Line 2: Line 2:
| number = ML18177A436
| number = ML18177A436
| issue date = 06/25/2018
| issue date = 06/25/2018
| title = Diablo Canyon Power Plant - Notification of an NRC Triennial Fire Baseline Inspection (NRC Inspection Report 05000275/2018007 and 05000323/2018007) and Request for Information
| title = Notification of an NRC Triennial Fire Baseline Inspection (NRC Inspection Report 05000275/2018007 and 05000323/2018007) and Request for Information
| author name = Drake J F
| author name = Drake J
| author affiliation = NRC/RGN-IV/DRS/EB-2
| author affiliation = NRC/RGN-IV/DRS/EB-2
| addressee name = Welsch J M
| addressee name = Welsch J
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| docket = 05000275, 05000323
| license number = DPR-080, DPR-082
| license number = DPR-080, DPR-082
| contact person = Drake J F
| contact person = Drake J
| document report number = IR 2018007
| document report number = IR 2018007
| document type = Letter
| document type = Letter
| page count = 12
| page count = 12
}}
}}
See also: [[followed by::IR 05000275/2018007]]
See also: [[see also::IR 05000275/2018007]]


=Text=
=Text=
{{#Wiki_filter:June 25, 2018  
{{#Wiki_filter:June 25, 2018
Mr. James M. Welsch
Mr. James M. Welsch Vice President, Nuclear Generation
Vice President, Nuclear Generation
  and Chief Nuclear Officer
Pacific Gas and Electric Company
P.O. Box 56
Mail Code 104/6
Avila Beach, CA 93424
SUBJECT:        DIABLO CANYON POWER PLANT - NOTIFICATION OF AN NRC TRIENNIAL
                FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
                REPORT 05000275/2018007 AND 05000323/2018007) AND REQUEST FOR
                INFORMATION
Dear Mr. Welsch:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
Region IV staff will conduct a triennial fire protection baseline inspection at the Diablo Canyon
Power Plant in October and November 2018. The inspection team will be comprised of
five reactor inspectors from the NRC Region IV office. The inspection will be conducted in
accordance with Inspection Procedure 71111.05XT, Fire Protection - NFPA 805 (Triennial),
the NRCs baseline fire protection inspection procedure.
The schedule for the inspection is as follows:
      Information gathering visit:    September 26 - 28, 2018
      On-site inspection:              October 15 - 19, 2018
                                        October 29 - November 2, 2018
The purpose of the information gathering visit is to obtain information and documentation
needed to support the inspection and to become familiar with the fire protection program, fire
protection features, safe shutdown success paths, plant layout, and mitigating strategies to
address Section B.5.b of NRC Order EA-02-026, Order for Interim Safeguards and Security
Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).
The team leader will participate in the information gathering visit to select the fire areas for
evaluation, identify additional documents needed to support the inspection, obtain unescorted
access, and meet with the key personnel who will support the inspection. The fire area
selection will require a walkdown of candidate fire areas with key personnel from your staff. The
enclosures to this letter provide an initial list of the documents the team will need for their
review. During the information gathering visit, the team leader will also discuss the following
inspection support administrative details: (1) office space size and location; (2) specific
documents requested to be made available to the team in their office spaces; (3) arrangements
for reactor site access (including radiation protection training, security, safety, and fitness for


  and Chief Nuclear Officer
J. Welsch                                        2
Pacific Gas and Electric Company
duty requirements); and (4) the availability of knowledgeable plant staff and licensing
P.O. Box 56
organization personnel to serve as points of contact during the inspection.
Mail Code 104/6
We request that during the on-site inspection weeks you ensure that copies of analyses,
Avila Beach, CA  93424
evaluations, or documentation regarding the implementation and maintenance of the station fire
protection program, including the success path necessary to achieve and maintain the nuclear
safety performance criteria, be readily accessible to the team for their review. Of specific
interest for the fire protection portion of the inspection are those documents which establish that
your fire protection program satisfies NRC regulatory requirements, and conforms to applicable
NRC and industry fire protection guidance (i.e., fire protection compliance assessment
documents). For the 10 CFR 50.54(hh)(2) portion of the inspection, those documents
implementing your mitigating strategies and demonstrating the management of your
commitments for the strategies are of specific interest. Also, personnel should be available at
the site during the inspection who are knowledgeable regarding those plant systems required to
achieve and maintain safe and stable plant conditions, including the electrical aspects of the
nuclear safety capability assessment, reactor plant fire protection systems and features, and the
station fire protection program and its implementation.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget under control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection or the inspection teams information or logistical needs, please
contact Sam Graves, the team lead inspector, in the Region IV office at (817) 200-1102 or
samuel.graves@nrc.gov.
                                                  Sincerely,
                                                  /RA/
                                                  James F. Drake, Acting Chief
                                                  Engineering Branch 2
                                                  Division of Reactor Safety
Docket Nos. 50-275 and 50-323
License Nos. DPR-80 and DPR-82
Enclosures:
1. Triennial Fire Protection Inspection Document Request
2. Mitigating Strategies Document Request


                      Triennial Fire Protection Inspection Document Request
SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
The documents and information requested below should generally be made available to the
REPORT 05000275/2018007 AND 05000323/2018007) AND REQUEST FOR INFORMATION
inspection team during the inspection. Electronic format is the preferred format, except where
specifically noted. If electronic files are made available via the internet-based inspection
Dear Mr. Welsch:
management system (IMS), then the remote document access must allow inspectors to
download, save, and print the documents in the NRCs regional office.
If IMS is utilized, it is recommended that a separate folder be used corresponding to each item
listed below and that multiple documents within each folder be combined into a ZIP file before
uploading. Electronic files on compact disc or paper records (hard copy) are also acceptable.
To allow review before the on-site information gathering visit, the following documents should be
made available to the team in the regional office no later than September 4, 2018:
        Post-fire nuclear safety capability, systems, and separation analysis (request A.1)
        Fire hazards analysis and/or NFPA 805 design basis document (request A.2)
        Fire probabilistic risk assessment (PRA) summary document or full PRA document
        (request A.3)
        NFPA 805 transition report, developed in accordance with NEI 04-02 (request A.4)
        Fire risk evaluations (i.e., NFPA 805, Section 2.4.3) (request A.5)
        Plant change evaluations (i.e., NFPA 805, Section 2.4.4) (request A.6)
        Analysis that demonstrates nuclear safety performance criteria can be achieved and
        maintained for those areas that require recovery actions (request A.7)
Based on a review of the above seven items, the team leader should identify a preliminary list of
fire areas being considered for inspection prior to the on-site information gathering visit. During
the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
determined.
This document request is based on typical documents that a generic plant might have. As such,
this generic document request is not meant to imply that any specific plant is required to have all
of the listed documents. It is recognized that some documents listed below may not be
available for your plant. In addition, the document titles listed below are based on typical
industry document names; your plant-specific document titles may vary.
To allow review before the on-site inspection weeks, the following documents should be made
available to the team in the regional office no later than October 1, 2018.
                                                                                          Enclosure 1


