Text
ber 26, 2018
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000275/2018007 AND 05000323/2018007
Dear Mr. Welsch:
On November 1, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Diablo Canyon Power Plant, Units 1 and 2. The NRC inspectors discussed the results of this inspection with Mr. J. Nimick, Senior Director, Nuclear Services, and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Gregory E. Werner, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82
Enclosure:
Inspection Report 05000275/2018007 and 05000323/2018007
Inspection Report
Docket Numbers: 05000275, 05000323 License Numbers: DPR-80, DPR-82 Report Number: 05000275/2018007 and 05000323/2018007 Enterprise Identifier: I-2018-007-0004 Licensee: Pacific Gas and Electric Company Facility: Diablo Canyon Power Plant, Units 1 and 2 Location: Avila Beach, California Inspection Dates: October 15, 2018, to November 1, 2018 Inspectors: S. Graves, Senior Reactor Inspector (Team Lead)
C. Bickett, Senior Reactor Inspector, Region I B. Correll, Reactor Inspector N. Okonkwo, Reactor Inspector Accompanied: A. Athar, Reactor Inspector Approved By: G. Werner Chief, Engineering Branch 2 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a fire protection (NFPA 805 - Triennial) inspection at Diablo Canyon Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more than minor significance were identified during the inspection.
INSPECTION SCOPE
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IPs requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
===71111.05XT - Fire Protection - NFPA 805 (Triennial)
The inspectors evaluated the following from October 15, 2018, to November 1, 2018.
Fire Protection Inspection Requirements ===
The inspectors evaluated fire protection program implementation in the following selected areas and/or fire zones, including analyzed electrical circuits:
Fire Area Description 7-A Unit 1, Cable Spreading Room 8-H Unit 2, Solid State Protection System Room Unit 1, 12 kV Switchgear Room TB-10 Unit 2, 4 kV Switchgear Room and Cable Spreading Room, F Bus TB-11 Unit 2, 4 kV Switchgear Room and Cable Spreading Room, G Bus TB-12 Unit 2, 4 kV Switchgear Room and Cable Spreading Room, H Bus
B.5.b Inspection Activities (1 Sample)
The inspectors evaluated feasibility of the following B.5.b Mitigating Strategy: EDMG EDG-8, Manual Operations to Control Steam Generator Water Level, Revision
INSPECTION RESULTS
The NRC inspectors did not identify any finding or violation of more than minor significance.
EXIT MEETINGS AND DEBRIEFS
On November 1, 2018, the inspectors presented the triennial fire protection inspection results to Mr. J. Nimick, Senior Director, Nuclear Services, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.
DOCUMENTS REVIEWED
71111.05XT - Fire Protection - NFPA 805 (Triennial)
Condition Reports
50038548 50998600* 51001023* 51000728* 51002303*
50522666 50998604* 50854730 51001014* 50895475
50523380 51001171* 51001107* 51000841* 51001022*
50523803 51001268* 51001025* 50854735 51000729*
50524391 51001209* 51000499* 51001020* 51000923*
50998535* 51001024* 51002888* 51001015* 50984012
50982622 51002778* 51002853* 51001036* A0732932
50305948 50294777 51000823 51000922 51003054
51003070 51003053
- Issued as a result of inspection activities.
