|
---|
Category:Legal-Affidavit
MONTHYEARRA-20-0335, Response to Request for Additional Information Regarding License Amendment Request to Reduce the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in .2020-11-24024 November 2020 Response to Request for Additional Information Regarding License Amendment Request to Reduce the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in . RA-19-0453, Response to Request for Additional Information Regarding License Amendment Request to Modify Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type2019-12-20020 December 2019 Response to Request for Additional Information Regarding License Amendment Request to Modify Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type RA-19-0017, License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type2019-04-10010 April 2019 License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type RA-18-0016, Response to Request for Additional Information Regarding Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses2018-06-0505 June 2018 Response to Request for Additional Information Regarding Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses HNP-18-045, Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval2018-04-18018 April 2018 Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval RA-17-0048, Transmittal of Response to Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-3009, Rev. 0 (Part 2)2017-10-30030 October 2017 Transmittal of Response to Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-3009, Rev. 0 (Part 2) RA-16-0023, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-1008-P2016-05-0404 May 2016 Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-1008-P ML16112A2752016-04-19019 April 2016 Robinson Fuel Meth Pre-sub Meeting - Presentation Affidavit for Closed Pre-Submittal Meeting with Duke Energy Progress to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re H.B. Robinson and Shearon Harris Plants HNP-15-038, License Amendment Request for Main Steam Safety Valve Lift Setting Tolerance Change2015-12-17017 December 2015 License Amendment Request for Main Steam Safety Valve Lift Setting Tolerance Change RA-15-0042, Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis.2015-11-19019 November 2015 Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis. RA-15-0041, Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted)2015-09-18018 September 2015 Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted) RA-15-0037, Transmittal of Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 52015-09-0909 September 2015 Transmittal of Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors.2015-08-19019 August 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. RA-15-0004, Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, Thermalhydraulic Statistical Core Design Methodology2015-03-0505 March 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, Thermalhydraulic Statistical Core Design Methodology ML12073A2922012-02-24024 February 2012 License Amendment Request for Revision to Technical Specification Core Operating Limits Report for Realistic Large Break LOCA Analysis RA-11-008, Progress Energy - Evidence of Guarantee of Payment of Deferred Premiums2011-04-14014 April 2011 Progress Energy - Evidence of Guarantee of Payment of Deferred Premiums ML0721203582007-07-20020 July 2007 Supplemental Declarations of Robert L. Smith, Judy Hogan, Worth Glover, Jr., Tony A. Hackney, Elbert Green, Derry J. Smith, Jr. and Beverly Ann D'Aquanni ML0217001992002-06-0404 June 2002 Joint Appendix Volume III: Pages 1299 - 1556, Petition to Review a Final Decision of the Nrc. Affidavit of Eric A. Mccartney, Michael J. Devoe, Benjamin Wesley Morgan, and Deposition of Gordon R. Thompson Regarding Contention EC-6 Volmen 3 ML0037715352000-11-20020 November 2000 Affidavit of Gareth W. Parry, Stephen F. Lavie, Robert L. Palla and Christopher Gratton in Support of NRC Staff Brief and Summary of Relevant Facts, Data and Arguments Upon Which the Staff Proposes to Rely at Oral Argument on Environmental ML0036737512000-01-0404 January 2000 Affidavit of Kenneth C. Heck in Support of NRC Staff'S Written Summary ML18230A4841979-06-12012 June 1979 Transmitting Affidavit of J. A. Jones, Marked for Identification as Applicant Exhibit Pp, & Revisions to Applicant'S Proposed Findings of Fact & Conclusion of Law in Form of Supplemental Initial Decision (Construction Permits) ML18230A4911979-04-17017 April 1979 NRC Staff Motion to Accept Transcript Corrections ML18230A5241979-01-23023 January 1979 Applicant'S Response to Conservation Council of North Carolina and Wake Environment, Inc.'S Motion to Remand to Licensing Board for Further Hearings 2020-11-24
