{{#Wiki_filter:IIIIIC FOIIM 195 U.So NUCLEAR REGULATORV COMMISSION l21P)y: Q;~NRC DISTRIBUTION FDR I'ART 50 DOCKET MATERIAL DOCKET NUMBER FILE NUMBER To: B.C.Rusche FRDMCaroliga Power 5 Light Co'.Raleigh, N.C.J.A.Jones DATE OF DOCUMENT DATE RECEIVED QLETTER)gORIGINAL QCOPV QNOTOR I2E D SUNCLASSIFIED PROP INPUT FORM NUMBER OF COPIES RECEIVED DESCRIPTION Ltr.notarized 5-5-76 Advising arrangements to meet with our staff to develop a coordinated schedule concerning the financial status arid amending hhe Enviro.%pt.(1 Original Received)Distrubution Per".M.Rushbrook ENCLOSURE j.DO NOT BEN.OVE'CKNOW<EDGED Shearon Harris 1-4 SAFETY ASSIGNED AD: BRANCH CHIEF: FOR ACTION/INFORMATION ASSIGNED AD: BRANCH'HIEF: ENVIRO PROJECT IIANAGER;IC~ASST'iner Rushbrook PROJECT MANAGER: IC~ASST XL RC PDR S E S INTERNAL DISTRI BUTION F.RNST I&E GOSSXCK&STAFF AS PROJECT MANAGEIIENT BOYD P, COLLINS OUSTON ETERSON 1ELTZ.'ELTEMES OVHOLT LPD~a eIg.TXC NSj'.ASLB EN INEER N KNIGHT SXIII<EXL PAMLICKI REACTOR SAFETY OSS NOVAK OSZTOCZY IIECK SALTZMAN RurBERG EXTERNAL DISTRIBUTION NATL IAB REG.V-IE LA PDR CONSULTANTS BENAROYA XPPOLITO OPERATING REACTORS TELLO OPERATING TECH EISENHUT SHAO BAER SCHIPENCER GRIMES ANALYSIS ENTON&MUT.LER BROOKIIAVI'.N NATL LAB ULRIKSON (ORNL)ALLARD SPANGLER SITE TECH A&IILL STEPP HUU IAN SITE ANALYSIS VOLLI 1ER BUNCII COLLINS EGER CONTROL NUMBER A'528NRC I ORM 196 I2 Ml e (*~~p C I'g f h~~s M'Ja ll~P II
{{#Wiki_filter:IIIIICFOIIM 195 l21P)           y:                         Q;             U.So NRC DISTRIBUTION FDR I'ART 50 DOCKET MATERIAL NUCLEAR REGULATORV COMMISSION DOCKET NUMBER
'egu1t File Gyw Carolina Power Mr.Benard C.Rusche, Director Office of Nuclear Reactor Regulati U.S.Nuclear Regulatory Commission Vashington, D.C.20555 RE: DOCKET NOS.50-40 oocxttat U g 187.8~3 tlcg'tedtcE eoctst C4A 2 AND May 5, C 50-4
                                                                            ~
FILE NUMBER To:                                                 FRDMCaroliga Power 5       Light Co'. DATE OF DOCUMENT B.C. Rusche Raleigh, N.C.
J.A. Jones                           DATE RECEIVED QLETTER                       QNOTOR I2E D           PROP                   INPUT FORM         NUMBER OF COPIES RECEIVED
    )gORIGINAL                SUNCLASSIFIED QCOPV DESCRIPTION                                                         ENCLOSURE Ltr. notarized         5-5-76                                               j Advising arrangements to meet with our staff to develop a coordinated schedule concerning the financial status arid amending hhe Enviro. %pt.                   .DO NOT BEN.OVE
( 1   Original Received)                                           'CKNOW<EDGED Distrubution         Per". M. Rushbrook Shearon Harris 1-4 SAFETY                                 FOR ACTION/INFORMATION               ENVIRO ASSIGNED AD:                                                           ASSIGNED  AD:
BRANCH CHIEF:                                                          BRANCH 'HIEF:
IC ~     ASST'iner PROJECT IIANAGER; Rushbrook PROJECT MANAGER:
IC ~ ASST INTERNAL DISTRI BUTION XL                         S E   S RC PDR                                                                                      F.RNST I &E                                                             BENAROYA                      ALLARD SPANGLER GOSSXCK & STAFF                   EN INEER N                    XPPOLITO SITE TECH AS                               KNIGHT                        OPERATING REACTORS            A&IILL SXIII<EXL                      TELLO                      STEPP PAMLICKI                                                  HUU IAN OPERATING TECH PROJECT MANAGEIIENT               REACTOR SAFETY                EISENHUT                    SITE ANALYSIS BOYD                                 OSS                          SHAO                        VOLLI1ER P, COLLINS                         NOVAK                          BAER                        BUNCII OUSTON                             OSZTOCZY                    SCHIPENCER                      COLLINS ETERSON                           IIECK                        GRIMES                          EGER 1ELTZ.'ELTEMES OVHOLT                         SALTZMAN                      ANALYSIS RurBERG                        ENTON & MUT.LER EXTERNAL DISTRIBUTION                                          CONTROL NUMBER LPD     ~   a eIg .             NATL IAB                      BROOKIIAVI'.N NATL LAB TXC                                REG. V-IE                     ULRIKSON (ORNL)
NSj'.                              LA PDR                                                                A'528 ASLB                              CONSULTANTS NRC I ORM 196 I2     Ml


