ML18193A905: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:TO LRWS HVAC DRAINS TO FLOOR DRAIN MISC CONTAINMENT FLOOR DRAINS SEAL INJECTION FILTER DRAINS (2)SAFETY INJECTION SYSTEM DRAINS REACTOR LOOP DRAINS REFUELING DRAIN RC PUMP CONTROL BLEED.OFF HDR RELIEF SHUTDOWN COOLING RELIEF VALVE REFUELING POOL DRAIN PRESSURIZER RELIEF SAFETY IN'ECTION TANK DRAIN M I M HVAC DRAINS LRS WASTE HOLDUP TANK OVERFLOW (3)LRS RECYCLE MONITOR TANK OVERFLOW (2)LRS MIXED BED (ON EXCH'R.DRAINS (21 LRS WASTE EVAP PACKAGE DRAIN GRS WASTE GAS COMPRESSOR DRAIN (2)CHEMICAL DRAIN TANK OVERFLOW CHEMICAL DRAIN TANK DRAIN MISC PUMP DRAINS LRS MIXED BED ION EXCH'R PRE FILTER DRAIN CHEMICAL DRAIN TANK FILTER DRAIN GRS SURGE TANK DRAIN GRS DECAY TANK DRAIN SPENT RESIN TANK DRAIN (21 LRS CONCENTRATE TANK OVERFLOW (21 CATALYST TANK DRAIN LRS HOLDUP TANK DRAINS 13)LRS RECYCLE MONITOR TANK DRAINS (21 MISC LOCAL SAMPLE DRAINS SPENT RESIN TANK RELIEF VALVE MISC RADWASTE RELIEF VALVE 3 IC Q IC 0 0 SPENT FUEL POOL ION EXCHANGER AFTER FILTER DRAIN SPENT FUEL POOL PURIFICATION FILTER DRAINS SPENT FUEL POOL ION EXCHANGER DRAINS SHUTDOWN HE SHELL AND TUBE DRAINS MISC LOCAL SAMPLE DRAINS EQUIPMENT DRAIN TANK DRAIN EQUIPMENT DRAIN TANK RELIEF SAFETY INJECTION PUMP DRAINS HOLDUP TANK OVERFLOW MISC PUMP DRAINS REFUELING WATER TANK OVERFLOW REFUELING WATER TANK RELIEF MISC AUX BLDG FLOOR DRAINS HVAC DRAINS LETDOWN HE TUBE DRAINS ISOLATION VALVE LEAKOFFS HPSI PUMP COMPARTMENT LPSI PUMP COMPARTMENT CONTAINMENT SPRAY PUMP COMPARTMENT HPSI PUMP COMPARTMENT LPSIPUMPCOMPAR)'MENT CONTAINMENT SPRAY PUMP COMPARTMENT CHEM DRAIN TANK RWS HVAC DRAINS SPENT FUEL POOL COOLING PUMP DRAINS SPENT FUEL POOL COOLING HE DRAINS SPENT FUEL POOL PURIFICATION PUMP DRAIN FUEL BLDG FLOOR DRAINS BORIC ACID CONCENTRATOR (ON EXCHANGER BORIC ACID CONCENTRATOR (ON EXCHANGER PRE-HOLDUP (ON EXCHANGER VENT PRE-HOLDUP ION EXCHANGER DRAIN PURIFICATION ION EXCHANGER DRAIN DEBORATING ION EXCHANGER DRAIN SAFETY INJECTION SAMPLE PURGE BORIC ACID BATC HING TANK REACTOR MAKE UP WATER FILTER BORIC ACID FILTER PURIFICATION FILTERS (2)CHARGING PUMP DRAINS AND LEAKAGE HYDROGEN RECOMB(NER VOLUME CONTROL TANK DRAIN REACTOR DRAIN FILTER SAMPLING PURGE BORIC ACID CONCENTRATOR DRAINS LOW PRESSURE SAFETY INJECTION RELIEF SAMPLING HEADER RELIEFS HIGH PRESSURE SAFETY INJECTION RE LIE FS LETDOWN R EL(EFS SAMPLE VESSEL HEADERS VOLUME CONTROL TANK RELIEF CHARGING PUMP RELIEF SHUTDOWN COOLING RETURN LINE RELIEF VENT DRAIN TO ATMOSPHERE LWS DRAIN TANK OVERFLOW LWS DRAIN TANK DRAIN LWS MIXED BED ION EXCHANGER PREFILTER LWS MIXED BED ION EXCHANGER DRAIN LWS ACTIVATED CARBON BED DRAINS (21 LWS MONITOR TANK OVERFLOW (2)LWS R EC YC LE MONITOR TANK DRAIN (2)LWS DRAIN TANK PUMP DRAINS (2)LWS RECYCLE MONITOR TANK PUMP DRAINS (2)LAUNDRY DRAIN TANK~H I I LSH TO VGCH~HA I LSH GAS SURGE HEADER TO BRS OF CVCS LSH TO VGCH LSH LSH TO VGCH LSH~H I I LSH TO VGCH TRAIN A LSH LSH TO VGCH TRAIN B LSH~H I LSH TO VGCH LSH TO VGCH TO BRS OF CVCS LSH TO ATMOSPHERE
{{#Wiki_filter:TO LRWS TO ATMOSPHERE BORIC ACID CONCENTRATOR (ON EXCHANGER VENT BORIC ACID CONCENTRATOR (ON EXCHANGER DRAIN PRE-HOLDUP (ON EXCHANGER VENT PRE-HOLDUP ION EXCHANGER DRAIN HVAC DRAINS                                                                                                                                                                                                                               PURIFICATION ION EXCHANGER DRAIN LRS WASTE HOLDUP TANK OVERFLOW (3)                                                                                                                                                                                                       DEBORATING ION EXCHANGER DRAIN LRS RECYCLE MONITOR TANK OVERFLOW (2)                                                                                                                                                                                                     SAFETY INJECTION SAMPLE PURGE LRS MIXED BED (ON EXCH'R. DRAINS (21             SPENT FUEL POOL ION EXCHANGER AFTER                                                                                                                                                      BORIC ACID BATC HING TANK LRS WASTE EVAP PACKAGE DRAIN                         FILTER DRAIN                                                                                                                                                                        REACTOR MAKE UP WATER FILTER HVAC DRAINS TO FLOOR DRAIN                                                            GRS WASTE GAS COMPRESSOR DRAIN (2)               SPENT FUEL POOL PURIFICATION FILTER                                                                                                                                                    BORIC ACID FILTER MISC CONTAINMENT FLOOR DRAINS                                                        CHEMICAL DRAIN TANK OVERFLOW                         DRAINS                                                                                                                                                                              PURIFICATION FILTERS (2)
