IR 05000293/2018012: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18305A834
| number = ML18305A834
| issue date = 11/01/2018
| issue date = 11/01/2018
| title = Pilgrim Nuclear Power Station - Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018012
| title = Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018012
| author name = Dimitriadis A
| author name = Dimitriadis A
| author affiliation = NRC/RGN-I/DRP/PB5
| author affiliation = NRC/RGN-I/DRP/PB5
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ber 1, 2018
[[Issue date::November 1, 2018]]


EA-17-086
==SUBJECT:==
 
PILGRIM NUCLEAR POWER STATION - CONFIRMATORY ACTION LETTER (EA-17-086) FOLLOW-UP INSPECTION REPORT 05000293/2018012
Mr. Brian Sullivan Site Vice President Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
 
SUBJECT: PILGRIM NUCLEAR POWER STATION - CONFIRMATORY ACTION LETTER (EA-17-086) FOLLOW-UP INSPECTION REPORT 05000293/2018012


==Dear Mr. Sullivan:==
==Dear Mr. Sullivan:==
On September 14, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an on-site team inspection at Pilgrim Nuclear Power Station (PNPS). The NRC inspectors discussed the results of this inspection with you and other members of your staff during an onsite debrief on September 14, 2018, and via teleconference exit on October 17, 2018. The results of this inspection are documented in the enclosed report.
On September 14, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an on-site team inspection at Pilgrim Nuclear Power Station (PNPS). The NRC inspectors discussed the results of this inspection with you and other members of your staff during an onsite debrief on September 14, 2018, and via teleconference exit on October 17, 2018. The results of this inspection are documented in the enclosed report.


The NRC inspection team reviewed PNPS's prog ress in implementing the actions from the PNPS Recovery Plan that were committed to in the Confirmatory Action Letter (CAL) dated August 2, 2017 (NRC's Agencywide Documents Access and Management System (ADAMS) Accession No. ML17214A088) (EA-17-086). Specifically, for this inspection the team reviewed the adequacy of the corrective actions PNPS completed to address 45 individual CAL items in the Corrective Action Program, Operations Standards and Site Leadership, Risk Recognition and Decision Making, Procedure Quality, Engineering Programs, Equipment Reliability, and Work Management Area Action Plans. The team also reviewed site performance to determine whether the actions completed for these plans, in aggregate, achieved the safety performance improvement objectives stated in the PNPS Recovery Plan for those seven Area Action Plans. Finally, the team conducted a targeted site safety culture assessment to properly assess individual CAL items with actions tied to safety culture and gather preliminary information for the final CAL follow-up inspection.
The NRC inspection team reviewed PNPSs progress in implementing the actions from the PNPS Recovery Plan that were committed to in the Confirmatory Action Letter (CAL) dated August 2, 2017 (NRCs Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17214A088) (EA-17-086). Specifically, for this inspection the team reviewed the adequacy of the corrective actions PNPS completed to address 45 individual CAL items in the Corrective Action Program, Operations Standards and Site Leadership, Risk Recognition and Decision Making, Procedure Quality, Engineering Programs, Equipment Reliability, and Work Management Area Action Plans. The team also reviewed site performance to determine whether the actions completed for these plans, in aggregate, achieved the safety performance improvement objectives stated in the PNPS Recovery Plan for those seven Area Action Plans.
 
Finally, the team conducted a targeted site safety culture assessment to properly assess individual CAL items with actions tied to safety culture and gather preliminary information for the final CAL follow-up inspection.


The team determined that all 45 individual CAL items reviewed and the 7 associated Area Action Plans were adequately completed and effective in achieving the associated PNPS Recovery Plan performance improvement objectives. As a result, the 45 CAL items and the Area Action Plans for Corrective Action Program, Operations Standards and Site Leadership, Risk Recognition and Decision Making, Procedure Quality, Engineering Programs, Equipment Reliability, and Work Management are closed.
The team determined that all 45 individual CAL items reviewed and the 7 associated Area Action Plans were adequately completed and effective in achieving the associated PNPS Recovery Plan performance improvement objectives. As a result, the 45 CAL items and the Area Action Plans for Corrective Action Program, Operations Standards and Site Leadership, Risk Recognition and Decision Making, Procedure Quality, Engineering Programs, Equipment Reliability, and Work Management are closed.