Work Orders
60112165 64147217 64200604 64200605 64200688 64200937 64202044
64148604 64182606 64206262 64206280 64206281 64206282 64206283
64183007 64206501 64188852 64190882 64191393 64200406 64200600
64185948 64200601 64206504 64207187 68040626 64204770 64206498
64187362 64205487 64148946 64149653 64169440 64174713 64178133
64192020 64200603 64003982 64019052 64035540 64036282 64136705
64196877 64160966 64133861 64154464 64195891 64133937 64151706
64160967 64133229 64133228 64121838 64121837
Procedures
Number Title Revision
335-DC Emergency Lighting and Communications 13
AD13.DC6 Fire Protection System Performance Based 5A
Surveillance Program
CF3.ID9 Design Change Development 37
CF3.ID9 Design Change Development 54
CF3.ID9 Design Change Development 56
CF6.ID1 Setpoint Control Program 8
CP M6 Site Fire Response 37
EDMG EDCG-1 ERO Guidance for Extensive Plant Damage Mitigation 1A
EDMG EDG-14 EDMG Equipment Annual Inventory 4
EDMG EDG-8 Manual Operations to Control Steam Generator Water 2
Level
EDMG EDMG-1 Extensive Damage Mitigation Guideline 4D
Procedures
Number Title Revision
MP E-57.2A Wire and Cable Pulling 8
MP E-62.5A Maintenance of Cutler Hammer 12 kV AM-VR Vacuum 07
Circuit Breakers
MP E-63.3A Instruction for Assembly and Insulation of 4 and 8
kV Bus
MP E-63.3B Potential Transformer Drawer Maintenance 13
MP E-63.3C-SHH Maintenance of 4 kV Switchgear - Bus H 0
MP E-63.3D-SHH Bus Connection Resistance Test - 4 KV Bus H 0
MP I-18-IFD Incipient Fire Detection System Maintenance 1
MP I-18-IFDPRO Incipient Fire Detection System Portable Detector 0
Routine Maintenance
OM10.ID6 Equipment Important to Emergency Response (EITER) 7
OM3.ID7 Portable Radio and Cellular Phone Use 6
OM5 Quality Assurance Program 12
OM8 Fire Protection Program 7
OM8 Fire Protection Program 8
OM8.ID4 Control of Flammable and Combustible Materials 28
OP A-4A:I Pressurizer - Make Available 32
OP AP-26 Loss of Offsite Power 21
OP AP-8A Control Room Inaccessibility - Establishing Hot Standby 45
OP AP-8A Control Room Inaccessibility - Establishing Hot 46
Standby
OP K-2C Fire Protection Network Operation 47
OP1.DC10 Conduct of Operations 54
OP1.ID2 Time Critical Operator Action 10
OP-K9 Instruction for Operation of the Diablo Canyon Power 16
Plant Radio System
STP I-18-IFD.A Incipient Fire Detection System Operability and 4
Channel Functional Test
Procedures
Number Title Revision
STP I-29 Emergency Signals and Communications Systems 49A
Functional Test
STP M-70.SWG Inspection of ECG Swing Type Doors 6
Design Documents Revision
Number Title or Date
DCL-13-065 NFPA 805 Transition Report June 26, 2013
Design Criteria Fire Protection System 25
Memorandum S-18
Drawings
Number Title Revision
DSK-5000055903, Site Radio Interconnect Diagram 0
Sh. 1
DSK-5000055903, Site Radio Interconnect Diagram 0
Sh. 2
57563 Cable Tray and Conduit Layout, Plan Below 35
Elevation 119-0 Area A
57578, Sh. 1 Electrical Cable Tray and Conduit Layout, Plan below 64
Elevation 107-0 Area A
57579 Electrical Cable Tray and Conduit Layout, Turbine 36
Generator Building Area A Section
57597 Embedded Conduit Layout, El. 85-0 Area FW-GW 12
57606 Electrical Cable Tray and Conduit Layout Section E-E 33
and F-F Area H
57612, Sh. 1 Electrical Conduit Layout Plan, Below 42
Elevation 140 - 0, Area H
57658 Electrical Conduit Layout, Area P Outdoors 14
066689 Penetration Seal Typical Design Details 2
066689, Sh. 5 & 6 Fire Seal Design Detail F-1 2
2008, Sh. 4 Chemical and Volume Control 115
2014, Sh. 5 Component Cooling Water 59
2019, Sh. 6A Liquid Radwaste System 82
106703, Sh. 3 Unit 1, Auxiliary Feedwater System 81
Drawings
Number Title Revision
106718, Sh. 4 Firewater Yard Loop 185
