November 26, 2018
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000275/2018007 AND 05000323/2018007
Dear Mr. Welsch:
On November 1, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Diablo Canyon Power Plant, Units 1 and 2. The NRC inspectors discussed the results of this inspection with Mr. J. Nimick, Senior Director, Nuclear Services, and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Gregory E. Werner, Chief Engineering Branch 2 Division of Reactor Safety
Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82
Enclosure:
Inspection Report 05000275/2018007 and 05000323/2018007
Inspection Report
Docket Numbers:
05000275, 05000323
License Numbers:
Report Number:
05000275/2018007 and 05000323/2018007
Enterprise Identifier: I-2018-007-0004
Licensee:
Pacific Gas and Electric Company
Facility:
Diablo Canyon Power Plant, Units 1 and 2
Location:
Avila Beach, California
Inspection Dates:
October 15, 2018, to November 1, 2018
Inspectors:
S. Graves, Senior Reactor Inspector (Team Lead)
C. Bickett, Senior Reactor Inspector, Region I
B. Correll, Reactor Inspector
N. Okonkwo, Reactor Inspector
Accompanied:
A. Athar, Reactor Inspector
Approved By:
G. Werner
Chief, Engineering Branch 2
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a fire protection (NFPA 805 - Triennial) inspection at Diablo Canyon Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified during the inspection.
INSPECTION SCOPE
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IPs requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
===71111.05XT - Fire Protection - NFPA 805 (Triennial) The inspectors evaluated the following from October 15, 2018, to November 1, 2018.
Fire Protection Inspection Requirements===
The inspectors evaluated fire protection program implementation in the following selected areas and/or fire zones, including analyzed electrical circuits:
Fire Area Description 7-A Unit 1, Cable Spreading Room 8-H Unit 2, Solid State Protection System Room Unit 1, 12 kV Switchgear Room TB-10 Unit 2, 4 kV Switchgear Room and Cable Spreading Room, F Bus TB-11 Unit 2, 4 kV Switchgear Room and Cable Spreading Room, G Bus TB-12 Unit 2, 4 kV Switchgear Room and Cable Spreading Room, H Bus
B.5.b Inspection Activities (1 Sample)
The inspectors evaluated feasibility of the following B.5.b Mitigating Strategy:
EDMG EDG-8, Manual Operations to Control Steam Generator Water Level, Revision
INSPECTION RESULTS
The NRC inspectors did not identify any finding or violation of more than minor significance.
EXIT MEETINGS AND DEBRIEFS
On November 1, 2018, the inspectors presented the triennial fire protection inspection results to Mr. J. Nimick, Senior Director, Nuclear Services, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.
DOCUMENTS REVIEWED
71111.05XT - Fire Protection - NFPA 805 (Triennial)
Condition Reports
50038548
50998600*
51001023*
51000728*
51002303*
50522666
50998604*
50854730
51001014*
50895475
50523380
51001171*
51001107*
51000841*
51001022*
50523803
51001268*
51001025*
50854735
51000729*
50524391
51001209*
51000499*
51001020*
51000923*
50998535*
51001024*
51002888*
51001015*
50984012
50982622
51002778*
51002853*
51001036*
A0732932
50305948
294777
51000823
51000922
51003054
51003070
51003053
- Issued as a result of inspection activities.