==Dear Mr.Rusche:==
e      p
As you are aware, the first of the four proposed Shearon Harris--Nuclear Power Plant units is scheduled for fuel loading on June 1, 1983.To meet this date, Carolina Power&Light Company (CP&L)had expected to complete additional site preparation activities this summer in anticipation of receipt of a Construction Permit (CP)in the spring of 1977.However, the additional site preparation activities were not allowed under the present Construction Permit exemption, and the Company has appropriately adjusted the construction plans for this plant.The resulting schedule provides an efficient, continuous construction sequence initiated with mobilization of construction forces in the fall of 1976 and receipt of the CP as early in the fall as possible but no later than December 1, 1976.Me believe that all necessary submittals and reviews can be completed in time to resume the public hearing by August 1, 1976.Consis-tent with this objective, by May 31, 1976, CP&L will amend the Construction Permit application to provide current information on the financial status of the Company and will amend the Environmental Report to provide the current projection of the need for power in the CP&L service area.Carolina Power&Light Company representatives will arrange to meet with your staff to develop a coordinated schedule consistent with the above objectives.
                        *
If additional information is needed to resume the formal review of this docket, please do not hesitate to contact us at any time.J.A.Jones Executive Vice President Engineering, Construction
(
&Operation JAJ/nj a Sworn to and subscribed before me this 5th day of May, 1976.Ey Commission Expires:~X(JN~4 Nota y Public 336 Fayetteville Street~P.O.Box 1551~Raleigh, N, C.27602 EEE u llrryy se:p:~O T A 9)'.(0~e'I,',l UB1 5 lllllllilllE UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of CAROLINA POWER 6r LIGHT COMPANY (Shearon Harris Nuclear Power Plant Units 1, 2, 3, and 4)Docket Nos.50-400 50-401 50-402 50-403 CERTIFICATE OF SERVICE This is to certify that a copy of Mr.J.A.Jones'etter concerning the accelerated Construction Permit issuance for its Shearon Harris Nuclear Power Plant Units 1, 2, 3, and 4 has this 5th day of May been served upon the Chief Executive Officers of Wake and Chatham Counties, North Carolina, by deposit of the same in the United States mail addressed as follows: Mr.Vassar P.Shearon, Chairman Board of County Commissioners of Wake County Post Office Box 550 Raleigh, North Carolina 27602 Mr.Ben Wimberly, Chairman Board of County Commissioners of Chatham County Post Office Box 111 Pittsboro, North Carolina 27312 A copy of this letter has also been served this day upon each member of the Atomic Safety and Licensing Board, and other appropriate NRC personnel by deposit of the same in the United States~ail addressed as follows: Thomas W.Reilly, Esq.Atomic Safety and Licensing Board Panel U.S.Nuclear Regulatory Commission Washington, D.C.20555 Mr.Glenn 0.Bright Atomic Safety and Licensing Board Panel U.S.Nuclear Regulatory Commission Washington, D.C.20555 Dr.J.V.Leeds, Jr.Post Office Box 941 Houston, Texas 77001 Mr.Nathaniel H.Goodrich, Chairman Atomic Safety and Licensing" Board Panel U.S.Nuclear Regulatory Commission Washington, D.C.20555 1 Secretary ,U.S.Nuclear Regulatory Commission Washington, D.C.20555 Attention:
                  ~ ~
Chief, Public Proceeding Staff Mr.Thomas S.Erwin Post Office Box 928 115 West Morgan Street Raleigh, North Carolina 27602 Mr.C.A.Barth Regulatory Staff Counsel U.S.Nuclear Regulatory Commission Washington, D.C.20555 Richard E.Jones Associate General Counsel Carolina Power 6 Light Company Business Address: 336 Fayetteville Street Raleigh, N.C.27602 Business Telephone:
C I'g f
Area Code 919 828-8211 Dated: May 5, 1976 e It 0 n,~A t t}}
h
  ~ ~ s  M  'Ja ll ~P II
 