[Table view] Category:Legal-Correspondence
MONTHYEARML0716402202007-06-12012 June 2007 E-mail from John H. O'Neill to the Board and Parties Stating That a Lmited Appearance Session on the Evening of July 16, 2007 Would Be Preferable to Tacking It on to the Oral Argument Session on July 17, 2007 ML0716402182007-06-12012 June 2007 E-mail from John D. Runkle to the Board and Parties Informing That He Is Available for the Oral Argument Scheduled for July 17, 2007 ML0716304772007-06-12012 June 2007 E-mail from Administrative Judge Young to Parties Informing That the Oral Argument Will Be Held on July 17, 2007 Due to the Unavailability of One of the Board Members. the Limited Appearance Session Will Be Held on July 16, 2007 ML0716303792007-06-11011 June 2007 E-mail from John H. O'Neill to the Board and Parties Informing That Progress Energy Can Support the Oral Argument Scheduled for July 19, 2007 and the Limited Appearance Session Scheduled for the Evening of July 18, 2007 ML0716301672007-06-11011 June 2007 E-mail from David Roth to Administrative Judge Young and Parties Informing That the Staff and Counsel Are Available the Evening of July 18, 2007 and Daytime July 19, 2007 ML0716301482007-06-11011 June 2007 E-mail from Administrative Judge Young to Parties Informing That July 19, 2007 Would Be a Good Date for the Oral Argument, with a Limited Appearance Session the Evening of July 18, 2007 ML0716202922007-06-0808 June 2007 Shearon Harris-Certificate of Service to the 06/08/07 Letter from David E. Roth to the Licensing Board ML0716202852007-06-0808 June 2007 Shearon Harris-Letter from David E. Roth Responding to the Licensing Board'S Order of 06/05/07 ML0712300462007-05-0101 May 2007 G20060793 - John D. Runkle Correspondence Petitioners' Response to Proposed Director'S Decision Under 10 C.F.R. 2.206 ML0217000492002-06-0404 June 2002 Joint Appendix Volume II: Pages 542 - 767, Petition to Review a Final Decision of the Nrc. Case Scheduled for Oral Argument September 5, 2002 ML0217001712002-06-0404 June 2002 Joint Appendix Volume III: Pages 1168 - 1298, Petition to Review a Final Decision of the Nrc. Orange County, Nc V. NRC and Carolina Power & Light Co ML0209300532002-03-27027 March 2002 Transmittal of Seven Copies of Initial Brief in Proceeding Orange County V. NRC, Nos. 01-1073 & 01-1246. ML0209803702002-03-27027 March 2002 Orange County, Nc V. NRC & USA ML0305901752002-03-27027 March 2002 Petition to Review Final Decision of NRC, Dated March 27, 2002 ML0305901602002-01-25025 January 2002 Order Establishing Argument Dale and Merit Panel, Dated January 25, 2002 ML18230A4841979-06-12012 June 1979 Transmitting Affidavit of J. A. Jones, Marked for Identification as Applicant Exhibit Pp, & Revisions to Applicant'S Proposed Findings of Fact & Conclusion of Law in Form of Supplemental Initial Decision (Construction Permits) ML18230A4851979-05-22022 May 1979 Applicant'S Reply to the Proposed Findings of Fact and Conclusions of Law of the NRC Staff ML18230A4881979-04-27027 April 1979 Letter Furnishing Information Regarding Carolina Power & Light Company'S Proposed Findings of Fact and Conclusions of Law ML18230A4911979-04-17017 April 1979 NRC Staff Motion to Accept Transcript Corrections ML18230A4891979-04-17017 April 1979 Transmitting Applicant'S Proposed Findings of Fact & Conclusions of Law in Form of Supplemental Initial Decision (Construction Permits), Which Are Being Distributed This Date in Accordance with Schedule for Findings Ordered by Board ML18230A4941979-04-0404 April 1979 Applicant'S Response to NRC Staff Motion to Accept Exhibits Into Evidence ML18230A4951979-03-21021 March 1979 Applicant'S Response to Postcard Request of Kudzu Alliance and Wells Eddleman ML18230A5031979-02-15015 February 1979 Letter Furnishing Response to Carolina Power & Light Company'S 7 February Ansewer to Appeal Brief and Notice to the Atomic