Work Orders
60112165
64147217
200604
200605
200688
200937
202044
64148604
64182606
206262
206280
206281
206282
206283
64183007
206501
64188852
64190882
64191393
200406
200600
64185948
200601
206504
207187
68040626
204770
206498
64187362
205487
64148946
64149653
64169440
64174713
64178133
64192020
200603
64003982
64019052
64035540
64036282
64136705
64196877
64160966
64133861
64154464
64195891
64133937
64151706
64160967
64133229
64133228
64121838
64121837
Procedures
Number
Title
Revision
335-DC
Emergency Lighting and Communications
AD13.DC6
Fire Protection System Performance Based
Surveillance Program
5A
CF3.ID9
Design Change Development
CF3.ID9
Design Change Development
CF3.ID9
Design Change Development
CF6.ID1
Setpoint Control Program
CP M6
Site Fire Response
EDMG EDCG-1
ERO Guidance for Extensive Plant Damage Mitigation
1A
EDMG EDG-14
EDMG Equipment Annual Inventory
EDMG EDG-8
Manual Operations to Control Steam Generator Water
Level
EDMG EDMG-1
Extensive Damage Mitigation Guideline
4D
Procedures
Number
Title
Revision
MP E-57.2A
Wire and Cable Pulling
MP E-62.5A
Maintenance of Cutler Hammer 12 kV AM-VR Vacuum
Circuit Breakers
MP E-63.3A
Instruction for Assembly and Insulation of 4 and
kV Bus
MP E-63.3B
Potential Transformer Drawer Maintenance
MP E-63.3C-SHH
Maintenance of 4 kV Switchgear - Bus H
MP E-63.3D-SHH
Bus Connection Resistance Test - 4 KV Bus H
MP I-18-IFD
Incipient Fire Detection System Maintenance
MP I-18-IFDPRO
Incipient Fire Detection System Portable Detector
Routine Maintenance
OM10.ID6
Equipment Important to Emergency Response (EITER) 7
OM3.ID7
Portable Radio and Cellular Phone Use
OM5
Quality Assurance Program
OM8
OM8
OM8.ID4
Control of Flammable and Combustible Materials
OP A-4A:I
Pressurizer - Make Available
OP AP-26
OP AP-8A
Control Room Inaccessibility - Establishing Hot Standby 45
OP AP-8A
Control Room Inaccessibility - Establishing Hot
Standby
OP K-2C
Fire Protection Network Operation
OP1.DC10
Conduct of Operations
OP1.ID2
OP-K9
Instruction for Operation of the Diablo Canyon Power
Plant Radio System
STP I-18-IFD.A
Incipient Fire Detection System Operability and
Channel Functional Test
Procedures
Number
Title
Revision
STP I-29
Emergency Signals and Communications Systems
Functional Test
49A
STP M-70.SWG
Inspection of ECG Swing Type Doors
Design Documents
Number
Title
Revision
or Date
NFPA 805 Transition Report
June 26, 2013
Design Criteria
Memorandum S-18
Fire Protection System
Drawings
Number
Title
Revision
DSK-5000055903,
Sh. 1
Site Radio Interconnect Diagram
DSK-5000055903,
Sh. 2
Site Radio Interconnect Diagram
57563
Cable Tray and Conduit Layout, Plan Below
Elevation 119-0 Area A
57578, Sh. 1
Electrical Cable Tray and Conduit Layout, Plan below
Elevation 107-0 Area A
57579
Electrical Cable Tray and Conduit Layout, Turbine
Generator Building Area A Section
57597
Embedded Conduit Layout, El. 85-0 Area FW-GW
57606
Electrical Cable Tray and Conduit Layout Section E-E
and F-F Area H
57612, Sh. 1
Electrical Conduit Layout Plan, Below
Elevation 140 - 0, Area H
57658
Electrical Conduit Layout, Area P Outdoors
066689
Penetration Seal Typical Design Details
066689, Sh. 5 & 6
Fire Seal Design Detail F-1
2008, Sh. 4
Chemical and Volume Control
115
2014, Sh. 5
Component Cooling Water
2019, Sh. 6A
Liquid Radwaste System
106703, Sh. 3
Unit 1, Auxiliary Feedwater System
Drawings
Number
Title
Revision
106718, Sh. 4
Firewater Yard Loop
185
106718, Sh. 2 & 3
Firewater Yard Loop
183
106718, Sh. 7
Unit 1 and Unit 2 Turbine Building Hose Reel Stations
180