                                      'egu1t                                                      File Gyw Carolina Power oocxttat U
May  5, C
Mr. Benard  C. Rusche, Director Office of Nuclear Reactor Regulati                                g    187.8~ 3 U.S. Nuclear Regulatory Commission tlcg 'tedtcE Vashington, D.C. 20555                                      eoctst C4A RE:    DOCKET NOS.        50-40                              2 AND    50-4
 
==Dear Mr. Rusche:==
 
As you   are aware, the first of the four proposed Shearon Harris
-- Nuclear Power   Plant units is scheduled for fuel loading on June 1, 1983.
To meet this date, Carolina Power & Light Company (CP&L) had expected to complete additional site preparation activities this summer in anticipation of receipt of a Construction Permit (CP) in the spring of 1977. However, the additional site preparation activities were not allowed under the present Construction Permit exemption, and the Company has appropriately adjusted the construction plans for this plant. The resulting schedule provides an efficient, continuous construction sequence initiated with mobilization of construction forces in the fall of 1976 and receipt of the CP as early in the fall as possible but no later than December 1, 1976.
Me believe that       all   necessary       submittals and reviews can be completed   in time to resume the public hearing by August 1, 1976. Consis-tent with this objective, by May 31, 1976, CP&L will amend the Construction Permit application to provide current information on the financial status of the Company and will amend the Environmental Report to provide the current projection of the need for power in the CP&L service area.
Carolina Power & Light Company representatives will arrange to meet with your staff to develop a coordinated schedule consistent with the above objectives. If additional information is needed to resume the formal review of this docket, please do not hesitate to contact us at any time.
J. A. Jones Executive Vice President Engineering, Construction & Operation JAJ/nj a Sworn to and subscribed before             me   this 5th         day of May, 1976.
EEE u llrryy Nota y Public                se Ey Commission   Expires:~X(                   JN~4                                                 :p:~ O T A 9         )
                                                                                                                                '. (0
                                                                                                                                  ~   e
                                                                                                        'I, ',l   UB1     5 336 Fayetteville Street  ~ P. O. Box 1551  ~  Raleigh, N, C. 27602 lllllllilllE
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of CAROLINA POWER   6r LIGHT COMPANY                         Docket Nos. 50-400 50-401 (Shearon Harris Nuclear Power Plant                                       50-402 50-403 Units 1, 2, 3, and 4)
CERTIFICATE OF SERVICE This is   to certify that   a copy of Mr. J. A. Jones'etter     concerning the accelerated     Construction Permit issuance for     its Shearon   Harris Nuclear Power Plant Units 1, 2, 3,     and 4 has this 5th day of May been served upon the Chief Executive Officers of       Wake and Chatham   Counties, North Carolina, by deposit of the   same   in the United States mail   addressed   as follows:
Mr. Vassar P. Shearon, Chairman Board of County Commissioners of Wake County Post Office Box 550 Raleigh, North Carolina       27602 Mr. Ben Wimberly, Chairman Board of County Commissioners       of Chatham County Post Office Box 111 Pittsboro, North Carolina       27312 A copy   of this letter   has also been served   this   day upon each member of the Atomic Safety and Licensing Board, and other appropriate             NRC personnel by deposit of the       same in the United States ~ail addressed       as follows:
Thomas W. Reilly, Esq.
Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Glenn 0. Bright Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D. C. 20555
 