No findings or violations of NRC requirements were identified during this inspection. In accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," PNPS will remain within the Multiple/Repetitive Degraded Cornerstone column of the NRC's Reactor Oversight Process Action Matrix pending completion of all actions needed to close the CAL. To review the remaining CAL actions and Area Action Plans, the NRC currently plans to complete one additional quarterly CAL follow-up inspection in addition to the four already completed. The NRC staff will assess the effectiveness of Entergy's implementation of these corrective actions and evaluate whether the safety performance of PNPS has demonstrated sustained improvement warranting transition of PNPS out of Column 4 in accordance with Inspection Manual Chapter 0305, Section 10.02d, paragraph 7. The final on-site CAL follow-up inspection is currently scheduled to be completed in December 2018, and the report documenting the results of that inspection to be issued shortly thereafter.
No findings or violations of NRC requirements were identified during this inspection. In accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, PNPS will remain within the Multiple/Repetitive Degraded Cornerstone column of the NRCs Reactor Oversight Process Action Matrix pending completion of all actions needed to close the CAL. To review the remaining CAL actions and Area Action Plans, the NRC currently plans to complete one additional quarterly CAL follow-up inspection in addition to the four already completed. The NRC staff will assess the effectiveness of Entergys implementation of these corrective actions and evaluate whether the safety performance of PNPS has demonstrated sustained improvement warranting transition of PNPS out of Column 4 in accordance with Inspection Manual Chapter 0305, Section 10.02d, paragraph 7. The final on-site CAL follow-up inspection is currently scheduled to be completed in December 2018, and the report documenting the results of that inspection to be issued shortly thereafter.


This letter, its enclosure, and your response (if any) will be made available for public inspection  
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.


and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely,
 
/RA/
Sincerely,/RA/ Anthony Dimitriadis, Chief Reactor Projects Branch 5  
Anthony Dimitriadis, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No. 50-293 License No. DPR-35
 
Division of Reactor Projects Docket No. 50-293 License No. DPR-35  


===Enclosure:===
===Enclosure:===
Inspection Report 05000293/2018012  
Inspection Report 05000293/2018012 w/Attachment: Confirmatory Action Letter Item Status
 
===w/Attachment:===
Confirmatory Action  
 
Letter Item Status  
 
cc w/encl: Distribution via ListServ
 
ML18305A834 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SRutenkroger via email LCline via email ADimitriadis DATE 11/1/18 11/1/18 11/1/18
 
1 Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report


Docket Number: 50-293  
==Inspection Report==
 
Docket Number: 50-293 License Number: DPR-35 Report Number: 05000293/2018012 Enterprise Identifier: I-2018-012-0014 Licensee: Entergy Nuclear Operations, Inc. (Entergy)
License Number: DPR-35  
Facility: Pilgrim Nuclear Power Station (PNPS)
 
Location: Plymouth, MA Inspection Dates: 09/10/2018 - 09/14/2018 Team Lead: S. Rutenkroger, PhD, Senior Resident Inspector Inspectors: L. Cline Jr., Senior Project Engineer Z. Hollcraft, Senior Resident Inspector J. Krafty, Senior Resident Inspector M. Keefe-Forsyth, Human Factors Specialist S. Morrow, Human Factors Engineer J. Dolecki, Resident Inspector M. Hardgrove, Project Engineer C. Roettgen, Resident Inspector C. Safouri, Project Engineer Approved By: Anthony Dimitriadis, Chief Reactor Projects Branch 5 Division of Reactor Projects Enclosure
Report Number: 05000293/2018012  
 
Enterprise Identifier: I-2018-012-0014  
 
Licensee: Entergy Nuclear Operations, Inc. (Entergy)  
 
Facility: Pilgrim Nuclear Power Station (PNPS)  
 