   
A. DESIGN AND LICENSING BASIS DOCUMENTS
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC), Region IV staff will conduct a triennial fire protection baseline inspection at the Diablo Canyon Power Plant in October and November 2018The inspection team will be comprised of  
  A.1 Post-fire Nuclear Safety Capability, Systems, and Separation Analysis
five reactor inspectors from the NRC Region IV officeThe inspection will be conducted in
  A.2  Fire Hazards Analysis and/or NFPA 805 Design Basis Document
accordance with Inspection Procedure 71111.05XT, "Fire Protection - NFPA 805 (Triennial),"
  A.3  Fire PRA Summary Document or full PRA Document (if summary document not
the NRC's baseline fire protection inspection procedure.  
        available)
  A.4  NFPA 805 Transition Report, developed in accordance with NEI 04-02
  A.5 Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3)
  A.6 Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4)
  A.7 Analysis that demonstrates nuclear safety performance criteria can be achieved and
        maintained for those areas that require recovery actions
  A.8  Fire Protection Program and/or Fire Protection Plan
  A.9  List of post-fire safe shutdown components (i.e., safe shutdown equipment list)
  A.10 Fire Protection System Design Basis Document
  A.11 List of applicable NFPA codes and standards and issuance dates (i.e., codes of
        record)
  A.12 List of deviations from (a) NFPA codes of record, or (b) NFPA 805 fundamental fire
        protection program and design elements (i.e., NFPA 805, Chapter 3)
  A.13 NFPA compliance review report
  A.14 Copy of licensee submittals and NRC safety evaluation reports that are specifically
        listed in the facility operating license for the approved fire protection program
  A.15 Copy of NRC Safety Evaluation Reports that form the licensing basis for:
                Fire Protection Program
                Post-fire Nuclear Safety Capability
  A.16 List of nuclear safety capability design changes completed in the last 3 years
        (including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations)
  A.17 Facility Operating License
  A.18 Technical Specifications (electronic format only)
  A.19 Technical Requirements Manual (electronic format only)
  A.20 Updated Final Safety Analysis Report (electronic format only)
                                                  2


The schedule for the inspection is as follows:
B. GENERAL PLANT DESIGN DOCUMENTS
  Information gathering visit:  September 26 - 28, 2018
  B.1 Piping and instrumentation diagrams (P&IDs) and legend list (electronic format and
  On-site inspection:  October 15 - 19, 2018  October 29 - November 2, 2018
      C-size paper drawings) for components used to achieve and maintain nuclear safety
      performance criteria for:
The purpose of the information gathering visit is to obtain information and documentation
            Fires outside the main control room
needed to support the inspection and to become familiar with the fire protection program, fire protection features, safe shutdown success paths, plant layout, and mitigating strategies to address Section B.5.b of NRC Order EA-02-026, "Order for Interim Safeguards and Security
            Fires in areas requiring recovery actions at other than primary control stations
Compensatory Measures," dated February 25, 2002, and 10 CFR 50.54(hh)(2).  
  B.2 Piping and instrumentation diagrams and legend list (electronic format and C-size
      paper drawings) for fire protection systems, including the fire water supply; water
      suppression sprinklers; and deluge, CO2, and Halon systems
  B.3 Yard layout drawings (electronic format and C-size paper drawings) for underground
      fire protection buried piping
  B.4 AC and DC electrical system single line diagrams (electronic format and C-size paper
      drawings), from off-site power down to the highest safety-related bus level (typically
      4kV, EDG bus)
  B.5 Single line diagrams for motor control centers (MCCs) that supply post-fire nuclear
      safety component loads (only for selected fire areas) (electronic format and C-size
      paper drawings)
  B.6 Equipment location drawings (electronic format and C-size paper drawings) which
      identify the physical plant locations of post-fire nuclear safety capability equipment
  B.7 Plant layout drawings (electronic format and C-size paper drawings) which identify:
            Plant fire area boundaries
            Combustible control zone drawings
            Areas protected by automatic fire suppression and detection
            Locations of fire protection equipment
C. CLASSIC FIRE PROTECTION
  C.1 Copy of fire protection program implementing procedures (e.g., administrative
      controls, surveillance testing, and fire brigade)
  C.2 List of calculations and engineering analyses, studies, or evaluations for the fire
      protection system, including the fire water system
  C.3 Hydraulic calculation or analysis for fire protection water system
  C.4 Last two completed surveillances of fire protection features in the selected fire areas
      (detection, suppression, damper inspections, damper tests, penetration inspections,
      barrier inspections, etc.)
  C.5 List of routine tests, surveillances, and preventive maintenance on fire pumps,
      including pump controllers and batteries
                                              3


   
C.6 Last two completed annual fire pump pressure and flow tests
The team leader will participate in the information gathering visit to select the fire areas for evaluation, identify additional documents needed to support the inspection, obtain unescorted access, and meet with the key personnel who will support the inspectionThe fire area
C.7 Last two completed monthly and/or quarterly fire pump tests
selection will require a walkdown of candidate fire areas with key personnel from your staffThe
C.8 Last two completed fire loop flow tests and loop flushes
enclosures to this letter provide an initial list of the documents the team will need for their reviewDuring the information gathering visit, the team leader will also discuss the following
C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate
inspection support administrative details:  (1) office space size and location; (2) specific documents requested to be made available to the team in their office spaces; (3) arrangements for reactor site access (including radiation protection training, security, safety, and fitness for
    concentrations and soak or hold times can be achieved (only for selected fire areas)
J. Welsch 2 duty requirements); and (4) the availability of knowledgeable plant staff and licensing organization personnel to serve as points of contact during the inspection.
C.10 Last five hot work permits (at power)
C.11 Last five transient combustible permits (at power)
C.12 For Fire Brigade drills, provide the following:
          Last five fire brigade drill critiques
          Last drill critique for a drill with off-site fire department support
          Last unannounced drill critique
          Last back-shift drill critique
          Dates, shifts, and locations of unannounced drills for last 3 years
          Summary of any unsatisfactory drill performance items for last 3 years
          Last unannounced drill critique by a qualified individual independent of the
          licensees staff
C.13 For fire brigade equipment provide the following:
        Procedure for inventory and inspection
        Most recent inspection and inventory results
C.14 Fire brigade qualifications, including self-contained breathing apparatus (SCBA), and
    training lesson plans
C.15 Copy of the mutual aid agreement for the first-due local fire department that is
    currently in effect
C.16 Copy of the evaluation or analysis of the effects of fire suppression activities on the
    ability to achieve the nuclear safety performance criteria (only for selected fire areas)
    demonstrating:
          The automatic or manual actuation of a suppression system, due to a fire in a
          single location, will not indirectly cause damage to the success path
                                                  4