106718, Sh. 2 & 3 Firewater Yard Loop 183
106718, Sh. 7 Unit 1 and Unit 2 Turbine Building Hose Reel Stations 180
106718, Sh. 10 Unit 1 and Unit 2 Auxiliary Building Hose Reel Stations 181
111805, Sh. 16 Fire Department - Radiological Control Area and 1
H Block Elevation 140
111805, Sh. 17 Fire Department - Radiological Control Area and 1
H Block Elevation 140 Unit 1 and Common
111805, Sh. 26 Fire Department - H Block Elevation 128, 154, and 26
164
111805, Sh. 27 Fire Department - H Block Elevation 128, 154, and 1
164
111805, Sh. 49 Fire Department - Turbine Building Elevation 85 1
111805, Sh. 50 Fire Department - Turbine Building Elevation 85 and 1
Unit 1
111805, Sh. 51 Fire Department - Turbine Building Elevation 76 1
111805, Sh. 63 Fire Protection Drawing - Turbine Building 1
Elevation 104
111805, Sh. 64 Fire Protection Drawing - Turbine Building 1
Elevation 104 U2
111906, Sh. 3 Turbine Building Elevation 76 5
111906, Sh. 6 Turbine Building Elevation 85 10
111906, Sh. 12 Turbine Building Elevation 104 7
111906, Sh. 13 Turbine Building Elevation 119 9
111906, Sh. 23 Auxiliary Building Elevation 140 13
111906, Sh. 25 Auxiliary Building Elevations 128, 154, 164, and 174 8
334336 Thermal Electric Design Standard, Contact 4
Protector/Transient Suppressor for Solenoid Valves
and Relay Coils
345883, Sh. 1 TCOM System Diagram, Calif. Dept. of Forestry/San 7
Luis Obispo County Fire Dept. - Radio System
437513, Sh. 1 Diagram of Connections, Hot Shutdown Control Panel 26
Drawings
Number Title Revision
437518, Sh. 1 Single Line Diagram for Station Auxiliaries 41
437533 Electrical Single Line Meter and Relay Diagram, 45
4160 Volt System
437579, Sh. 1 Schematic Diagram 4 kV Diesel Generator Control 44
No. 11 and 12
437608 Schematic Diagram Component Cooling System Motor 20
Operated Valves
437667, Sh. 1 Schematic Diagram 4 kV Diesel Generator Control 46
No. 13
437683, Sh. 1 Schematic Diagram Chemical and Volume Control 24
System Solenoid Valves
437819, Sh. 1 Electrical Diagram of Connection, Diesel Generator, 27
and Associated Equipment
437902, Sh. 1 Diagram and Panel Schedule Lighting Distribution 88
437920, Sh. 1 Diagram of Connections, Penetration 8E 9
441220, Sh. 1 Single Line Diagram for Station Auxiliaries 30
441493, Sh. 1 Diagram and Panel Schedule Lighting Distribution 81
480281, Sh. 1 Diagram of Connections, Incipient Fire Detection 01
480282, Sh. 1 Diagram of Connections, Incipient Fire Detection 01
480284, Sh. 1 Diagram of Connections, Incipient Fire Detection 01
480285, Sh. 1 Diagram of Connections, Incipient Fire Detection 01
480289, Sh. 1 Diagram of Connections, Incipient Fire Detection 01
501452 Embedded Conduit Layout, EL 140-0 Area H 3
2110 Electrical Single Line Diagram, 21
500/230/25/12/4.16 kV Systems
663089, Sh. 217 Incipient EFID01 Configuration 1
663339, Sh. 1 Arrangement, Outdoor Bus Duct 10
663339, Sh. 10 Arrangement layout Indoor/Outdoor Bus Duct 6
Arrangement 5 and 15 kV
663339, Sh. 11 Electrical Indoor- Outdoor Bus Duct Arrangement 7
Drawings
Number Title Revision
663339, Sh. 15 Electrical Installation Detail for Indoor and Outdoor Bus 7
Duct
Miscellaneous
Documents Revision
Number Title or Date
CAL FIRE 2018 Operating Plan for On-Site Fire and March 7, 2018
Rescue Response at Diablo Canyon Power Plant
Diablo Canyon Power Plant, Units 1 and 2 - Issuance of April 14, 2016
Amendments Regarding Transition to a Risk-Informed,
Performance-Based Fire Protection Program in
accordance with 10 CFR 50.48(c)
50953336 2018 Fire Protection Pre-Triennial Self-Assessment June 18, 2018
Report
DCL 13-065 License Amendment Request to Adopt NFPA 805 June 26, 2013
Performance-Based Standard for Fire Protection for
