U.S. NUCI EAR REGULATORY COMMI NRC FORM 195 (2-70)
, NRC DISTRlBOTlON FoR PART 50 DOCKET MATERlAL DOCKET NUMBERS
$5-FILE NUMBER PSAR/FSAR Ai~IDT DIST.
TO:
LETTER QQR IGINAL QCOPY OESCRIPTION
. ONOTORIZEO QVNCLASSIFIED Mr. Edson Gi Case PROP INPUT FORM ENCLOSURE FROM:
Carolina Power 8c Light Company
- Raleigh, North Carolina M, A McDuffie OATE OF OOCUMENT 12/15/77 DATE RECEIVEO 12/21/77 NUMBER OF COPIES RECEIVFO Consists of information rei the observance of a minor geological feature near the Shearon Harris Site
~ ~ iw/att Certificate of Servicei ~ ~ ~ ~
PLANT NIXIE: Shearon Harris 1-2>>3-4
'BJL 12/21/77 (2-P)
(2-P)
ASSIGNED AD:
LTR BRANCH CHIEF:
PROJECT IIANAGER:
LIC ASST:
LTR FOR ACTION/INFORMATION G~F PDR L~AS IPPOLITO INTERNAL0 ISTR I BUTION ICE P.
COLLINS HOUSTON HELTEiiES CASE
( L'TR)
I NIPC LTR)
KNIGHT (LTR)
BOSNAK SIHWEIL PANLICKI ROSS (LTR)
NOVAK ROSZTOCZY CHECK TEDESCO LTR BENAROYA LPDRI TIC NSIC ACRS 16 CYS SEiIT CATk F.
ROSA GRPiIILL
( 2 )
VOLLNER (LTR)
BUNCH J.
COLLINS KREGER KIEUQVOOD EXTERNALDISTRIBUTION CONTROL NUMBER f==
773550052
\\
Carolina Power 8 Light Company December 15, 1977 Mr. Edson G.
- Case, Acting Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 l~,
l~ +y 5+~
RE:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS. 1, 2, 3, AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-403 GEOLOGICAL FEATURE NEAR THE'SHEARON'HARRIS*NUCLEAR'PLANT'SITE
Dear Mr. Case:
On December 12, 1977, Carolina Power
& Light Company formally notified the Nuclear Regulatory Commission that a minor geological feature had been observed at the Shearon Harris Nuclear Power Plant during excavation associated with the railroad relocation previously approved by t:he staff.
This feature is greater than 300 feet from the nearest Seismic Class I structure.
In the December 12, 1977, letter, we indicated that we would continue to keep the staff informed.
Since then, our consultants have been analyzing this feature, and we are now reporting the results of this assessment.
Our results are based on field studies.
An NRC staff geologist visited the site on December 14, 1977, to inde-pendently observe this feature with our consultants.
This feature consists of a quartz vein, approximately three centimeters in width, which cuts across a gneiss layer beneath the spillway west of the main dam and is disrupted where it intersects with an amphibole-chlorite schist layer about 70 centimeters in thickness.
The quartz vein within the schist is offset 3 to 8 centimeters relative to its position in the gneiss.
The vein is nearly planar and is clearly a joint filling.
The offsets occur near the con-tact between the schist and the gneiss, suggesting that either the quartz was injected in this configuration or that the plastic deformation which accompanied regional deformation hundreds of millions of years ago was responsible for breaking the continuity of the quartz vein.
The schist layer pinches and swells along strike and appears to be less than 30 meters long. It does not separate two different types of rock; the gneiss is the same on both sides of the schist layer.
The orientation of the schist layer (strike N 80', dip about 30'W) is parallel to the orientation of foliation partings in the gneiss, suggesting the schist layer was emplaced prior to the latest episode of regional deformation in Paleozo'ic time.
Undeformed euhedral crystals and crystal aggregates 0.5 to 1 cm in length of asbestos, ilmenite or rutile, at least two generations of quartz, and possibly zeblites are contained within the schist layer.
The schist is deformed around the larger masses of quartz, demonstrating that the earliest quartz was injected prior tothe last phase of compressive deformation of Paleozoic times.
Crystals of amphibole and chlorite in the schist are undeformed, suggesting absence of deforming stresses'ince a time of high heat flow and/or extremely deep burial when the crystals were formed.
h
~" 5()05>
77/$5 336 Fayettevitle Street
~ P. O. Box 1551
~ Raleigh, N. C. 27602
el
~
l 1
Mr. Edson G.
