ML18230B134

From kanterella
Jump to navigation Jump to search
Letter Providing Submission Schedules for Final Acceptance Criteria by 7/11/1975, Loose Parts Monitoring System by 9/16/1975, & Regulatory Guide by 9/22/1975
ML18230B134
Person / Time
Site: Harris  Duke energy icon.png
Issue date: 08/29/1975
From: Jackie Jones
Carolina Power & Light Co
To: Rusche B
Office of Nuclear Reactor Regulation
References
Download: ML18230B134 (4)


Text

'1~ COIU'O'Sr OIE-iC

~/z.e/r

QeP<~>.gl Carolina power rt Light Company August 29,. 1o75 r!oe!!rrrr!

VSNRC Mr. Benard C. Rusche, Director SEP '2 1S75 >

Office of Nuclear Reactor Regulation 0!lier ol !ho sociar~~

H>

U. S. Nuclear .Regulatory Commission Ooc4 Ie1 !! Sore< ) y~ /

@gag:.'". '

Soctl ~

Washington, D. C. 20555 C~

RE: DOCKET HOS -401 50-402 AND 50-403 u

Dear Mr. Rusche:

aCarolinh Power. 6 Light Company has recently finalized its schedule for submittal of. additi'onal information required by the NRC staff. This submitted information will result in completion of all safety-related issues. Schedules for providing "need for poorer." and "financial" information will be provided to t: he Staff in the near future.

Final Accentance. Criteria The additional information requested in Hr. 4'alter Butler' letter of July 2, 1975 will be provided .by September 3.6, 1975. The information will be consistent with that provided by other Mes'tinghouse plants and with the Ilarris analysis previ.ously supplied to the NRC staf'f on July 11, 1975.

E A commitment to provide a loose parts tnonitoring systemas requested in Mr. Halter But:1er's letter of July 3,-1975, will bc made by September 16, 1975.

Regulatory Guirics Carolina Power 6 Light Compan> met ~rith NRC representatives on.

August 26, 1975 to discuss those specific regulatory guide positions irhi,ch have been identified by the NRC staff as current:3y unacceptable t:o then.

During this m'eting, CP&L responses t:o Mr. Walter But3.er s letters of.

M y 21, 1975 and Hay 29, 1975 vere discussed. Resolved posit:ions will be documented in the PSAR by September 22, 1975.

Regulat:ory Guides 3..88, 1.90, 1.91, 1.93, 1,94, 3,95, and 1.96 were addres ed in our letter of August 14, 1975. 'Picmaining tcchnical positions on guides 1.89 and 1.92 will be submitted to you no later than Sept:ember 22, 1975.

fl4;s Iah~,'! 1 Vga ' III' r \ ~ p(t "p th 4 ~

A~~v4 i s ao'.s '~o 0r~ - ~ Hr g

!w'r'.J

~ y i')

~

~ e ~el

<3u i ay>>nev!It<! '.itn!i!( ~ Eto< 1'.>t>t ~ f(af!:!gh. t4 c. )7(>0~

Mr. Benard C. Rusche 0

These scheduled dates have been selected to enable the Staff to complete their analysis in a timely fashion. If the proposed submittal dates require any changes to facilitate Staff .review, please contact us, so'hat we can determine if any such readjustment can be made.

Yours veiy truly, J. A. goes Executive Vic President Engineering, Construction & Operation CMjr/nc Sworn ta and subscriped before me this 29th day oj August, 1975.

N4 ary.Public Hy Commission Expires:;- 'd'z.i /i'6 incog

~

y

~

~

~

4

0 DOC<:rgb USHgq UNITED STATES OF,PJ'tERICA SEP 2 I "i'6;.- ~;,-

O<<ce cf t>> S>>- >vv COi'EMISSION NUCLEAR REGULATORY t'gi~

In thc %fatter of )

)

CAROLINA POWER & LIGHT CONPANY ) Docket Nos. 50-400 "

) 50-'401 (Shearon Harris Nuclear Power Plant ). 50-402

) 50-403 Units 1, 2, 3, and 4) )

CERTIFICATE OF SERVICE This is to certify that a copy of Hr. J. A. Jones'etter of August 29, 3.975, transmitting a schedule for submi.ttal of additional information required by the NRC staff. for the Shearon Harris Nuclear Power Plant Units 1, 2, 3, and 4, has this 29th day af August boon served upon the Chief Executive Officers of Hake and Chatham Counties, North Caroliiia, by dcposi't of the same in the United States mail addressed as fol3,ows:

Hr. Vassar P. Shearon, Chairman Board of County Commissioners of Wake County P. O. Box 550 Ra3.cigh, N. C. 27602

>11. Junc Hrenn, Chairman Board of County Commi.s. ioners of Chatham County.

Silcr City, North Carolina 27344 A copy of..this letter has also been served this day upon each member of the Atomic Safety and Licensing Board, and other appropriate NRC personnel. by deposit of tho same in the United'States mail addressed as follows>>

Thoma., W. Rcilly, Hsq.

Atomic Safety and Licensing Board Panel ';

S. Nuclear Rogu3.story Commission Washington, D. C. 20555

>>$ I

Mr. Glenn 0. Bright Atomic Safety and Licensing Board Panel U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. J. V. Leeds', Jr.

P, 0. Box 941 Houston, Texas 77001 Mr. Nathaniel H. Goodrich, Chairman Atomic Safety and Licensing Board Panel U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Secre'tary U. S. Nuclear Regulatory Commission Washington, D, C. 20555 Attention.'hief, Public Proceeding Sta'ff Mr. Thomas S. Erwin P. 0. Box 928 115 West Morgan Street .

Raleigh, North Carolina 27602 Mr. C. A. Barth Regulatory Staff Counsel U. S. nuclear Regulatory Commission Washington, D. C. 20555 R. E.

Jove'eneral Counsel Carolina Power. & Light Company Bu .iness Addrc. ": 336 Payetteville Street Raleigh, N. C. 2/602 Business Telephone: Area Code 919 828-8211 August 29 1975