Location: Plymouth, MA  
 
Inspection Dates: 09/10/2018 - 09/14/2018  
 
Team Lead: S. Rutenkroger, PhD, Senior Resident Inspector  
 
Inspectors: L. Cline Jr., Senior Project Engineer Z. Hollcraft, Senior Resident Inspector J. Krafty, Senior Resident Inspector M. Keefe-Forsyth, Human Factors Specialist S. Morrow, Human Factors Engineer J. Dolecki, Resident Inspector M. Hardgrove, Project Engineer C. Roettgen, Resident Inspector C. Safouri, Project Engineer  
 
Approved By: Anthony Dimitriadis, Chief Reactor Projects Branch 5 Division of Reactor Projects  
 
2


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Entergy's performance at PNPS by conducting the fourth confirmatory action letter (CAL) follow-up inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Entergys performance at PNPS by conducting the fourth confirmatory action letter (CAL) follow-up inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.


The team reviewed 45 of the 156 items that Entergy committed to complete in the PNPS CAL (EA-17-086). The items reviewed were associated with the Corrective Action Program (CAP), Operations Standards and Site Leadership (OPS), Risk Recognition and Decision Making (RRDM), Procedure Quality (PQ), Engineering Programs (EP), Equipment Reliability (ER), and Work Management (WM) Area Action Plans. The team determined that all 45 individual CAL items reviewed and the associated Area Action Plans were adequately completed and effective in achieving the associated PNPS Recovery Plan performance improvement objectives. As a result, the 45 CAL items and these 7 Area Action Plans are closed. No findings or more-than-minor violations were identified.
The team reviewed 45 of the 156 items that Entergy committed to complete in the PNPS CAL (EA-17-086). The items reviewed were associated with the Corrective Action Program (CAP),
Operations Standards and Site Leadership (OPS), Risk Recognition and Decision Making (RRDM), Procedure Quality (PQ), Engineering Programs (EP), Equipment Reliability (ER), and Work Management (WM) Area Action Plans. The team determined that all 45 individual CAL items reviewed and the associated Area Action Plans were adequately completed and effective in achieving the associated PNPS Recovery Plan performance improvement objectives. As a result, the 45 CAL items and these 7 Area Action Plans are closed.


Additional Tracking Items Type Issue number Title Report Section Status CAL  EA-17-086 PNPS Confirmatory Action letter  Inspection Results 92702 Discussed
No findings or more-than-minor violations were identified.


3
Additional Tracking Items Type    Issue        Title                                      Report        Status number                                                  Section CAL      EA-17-086    PNPS Confirmatory Action letter            Inspection    Discussed Results 92702


=INSPECTION SCOPES=
=INSPECTION SCOPES=


This inspection was conducted using the appropriate portions of the applicable inspection procedure in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the NRC  
This inspection was conducted using the appropriate portions of the applicable inspection procedure in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the NRC website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess Entergys performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
 
website at http://www.nrc.gov/reading-rm/doc-co llections/insp-manual/inspection-procedure/index.html. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess Entergy's performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
- TEMPORARY INSTRUCTIONS, INFREQUENT, AND ABNORMAL 92702 - Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders The inspectors reviewed the status of the corrective actions that Entergy had reported complete for 45 of the 156 items listed on Enclosure 2 of the PNPS CAL (EA-17-086)  
- TEMPORARY INSTRUCTIONS, INFREQUENT, AND ABNORMAL 92702 - Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders The inspectors reviewed the status of the corrective actions that Entergy had reported complete for 45 of the 156 items listed on Enclosure 2 of the PNPS CAL (EA-17-086)
(ADAMS Accession No. ML17214A088). The inspectors also conducted a targeted safety culture assessment to review the current status of PNPS corrective actions intended to improve site safety culture in these areas.
    (ADAMS Accession No. ML17214A088). The inspectors also conducted a targeted safety culture assessment to review the current status of PNPS corrective actions intended to improve site safety culture in these areas.