Safety and Licensing Appeal Board ML18230A5051979-02-0808 February 1979 Regarding Hearing Scheduled on 2/27 at 9 Am, Letter Advising to Reschedule It in the Evening or on Saturdays ML18230A5241979-01-23023 January 1979 Applicant'S Response to Conservation Council of North Carolina and Wake Environment, Inc.'S Motion to Remand to Licensing Board for Further Hearings ML18230A5091979-01-17017 January 1979 Petition for Remanded or Proposed Hearings, Petition to Suspend Construction, & Petition for Order on Further Opportunities for Intervention & Full Publicity ML18230A5191979-01-0404 January 1979 Further Amendments & Clarification of Petition of Intervene, Kudzu Alliance & Wells Eddleman Respectfully Request ASLB or Lawful Appointee to Hear Petitions ML18230A5141978-12-19019 December 1978 Applicant'S Request for Extension of Time to Respond to Communication from Wells Eddleman and Kudzu Alliance Dated November 29, 1978 ML18230A5151978-12-18018 December 1978 Applicant'S Response to Amendment to Request for Intervention by Mr. Wells Eddleman and Kudzu Alliance ML18230A5121978-12-0808 December 1978 Applicant'S Request for Extension of Time for Christmas, New Year Holidays, and year-end Vacation Schedules ML18230A5431978-11-29029 November 1978 After Receiving Response to Petition to Intervene, Letter Advising Alliance Members Should Be Allowed to Intervene ML18230A5451978-11-0707 November 1978 Transmitting Letter from Citizen in North Carolina Who Opposes Construction of Shearon Harris Nuclear Power Plant, Letter Advising to Provide Comments About the Points Which Are Raised ML18230A5461978-11-0707 November 1978 Letter Requesting to Become Intervenors & Furnishing Information Concerning Health, Safety, Power Bills, Eater Resources, Environment, Lives Civil Liberties & Right to Pursue Happiness ML18230A5501978-11-0101 November 1978 Letter Asking Schedule for re-opened Hearing, Requesting Kudzu Alliance Be Intervenor in Hearing & to Learn How to Become Intervenor Status ML18230A5661978-08-14014 August 1978 Applicant'S Memorandum in Response to ALAB-480 on the Perkins Initial Decision (in the Form of Proposed Findings and Conclusions Related to the Radon Issue) ML18230A5691978-07-26026 July 1978 Applicant'S Response to ALAB-480 Concerning Use of the Perkins Record on the Radon Issue ML18230A5791978-03-13013 March 1978 Applicant'S Response in Opposition to Intervenors' Exceptions ML18230A2111977-12-15015 December 1977 Letter Consisting of Information Re Observance of Minor Geological Feature Near Shearon Harris Site, Which Should Not Be of Concern, & Transmitting Certificate of Service ML18230A2121977-12-12012 December 1977 Consisting of Information Re Observance of Minor Geological Feature Near Shearon Harris Site, Letter Advising CP&L Is Evaluating Impact of This Feature, & Transmitting Certificate of Service ML18230B0291977-09-23023 September 1977 Agreement Terminating Carolinas-Virginias Power Pool Agreement ML18230B3131977-09-16016 September 1977 Applicant'S Proposed Agenda for Resumption of Evidentiary Hearings ML18230A8111976-12-0101 December 1976 Carolina Power & Light Company - Application for a General Increase in Rates and Notice of Filing Change of Rates ML18230A0881976-09-20020 September 1976 as Discussed, Letter Transmitting Information Regarding Containment Structure Load Combination, Containment Internal Structure, Seismic Category I Structure, Index to Positions & Regulatory Guides ML18230A0891976-09-0707 September 1976 Transmitting Joint Wind Frequency Distribution Tables Compiled from On-Site Data Collected Between the Period January 15, 1976 Through July 15, 1976 ML18230A0901976-07-13013 July 1976 Furnishing Meteorological Information to Support Cp&L'S Evaluation of Plant'S Compliance with Appendix I to 10CFR50, & Transmitting Certificate of Service ML18230B0381976-05-28028 May 1976 Submits Amendment No. 46 to License Application, Consisting of Environmental Report Providing Current Information on Specific Power Needs for Section 4 ML18230A3331976-05-0505 May 1976 to Meet Scheduled Fuel Loading on 6/1/1983 & for Other Submittals, Letter Advising Arrangements to Meet with NRC Staff to Develop Coordinated Schedule Concerning the Financial Status & Amending Environmental Report ML18230B0981976-02-0303 February 1976 Amended Notice of Appearance ML18230B1331975-11-0303 November 1975 Responding to Letter of 9/18/1975, Letter Providing Requested Information Necessary to Schedule Review & to Project for Resumption of Public Hearing ML18230B1341975-08-29029 August 1975 Letter Providing Submission Schedules for Final Acceptance Criteria by 7/11/1975, Loose Parts Monitoring System by 9/16/1975, & Regulatory Guide by 9/22/1975 2007-06-08