We request that during the on-site inspection weeks you ensure that copies of analyses, evaluations, or documentation regarding the implementation and maintenance of the station fire
        The inadvertent actuation or rupture of a suppression system will not indirectly
protection program, including the success path necessary to achieve and maintain the nuclear
          cause damage to the success path
safety performance criteria, be readily accessible to the team for their review. Of specific
        Adequate drainage for areas protected by water suppression systems
interest for the fire protection portion of the inspection are those documents which establish that
        The hydrostatic rating of any floor penetration seals installed within the fire areas
your fire protection program satisfies NRC regulatory requirements, and conforms to applicable NRC and industry fire protection guidance (i.e., fire protection compliance assessment documents).  For the 10 CFR 50.54(hh)(2) portion of the inspection, those documents
          that are credited with keeping water from leaking into fire areas below
implementing your mitigating strategies and demonstrating the management of your commitments for the strategies are of specific interest.  Also, personnel should be available at
C.17 Pre-fire plans for all fire areas
the site during the inspection who are knowledgeable regarding those plant systems required to achieve and maintain safe and stable plant conditions, including the electrical aspects of the nuclear safety capability assessment, reactor plant fire protection systems and features, and the station fire protection program and its implementation.  
C.18 For emergency lighting units, provide the following:
        Copy of performance-based emergency light assessments
        List of preventive maintenance tasks, frequencies, and bases
        Most recently performed monthly or quarterly functional test
        Most recently performed battery discharge performance test or conductance
          measurement test
        Emergency lighting units battery loading analysis
        Vendor manual(s) for on-site inspector use
        Results of black-out testing (if performed)
        Maintenance Rule program information related to the emergency lighting system
        Compensatory measures taken when emergency lighting units are out of service
        Drawings showing emergency light locations and lamp orientation
C.19 Impairment log (at start of inspection) for fire protection features that are out of
    service
C.20 Fire protection screening reviews for recent design changes, modifications, or
    temporary modifications (i.e., an NFPA 805 plant change evaluation that screened
    out) in the last 3 years
C.21 List of penetration seal work, re-work, or installation activities, in the last 3 years
C.22 List of fire wrap work, re-work, or installation activities, in the last 3 years
C.23 Fire protection system health reports for the two most recent quarters
C.24 Fire protection program health reports for the two most recent quarters
C.25 Emergency lighting system health reports for the two most recent quarters
                                            5


   
  C.26 List of fire protection system design changes completed in the last 3 years (including
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.)Existing information collection requirements were approved by the Offi
        their associated 10 CFR 50.59 and NFPA 805 plant change evaluations)
ce of Management and Budget under control number 3150-0011The NRC may not conduct or sponsor, and a person is not required to  
  C.27 List of fire protection system NFPA 805 engineering equivalency evaluations
respond to, a request for information or an information collection requirement unless the  
        completed in the last 3 years
requesting document displays a currently valid Office of Management and Budget control
  C.28 Licensee evaluations of industry operating experience concerning fire protection
        issues completed in the last 3 years
D. ELECTRICAL
  D.1 Identify any thermoplastic cable in the selected fire areas
  D.2  Nuclear safety circuit coordination analysis for fuse and breaker coordination of
        nuclear safety capability components (only for selected fire areas)
  D.3  Administrative or configuration control procedures that govern fuse replacement
        (e.g., fuse control procedures)
  D.4  Maintenance procedures that verify breaker over-current trip settings to ensure
        coordination remains functional for post-fire nuclear safety capability components
  D.5 Electrical system health reports for the two most recent quarters
  D.6  Last surveillance demonstrating operability of those components operated from the
        primary control stations
  D.7 Schematic or elementary diagrams (C-size paper drawings) for circuits to be reviewed
        (samples to be identified by the inspector)
  D.8  Cable routing for components and equipment credited for post-fire nuclear safety
        capability systems and components (only for selected fire areas)
  D.9  List of post-fire nuclear safety capability system and component design changes
        completed in the last 3 years
  D.10 List of identified fire induced circuit failure configurations (only for selected fire areas)
E. OPERATIONS
  E.1  List of calculations and engineering analyses, studies, or evaluations for the nuclear
        safety capability methodology
  E.2  List of licensed operator Job Performance Measures (JPMs) for operator actions
        required to achieve and maintain post-fire nuclear safety performance criteria
  E.3  List of non-licensed operator training associated with non-licensed operator actions to
        achieve and maintain post-fire nuclear safety performance criteria (including JPMs,
        in-field training walkdowns, simulations, or initial qualification)
                                                  6


numberThis letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html
E.4 Lesson plans for post-fire nuclear safety capability training for licensed and non-
  and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding.
    licensed operators
Your cooperation and support during this inspection will be appreciatedIf you have questions concerning this inspection or the inspection team's information or logistical needs, please 
E.5  For recovery actions, provide the following:
contact Sam Graves, the team lead inspector, in the Region IV office at (817) 200-1102 or
        Manual Action Feasibility Study
samuel.graves@nrc.gov.  
        Operator Time Critical Action Program
Sincerely,
        Timelines for time-critical recovery actions
/RA/ 
        Timeline validations
James F. Drake, Acting Chief Engineering Branch 2
E.6  Thermal hydraulic calculation or analysis that determines the time requirements for
Division of Reactor Safety
    time-critical manual operator actions
E.7  Operating procedures to achieve and maintain nuclear safety performance criteria
Docket Nos. 50-275 and 50-323
    from the control room with a postulated fire in the selected fire areas
License Nos. DPR-80 and DPR-82
E.8 Operating procedures to achieve and maintain nuclear safety performance criteria
    from outside the control room with a postulated fire in the control room, cable
    spreading room, or any area requiring recovery actions (other than recovery actions
    performed in the control room or primary control stations) and any associated
    procedure basis documents
E.9 For safe shutdown equipment and tools, provide the following:
        Procedure for inventory and inspection
        Most recent inspection and inventory results
E.10 List of procedures that implement cold shutdown repairs
E.11 For cold shutdown repairs, provide the following:
        Procedure for inventory and inspection (i.e., needed tools, material, etc.)
        Most recent inspection and inventory results
E.12 For radio communications, provide the following:
        Communications plan for firefighting and post-fire safe shutdown manual actions
        Repeater locations
        Cable routing for repeater power supply cables
        Radio coverage test results
        Radio dead spot locations in the plant
E.13 For telephone, plant pager or sound powered phone systems, if relied upon to
    achieve and maintain safe and stable conditions, provide the following:
        Communications plan for firefighting and post-fire safe shutdown manual actions
        Locations of phone, pager units, sound powered phone jacks and sound
          powered phone headsets
                                            7


  Enclosures: 1. Triennial Fire Protection Inspection Document Request
            Cable routing including power supply cables
2. Mitigating Strategies Document Request
  E.14 Environmental and habitability evaluations for post-fire operator actions (temperature,
        smoke, humidity, SCBAs, etc.)
F. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS
  F.1 Corrective actions for fire-induced circuit failures (including but not limited to NRC
        IN 92-18), both single and multiple spurious actuations (only for selected fire areas)
  F.2  Corrective actions associated with operator actions to achieve and maintain post-fire
        nuclear safety performance criteria
  F.3  Self-assessments, peer assessments, and audits of fire protection activities for the
        last 3 years
  F.4  Self-assessments, peer assessments, and audits of post-fire nuclear safety capability
        methodology for the last 3 years
  F.5  List of open and closed condition reports for the fire protection system for the last
        3 years
  F.6  List of fire event analysis reports for the last 3 years
  F.7  List of open and closed condition reports for emergency lighting units for the last
        3 years
  F.8  List of open and closed condition reports for post-fire nuclear safety capability issues
        for the last 3 years. This includes issues affecting the nuclear safety capability
        analysis, fire hazards analysis, NFPA 805 design basis, fire risk evaluations, plant
        change evaluations, post-fire operating procedures and/or training, timeline
        evaluations for operator actions, and supporting engineering evaluations, analysis, or
        calculations.
  F.9  List of procedures that control the configuration of the fire protection program,
        features, and post-fire nuclear safety capability methodology and system design.
                                                8