~H I LSH LC CONTAINMENT SUMP(S)REACTOR DRAIN TANK INSIDE CONTAINMENT RAOWASTE BLDG SUMP(S)OUTSIDE CONTAINMENT AUXILIARY BLDG SUMP(3)ENGINEERED SAFETY FEATURES COMPARTMENTS BUMPS FUEL SLOG SUMP(S)EQUIPMENT DRAIN TANKIS)B LAUNDRY AREA OF SERVICE BLDG SUMP(S)NOTES: 1.CHEMICAL LAB DRAINS 3 DECONTAMINATION DRAINS DISCHARGE INTO THE CHEMICAL DRAIN TANK-LIQUIDS CONTAINING DICHROMATE ARE ROUTED TO CHEMICAL DRAIN TANK 2.DRAINS ARE ROUTED TO THE RECEIVING TANKS DIRECTLY WHENEVER POSSIBLE LEGEND VGCH=VENT GAS COLLECTION HEADER 3 ASSUMING ITEMS LOCATED IN BUILDING AS NOTED 3.EQUIPMENTS/OR DRAINAGE SYSTEMS LOCATED IN A SEISMIC CAT I AREA OR PART OF A SEISMIC CAT I SYSTEM ARE SEISMIC CAT H UP TO AND INCLUDING ISOLATION VALVES Arizona Nuclear Power Project Palo Verde Nuclear Generating Station Units 1, 2&3 EQUIPMENT AND FLOOR DRAINAGE SYSTEM FLOW DIAGRAM (Sheet 1 of 2)Figure 9.3-2 I 0407-1 I A 31 MR4-33}}
CHEMICAL DRAIN TANK DRAIN                         SPENT FUEL POOL ION EXCHANGER DRAINS                                                                                                          CHEM                                      CHARGING PUMP DRAINS AND LEAKAGE M  M MISC PUMP DRAINS                                 SHUTDOWN HE SHELL AND TUBE DRAINS                                                                                                              DRAIN                                    HYDROGEN RECOMB( NER LRS MIXED BED ION EXCH'R PRE FILTER DRAIN         MISC LOCAL SAMPLE DRAINS                                                                                                                      TANK                                      VOLUME CONTROL TANK DRAIN                        LAUNDRYDRAIN TANK I              CHEMICAL DRAIN TANK FILTER DRAIN                 EQUIPMENT DRAIN TANK DRAIN                                                                                                                                                              REACTOR DRAIN FILTER GRS SURGE TANK DRAIN                     3      EQUIPMENT DRAIN TANK RELIEF                                                                                                                                                            SAMPLING PURGE SEAL INJECTION FILTER DRAINS (2)                        GRS DECAY TANK DRAIN                             SAFETY INJECTION PUMP DRAINS                                                                                                                                                            BORIC ACID CONCENTRATOR DRAINS RWS                                                                            LWS  DRAIN TANK OVERFLOW SAFETY INJECTION SYSTEM DRAINS                          SPENT RESIN TANK DRAIN (21               IC Q      HOLDUP TANK OVERFLOW                                                                                                                                                                    LOW PRESSURE SAFETY INJECTION RELIEF LRS CONCENTRATE TANK OVERFLOW (21                 MISC PUMP DRAINS LWS  DRAIN TANK DRAIN REACTOR LOOP DRAINS                                                                              IC                                                                                                                                                                                              SAMPLING HEADER RELIEFS                          LWS  MIXED BED ION EXCHANGER PREFILTER REFUELING DRAIN                                        CATALYST TANK DRAIN                       0      REFUELING WATER TANK OVERFLOW                                                                                                                                                          HIGH PRESSURE SAFETY INJECTION RE LIE FS RC PUMP CONTROL BLEED.OFF HDR RELIEF                    LRS HOLDUP TANK DRAINS 13)               0      REFUELING WATER TANK RELIEF                                                                                                                    HVAC DRAINS                            LETDOWN R EL( EFS LWS  MIXED BED ION EXCHANGER DRAIN LRS RECYCLE MONITOR TANK DRAINS (21 LWS  ACTIVATEDCARBON BED DRAINS (21 SHUTDOWN COOLING RELIEF VALVE                                                                             MISC AUX BLDG FLOOR DRAINS                                                                                                                     SPENT FUEL POOL COOLING PUMP DRAINS     SAMPLE VESSEL HEADERS                            LWS  MONITOR TANK OVERFLOW (2)
REFUELING POOL DRAIN                                    MISC LOCAL SAMPLE DRAINS                         HVAC DRAINS                                 HPSI PUMP COMPARTMENT                               HPSI PUMP COMPARTMENT                         SPENT FUEL POOL COOLING HE DRAINS       VOLUME CONTROL TANK RELIEF                        LWS  R EC YC LE MONITOR TANK DRAIN (2)