[Table view] Category:Legal-Motion
MONTHYEARML0816900642008-06-16016 June 2008 Oyster Creek, Indian Point, Pilgrim, Vermont Yankee - NRC Staff'S Response to Joint Motion for Leave to Reply to NRC Staff Opposition to Supplemental Petition for Additional Investigation and Correction of Deficiencies in Licence Renewal.. ML0720400852007-07-20020 July 2007 Shearon Harris - NRC Staff Response to and Opposition to Motion to Stay the Proceeding ML0720802702007-06-27027 June 2007 Petitioners' Motion to Stay the Proceedings ML0305901252002-01-17017 January 2002 Consent Motions for Extension of Time to Accommodate Mediation, Dated January 17, 2002 ML18230A4911979-04-17017 April 1979 NRC Staff Motion to Accept Transcript Corrections 2008-06-16
[Table view] Category:Letter
MONTHYEARIR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter IR 05000400/20243012023-05-15015 May 2023 Notification of Licensed Operator Initial Examination 05000400/2024301 IR 05000400/20230012023-05-10010 May 2023 Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000400/20220032022-11-10010 November 2022 Integrated Inspection Report 05000400/2022003 IR 05000400/20223012022-11-0202 November 2022 NRC Operator License Examination Report 05000400/2022301 ML22271A6202022-09-29029 September 2022 Notification of Shearon Harris Nuclear Power Plant Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000400/2023010 ML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22227A0682022-09-0202 September 2022 Alternative to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Code for Operation and Maintenance for Certain Target Rock Solenoid Valves IR 05000400/20220052022-08-24024 August 2022 Updated Inspection Plan for Shearon Harris Nuclear Power Plant (Report 05000400/2022005) IR 05000400/20224032022-08-23023 August 2022 Security Baseline Inspection Report 05000400/2022403 ML22126A0082022-08-0909 August 2022 Issuance of Amendment No. 194 Revise Technical Specifications Related to Reactor Protection System Instrumentation P7 IR 05000400/20220022022-08-0505 August 2022 Integrated Inspection Report 05000400/2022002 ML22161B0332022-07-28028 July 2022 Issuance of Amendment No. 193 Regarding Revision of Surveillance Requirements to Remove Shutdown Limitation IR 05000400/20220112022-07-20020 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000400 2022011 IR 05000400/20224022022-06-30030 June 2022 Material Control and Accounting Program Inspection Report 05000400/2022402 (OUO Removed) IR 05000400/20220102022-06-13013 June 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000400/2022010 ML22138A4012022-05-26026 May 2022 Project Manager Reassignment ML22101A2822022-05-0606 May 2022 Regulatory Audit Summary Related to the Review of License Amendment Regarding Revising the Flood Hazard Protection Scheme IR 05000400/20220012022-05-0404 May 2022 Integrated Inspection Report 05000400/2022001 IR 05000400/20224012022-03-24024 March 2022 Security Baseline Inspection Report 05000400/2022401 ML22020A0072022-03-10010 March 2022 Issuance of Amendment No. 192 Regarding Removal of Extraneous Content and Requirements from the Renewed Facility Operating License and Technical Specifications ML22010A2812022-03-0404 March 2022 Issuance of Amendments to Adopt TSTF-577, Rev. 1 Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0161 IR 05000400/20210062022-03-0202 March 2022 Annual Assessment Letter for Shearon Harris Nuclear Power Plant (Report No. 05000400/2021006) ML21351A4722022-02-10010 February 2022 Issuance of Amendment No. 190 Regarding Revision to Containment Spray Nozzle Test Frequency IR 05000400/20210042022-02-0404 February 2022 Integrated Inspection Report 05000400/2021004 ML22034A5352022-02-0202 February 2022 Notification of Licensed Operator Initial Examination 05000400/2022301 2024-01-30
[Table view] |
Text
SHAW, PITTMAN, POTTS & TROWBRIOGE 1800 M STREET, N. W.