Case If the quartz vein was actually offset by movement and was not injected in an apparently offset condition, the offsets were formed by com-pressive strain.
These rocks have not undergone deforming compressive stresses since the deposition of Triassic sediments in the adjacent Durham Basin.
The gneiss rock was dated using core samples taken at the main dam and two other nearby locations.
This information was reported to the staff in "Shearon Harris Nuclear Power Plant, Fault Investigation:
responses to Mr. W. R. Butler's letter of May 16, 1975', Question 9" transmitted by our letter of June 12, 1975.
This response proves the gneiss rock underwent a sustained thermal event more than 250 million years ago and records the latest tectonic phase of activity in the late Paleozo'ic period.
This activity produced the latest tectonic offsets and vein infillings in most of the Piedmont as reported in the "Final Geological Report Brecciated Zones,"
Catawba Nuclear Units 1 and 2, Duke Power
- Company, March 1, 1976, and January 31, 1977.
The identified quartz vein offset is believed to be at least older than 250 million years and is not of regulatory significance as defined in Appendix A, Part 100 of Chapter 10 in the Code of Federal Regulations.
The initial investigation of the site for the railroad relocation, main dam and spillway at Shearon Harris was extensive, involving numerous core
- borings, seismic refraction lines, and trenching.
The results of this work are contained in the SHNPP Preliminary Safety Analysis Report and have been reviewed and approved by your staff.
The minor offset reported upon by this letter is typical of geological features in the Slate Belt rocks.
Several ages of gneiss and intru-sions of granite are recognized in the region.
Quartz veins are very common in these rocks, and in many locations these intrusive rocks are jointed and faulted.
- However, most of these faults and joints occurred during pre-Triassic time (more than 180 million years ago),
and relatively few are found in Triassic and younger rocks in the region.
A number of these relic structural features may be found as excavation proceeds.
These features should not be of concern.
Yours very truly, Qa)e ~
M. A. McDuffie Senior Vice President Engineering
& Construction MAM/mf
4 h
'4 P
E X
k
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ff In the Matter of
)
)
CAROLINA POWER 6 LIGHT COMPANY
)
)
(Shearon Harris Nuclear Power Plant
)
)
Units 1, 2, 3, and 4)
)
Docket Nos. 50-400 50-401 50-402 50-403 CERTIFICATE OF SERVICE This is to certify that a copy of Mr. M. A. McDuffie's letter of December 15, 1977, to Mr. Edson G.
Case concerning a geological feature near the Shearon Harris Nuclear Power Plant site has this 15th day of December
- 1977, been served upon the Chief Executive Officers of Wake and Chatham Counties, North
- Carolina, by deposit of the same in the United States mail addressed as follows:
Mr. Vassar P.
- Shearon, Chairman Board of County Commissioners of Wake County P.O.
Box 550
- Raleigh, North Carolina 27602 Mr. Ben Wimberly, Chairman Board of County Commissioners of Chatham County Post Office Box 111 Pittsboro, North Carolina 27312 A copy of this letter has also been served this day upon each member of the Atomic Safety and Licensing Board, other appropriate NRC personnel, and additional parties to the proceedings by deposit of the same in the United States mail addressed as follows:
Ivan W. Smith, Esq.
'tomic Safety and Licensing Board Panel U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Mr. Glenn 0. Bright Atomic Safety and Licensing Board Panel U.
S. Nuclear Regulatory Commission Washington, D. C.
20555
V I
~
I
~
Dr. J. V. Leeds 10807 Atwell
- Houston, Texas 77001 Mr. Nathaniel H. Goodrich, Chairman Atomic Safety and Licensing Board Panel U.
S. Nuclear Regulatory Commission Washington, D. C.
20555 Mr. Thomas S. Erwin Post Office Box 928 115 West Morgan Street Raleigh, North Carolina 27602 Mr. C. A. Barth Regulatory Staff Counsel U.
S. Nuclear Regulatory Commission Washington, D. C.
20555 Jesse C. Brake, Esq.
Department of Justice Post Office Box 629 Raleigh, North Carolina 27602 Office of Intergovernmental Relations 116 West Jones Street Raleigh, North Carolina 27603 Environmental Protection Agency EIS Branch 345 Courtland Street, NE Atlanta, Georgia 30308 Richard E. Jones Associate General Counsel Carolina Power
& Light Company Business Address:
419 Fayetteville Street
- Raleigh, N.
C.
27602 Business Telephone:
Area Code 919 836-6517 Dated:
December 15, 1977
)977 DEC 20 Q l0 N'