Light Water Reactor Electric Generating Plants
(2001 Edition)
ECG 18.0 Equipment Control Guidelines: Fire Protection 10
Lesson EDCG-1 B.5.b. - ERO Guidance for Extensive Plant Damage July 6, 2011
Mitigation
Lesson FTFD009 Extensive Plant Mitigation Guidelines November 29,
2017
Lesson LEDMG EDMG - B.5.b. Initial Response and Implementing February 23,
Guidelines 2018
Lesson R136C2 Extensive Damage Mitigation Guidelines March 15, 2014
LPA-8 OP AP-8 Control Room Inaccessibility Reactor 16A
Operator, Senior Reactor Operator, and Shift Technical
Advisor
NFPA 12A Halon 1301 Fire Extinguishing Systems 1992
NFPA 72 National Fire Alarm and Signaling Code 2016
NFPA 76 Standard for the Fire Protection of Telecommunications 2016
Facilities
NFPA 805 Performance-Based Standard for Fire Protection for 2001
Light Water Reactor Electric Generating Plants
Miscellaneous
Documents Revision
Number Title or Date
NRC FAQ 08-0046 Closure of National Fire Protection Association 805 November 23,
Frequently Asked Question 08-0046 Incipient Fire 2009
Detection Systems
R176C8 Electrical Task Training Non-Licensed Operator 0
R181C6 Hot Shutdown Panel/AP-8 Continuing Training for 0
Licensed Personnel
TR-1006756 Fire Protection Equipment Surveillance Optimization July 2003
and Maintenance Guide
Vendor
Documents Revision
Number Title or Date
P1890-002-004 Fire Protection Code Conformance Review 1
030023-RPT-01 Review of Monitoring Criteria for HSS Nuclear Safety 0
Capability Assessment (NSCA) Components
663089-244-2 Cirrus Pro Aspirating Fire Detector Engineers Manual June 1, 2017
663089-245-2 Cirrus Pro Aspirating Fire Detector User Manual and May 9, 2017
Responsibilities
663082 Instruction Book for Switchgear Supplied by Alco 3
Products Inc., Engine Controls and Gauge Panels
663332-80 Instruction and Renewal Part for Metal Clad Switchgear 27
Types M-26 and M-36
Modifications
Number Title
DCP 1000000078 Diablo Canyon Power Plant, Unit 1 Integrated Head Assembly (IHA)
Revision 1
DCP 1000025244 Unit 1, Incipient Fire Detection System
DCP 1000025255 Unit 2, Incipient Fire Detection System
Engineering Revision
Reports Number Title or Date
FPEE-075 1 Hour Barrier in SSPS Rooms September 7, 2017
FPEE-133 Seismic/Construction Gaps in the 12 kV Switchgear November 20, 2017
Rooms
FPEE-147 Evaluation of Unistrut Configurations in 128 Cable December 13, 2017
Spreading Room
Engineering Revision
Reports Number Title or Date
FPEE-147A Evaluation of Unistrut Configurations in 128 Cable December 13, 2017
Spreading Room
FPEE-170 NFPA 805 Internal Conduit Seal Design Criteria August 16, 2017
Equivalency
FPEE 80 Fire Dampers Installed at Variance with 0
Manufacturers Instructions
FPEE 138 Drain Holes in Pyrocrete Raceway Fire Barrier 0
Panels
Calculations
Number Title Revision
M-1023 Verify Cable Spreading Room CO2 Retention Time 0
M-997 (Appendix 2.1) Qualification of Penetration Seal 1
Typical F-1
M-944 10 CFR 50, Appendix R Alternate Shutdown 7
Methodology - Time and Manpower Study/Safe
Shutdown System Considerations
9000032684 Emergency Lighting and Communications 13
9000041048 Associated CKT Analysis - Fire Protection 02
9000041466 Nuclear Safety Capability Assessment (NSCA) 004/00
9000041468 Recovery Action Feasibility Assessment (RAFA) 004/00
9000041689 NFPA 805 Design Basis Document 00
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002
By: STG Yes No Publicly Available Sensitive
OFFICE SRI:EB2 RI:EB2 RI:EB2 SRI:RI/EB2 BC:EB2 BC:DRPA BC:EB2
NAME SGraves BCorrell NOkonkwo CBickett GWerner MHaire GWerner
SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ /RA/
DATE 11/20/2018 11/26/2018 11/06/2018 11/19/2018 11/26/2018 11/26/2018 11/26/2018