WASHINGTONp D. C. 20036 RAM SAY 0. POTTS STEVEN L. MCLTZCR (202) 33( KIOO STEUART L. PITTMAN DEAN 0. AVLICK GCORGC F. TROWBRIDGC JOHN CNGEL STEPHEN 0. POTTS STCPHEN 8. HVTTLCR TELECOPIER GERALD CHARNOFF WINTHROP N. BROWN PHILLIP D BOSTWICK JAMES 8. HAMLIN (202l 298 0894 5 298 IFSO R, TIMOTHY HANLON ROBERT C.ZAHLCR GCORGC M ROGERS'R. RICHARD C GALCN JOHN 8. RHINELANDCR ROBERT 8. ROBBINS BRVCC W CHURCHILL LAVRA K. FARRANO TELEX LCSLIC A NICHOLSONp JR MATIAS F. TRAVICSO DIAZ 89 2893 (SHAWLAW WSH)
MARTIN D. KRALL VICTORIA J. PERKIN5 RICHARD J. KCNOALL JOHN H 0NCILLrJR CABLE ~SHAWLAW~
JAY C. SILBERG JAY A CPSTIEN BARBARA M. ROSSOTTI FRANKLIN D. CHV GCORGC V. ALLEN'R GCORGC D CROWLCYi JR WM. BRADFORD REYNOLDS MICHAEL D HAYS JOHN H. SHARON FRED A. LITTLC THOMAS H. McGORMICK EDWARD 8 CROSLAND FRED DRASNER SUSAN 0. FALKSON NATHANICLR BREEDS JR STEVEN M LVCAS COUNSEL MARK AUGENBLICK RAND L ALLCN CRNCST I,. BLAKC,JR. ALAN J WCISBARD CARLETON S. JONCS WILLIAMP. BARR THOMAS A. BAXTER ALAN R YVSPCH JAMES M. BVRGCR JOHN L CARR, JR.
5HELDON J WCI5CL PHILIP J HARVEY JOHN A. McCULLOVGH JAMES THOMAS I.CNHART KAY L. RICHMAN April 17, 1979 Ivan W. Smith, Esquire Dr. J. V. Leeds, Jr.
Chairman 10807 Atwell Atomic Safety and Licensing Houston, Texas 77096 Board U.S. Nuclear. Regulatory Commission Washington, D.C. 20555 Mr. Glenn 0. Bright Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 In the Matter of Carolina Power and Light Company (Shearon Harris Nuclear Plant, Units 1, 2, 3 6 4)
Docket Nos. 50-400, 50-401, 50-402, 50-403 Gentlemen:
I enclose copies of "Applicant's Proposed Findings of Fact and Conclusions of Law in the Form of a Supplemental Initial Decision (Construction Permits)," which are being distributed this date in accordance with the schedule for findings ordered by the Board. Tr. 3790-3791.
Also enclosed are copies of "Applicant's Transcript Corrections" for the above-captioned proceeding.
Respe fully submitted, or F. T bridge Enclosure ounsel for Applicant cc: per certificate of service
492~~
UNITFD STATES OF AMERICA NUCLEAR RFXiULATORY COfNISSION oP BEFORE THE ATOMIC SAFETY AND LICENSING BOARD gee 'a<~ QO 04 In the Matter of )
)
CAROLINA POllER AND LIGHT COMPANY ) Docket Nos. 50-400
~
) 50-401 (Shearon Harris Nuclear Power Plant, ) 50-402 Units 1, 2, 3 and 4) ) 50-403 NRC STAFF MOTION TO ACCEPT TRANSCRIPT CORRECTIONS A hearing was held in the captioned proceeding in Raleigh, North Carolina from February 27, 1970 through March 8, 1979. The proceedings were recorded on Transcript pages 2164 through 3792. The NRC Staff has reviewed that transcript and moves this Board to admit the attached changes as corrections to the transcript.