All 45 items reviewed for this inspection are identified in the Confirmatory Action Letter Item Status summary table included as an Attachment to this report. The inspectors also reviewed the status of the Area Action Plans associated with these 45 items, which in accordance with Enclosure 2 of the PNPS CAL included the CAP, OPS, RRDM, PQ, EP, ER, and WM Area Action Plans. Entergy had reported these seven Area Action Plans were  
All 45 items reviewed for this inspection are identified in the Confirmatory Action Letter Item Status summary table included as an Attachment to this report. The inspectors also reviewed the status of the Area Action Plans associated with these 45 items, which in accordance with Enclosure 2 of the PNPS CAL included the CAP, OPS, RRDM, PQ, EP, ER, and WM Area Action Plans. Entergy had reported these seven Area Action Plans were complete and effective.
 
complete and effective.


The inspectors evaluated these items to determine if:
The inspectors evaluated these items to determine if:
Line 115: Line 79:


During this review, the inspectors completed the following specific activities:
During this review, the inspectors completed the following specific activities:
: (1) Reviewed Entergy's closure packages for each of the CAL action items.
: (1) Reviewed Entergys closure packages for each of the CAL action items.
: (2) Reviewed Entergy's closure reports for each of the Area Action Plans.
: (2) Reviewed Entergys closure reports for each of the Area Action Plans.
: (3) Reviewed Entergy's interim and final effectiveness reviews and self-assessments completed for the Area Action Plans.
: (3) Reviewed Entergys interim and final effectiveness reviews and self-assessments completed for the Area Action Plans.
: (4) Reviewed Entergy's performance indicators and recovery metrics for the Area Action Plans through August 2018.
: (4) Reviewed Entergys performance indicators and recovery metrics for the Area Action Plans through August 2018.
: (5) Overall, conducted 72 individual interviews, 8 focus group panel discussions, and multiple as-needed follow-up discussions with 117 PNPS staff, supervisors, managers, and directors from Plant Operations, Engineering, Maintenance, Production, Training, Security, Human Resources, Regulatory and Performance Improvement, Chemistry, Radiation Protection, and Recovery (including contract personnel such as Subject Matter Experts and Mentors in operations, corrective actions, and risk decision making).
: (5) Overall, conducted 72 individual interviews, 8 focus group panel discussions, and multiple as-needed follow-up discussions with 117 PNPS staff, supervisors, managers, and directors from Plant Operations, Engineering, Maintenance, Production, Training, Security, Human Resources, Regulatory and Performance Improvement, Chemistry, Radiation Protection, and Recovery (including contract personnel such as Subject Matter Experts and Mentors in operations, corrective actions, and risk decision making).
: (6) Reviewed Organizational Health Index survey results, Nuclear Safety Culture Leadership Team and Monitoring Panel meeting minutes, Nuclear Safety Culture Advocate reports, and CAP subject matter expert assessment reports from 2016 through 2018.
: (6) Reviewed Organizational Health Index survey results, Nuclear Safety Culture Leadership Team and Monitoring Panel meeting minutes, Nuclear Safety Culture Advocate reports, and CAP subject matter expert assessment reports from 2016 through 2018.
: (7) Performed numerous walk-downs and independent field observations of the conduct of operations, in-progress training, and maintenance planning.
: (7) Performed numerous walk-downs and independent field observations of the conduct of operations, in-progress training, and maintenance planning.
: (8) Observed site meetings associated with engineering reviews, work planning (multiple T-weeks), and daily/weekly production.
: (8) Observed site meetings associated with engineering reviews, work planning (multiple T-weeks), and daily/weekly production.
: (9) Reviewed procedures, procedure change requests and revisions, training presentations, case study presentations, training attendance records, critical decision making documents, what it looks like (WILL) sheets, backlog status reports, self-assessments, operating crew training performance and feedback records, final written and simulator examinations, operating crew event critiques, individual targeted performance improvement plans, coaching feedback records, work planning man-hour estimates, timesheets, critical and non-critical corrective and deficient backlog records, critical preventive maintenance deferred (and/or in grace) records, single-point and aging vulnerability assessments and records, and work orders.
: (9) Reviewed procedures, procedure change requests and revisions, training presentations, case study presentations, training attendance records, critical decision making documents, what it looks like (WILL) sheets, backlog status reports, self-assessments, operating crew training performance and feedback records, final written and simulator examinations, operating crew event critiques, individual targeted performance improvement plans, coaching feedback records, work planning man-hour estimates, timesheets, critical and non-critical corrective and deficient backlog records, critical preventive maintenance deferred (and/or in grace) records, single-point and aging vulnerability assessments and records, and work orders.