 
                    MITIGATING STRATEGIES DOCUMENT REQUEST
   Enclosure 1 Triennial Fire Protection Inspection Document Request
G. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS
  The documents and information requested below should generally be made available to the inspection team during the inspectionElectronic format is the preferred format, except where specifically notedIf electronic files are made available via the internet-based inspection  
   G.1 List of all changes to regulatory commitments made to meet the requirements of,
management system (IMS), then the remote document access must allow inspectors to
        Section B.5.b of NRC Order EA-02-026, Order for Interim Safeguards and Security
download, save, and print the documents in the NRC's regional office.  
        Compensatory Measures, dated February 25, 2002, and Title 10 of the Code of
        Federal Regulations (10 CFR) 50.54(hh)(2).
  G.2 List of procedures and guidelines that were revised or generated to implement the
        mitigating strategies. These could be extensive damage mitigation guidelines
        (EDMGs), severe accident management guidelines (SAMGs), emergency operating
        procedures (EOPs), abnormal operating procedures (AOPs), etc.
  G.3  A matrix that shows the correlation between the mitigation strategies identified in
        Nuclear Energy Institute, 06-12, Revision 2, B.5.b Phase 2 and 3 Submittal
        Guideline, issued December 2006, and the site-specific procedures or guidelines
        that are used to implement each strategy.
  G.4  List of engineering evaluations or calculations that were used to verify the
        engineering bases for the mitigating strategies.
  G.5 Piping and instrumentation diagrams and legend list or simplified flow diagrams
        (electronic format and C-size paper drawings) for systems relied upon in the
        mitigating strategies. These could be the type used for training.
  G.6  List of modification packages or summary descriptions of modifications with simplified
        drawings for necessary facility changes to implement the mitigating strategies.
  G.7  List of routine tests, surveillances, and preventive maintenance for equipment and
        tools needed to implement 10 CFR 50.54(hh)(2) strategies.
  G.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,
        provide the following:
            Procedures for inventory and inspection
            Most recent inspection and inventory results
  G.9  List of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that
        differ from that documented in the submittals or the safety evaluation report.
  G.10 Site general arrangement drawings (electronic format and C-size paper drawings)
        that show the majority of buildings and areas referenced in 10 CFR 50.54(hh)(2)
        documents.
  G.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).
  G.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments)
        required to implement any mitigating strategies.
                                                                                    Enclosure 2


If IMS is utilized, it is recommended that a separate folder be used corresponding to each item listed below and that multiple documents within each folder be combined into a ZIP file before uploading.  Electronic files on compact disc or paper records (hard copy) are also acceptable. 


   
  ML18177A436
To allow review before the on-site information gathering visit, the following documents should be
  SUNSI Review: ADAMS:         Non-Publicly Available Non-Sensitive Keyword: NRC-002
made available to the team in the regional office no later than September 4, 2018:
By: STG         Yes No     Publicly Available     Sensitive
  Post-fire nuclear safety capability, systems, and separation analysis (request A.1)
  OFFICE       SRI:DRS/EB2 AC:DRS/EB2
  Fire hazards analysis and/or NFPA 805 design basis document (request A.2)
NAME         SGraves     JDrake
  Fire probabilistic risk assessment (PRA) summary document or full PRA document
SIGNATURE         /RA/         /RA/
(request A.3)
DATE           06/25/2018   06/25/2018
  NFPA 805 transition report, developed in accordance with NEI 04-02 (request A.4)
  Fire risk evaluations (i.e., NFPA 805, Section 2.4.3) (request A.5)
  Plant change evaluations (i.e., NFPA 805, Section 2.4.4) (request A.6)
  Analysis that demonstrates nuclear safe
ty performance criteria can be achieved and maintained for those areas that require recovery actions (request A.7)
Based on a review of the above seven items, the team leader should identify a preliminary list of
fire areas being considered for inspection prior to the on-site information gathering visit.  During the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
determined.
 
This document request is based on typical documents that a generic plant might have.  As such,
this generic document request is not meant to imply that any specific plant is required to have all of the listed documents.  It is recognized that some documents listed below may not be available for your plant.  In addition, the document titles listed below are based on typical
industry document names; your plant-specific document titles may vary.
To allow review before the on-site inspection weeks, the following documents should be made
available to the team in the regional office no later than October 1, 2018.
 
  2 A. DESIGN AND LICENSING BASIS DOCUMENTS
A.1 Post-fire Nuclear Safety Capability, Systems, and Separation Analysis
A.2 Fire Hazards Analysis and/or NFPA 805 Design Basis Document
 
A.3 Fire PRA Summary Document or full PRA Document (if summary document not
available)
A.4 NFPA 805 Transition Report, developed in accordance with NEI 04-02
A.5 Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3)
 
A.6 Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4)
A.7 Analysis that demonstrates nuclear sa
fety performance criteria can be achieved and maintained for those areas that require recovery actions
A.8 Fire Protection Program and/or Fire Protection Plan
A.9 List of post-fire safe shutdown components (i.e., safe shutdown equipment list)
A.10 Fire Protection System Design Basis Document
 
A.11 List of applicable NFPA codes and standards and issuance dates (i.e., codes of
record) 
A.12 List of deviations from (a) NFPA codes of record, or (b) NFPA 805 fundamental fire protection program and design elements (i.e., NFPA 805, Chapter 3)
A.13 NFPA compliance review report
A.14 Copy of licensee submittals and NRC safety evaluation reports that are specifically listed in the facility operating license for the approved fire protection program
A.15 Copy of NRC Safety Evaluation Reports that form the licensing basis for: 
  Fire Protection Program  Post-fire Nuclear Safety Capability
A.16 List of nuclear safety capability design changes completed in the last 3 years (including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations)
A.17 Facility Operating License
 
A.18 Technical Specifications (electronic format only)
A.19 Technical Requirements Manual (electronic format only)
 
A.20 Updated Final Safety Analysis Report (electronic format only)
 