Respectfully submitted, Charles A. Barth Counsel for NRC Staff Dated at Bethesda, 'maryland this 16th day of April, 197~
ATTACH."IENT Corrections to Shearon Harris Hearin Testimon
- 1. On page 2,216; line 7 change "Title" to "Panel".
- 2. On page 2,226; line 19 change "testimony" to"Permit".
- 3. On page 2,230; N line 2, delete "just" and change "passed" to "pass".
t
- 4. On page 2, 230; line 6, change "Cantrell" to "Dance".
- 5. On page 2,260> line 25, change "LARS" to "LER's" and "amendment" to "Events' U
- 6. On page 2,263; line 4, change "percentage" to "power plants".
- 7. On page 2,265; line 4, change "70" to "7".
- 8. On page 2,297; line 14, change "can'" to "can".
- 9. Qn page 2,298; line ll, insert "know" after "don'".
- 10. On page 2,311; line 20, change "done" to "identified".
ll On page 2,315; line 6, change "orderly" to "quarterly
- 12. On page 2,354; line 17, change "letup" to "letter".
- 13. On page 2, 357; line 3, change "problemmatic" to "problem at a".
- 14. On page 2,359; line 13, change "30" to "certain".
- 15. On page 2,413; line 15, change "have" to haven'".
- 16. On page 2,432; line 19, change "edit" to "audits".
- 17. On page 2.437; line 24, insert " not" after "that".
- 18. On page 2,438; line 3, change "evaporate" to "elaborates".
- 19. On page 2,479; line 3, change "thou'gh" to "through".
- 20. On page 2,480; line 14, after "testimony" delete the period, add
" without accompanying resolution corrective actions".
- 21. On page 2,480; line 23, delete the period and add "precluded undue concern. Open items were simply identified in the testimony.
0
- 22. On page 2,481; Beginning on line 3, add "These matters wouldII all have been documented in inspection reports and enforcement correspondence.
- 23. On page 2,502; line 19, delete the period and "We have had a meeting".
- 24. On page 2,536; line 21, change "Allan" to "Alan".
- 25. On page 2,542; line 16, change "MacFarland" to :McFarland and "Bzyany" to "Bryant".
- 26. On page 2,544; line 5, change "Bryan" to "Bryant".
II
- 27. On page 2,547; line 5, change "thing" to "things",
28.yOn page'2,572; lune 23, change "of" to "as".
- 29. On page 2,572, line 25, change "any" to "these".
- 30. On page 2,573, beginning on line 10. Change to read "exactly right.
The fact is that he found it, and it was corrected. It was negative and now it is positive".
- 31. On page 2,575; line 4, add "program" after "sampling".
- 32. On page 2,576; line 14, change "numers" to "numbers".
- 33. On page 2,583, line 2, change "Depot" to "people".
34 'n page 2,585; line 4m change "problem" to "program" ~
- 35. On page 2,586; line 24, "PP&L" to "CP&L".
- 36. On page 2,604; line 17, change "contentioncies" to "contengencies",
- 37. On page 2,610; line 20, change "Cogden" to "Conlon".
- 38. On page 2,611; line 1, change "Cogden" to "Conlon"-.
- 39. On page 2,612; lines 13 and 14, change "Swann" to "Swan".
- 40. On page 2,612, li'ne 25, change the period after management to a comma, and on page 2,613, line 1, change the 0 in Our to lower case.
- 41. On page 2,681, line 15, change "changed" to "changes",
- 42. On page 2,744, change "E" to "NDE".
4
- 43. On page 2,752, change "1&A" to "1&E".
- 44. On page 2,755; line 22, change "my" to "by".
- 45. On page 2,761; line 12, change "stuff" to "staff".
- 46. On page 2,763; line 9, change "been to" to "men at".
