IIIIICFOIIM 195 U.So NUCLEAR REGULATORV COMMISSION l21P) y:
Q;
~
NRC DISTRIBUTION FDR I'ART50 DOCKET MATERIAL DOCKET NUMBER FILE NUMBER To:
B.C.
Rusche FRDMCaroliga Power 5 Light Co'.
- Raleigh, N.C.
J.A. Jones DATE OF DOCUMENT DATE RECEIVED QLETTER
)gORIGINAL QCOPV QNOTOR I2E D SUNCLASSIFIED PROP INPUT FORM NUMBER OF COPIES RECEIVED DESCRIPTION Ltr. notarized 5-5-76 Advising arrangements to meet with our staff to develop a coordinated schedule concerning the financial status arid amending hhe Enviro. %pt.
(
1 Original Received)
Distrubution Per".
M. Rushbrook ENCLOSURE j
.DO NOT BEN.OVE
'CKNOW<EDGED Shearon Harris 1-4 SAFETY ASSIGNED AD:
BRANCH CHIEF:
FOR ACTION/INFORMATION ASSIGNED AD:
BRANCH'HIEF:
ENVIRO PROJECT IIANAGER; IC ~ ASST'iner Rushbrook PROJECT MANAGER:
E S
INTERNALDISTRIBUTION F.RNST I &E GOSSXCK & STAFF AS PROJECT MANAGEIIENT BOYD P,
COLLINS OUSTON ETERSON 1ELTZ.'ELTEMES OVHOLT LPD
~
a eIg TXC NSj'.
ASLB EN INEER N KNIGHT SXIII<EXL PAMLICKI REACTOR SAFETY OSS NOVAK OSZTOCZY IIECK SALTZMAN RurBERG EXTERNAL DISTRIBUTION NATL IAB REG. V-IE LA PDR CONSULTANTS BENAROYA XPPOLITO OPERATING REACTORS TELLO OPERATING TECH EISENHUT SHAO BAER SCHIPENCER GRIMES ANALYSIS ENTON & MUT.LER BROOKIIAVI'.N NATL LAB ULRIKSON(ORNL)
ALLARD SPANGLER SITE TECH A&IILL STEPP HUUIAN SITE ANALYSIS VOLLI1ER BUNCII COLLINS EGER CONTROL NUMBER A'528 NRC I ORM 196 I2 Ml
e
(
~
~
p C
I'g f
h
~
~
s M
'Ja ll
~ P II
'egu1t File Gyw Carolina Power Mr. Benard C. Rusche, Director Office of Nuclear Reactor Regulati U.S. Nuclear Regulatory Commission Vashington, D.C.
20555 RE:
DOCKET NOS. 50-40 oocxttat U
g 187.8~ 3 tlcg 'tedtcE eoctst C4A 2 AND May 5, C
50-4
Dear Mr. Rusche:
As you are aware, the first of the four proposed Shearon Harris
-- Nuclear Power Plant units is scheduled for fuel loading on June 1, 1983.
To meet this date, Carolina Power
& Light Company (CP&L) had expected to complete additional site preparation activities this summer in anticipation of receipt of a Construction Permit (CP) in the spring of 1977.
- However, the additional site preparation activities were not allowed under the present Construction Permit exemption, and the Company has appropriately adjusted the construction plans for this plant.
The resulting schedule provides an efficient, continuous construction sequence initiated with mobilization of construction forces in the fall of 1976 and receipt of the CP as early in the fall as possible but no later than December 1, 1976.
Me believe that all necessary submittals and reviews can be completed in time to resume the public hearing by August 1, 1976.
Consis-tent with this objective, by May 31, 1976, CP&L will amend the Construction Permit application to provide current information on the financial status of the Company and will amend the Environmental Report to provide the current projection of the need for power in the CP&L service area.
Carolina Power
& Light Company representatives will arrange to meet with your staff to develop a coordinated schedule consistent with the above objectives.
If additional information is needed to resume the formal review of this docket, please do not hesitate to contact us at any time.
J. A. Jones Executive Vice President Engineering, Construction
& Operation JAJ/nj a Sworn to and subscribed before me this 5th day of May, 1976.
Ey Commission Expires:~X( JN~4 Nota y Public 336 Fayetteville Street
~ P. O. Box 1551
~ Raleigh, N, C. 27602 EEE u llrryy se
- p:~ O T A 9 ) '. (0
~
e
'I,
',l UB1 5
lllllllilllE
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of CAROLINA POWER 6r LIGHT COMPANY (Shearon Harris Nuclear Power Plant Units 1, 2, 3, and 4)
Docket Nos. 50-400 50-401 50-402 50-403 CERTIFICATE OF SERVICE This is to certify that a copy of Mr. J. A. Jones'etter concerning the accelerated Construction Permit issuance for its Shearon Harris Nuclear Power Plant Units 1, 2, 3, and 4 has this 5th day of May been served upon the Chief Executive Officers of Wake and Chatham Counties, North Carolina, by deposit of the same in the United States mail addressed as follows:
Mr. Vassar P.
- Shearon, Chairman Board of County Commissioners of Wake County Post Office Box 550 Raleigh, North Carolina 27602 Mr. Ben Wimberly, Chairman Board of County Commissioners of Chatham County Post Office Box 111 Pittsboro, North Carolina 27312 A copy of this letter has also been served this day upon each member of the Atomic Safety and Licensing Board, and other appropriate NRC personnel by deposit of the same in the United States ~ail addressed as follows:
Thomas W. Reilly, Esq.
Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.
C.
20555 Mr. Glenn 0. Bright Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dr. J.
V. Leeds, Jr.
Post Office Box 941
- Houston, Texas 77001 Mr. Nathaniel H. Goodrich, Chairman Atomic Safety and Licensing" Board Panel U.S. Nuclear Regulatory Commission Washington, D. C.
20555 1
Secretary
,U.S. Nuclear Regulatory Commission Washington, D.
C.
20555 Attention:
Chief, Public Proceeding Staff Mr. Thomas S. Erwin Post Office Box 928 115 West Morgan Street Raleigh, North Carolina 27602 Mr. C. A. Barth Regulatory Staff Counsel U.S. Nuclear Regulatory Commission Washington, D.
C.
20555 Richard E. Jones Associate General Counsel Carolina Power 6 Light Company Business Address:
336 Fayetteville Street
- Raleigh, N.
C.
27602 Business Telephone:
Area Code 919 828-8211 Dated:
May 5, 1976