  3 B. GENERAL PLANT DESIGN DOCUMENTS
B.1 Piping and instrumentation diagrams (P&IDs) and legend list (electronic format and C-size paper drawings) for components used to achieve and maintain nuclear safety performance criteria for:
  Fires outside the main control room  Fires in areas requiring recovery actions at other than primary control stations
B.2 Piping and instrumentation diagrams and legend list (electronic format and C-size paper drawings) for fire protection systems, including the fire water supply; water
suppression sprinklers; and deluge, CO
2 , and Halon systems
B.3 Yard layout drawings (electronic format and C-size paper drawings) for underground fire protection buried piping
B.4 AC and DC electrical system single line diagrams (electronic format and C-size paper
drawings), from off-site power down to the highest safety-related bus level (typically 4kV, EDG bus)
B.5 Single line diagrams for motor control centers (MCCs) that supply post-fire nuclear safety component loads (only for selected fire areas) (electronic format and C-size
 
paper drawings)
B.6 Equipment location drawings (electronic format and C-size paper drawings) which identify the physical plant locations of post-fire nuclear safety capability equipment
B.7 Plant layout drawings (electronic format and C-size paper drawings) which identify:
  Plant fire area boundaries  Combustible control zone drawings  Areas protected by automatic fire suppression and detection  Locations of fire protection equipment
C. CLASSIC FIRE PROTECTION
C.1 Copy of fire protection program implementing procedures (e.g., administrative controls, surveillance testing, and fire brigade)
C.2 List of calculations and engineering analyses, studies, or evaluations for the fire protection system, including the fire water system
C.3 Hydraulic calculation or analysis for fire protection water system
C.4 Last two completed surveillances of fire protection features in the selected fire areas (detection, suppression, damper inspections, damper tests, penetration inspections,
barrier inspections, etc.)
C.5 List of routine tests, surveillances, and preventive maintenance on fire pumps, including pump controllers and batteries 
  4  C.6 Last two completed annual fire pump pressure and flow tests
C.7 Last two completed monthly and/or quarterly fire pump tests
C.8 Last two completed fire loop flow tests and loop flushes
C.9 CO 2 and Halon initial discharge testing or calculation that determined appropriate concentrations and soak or hold times can be achieved (only for selected fire areas)
C.10 Last five hot work permits (at power)
C.11 Last five transient combustible permits (at power)
C.12 For Fire Brigade drills, provide the following:
  Last five fire brigade drill critiques
  Last drill critique for a drill with off-site fire department support
  Last unannounced drill critique
  Last back-shift drill critique
  Dates, shifts, and locations of unannounced drills for last 3 years
  Summary of any unsatisfactory drill performance items for last 3 years
  Last unannounced drill critique by a qualified individual independent of the licensee's staff
C.13 For fire brigade equipment provide the following:
  Procedure for inventory and inspection  Most recent inspection and inventory results
C.14 Fire brigade qualifications, including self-contained breathing apparatus (SCBA), and
training lesson plans
C.15 Copy of the mutual aid agreement for the "first-due" local fire department that is currently in effect
C.16 Copy of the evaluation or analysis of the effects of fire suppression activities on the ability to achieve the nuclear safety performance criteria (only for selected fire areas)
demonstrating:
  The automatic or manual actuation of a suppression system, due to a fire in a single location, will not indirectly cause damage to the success path
 
  5  The inadvertent actuation or rupture of a suppression system will not indirectly cause damage to the success path
  Adequate drainage for areas protected by water suppression systems
  The hydrostatic rating of any floor penetration seals installed within the fire areas that are credited with keeping water from leaking into fire areas below
C.17 Pre-fire plans for all fire areas
C.18 For emergency lighting units, provide the following:
  Copy of performance-based emergency light assessments
  List of preventive maintenance tasks, frequencies, and bases
  Most recently performed monthly or quarterly functional test
  Most recently performed battery discharge performance test or conductance measurement test
  Emergency lighting units battery loading analysis
  Vendor manual(s) for on-site inspector use
  Results of black-out testing (if performed)
  Maintenance Rule program information related to the emergency lighting system
  Compensatory measures taken when emergency lighting units are out of service
  Drawings showing emergency light locations and lamp orientation
C.19 Impairment log (at start of inspection) for fire protection features that are out of service  C.20 Fire protection screening reviews for recent design changes, modifications, or temporary modifications (i.e., an NFPA 805 plant change evaluation that screened
out) in the last 3 years
C.21 List of penetration seal work, re-work, or installation activities, in the last 3 years
C.22 List of fire wrap work, re-work, or installation activities, in the last 3 years
C.23 Fire protection system health reports for the two most recent quarters
C.24 Fire protection program health reports for the two most recent quarters
C.25 Emergency lighting system health reports for the two most recent quarters
 
  6 C.26 List of fire protection system design changes completed in the last 3 years (including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations)
C.27 List of fire protection system NFPA 805 engineering equivalency evaluations completed in the last 3 years
C.28 Licensee evaluations of industry operating experience concerning fire protection issues completed in the last 3 years
D. ELECTRICAL
D.1 Identify any thermoplastic cable in the selected fire areas
D.2 Nuclear safety circuit coordination analysis for fuse and breaker coordination of nuclear safety capability components (only for selected fire areas)
D.3 Administrative or configuration control procedures that govern fuse replacement (e.g., fuse control procedures)
D.4 Maintenance procedures that verify breaker over-current trip settings to ensure coordination remains functional for post-fire nuclear safety capability components
D.5 Electrical system health reports for the two most recent quarters
D.6 Last surveillance demonstrating operability of those components operated from the primary control stations
D.7 Schematic or elementary diagrams (C-size paper drawings) for circuits to be reviewed (samples to be identified by the inspector)
D.8 Cable routing for components and equipment credited for post-fire nuclear safety capability systems and components (only for selected fire areas)
D.9 List of post-fire nuclear safety capability system and component design changes completed in the last 3 years
D.10 List of identified fire induced circuit failure configurations (only for selected fire areas)
E. OPERATIONS
E.1 List of calculations and engineering analyses, studies, or evaluations for the nuclear
safety capability methodology
E.2 List of licensed operator Job Perform
ance Measures (JPMs) for operator actions required to achieve and maintain post-fire nuclear safety performance criteria
E.3 List of non-licensed operator training associated with non-licensed operator actions to achieve and maintain post-fire nuclear safety performance criteria (including JPMs,
in-field training walkdowns, simulations, or initial qualification)
 
  7 E.4 Lesson plans for post-fire nuclear safety capability training for licensed and non-licensed operators
E.5 For recovery actions, provide the following:
  Manual Action Feasibility Study  Operator Time Critical Action Program  Timelines for time-critical recovery actions  Timeline validations
E.6 Thermal hydraulic calculation or analysis that determines the time requirements for time-critical manual operator actions
E.7 Operating procedures to achieve and maintain nuclear safety performance criteria from the control room with a postulated fire in the selected fire areas
E.8 Operating procedures to achieve and maintain nuclear safety performance criteria from outside the control room with a postulated fire in the control room, cable
spreading room, or any area requiring recovery actions (other than recovery actions
performed in the control room or primary control stations) and any associated
procedure basis documents
E.9 For safe shutdown equipment and tools, provide the following:
  Procedure for inventory and inspection  Most recent inspection and inventory results
E.10 List of procedures that implement cold shutdown repairs
E.11 For cold shutdown repairs, provide the following:
  Procedure for inventory and inspection (i.e., needed tools, material, etc.)  Most recent inspection and inventory results
E.12 For radio communications, provide the following:
  Communications plan for firefighting and post-fire safe shutdown manual actions  Repeater locations  Cable routing for repeater power supply cables  Radio coverage test results  Radio dead spot locations in the plant
E.13 For telephone, plant pager or sound powered phone systems, if relied upon to achieve and maintain safe and stable conditions, provide the following:
  Communications plan for firefighting and post-fire safe shutdown manual actions
  Locations of phone, pager units, sound powered phone jacks and sound powered phone headsets
 