- 47. On page 2,765; line 17, change "McDuffy" to "McDuffie",
- 48. On page 2y765> line 18, change "Basco to "Ebasco".
- 49. On page 2,765; line 20, change "gone" to "come".
- 50. On page 2,766; lime 12, change"ilittle" to "little".
- 51. On page 2,766; line 17, change "essentially" to "essential".
- 52. On page 2,755; line 24, change "ANSN" to "ANSI".
- 53. On page 2,776; line 1, change "Nuclear Society" to "National Standards Institute".
- 54. On page 2,776; line 12, change ".Nuclear Society" to "National Standards Institute".
- 55. On page 2,781; line 24, change "/Witness Murphe" to "(Witness Murphy)".
- 56. On page 2,802; line 24, change "at" to "and".
- 57. On page 2,913; line 20, change "conceru" to "concern".
- 58. On page 2,991; line 9, change "say" to "way".
- 59. On page 2,993; line 1, change "can'" to "can".
- 60. On page 3,019, lines 1 and 2 and 3, change to read "of noncompliance, a violation being the most severe, infraction most typical, and a deficiency a minor noncomplisnce".
- 61. On page 3,022; line 24, first word, change "The" to "They".
- 62. On page 3,027; line 3, change "fair middle" to "bare minimum".
- 63. On page 3,062, line 6, change "is" to "it".
- 64. On page 3,103; line 8, change "be aware" to "beware".
e \
- 65. On page 3,162; line 9, change "their" to "the".
- 66. On page 3,178; line 25, change "alternating" to "augmented".
- 67. On page 3,181; line 2, delete the first "is".
- 68. On page 3,201; line 1, delete the "1" ahead of"positions".
I h,
Uf3(TED STATES QI'iERI,CA NUCLEAR REGULATQQY COi}iiI.SS ION
'BEFORE TIIE ATOMIC SAFETY'AND LICEHSIHG BOARD In the Matter of CAROLINA POt'lER AHD LI'GNT COMPANY Docket Hos. 50-400
) 50-401 (Shearon Harris Nuclear Power Plant, 50-402 Units 1, 2, 3 'and 4} ) 50-403
'CERTIFICATE'OF SERVICE I hereby certify that copies of "NRC STAFF MOTION TO ACCEPT TRANSCRIPT COINIECTIONS" and Attached "CORRECTiONS TO SHEAROI'I HARRIS HEARING TESTII1ONY" in; the above-captioned proceeding have been served on the following by deposit in the United States mai'1, first class, or, as indicated by an asterisk, through deposi't in the Nuclear Regulatory Commission's internal mail system, this 16th day of April, 1979:
Ivan W. Smith, Esq., Chairman~ Thomas Erwin, Esq.
Atomic Safety and Licensing 115 liest Morgan Street Board Panel Raleigh, North Carolina 27602 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Atomic Safety and Licensing Appeal Board*
Mr. Glenn 0. Bright" U.S. Nuclear Regulatory Comnission Atomic Safety and Licensing Washington, D.C. 20555 Board Panel U.S. Nuclear Regulatory Commission Atomic Safety and'Licensing Washington, D.C. 20555 Board Panel*
U.S. Nuclear Regulatory Coi-;;"".ission Dr. J. V. Leeds, Jr. Washington, D.C. 20555 10807 Atwell Drive Houston, Texas 77096 Docketing and Service Section*
Office of the Secretary Richard E. Jones, Esq. U.S. Nuclear Regulatory Commission Associate General Counsel Washington, D.C. '0555 Carolina Power 8 Light Company 336 Fayetteville Street Wa ke Coun ty Pub 1 i c Libra ry Raleigh, North Carolina 27602 104 Fayettevil le Street Raleigh, North Carolina 27601
0 ~ ~
George F. Trowbridge, Esq.
Shaw, Pittman, Potts & Trowbridge 1800 H Street, N.l<.
llashington, D.C.'0036 Dennis P. Hyers Attorney General's Office State of North Carolina P. 0. Box 629 Raleigh, North Carolina 27602 Charles A. Barth Counsel for HRC Staff