PRESSURIZER RELIEF                                      SPENT RESIN TANK RELIEF VALVE                    LETDOWN HE TUBE DRAINS                       LPSI PUMP COMPARTMENT                              LPSIPUMPCOMPAR)'MENT                          SPENT FUEL POOL PURIFICATION PUMP DRAIN CHARGING PUMP RELIEF MISC RADWASTE RELIEF VALVE LWS DRAIN TANK PUMP DRAINS (2)
SAFETY IN 'ECTION TANK DRAIN                                                                             ISOLATION VALVE LEAKOFFS                    CONTAINMENT SPRAY PUMP                              CONTAINMENT SPRAY PUMP                         FUEL BLDG FLOOR DRAINS                 SHUTDOWN COOLING RETURN LINE RELIEF              LWS RECYCLE MONITOR TANK PUMP DRAINS (2)
COMPARTMENT                                        COMPARTMENT TO TO VGCH                                          TO VGCH                                      TO VGCH                                            TO VGCH                                      TO VGCH                                                                                  ATMOSPHERE TO VGCH                                GAS SURGE
  ~H                                  ~HA                  HEADER                                                                                                                        ~H                                                                                              ~H                                                                 TO VGCH
                                                                                                                                                                                                                                                                                                                                                                                                                            ~H I                                                                                                                                                  I I
I                                                                                                I I                                                                                                                                                                                                                                                                                                                                                                                                                      I TO BRS                                                                                                                                                                                                                                                                                           TO OF                                                                                                                                                                                                                                                                                               BRS LSH                      LSH                                                        LSH                         LSH                   LSH                         LSH               LSH         TRAIN           LSH                   LSH                           LSH             LSH                         LSH                                         OF               LSH CVCS                                                                                                                                                                                   TRAIN                                                                                                                                                    LSH A                                                  B                                                                                                      CVCS LC EQUIPMENT                                        LAUNDRY AREA OF CONTAINMENTSUMP(S)             REACTOR DRAIN TANK                                   RAOWASTE BLDG SUMP(S)                             AUXILIARYBLDG SUMP(3)                                     ENGINEERED SAFETY FEATURES COMPARTMENTS BUMPS                                           FUEL SLOG SUMP(S)                     DRAIN TANKIS)B                                   SERVICE BLDG SUMP(S)
INSIDE CONTAINMENT      OUTSIDE CONTAINMENT NOTES:                                                      LEGEND
: 1. CHEMICAL LAB DRAINS 3 DECONTAMINATIONDRAINS              VGCH = VENT GAS COLLECTION HEADER DISCHARGE INTO THE CHEMICAL DRAIN TANK- LIQUIDS                 ASSUMING ITEMS LOCATED IN BUILDING AS NOTED 3
CONTAINING DICHROMATE ARE ROUTED TO CHEMICAL DRAIN TANK
: 2. DRAINS ARE ROUTED TO THE RECEIVING TANKS DIRECTLY WHENEVER POSSIBLE
: 3. EQUIPMENTS/OR DRAINAGE SYSTEMS LOCATED IN A SEISMIC CAT I AREA OR PART OF A SEISMIC CAT I SYSTEM ARE SEISMIC CAT H UP TO AND INCLUDING ISOLATION VALVES Arizona Nuclear Power Project Palo Verde Nuclear Generating Station Units 1, 2 & 3 EQUIPMENT AND FLOOR DRAINAGE SYSTEM FLOW DIAGRAM (Sheet       1 of   2)
Figure 9. 3-2 I 0407-1 I A 31 MR4-33}}