  8  Cable routing including power supply cables
E.14 Environmental and habitability evaluations for post-fire operator actions (temperature, smoke, humidity, SCBAs, etc.)
F. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS
F.1 Corrective actions for fire-induced circui
t failures (including but not limited to NRC IN 92-18), both single and multiple spurious actuations (only for selected fire areas)
F.2 Corrective actions associated with operator actions to achieve and maintain post-fire nuclear safety performance criteria
F.3 Self-assessments, peer assessments, and audits of fire protection activities for the
last 3 years
F.4 Self-assessments, peer assessments, and audits of post-fire nuclear safety capability
methodology for the last 3 years
F.5 List of open and closed condition reports for the fire protection system for the last 
3 years  F.6 List of fire event analysis reports for the last 3 years
F.7 List of open and closed condition reports for emergency lighting units for the last 
3 years  F.8 List of open and closed condition reports for post-fire nuclear safety capability issues for the last 3 years.  This includes issues affecting the nuclear safety capability analysis, fire hazards analysis, NFPA 805 design basis, fire risk evaluations, plant change evaluations, post-fire operating procedures and/or training, timeline
evaluations for operator actions, and supporting engineering evaluations, analysis, or calculations.
F.9 List of procedures that control the configuration of the fire protection program, features, and post-fire nuclear safety capability methodology and system design. 
  Enclosure 2
MITIGATING STRATEGIES DOCUMENT REQUEST
G. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS
G.1 List of all changes to regulatory commitments made to meet the requirements of, Section B.5.b of NRC Order EA-02-026, "Order for Interim Safeguards and Security Compensatory Measures," dated February 25, 2002, and Title 10 of the
Code of Federal Regulations (10 CFR) 50.54(hh)(2).
G.2 List of procedures and guidelines that were revised or generated to implement the mitigating strategies.  These could be extensive damage mitigation guidelines
(EDMGs), severe accident management guidelines (SAMGs), emergency operating
procedures (EOPs), abnormal operating procedures (AOPs), etc.
G.3 A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute, 06-12, Revision 2, "B.5.b Phase 2 and 3 Submittal
Guideline," issued December 2006, and the site-specific procedures or guidelines
that are used to implement each strategy.
G.4 List of engineering evaluations or calculations that were used to verify the engineering bases for the mitigating strategies.
G.5 Piping and instrumentation diagrams and legend list or simplified flow diagrams (electronic format and C-size paper drawings) for systems relied upon in the mitigating strategies.  These could be the type used for training.
G.6 List of modification packages or summary descriptions of modifications with simplified drawings for necessary facility changes to implement the mitigating strategies.
G.7 List of routine tests, surveillances, and preventive maintenance for equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies.
G.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies, provide the following:
  Procedures for inventory and inspection  Most recent inspection and inventory results
G.9 List of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that
differ from that documented in the submittals or the safety evaluation report.
G.10 Site general arrangement drawings (electronic format and C-size paper drawings) that show the majority of buildings and areas referenced in 10 CFR 50.54(hh)(2)
 
documents.
G.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).
G.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments) required to implement any mitigating strategies.
 
  ML18177A436 SUNSI Review:     ADAMS:               Non-Publicly Available         Non-Sensitive       Keyword: NRC-002 By: STG                   Yes   No Publicly Available                   Sensitive  OFFICE SRI:DRS/EB2 AC:DRS/EB2     NAME SGraves JDrake     SIGNATURE /RA/ /RA/     DATE 06/25/2018 06/25/2018
}}
}}

Latest revision as of 21:43, 20 October 2019

Notification of an NRC Triennial Fire Baseline Inspection (NRC Inspection Report 05000275/2018007 and 05000323/2018007) and Request for Information
ML18177A436
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/25/2018
From: James Drake
NRC/RGN-IV/DRS/EB-2
To: Welsch J
Pacific Gas & Electric Co
Drake J
References
IR 2018007
Download: ML18177A436 (12)


See also: IR 05000275/2018007

Text

June 25, 2018

Mr. James M. Welsch

Vice President, Nuclear Generation

and Chief Nuclear Officer

Pacific Gas and Electric Company

P.O. Box 56

Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF AN NRC TRIENNIAL

FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION

REPORT 05000275/2018007 AND 05000323/2018007) AND REQUEST FOR

INFORMATION

Dear Mr. Welsch:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at the Diablo Canyon

Power Plant in October and November 2018. The inspection team will be comprised of

five reactor inspectors from the NRC Region IV office. The inspection will be conducted in

accordance with Inspection Procedure 71111.05XT, Fire Protection - NFPA 805 (Triennial),

the NRCs baseline fire protection inspection procedure.

The schedule for the inspection is as follows:

Information gathering visit: September 26 - 28, 2018

On-site inspection: October 15 - 19, 2018

October 29 - November 2, 2018

The purpose of the information gathering visit is to obtain information and documentation

needed to support the inspection and to become familiar with the fire protection program, fire

protection features, safe shutdown success paths, plant layout, and mitigating strategies to

address Section B.5.b of NRC Order EA-02-026, Order for Interim Safeguards and Security

Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).

The team leader will participate in the information gathering visit to select the fire areas for

evaluation, identify additional documents needed to support the inspection, obtain unescorted

access, and meet with the key personnel who will support the inspection. The fire area

selection will require a walkdown of candidate fire areas with key personnel from your staff. The

enclosures to this letter provide an initial list of the documents the team will need for their

review. During the information gathering visit, the team leader will also discuss the following

inspection support administrative details: (1) office space size and location; (2) specific

documents requested to be made available to the team in their office spaces; (3) arrangements

for reactor site access (including radiation protection training, security, safety, and fitness for

J. Welsch 2

duty requirements); and (4) the availability of knowledgeable plant staff and licensing

organization personnel to serve as points of contact during the inspection.

We request that during the on-site inspection weeks you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the station fire

protection program, including the success path necessary to achieve and maintain the nuclear

safety performance criteria, be readily accessible to the team for their review. Of specific

interest for the fire protection portion of the inspection are those documents which establish that

your fire protection program satisfies NRC regulatory requirements, and conforms to applicable

NRC and industry fire protection guidance (i.e., fire protection compliance assessment

documents). For the 10 CFR 50.54(hh)(2) portion of the inspection, those documents

implementing your mitigating strategies and demonstrating the management of your

commitments for the strategies are of specific interest. Also, personnel should be available at

the site during the inspection who are knowledgeable regarding those plant systems required to

achieve and maintain safe and stable plant conditions, including the electrical aspects of the

nuclear safety capability assessment, reactor plant fire protection systems and features, and the

station fire protection program and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget under control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection teams information or logistical needs, please

contact Sam Graves, the team lead inspector, in the Region IV office at (817) 200-1102 or

samuel.graves@nrc.gov.

Sincerely,

/RA/

James F. Drake, Acting Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-275 and 50-323

License Nos. DPR-80 and DPR-82

Enclosures:

1. Triennial Fire Protection Inspection Document Request

2. Mitigating Strategies Document Request

Triennial Fire Protection Inspection Document Request

The documents and information requested below should generally be made available to the

inspection team during the inspection. Electronic format is the preferred format, except where

specifically noted. If electronic files are made available via the internet-based inspection

management system (IMS), then the remote document access must allow inspectors to

download, save, and print the documents in the NRCs regional office.