106718, Sh. 10
Unit 1 and Unit 2 Auxiliary Building Hose Reel Stations
181
111805, Sh. 16
Fire Department - Radiological Control Area and
H Block Elevation 140
111805, Sh. 17
Fire Department - Radiological Control Area and
H Block Elevation 140 Unit 1 and Common
111805, Sh. 26
Fire Department - H Block Elevation 128, 154, and
164
111805, Sh. 27
Fire Department - H Block Elevation 128, 154, and
164
111805, Sh. 49
Fire Department - Turbine Building Elevation 85
111805, Sh. 50
Fire Department - Turbine Building Elevation 85 and
Unit 1
111805, Sh. 51
Fire Department - Turbine Building Elevation 76
111805, Sh. 63
Fire Protection Drawing - Turbine Building
Elevation 104
111805, Sh. 64
Fire Protection Drawing - Turbine Building
Elevation 104 U2
111906, Sh. 3
Turbine Building Elevation 76
111906, Sh. 6
Turbine Building Elevation 85
111906, Sh. 12
Turbine Building Elevation 104
111906, Sh. 13
Turbine Building Elevation 119
111906, Sh. 23
Auxiliary Building Elevation 140
111906, Sh. 25
Auxiliary Building Elevations 128, 154, 164, and 174
334336
Thermal Electric Design Standard, Contact
Protector/Transient Suppressor for Solenoid Valves
and Relay Coils
345883, Sh. 1
TCOM System Diagram, Calif. Dept. of Forestry/San
Luis Obispo County Fire Dept. - Radio System
437513, Sh. 1
Diagram of Connections, Hot Shutdown Control Panel
Drawings
Number
Title
Revision
437518, Sh. 1
Single Line Diagram for Station Auxiliaries
437533
Electrical Single Line Meter and Relay Diagram,
4160 Volt System
437579, Sh. 1
Schematic Diagram 4 kV Diesel Generator Control
No. 11 and 12
437608
Schematic Diagram Component Cooling System Motor
Operated Valves
437667, Sh. 1
Schematic Diagram 4 kV Diesel Generator Control
No. 13
437683, Sh. 1
Schematic Diagram Chemical and Volume Control
System Solenoid Valves
437819, Sh. 1
Electrical Diagram of Connection, Diesel Generator,
and Associated Equipment
437902, Sh. 1
Diagram and Panel Schedule Lighting Distribution
437920, Sh. 1
Diagram of Connections, Penetration 8E
441220, Sh. 1
Single Line Diagram for Station Auxiliaries
441493, Sh. 1
Diagram and Panel Schedule Lighting Distribution
480281, Sh. 1
Diagram of Connections, Incipient Fire Detection
480282, Sh. 1
Diagram of Connections, Incipient Fire Detection
480284, Sh. 1
Diagram of Connections, Incipient Fire Detection
480285, Sh. 1
Diagram of Connections, Incipient Fire Detection
480289, Sh. 1
Diagram of Connections, Incipient Fire Detection
501452
Embedded Conduit Layout, EL 140-0 Area H
2110
Electrical Single Line Diagram,
500/230/25/12/4.16 kV Systems
663089, Sh. 217
Incipient EFID01 Configuration
663339, Sh. 1
Arrangement, Outdoor Bus Duct
663339, Sh. 10
Arrangement layout Indoor/Outdoor Bus Duct
Arrangement 5 and 15 kV
663339, Sh. 11
Electrical Indoor-Outdoor Bus Duct Arrangement
Drawings
Number
Title
Revision
663339, Sh. 15
Electrical Installation Detail for Indoor and Outdoor Bus
Duct
Miscellaneous
Documents
Number
Title
Revision
or Date
CAL FIRE 2018 Operating Plan for On-Site Fire and
Rescue Response at Diablo Canyon Power Plant
March 7, 2018
Diablo Canyon Power Plant, Units 1 and 2 - Issuance of
Amendments Regarding Transition to a Risk-Informed,
Performance-Based Fire Protection Program in
accordance with 10 CFR 50.48(c)
April 14, 2016
50953336
2018 Fire Protection Pre-Triennial Self-Assessment
Report
June 18, 2018
License Amendment Request to Adopt NFPA 805
Performance-Based Standard for Fire Protection for
Light Water Reactor Electric Generating Plants
(2001 Edition)
June 26, 2013
ECG 18.0