Latest revision as of 21:24, 20 October 2019

Figure 9.3-2, Equipment and Floor Drainage System Flow Diagram. Sheet 1 of 2
ML18193A905
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/12/2018
From:
Arizona Nuclear Power Project
To:
Office of Nuclear Reactor Regulation
References
9.3-2
Download: ML18193A905 (1)


Text

TO LRWS TO ATMOSPHERE BORIC ACID CONCENTRATOR (ON EXCHANGER VENT BORIC ACID CONCENTRATOR (ON EXCHANGER DRAIN PRE-HOLDUP (ON EXCHANGER VENT PRE-HOLDUP ION EXCHANGER DRAIN HVAC DRAINS PURIFICATION ION EXCHANGER DRAIN LRS WASTE HOLDUP TANK OVERFLOW (3) DEBORATING ION EXCHANGER DRAIN LRS RECYCLE MONITOR TANK OVERFLOW (2) SAFETY INJECTION SAMPLE PURGE LRS MIXED BED (ON EXCH'R. DRAINS (21 SPENT FUEL POOL ION EXCHANGER AFTER BORIC ACID BATC HING TANK LRS WASTE EVAP PACKAGE DRAIN FILTER DRAIN REACTOR MAKE UP WATER FILTER HVAC DRAINS TO FLOOR DRAIN GRS WASTE GAS COMPRESSOR DRAIN (2) SPENT FUEL POOL PURIFICATION FILTER BORIC ACID FILTER MISC CONTAINMENT FLOOR DRAINS CHEMICAL DRAIN TANK OVERFLOW DRAINS PURIFICATION FILTERS (2)