If IMS is utilized, it is recommended that a separate folder be used corresponding to each item

listed below and that multiple documents within each folder be combined into a ZIP file before

uploading. Electronic files on compact disc or paper records (hard copy) are also acceptable.

To allow review before the on-site information gathering visit, the following documents should be

made available to the team in the regional office no later than September 4, 2018:

Post-fire nuclear safety capability, systems, and separation analysis (request A.1)

Fire hazards analysis and/or NFPA 805 design basis document (request A.2)

Fire probabilistic risk assessment (PRA) summary document or full PRA document

(request A.3)

NFPA 805 transition report, developed in accordance with NEI 04-02 (request A.4)

Fire risk evaluations (i.e., NFPA 805, Section 2.4.3) (request A.5)

Plant change evaluations (i.e., NFPA 805, Section 2.4.4) (request A.6)

Analysis that demonstrates nuclear safety performance criteria can be achieved and

maintained for those areas that require recovery actions (request A.7)

Based on a review of the above seven items, the team leader should identify a preliminary list of

fire areas being considered for inspection prior to the on-site information gathering visit. During

the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be

determined.

This document request is based on typical documents that a generic plant might have. As such,

this generic document request is not meant to imply that any specific plant is required to have all

of the listed documents. It is recognized that some documents listed below may not be

available for your plant. In addition, the document titles listed below are based on typical

industry document names; your plant-specific document titles may vary.

To allow review before the on-site inspection weeks, the following documents should be made

available to the team in the regional office no later than October 1, 2018.

Enclosure 1

A. DESIGN AND LICENSING BASIS DOCUMENTS

A.1 Post-fire Nuclear Safety Capability, Systems, and Separation Analysis

A.2 Fire Hazards Analysis and/or NFPA 805 Design Basis Document

A.3 Fire PRA Summary Document or full PRA Document (if summary document not

available)

A.4 NFPA 805 Transition Report, developed in accordance with NEI 04-02

A.5 Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3)

A.6 Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4)

A.7 Analysis that demonstrates nuclear safety performance criteria can be achieved and

maintained for those areas that require recovery actions

A.8 Fire Protection Program and/or Fire Protection Plan

A.9 List of post-fire safe shutdown components (i.e., safe shutdown equipment list)

A.10 Fire Protection System Design Basis Document

A.11 List of applicable NFPA codes and standards and issuance dates (i.e., codes of

record)

A.12 List of deviations from (a) NFPA codes of record, or (b) NFPA 805 fundamental fire

protection program and design elements (i.e., NFPA 805, Chapter 3)

A.13 NFPA compliance review report

A.14 Copy of licensee submittals and NRC safety evaluation reports that are specifically

listed in the facility operating license for the approved fire protection program

A.15 Copy of NRC Safety Evaluation Reports that form the licensing basis for:

Fire Protection Program

Post-fire Nuclear Safety Capability

A.16 List of nuclear safety capability design changes completed in the last 3 years

(including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations)

A.17 Facility Operating License

A.18 Technical Specifications (electronic format only)

A.19 Technical Requirements Manual (electronic format only)

A.20 Updated Final Safety Analysis Report (electronic format only)

2

B. GENERAL PLANT DESIGN DOCUMENTS

B.1 Piping and instrumentation diagrams (P&IDs) and legend list (electronic format and

C-size paper drawings) for components used to achieve and maintain nuclear safety

performance criteria for:

Fires outside the main control room

Fires in areas requiring recovery actions at other than primary control stations

B.2 Piping and instrumentation diagrams and legend list (electronic format and C-size

paper drawings) for fire protection systems, including the fire water supply; water

suppression sprinklers; and deluge, CO2, and Halon systems

B.3 Yard layout drawings (electronic format and C-size paper drawings) for underground

fire protection buried piping

B.4 AC and DC electrical system single line diagrams (electronic format and C-size paper

drawings), from off-site power down to the highest safety-related bus level (typically

4kV, EDG bus)

B.5 Single line diagrams for motor control centers (MCCs) that supply post-fire nuclear

safety component loads (only for selected fire areas) (electronic format and C-size

paper drawings)

B.6 Equipment location drawings (electronic format and C-size paper drawings) which

identify the physical plant locations of post-fire nuclear safety capability equipment

B.7 Plant layout drawings (electronic format and C-size paper drawings) which identify:

Plant fire area boundaries

Combustible control zone drawings

Areas protected by automatic fire suppression and detection

Locations of fire protection equipment

C. CLASSIC FIRE PROTECTION

C.1 Copy of fire protection program implementing procedures (e.g., administrative

controls, surveillance testing, and fire brigade)

C.2 List of calculations and engineering analyses, studies, or evaluations for the fire

protection system, including the fire water system

C.3 Hydraulic calculation or analysis for fire protection water system

C.4 Last two completed surveillances of fire protection features in the selected fire areas

(detection, suppression, damper inspections, damper tests, penetration inspections,

barrier inspections, etc.)

C.5 List of routine tests, surveillances, and preventive maintenance on fire pumps,

including pump controllers and batteries

3

C.6 Last two completed annual fire pump pressure and flow tests

C.7 Last two completed monthly and/or quarterly fire pump tests

C.8 Last two completed fire loop flow tests and loop flushes

C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate

concentrations and soak or hold times can be achieved (only for selected fire areas)

C.10 Last five hot work permits (at power)

C.11 Last five transient combustible permits (at power)

C.12 For Fire Brigade drills, provide the following:

Last five fire brigade drill critiques

Last drill critique for a drill with off-site fire department support

Last unannounced drill critique

Last back-shift drill critique

Dates, shifts, and locations of unannounced drills for last 3 years

Summary of any unsatisfactory drill performance items for last 3 years

Last unannounced drill critique by a qualified individual independent of the

licensees staff

C.13 For fire brigade equipment provide the following:

Procedure for inventory and inspection

Most recent inspection and inventory results

C.14 Fire brigade qualifications, including self-contained breathing apparatus (SCBA), and

training lesson plans

C.15 Copy of the mutual aid agreement for the first-due local fire department that is

currently in effect

C.16 Copy of the evaluation or analysis of the effects of fire suppression activities on the

ability to achieve the nuclear safety performance criteria (only for selected fire areas)

demonstrating:

The automatic or manual actuation of a suppression system, due to a fire in a

single location, will not indirectly cause damage to the success path

4

The inadvertent actuation or rupture of a suppression system will not indirectly

cause damage to the success path

Adequate drainage for areas protected by water suppression systems

The hydrostatic rating of any floor penetration seals installed within the fire areas

that are credited with keeping water from leaking into fire areas below

C.17 Pre-fire plans for all fire areas

C.18 For emergency lighting units, provide the following:

Copy of performance-based emergency light assessments

List of preventive maintenance tasks, frequencies, and bases

Most recently performed monthly or quarterly functional test

Most recently performed battery discharge performance test or conductance

measurement test

Emergency lighting units battery loading analysis

Vendor manual(s) for on-site inspector use

Results of black-out testing (if performed)

Maintenance Rule program information related to the emergency lighting system

Compensatory measures taken when emergency lighting units are out of service

Drawings showing emergency light locations and lamp orientation

C.19 Impairment log (at start of inspection) for fire protection features that are out of

service

C.20 Fire protection screening reviews for recent design changes, modifications, or

temporary modifications (i.e., an NFPA 805 plant change evaluation that screened

out) in the last 3 years

C.21 List of penetration seal work, re-work, or installation activities, in the last 3 years