Equipment Control Guidelines: Fire Protection
Lesson EDCG-1
B.5.b. - ERO Guidance for Extensive Plant Damage
Mitigation
July 6, 2011
Lesson FTFD009
Extensive Plant Mitigation Guidelines
November 29,
2017
Lesson LEDMG
EDMG - B.5.b. Initial Response and Implementing
Guidelines
February 23,
2018
Lesson R136C2
Extensive Damage Mitigation Guidelines
March 15, 2014
LPA-8
OP AP-8 Control Room Inaccessibility Reactor
Operator, Senior Reactor Operator, and Shift Technical
Advisor
16A
NFPA 12A
Halon 1301 Fire Extinguishing Systems
1992
National Fire Alarm and Signaling Code
2016
Standard for the Fire Protection of Telecommunications
Facilities
2016
Performance-Based Standard for Fire Protection for
Light Water Reactor Electric Generating Plants
2001
Miscellaneous
Documents
Number
Title
Revision
or Date
NRC FAQ 08-0046 Closure of National Fire Protection Association 805
Frequently Asked Question 08-0046 Incipient Fire
Detection Systems
November 23,
2009
R176C8
Electrical Task Training Non-Licensed Operator
R181C6
Hot Shutdown Panel/AP-8 Continuing Training for
Licensed Personnel
TR-1006756
Fire Protection Equipment Surveillance Optimization
and Maintenance Guide
July 2003
Vendor
Documents
Number
Title
Revision
or Date
P1890-002-004
Fire Protection Code Conformance Review
030023-RPT-01
Review of Monitoring Criteria for HSS Nuclear Safety
Capability Assessment (NSCA) Components
663089-244-2
Cirrus Pro Aspirating Fire Detector Engineers Manual
June 1, 2017
663089-245-2
Cirrus Pro Aspirating Fire Detector User Manual and
Responsibilities
May 9, 2017
663082
Instruction Book for Switchgear Supplied by Alco
Products Inc., Engine Controls and Gauge Panels
663332-80
Instruction and Renewal Part for Metal Clad Switchgear
Types M-26 and M-36
Modifications
Number
Title
DCP 1000000078
Revision 1
Diablo Canyon Power Plant, Unit 1 Integrated Head Assembly (IHA)
DCP 1000025244 Unit 1, Incipient Fire Detection System
DCP 1000025255 Unit 2, Incipient Fire Detection System
Engineering
Reports Number
Title
Revision
or Date
FPEE-075
Hour Barrier in SSPS Rooms
September 7, 2017
FPEE-133
Seismic/Construction Gaps in the 12 kV Switchgear
Rooms
November 20, 2017
FPEE-147
Evaluation of Unistrut Configurations in 128 Cable
Spreading Room
December 13, 2017
Engineering
Reports Number
Title
Revision
or Date
FPEE-147A
Evaluation of Unistrut Configurations in 128 Cable
Spreading Room
December 13, 2017
FPEE-170
NFPA 805 Internal Conduit Seal Design Criteria
Equivalency
August 16, 2017
FPEE 80
Fire Dampers Installed at Variance with
Manufacturers Instructions
FPEE 138
Drain Holes in Pyrocrete Raceway Fire Barrier
Panels
Calculations
Number
Title
Revision
M-1023
Verify Cable Spreading Room CO2 Retention Time
M-997
(Appendix 2.1) Qualification of Penetration Seal
Typical F-1
M-944
CFR 50, Appendix R Alternate Shutdown
Methodology - Time and Manpower Study/Safe
Shutdown System Considerations
9000032684
Emergency Lighting and Communications
9000041048
Associated CKT Analysis - Fire Protection
9000041466
Nuclear Safety Capability Assessment (NSCA)
004/00
9000041468
Recovery Action Feasibility Assessment (RAFA)
004/00
9000041689
NFPA 805 Design Basis Document
SUNSI Review: ADAMS:
Non-Publicly Available Non-Sensitive Keyword: NRC-002
By: STG Yes No
Publicly Available
Sensitive
OFFICE
SRI:EB2
RI:EB2
RI:EB2
SRI:RI/EB2
BC:EB2
BC:DRPA
BC:EB2
NAME
SGraves
BCorrell
NOkonkwo
CBickett
GWerner
MHaire
GWerner
SIGNATURE
/RA/
/RA/
/RA/
/RA/
/RA/
/RA/
/RA/
DATE
11/20/2018
11/26/2018
11/06/2018
11/19/2018
11/26/2018
11/26/2018
11/26/2018