Dr. J. V. Leeds, Jr.
Post Office Box 941 Houston, Texas 77001 Mr. Nathaniel H. Goodrich, Chairman Atomic Safety and Licensing" Board Panel U.S. Nuclear Regulatory Commission Washington, D. C. 20555 1
Secretary
        ,U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Chief, Public Proceeding Staff Mr. Thomas S. Erwin Post Office Box 928 115 West Morgan Street Raleigh, North Carolina   27602 Mr. C. A. Barth Regulatory Staff Counsel U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Richard E. Jones Associate General Counsel Carolina Power 6 Light Company Business Address:   336 Fayetteville Street Raleigh, N. C. 27602 Business Telephone:   Area Code 919 828-8211 Dated: May 5, 1976
 
e It     0   n,
  ~ A t
t}}

Revision as of 17:26, 20 October 2019

to Meet Scheduled Fuel Loading on 6/1/1983 & for Other Submittals, Letter Advising Arrangements to Meet with NRC Staff to Develop Coordinated Schedule Concerning the Financial Status & Amending Environmental Report
ML18230A333
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 05/05/1976
From: Jackie Jones
Carolina Power & Light Co
To: Rusche B
Office of Nuclear Reactor Regulation
References
Download: ML18230A333 (6)


Text

IIIIICFOIIM 195 l21P) y: Q; U.So NRC DISTRIBUTION FDR I'ART 50 DOCKET MATERIAL NUCLEAR REGULATORV COMMISSION DOCKET NUMBER

~

FILE NUMBER To: FRDMCaroliga Power 5 Light Co'. DATE OF DOCUMENT B.C. Rusche Raleigh, N.C.

J.A. Jones DATE RECEIVED QLETTER QNOTOR I2E D PROP INPUT FORM NUMBER OF COPIES RECEIVED

)gORIGINAL SUNCLASSIFIED QCOPV DESCRIPTION ENCLOSURE Ltr. notarized 5-5-76 j Advising arrangements to meet with our staff to develop a coordinated schedule concerning the financial status arid amending hhe Enviro. %pt. .DO NOT BEN.OVE

( 1 Original Received) 'CKNOW<EDGED Distrubution Per". M. Rushbrook Shearon Harris 1-4 SAFETY FOR ACTION/INFORMATION ENVIRO ASSIGNED AD: ASSIGNED AD:

BRANCH CHIEF: BRANCH 'HIEF:

IC ~ ASST'iner PROJECT IIANAGER; Rushbrook PROJECT MANAGER:

IC ~ ASST INTERNAL DISTRI BUTION XL S E S RC PDR F.RNST I &E BENAROYA ALLARD SPANGLER GOSSXCK & STAFF EN INEER N XPPOLITO SITE TECH AS KNIGHT OPERATING REACTORS A&IILL SXIII<EXL TELLO STEPP PAMLICKI HUU IAN OPERATING TECH PROJECT MANAGEIIENT REACTOR SAFETY EISENHUT SITE ANALYSIS BOYD OSS SHAO VOLLI1ER P, COLLINS NOVAK BAER BUNCII OUSTON OSZTOCZY SCHIPENCER COLLINS ETERSON IIECK GRIMES EGER 1ELTZ.'ELTEMES OVHOLT SALTZMAN ANALYSIS RurBERG ENTON & MUT.LER EXTERNAL DISTRIBUTION CONTROL NUMBER LPD ~ a eIg . NATL IAB BROOKIIAVI'.N NATL LAB TXC REG. V-IE ULRIKSON (ORNL)