C.22 List of fire wrap work, re-work, or installation activities, in the last 3 years

C.23 Fire protection system health reports for the two most recent quarters

C.24 Fire protection program health reports for the two most recent quarters

C.25 Emergency lighting system health reports for the two most recent quarters

5

C.26 List of fire protection system design changes completed in the last 3 years (including

their associated 10 CFR 50.59 and NFPA 805 plant change evaluations)

C.27 List of fire protection system NFPA 805 engineering equivalency evaluations

completed in the last 3 years

C.28 Licensee evaluations of industry operating experience concerning fire protection

issues completed in the last 3 years

D. ELECTRICAL

D.1 Identify any thermoplastic cable in the selected fire areas

D.2 Nuclear safety circuit coordination analysis for fuse and breaker coordination of

nuclear safety capability components (only for selected fire areas)

D.3 Administrative or configuration control procedures that govern fuse replacement

(e.g., fuse control procedures)

D.4 Maintenance procedures that verify breaker over-current trip settings to ensure

coordination remains functional for post-fire nuclear safety capability components

D.5 Electrical system health reports for the two most recent quarters

D.6 Last surveillance demonstrating operability of those components operated from the

primary control stations

D.7 Schematic or elementary diagrams (C-size paper drawings) for circuits to be reviewed

(samples to be identified by the inspector)

D.8 Cable routing for components and equipment credited for post-fire nuclear safety

capability systems and components (only for selected fire areas)

D.9 List of post-fire nuclear safety capability system and component design changes

completed in the last 3 years

D.10 List of identified fire induced circuit failure configurations (only for selected fire areas)

E. OPERATIONS

E.1 List of calculations and engineering analyses, studies, or evaluations for the nuclear

safety capability methodology

E.2 List of licensed operator Job Performance Measures (JPMs) for operator actions

required to achieve and maintain post-fire nuclear safety performance criteria

E.3 List of non-licensed operator training associated with non-licensed operator actions to

achieve and maintain post-fire nuclear safety performance criteria (including JPMs,

in-field training walkdowns, simulations, or initial qualification)

6

E.4 Lesson plans for post-fire nuclear safety capability training for licensed and non-

licensed operators

E.5 For recovery actions, provide the following:

Manual Action Feasibility Study

Operator Time Critical Action Program

Timelines for time-critical recovery actions

Timeline validations

E.6 Thermal hydraulic calculation or analysis that determines the time requirements for

time-critical manual operator actions

E.7 Operating procedures to achieve and maintain nuclear safety performance criteria

from the control room with a postulated fire in the selected fire areas

E.8 Operating procedures to achieve and maintain nuclear safety performance criteria

from outside the control room with a postulated fire in the control room, cable

spreading room, or any area requiring recovery actions (other than recovery actions

performed in the control room or primary control stations) and any associated

procedure basis documents

E.9 For safe shutdown equipment and tools, provide the following:

Procedure for inventory and inspection

Most recent inspection and inventory results

E.10 List of procedures that implement cold shutdown repairs

E.11 For cold shutdown repairs, provide the following:

Procedure for inventory and inspection (i.e., needed tools, material, etc.)

Most recent inspection and inventory results

E.12 For radio communications, provide the following:

Communications plan for firefighting and post-fire safe shutdown manual actions

Repeater locations

Cable routing for repeater power supply cables

Radio coverage test results

Radio dead spot locations in the plant

E.13 For telephone, plant pager or sound powered phone systems, if relied upon to

achieve and maintain safe and stable conditions, provide the following:

Communications plan for firefighting and post-fire safe shutdown manual actions

Locations of phone, pager units, sound powered phone jacks and sound

powered phone headsets

7

Cable routing including power supply cables

E.14 Environmental and habitability evaluations for post-fire operator actions (temperature,

smoke, humidity, SCBAs, etc.)

F. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS

F.1 Corrective actions for fire-induced circuit failures (including but not limited to NRC

IN 92-18), both single and multiple spurious actuations (only for selected fire areas)

F.2 Corrective actions associated with operator actions to achieve and maintain post-fire

nuclear safety performance criteria

F.3 Self-assessments, peer assessments, and audits of fire protection activities for the

last 3 years

F.4 Self-assessments, peer assessments, and audits of post-fire nuclear safety capability

methodology for the last 3 years

F.5 List of open and closed condition reports for the fire protection system for the last

3 years

F.6 List of fire event analysis reports for the last 3 years

F.7 List of open and closed condition reports for emergency lighting units for the last

3 years

F.8 List of open and closed condition reports for post-fire nuclear safety capability issues

for the last 3 years. This includes issues affecting the nuclear safety capability

analysis, fire hazards analysis, NFPA 805 design basis, fire risk evaluations, plant

change evaluations, post-fire operating procedures and/or training, timeline

evaluations for operator actions, and supporting engineering evaluations, analysis, or

calculations.

F.9 List of procedures that control the configuration of the fire protection program,

features, and post-fire nuclear safety capability methodology and system design.

8

MITIGATING STRATEGIES DOCUMENT REQUEST

G. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS

G.1 List of all changes to regulatory commitments made to meet the requirements of,

Section B.5.b of NRC Order EA-02-026, Order for Interim Safeguards and Security

Compensatory Measures, dated February 25, 2002, and Title 10 of the Code of

Federal Regulations (10 CFR) 50.54(hh)(2).

G.2 List of procedures and guidelines that were revised or generated to implement the

mitigating strategies. These could be extensive damage mitigation guidelines

(EDMGs), severe accident management guidelines (SAMGs), emergency operating

procedures (EOPs), abnormal operating procedures (AOPs), etc.

G.3 A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute, 06-12, Revision 2, B.5.b Phase 2 and 3 Submittal

Guideline, issued December 2006, and the site-specific procedures or guidelines

that are used to implement each strategy.

G.4 List of engineering evaluations or calculations that were used to verify the

engineering bases for the mitigating strategies.

G.5 Piping and instrumentation diagrams and legend list or simplified flow diagrams

(electronic format and C-size paper drawings) for systems relied upon in the

mitigating strategies. These could be the type used for training.

G.6 List of modification packages or summary descriptions of modifications with simplified

drawings for necessary facility changes to implement the mitigating strategies.

G.7 List of routine tests, surveillances, and preventive maintenance for equipment and

tools needed to implement 10 CFR 50.54(hh)(2) strategies.

G.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,

provide the following:

Procedures for inventory and inspection

Most recent inspection and inventory results

G.9 List of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that

differ from that documented in the submittals or the safety evaluation report.

G.10 Site general arrangement drawings (electronic format and C-size paper drawings)

that show the majority of buildings and areas referenced in 10 CFR 50.54(hh)(2)

documents.

G.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).

G.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments)

required to implement any mitigating strategies.

Enclosure 2

ML18177A436

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002

By: STG Yes No Publicly Available Sensitive

OFFICE SRI:DRS/EB2 AC:DRS/EB2

NAME SGraves JDrake

SIGNATURE /RA/ /RA/

DATE 06/25/2018 06/25/2018