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Observation 92702 CAL Items Closed The team closed all of the following 45 CAL items (a narrative description of each item is listed in Enclosure 1 to the PNPS CAL (ADAMS Accession No. ML17214A088):
Observation                                         92702 CAL Items Closed The team closed all of the following 45 CAL items (a narrative description of each item is listed in Enclosure 1 to the PNPS CAL (ADAMS Accession No. ML17214A088):
Corrective Action Program (CAP) - 1.3 and 1.8 Operations Standards and Site Leadership (OPS) - 1.1, 1.2, 1.4, 1.6, 1.7, 2.2, 3.1, 3.2, 4.1, 4.2, and 5.3 Risk Recognition and Decision Making (RRDM) - 1.1, 1.2, 1.3, 2.1, 3.1, 3.2, 3.3, 4.8, and 4.9 Procedure Quality (PQ) - 1.1 and 5.2 Engineering Programs (EP) - 1.2, 2.1, 2.2, 2.3, 2.4, 3.1, and 4.1   Equipment Reliability (ER) - 1.3, 2.1, 2.2, 3.1, 3.2, and 3.3 Work Management (WM) - 1.1, 1.2, 1.3, 2.1, 2.2, 3.1, 3.3, and 4.2 CAL Area Action Plan Summary Review The inspectors concluded that the individual CAL items described above and the associated Area Action Plans were adequately completed and effective in achieving the associated performance improvement objectives described in the PNPS Recovery Plan.
Corrective Action Program (CAP) - 1.3 and 1.8 Operations Standards and Site Leadership (OPS) - 1.1, 1.2, 1.4, 1.6, 1.7, 2.2, 3.1, 3.2, 4.1, 4.2, and 5.3 Risk Recognition and Decision Making (RRDM) - 1.1, 1.2, 1.3, 2.1, 3.1, 3.2, 3.3, 4.8, and 4.9 Procedure Quality (PQ) - 1.1 and 5.2 Engineering Programs (EP) - 1.2, 2.1, 2.2, 2.3, 2.4, 3.1, and 4.1 Equipment Reliability (ER) - 1.3, 2.1, 2.2, 3.1, 3.2, and 3.3 Work Management (WM) - 1.1, 1.2, 1.3, 2.1, 2.2, 3.1, 3.3, and 4.2 CAL Area Action Plan Summary Review The inspectors concluded that the individual CAL items described above and the associated Area Action Plans were adequately completed and effective in achieving the associated performance improvement objectives described in the PNPS Recovery Plan.


Therefore, the following Area Action Plans listed in Enclosure 2 to the PNPS CAL are closed based on the reviews completed during this inspection: Operations Standards and Site Leadership (OPS) Risk Recognition and Decision Making (RRDM) Engineering Programs (EP) Equipment Reliability (ER) Work Management (WM)
Therefore, the following Area Action Plans listed in Enclosure 2 to the PNPS CAL are closed based on the reviews completed during this inspection:
Operations Standards and Site Leadership (OPS)
Risk Recognition and Decision Making (RRDM)
Engineering Programs (EP)
Equipment Reliability (ER)
Work Management (WM)
Actions associated with the PQ and CAP Area Action Plans were reviewed during previous inspections and these Area Action Plans were held open because additional action and review was required as documented in NRC IR 05000293/2017010 (ADAMS Accession No.
Actions associated with the PQ and CAP Area Action Plans were reviewed during previous inspections and these Area Action Plans were held open because additional action and review was required as documented in NRC IR 05000293/2017010 (ADAMS Accession No.