NSj'. LA PDR A'528 ASLB CONSULTANTS NRC I ORM 196 I2 Ml

e p

(

~ ~

C I'g f

h

~ ~ s M 'Ja ll ~P II

'egu1t File Gyw Carolina Power oocxttat U

May 5, C

Mr. Benard C. Rusche, Director Office of Nuclear Reactor Regulati g 187.8~ 3 U.S. Nuclear Regulatory Commission tlcg 'tedtcE Vashington, D.C. 20555 eoctst C4A RE: DOCKET NOS. 50-40 2 AND 50-4

Dear Mr. Rusche:

As you are aware, the first of the four proposed Shearon Harris

-- Nuclear Power Plant units is scheduled for fuel loading on June 1, 1983.

To meet this date, Carolina Power & Light Company (CP&L) had expected to complete additional site preparation activities this summer in anticipation of receipt of a Construction Permit (CP) in the spring of 1977. However, the additional site preparation activities were not allowed under the present Construction Permit exemption, and the Company has appropriately adjusted the construction plans for this plant. The resulting schedule provides an efficient, continuous construction sequence initiated with mobilization of construction forces in the fall of 1976 and receipt of the CP as early in the fall as possible but no later than December 1, 1976.

Me believe that all necessary submittals and reviews can be completed in time to resume the public hearing by August 1, 1976. Consis-tent with this objective, by May 31, 1976, CP&L will amend the Construction Permit application to provide current information on the financial status of the Company and will amend the Environmental Report to provide the current projection of the need for power in the CP&L service area.

Carolina Power & Light Company representatives will arrange to meet with your staff to develop a coordinated schedule consistent with the above objectives. If additional information is needed to resume the formal review of this docket, please do not hesitate to contact us at any time.

J. A. Jones Executive Vice President Engineering, Construction & Operation JAJ/nj a Sworn to and subscribed before me this 5th day of May, 1976.

EEE u llrryy Nota y Public se Ey Commission Expires:~X( JN~4 :p:~ O T A 9 )

'. (0

~ e

'I, ',l UB1 5 336 Fayetteville Street ~ P. O. Box 1551 ~ Raleigh, N, C. 27602 lllllllilllE

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of CAROLINA POWER 6r LIGHT COMPANY Docket Nos. 50-400 50-401 (Shearon Harris Nuclear Power Plant 50-402 50-403 Units 1, 2, 3, and 4)

CERTIFICATE OF SERVICE This is to certify that a copy of Mr. J. A. Jones'etter concerning the accelerated Construction Permit issuance for its Shearon Harris Nuclear Power Plant Units 1, 2, 3, and 4 has this 5th day of May been served upon the Chief Executive Officers of Wake and Chatham Counties, North Carolina, by deposit of the same in the United States mail addressed as follows:

Mr. Vassar P. Shearon, Chairman Board of County Commissioners of Wake County Post Office Box 550 Raleigh, North Carolina 27602 Mr. Ben Wimberly, Chairman Board of County Commissioners of Chatham County Post Office Box 111 Pittsboro, North Carolina 27312 A copy of this letter has also been served this day upon each member of the Atomic Safety and Licensing Board, and other appropriate NRC personnel by deposit of the same in the United States ~ail addressed as follows:

Thomas W. Reilly, Esq.

Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Glenn 0. Bright Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Dr. J. V. Leeds, Jr.

Post Office Box 941 Houston, Texas 77001 Mr. Nathaniel H. Goodrich, Chairman Atomic Safety and Licensing" Board Panel U.S. Nuclear Regulatory Commission Washington, D. C. 20555 1

Secretary

,U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Chief, Public Proceeding Staff Mr. Thomas S. Erwin Post Office Box 928 115 West Morgan Street Raleigh, North Carolina 27602 Mr. C. A. Barth Regulatory Staff Counsel U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Richard E. Jones Associate General Counsel Carolina Power 6 Light Company Business Address: 336 Fayetteville Street Raleigh, N. C. 27602 Business Telephone: Area Code 919 828-8211 Dated: May 5, 1976

e It 0 n,

~ A t

t