1996.
1.
Table of Contents (Each Revision)
The Table of Contents has been revised at each revision of a portion of the TQAR to reflect the most recent revision of all documents within the TQAR.
2.
T R 1.0:
ORGANIZATION (Rev. 28 to Rev. 29)
Revisions to reflect organizational change and restructuring.
Changes made in the realignment of Nuclear Engineering organization.
4.
T R 2.0:
UALITYASSURANCE PROGRAM (Rev. 14 to Rev. 15)
One title change and relocation of a required review from TQR 1.0.
5.
T R 3.0:
DESIGN CONTROL (Rcv. 12 to Rev. 13)
This revision eliminates outdated examples of safety related item databases; removes the description of design change reviews for CNRB,
- PNSC, and FRG from the IMPLEMENTATIONsection (specifics remain in the RESPONSIBILITIES section);
clarifies software requirements; corrects several titles resulting from organizational changes; and relocates a required review from TQR 1.0.
Florida Power R Light Topical Quality Assurance Report Change Summary June, 1997 (Page 2 of 5)
ENCLOSURE I 6.
T R 4.0:
PROCUREMENT DOCUMENT CONTROL (Rev. 8 to Rev. 9)
This revision corrects titles resulting from organizational changes; clarifies Nuclear Engineering's role in procurement activities; and corrects typographical errors.
7.
T R 5.0:
INSTRUCTIONS PROCEDURES A DRAWINGS (Rev.
11 to Rev. 12)
To correct titles as a result of reorganization.
8.
T R 6.0:
DOCUMENT CONTROL (Rev. 10 to Rev. 11)
To correct titles as a result of reorganization.
9.
T R 7.0:
CONTROL OF PURCHASED ITEMS A SERVICES (Rev. 8 to Rev. 9)
To correct titles as a result of reorganization.
10.
TQR 8.0:
IDENTIFICATIONANDCONTROL OF MATERIALS PARTS ANDCOMPONENTS (Rev. 3 to Rev. 4)
To correct references to M&S numbers and correct titles as a result of reorganization.
11.
T R9.0:
CONTROL OF SPECIAL PROCESSES (Rev. 12 to Rev. 13)
To correct titles as a result of reorganization.
0
Florida Power 4 Light Topical Quality Assurance Report Change Summary June, 1997 (Page 3 of 5)
ENCLOSURE I 12.
T R 11.0:
TEST CONTROL (Rev. 5 to Rev. 6)
To correct titles as a result of reorganization.
13.
TQR 13.0:
HANDLING STORAGE SHIPPING CLEANNESS CONTROL 8c HOUSEKEEPING (Rev. 9 to Rev. 10)
To correct titles as a result of reorganization.
t 14.
TQR 15.0:
NONCONFORMING MATERIALS PARTS OR COMPONENTS (Rev. 11 to Rev. 12)
To correct titles as a result of reorganization and clarify the wording relative to providing dispositions for nonconforming items.
15.
T R 16.0:
CORRECTIVE ACTION (Rev. 9 to Rev. 10)
The requirements for tracking corrective actions and commitments are relocated and consolidated from TQR 1.0.
16.
T R 17.0:
UALITYASSURANCE RECORDS (Rev. 4 to Rev. 5)
This revision clarifies specific record retention requirements and the responsibilities ofthe Records Official; corrects titles resulting from organizational changes; and specifies requirements for temporary storage of records.
Florida Power 4 Light Topical Quality Assurance Report Change Summary June, 1997 (Page 4 of 5)
ENCLOSURE I 17.
A endix A Fi ure 1-1: ORGANIZATION& FIGURES (Rev. 22 to Rev. 23)
Revised to reflect organizational change and restructuring.
18.
A endix A Fi ure 1-1: ORGANIZATION& FIGURES (Rev. 23 to Rev. 24)
Changes adding three additional functions under Vice President Nuclear Engineering.
Change Fuels to Fuel.
19.
A endix A Fi ure 1-1: ORGANIZATION& FIGURES (Rev. 24 to Rev. 25)
Correct QA department titles.
20.
A endix A Fi ure 1-2: ORGANIZATION& FIGURES (Rev. 7 to Rev. 8)
Reflects current Turkey Point Plant organization.
21.
A endix A Fi ure 1-2: ORGANIZATION& FIGURES (Rev. 8 to Rev. 9)
Reflects current Turkey Point Plant organization.
22.
A endix A Fi ure 1-2: ORGANIZATION& FIGURES (Rev. 9 to Rev. 10)
Reflects current Turkey Point Plant organization.
23.
A endix A Fi ure 1-2: ORGANIZATION& FIGURES (Rev. 10 to Rev. 11)
To change "Outage Manager" to "Work Control Manager".
e Florida Power & Light Topical Quality Assurance Report Change Summary June, 1997 (Page 5 of 5)
ENCLOSURE I 24.
A endix A Fi ure 1-2: ORGANIZATION8r, FIGURES (Rev. 11 to Rev. 12)
Change and clarification of organization to a direct line of communication between the Health Physics Supervisor and the Plant General Manager for matters relating to the radiological health and safety of employees and the public.
Change Engineering Department titles to:
Administrative Systems Engineering Plant Engineering Operations Support Engineering 25.
A endix A Fi ure 1-3: ORGANIZATIONK FIGURES (Rev. 7 to Rev. 8)
Reflects current St. Lucie Plant organization 26.
A endix A Fi ure 1-3: ORGANIZATION& FIGURES (Rev. 8 to Rev. 9)
Change Engineering Department titles to:
Administrative Systems Engineering Plant Engineering Operations Support Engineering 27.
A endix C: BASELINE DOCUMENT MATRIX (Rev. 14 to Rev. 15)
This revision clarifies FPL's addressing of ANSI N18.7-1976, Section 5.2; corrects organizational titles; eliminates the clarification of ANSI N18.7-1976, Paragraph 5.3.5(4) so that FPL reverts to the text in the ANSI N18.7-1976; clarifies temporary storage of records at FPL in the section addressing ANSIN45.2.9-1974; and eliminates the definition of commercial grade items from the section addressing ANSI N45.2.13-1976-this definition is in the Glossary.