CHEMICAL DRAIN TANK DRAIN SPENT FUEL POOL ION EXCHANGER DRAINS CHEM CHARGING PUMP DRAINS AND LEAKAGE M M MISC PUMP DRAINS SHUTDOWN HE SHELL AND TUBE DRAINS DRAIN HYDROGEN RECOMB( NER LRS MIXED BED ION EXCH'R PRE FILTER DRAIN MISC LOCAL SAMPLE DRAINS TANK VOLUME CONTROL TANK DRAIN LAUNDRYDRAIN TANK I CHEMICAL DRAIN TANK FILTER DRAIN EQUIPMENT DRAIN TANK DRAIN REACTOR DRAIN FILTER GRS SURGE TANK DRAIN 3 EQUIPMENT DRAIN TANK RELIEF SAMPLING PURGE SEAL INJECTION FILTER DRAINS (2) GRS DECAY TANK DRAIN SAFETY INJECTION PUMP DRAINS BORIC ACID CONCENTRATOR DRAINS RWS LWS DRAIN TANK OVERFLOW SAFETY INJECTION SYSTEM DRAINS SPENT RESIN TANK DRAIN (21 IC Q HOLDUP TANK OVERFLOW LOW PRESSURE SAFETY INJECTION RELIEF LRS CONCENTRATE TANK OVERFLOW (21 MISC PUMP DRAINS LWS DRAIN TANK DRAIN REACTOR LOOP DRAINS IC SAMPLING HEADER RELIEFS LWS MIXED BED ION EXCHANGER PREFILTER REFUELING DRAIN CATALYST TANK DRAIN 0 REFUELING WATER TANK OVERFLOW HIGH PRESSURE SAFETY INJECTION RE LIE FS RC PUMP CONTROL BLEED.OFF HDR RELIEF LRS HOLDUP TANK DRAINS 13) 0 REFUELING WATER TANK RELIEF HVAC DRAINS LETDOWN R EL( EFS LWS MIXED BED ION EXCHANGER DRAIN LRS RECYCLE MONITOR TANK DRAINS (21 LWS ACTIVATEDCARBON BED DRAINS (21 SHUTDOWN COOLING RELIEF VALVE MISC AUX BLDG FLOOR DRAINS SPENT FUEL POOL COOLING PUMP DRAINS SAMPLE VESSEL HEADERS LWS MONITOR TANK OVERFLOW (2)

REFUELING POOL DRAIN MISC LOCAL SAMPLE DRAINS HVAC DRAINS HPSI PUMP COMPARTMENT HPSI PUMP COMPARTMENT SPENT FUEL POOL COOLING HE DRAINS VOLUME CONTROL TANK RELIEF LWS R EC YC LE MONITOR TANK DRAIN (2)

PRESSURIZER RELIEF SPENT RESIN TANK RELIEF VALVE LETDOWN HE TUBE DRAINS LPSI PUMP COMPARTMENT LPSIPUMPCOMPAR)'MENT SPENT FUEL POOL PURIFICATION PUMP DRAIN CHARGING PUMP RELIEF MISC RADWASTE RELIEF VALVE LWS DRAIN TANK PUMP DRAINS (2)

SAFETY IN 'ECTION TANK DRAIN ISOLATION VALVE LEAKOFFS CONTAINMENT SPRAY PUMP CONTAINMENT SPRAY PUMP FUEL BLDG FLOOR DRAINS SHUTDOWN COOLING RETURN LINE RELIEF LWS RECYCLE MONITOR TANK PUMP DRAINS (2)

COMPARTMENT COMPARTMENT TO TO VGCH TO VGCH TO VGCH TO VGCH TO VGCH ATMOSPHERE TO VGCH GAS SURGE

~H ~HA HEADER ~H ~H TO VGCH

~H I I I

I I I I TO BRS TO OF BRS LSH LSH LSH LSH LSH LSH LSH TRAIN LSH LSH LSH LSH LSH OF LSH CVCS TRAIN LSH A B CVCS LC EQUIPMENT LAUNDRY AREA OF CONTAINMENTSUMP(S) REACTOR DRAIN TANK RAOWASTE BLDG SUMP(S) AUXILIARYBLDG SUMP(3) ENGINEERED SAFETY FEATURES COMPARTMENTS BUMPS FUEL SLOG SUMP(S) DRAIN TANKIS)B SERVICE BLDG SUMP(S)

INSIDE CONTAINMENT OUTSIDE CONTAINMENT NOTES: LEGEND

1. CHEMICAL LAB DRAINS 3 DECONTAMINATIONDRAINS VGCH = VENT GAS COLLECTION HEADER DISCHARGE INTO THE CHEMICAL DRAIN TANK- LIQUIDS ASSUMING ITEMS LOCATED IN BUILDING AS NOTED 3

CONTAINING DICHROMATE ARE ROUTED TO CHEMICAL DRAIN TANK

2. DRAINS ARE ROUTED TO THE RECEIVING TANKS DIRECTLY WHENEVER POSSIBLE
3. EQUIPMENTS/OR DRAINAGE SYSTEMS LOCATED IN A SEISMIC CAT I AREA OR PART OF A SEISMIC CAT I SYSTEM ARE SEISMIC CAT H UP TO AND INCLUDING ISOLATION VALVES Arizona Nuclear Power Project Palo Verde Nuclear Generating Station Units 1, 2 & 3 EQUIPMENT AND FLOOR DRAINAGE SYSTEM FLOW DIAGRAM (Sheet 1 of 2)

Figure 9. 3-2 I 0407-1 I A 31 MR4-33