ML18032A463) and NRC IR 05000293/2018011 (ADAMS Accession No. ML18282A039).
ML18032A463) and NRC IR 05000293/2018011 (ADAMS Accession No. ML18282A039).


The basis for closure for these two Area Action Plans, considering the problems described in these resports, is described below:  
The basis for closure for these two Area Action Plans, considering the problems described in these resports, is described below:
 
PQ Area Action Plan:
PQ Area Action Plan: The inspectors determined that PNPS's WILL sheet revisions, PQ training presentation, and extent of condition corrective actions adequately corrected the problems the inspectors previously identified with PNPS implementation of PQ-1.1 and PQ-5.2 per NRC IR 05000293/2017010. Combined with the adequate completion of the other PQ Area Action Plan CAL items per NRC IR 05000293/2017010, the inspectors concluded that the PQ Area Action Plan was adequately completed and effective in achieving the associated performance improvement objectives described in the PNPS Recovery Plan.
The inspectors determined that PNPSs WILL sheet revisions, PQ training presentation, and extent of condition corrective actions adequately corrected the problems the inspectors previously identified with PNPS implementation of PQ-1.1 and PQ-5.2 per NRC IR 05000293/2017010. Combined with the adequate completion of the other PQ Area Action Plan CAL items per NRC IR 05000293/2017010, the inspectors concluded that the PQ Area Action Plan was adequately completed and effective in achieving the associated performance improvement objectives described in the PNPS Recovery Plan.


CAP Area Action Plan: The inspectors concluded that based on the adequate completion of the CAP Area Action Plan CAL items documented in NRC IR 05000293/2018011 (ADAMS Accession No. ML18282A039)) and the results of safety culture assessment activities conducted during the onsite week of this inspection (described below), the CAP Area Action Plan was adequately completed and effective in achieving the associated performance improvement objectives described in the PNPS Recovery Plan.
CAP Area Action Plan:
The inspectors concluded that based on the adequate completion of the CAP Area Action Plan CAL items documented in NRC IR 05000293/2018011 (ADAMS Accession No. ML18282A039)) and the results of safety culture assessment activities conducted during the onsite week of this inspection (described below), the CAP Area Action Plan was adequately completed and effective in achieving the associated performance improvement objectives described in the PNPS Recovery Plan.


Targeted Safety Culture Assessment The inspectors conducted interviews and focus groups with 72 staff, first line supervisors, and managers, which represented about 14% of the workforce. The eight focus groups conducted were representative of the major departments at PNPS, including maintenance, operations, security, and engineering. The focus group discussions and interviews conducted as part of the scope of this inspection focused on the traits of a positive safety culture, with emphasis on leadership safety values and actions, problem identification and resolution, decision making, and work processes. Insights were also gathered by reviewing various subject matter expert reports, contractor-conducted surveys, and PNPS nuclear safety culture monitoring panel meeting minutes.
Targeted Safety Culture Assessment The inspectors conducted interviews and focus groups with 72 staff, first line supervisors, and managers, which represented about 14% of the workforce. The eight focus groups conducted were representative of the major departments at PNPS, including maintenance, operations, security, and engineering. The focus group discussions and interviews conducted as part of the scope of this inspection focused on the traits of a positive safety culture, with emphasis on leadership safety values and actions, problem identification and resolution, decision making, and work processes. Insights were also gathered by reviewing various subject matter expert reports, contractor-conducted surveys, and PNPS nuclear safety culture monitoring panel meeting minutes.


During the focus groups, PNPS staff indicated work management process changes had improved interdepartmental coordination and communication and had increased the recognition of the risk impact of planned work activities; while CAP changes had improved feedback to staff who initiate condition reports, increased the focus on taking timely action to correct safety concerns, and increased accountability at all levels of the organization for completing corrective actions.
During the focus groups, PNPS staff indicated work management process changes had improved interdepartmental coordination and communication and had increased the recognition of the risk impact of planned work activities; while CAP changes had improved feedback to staff who initiate condition reports, increased the focus on taking timely action to correct safety concerns, and increased accountability at all levels of the organization for completing corrective actions.
Line 151: Line 121:
The inspectors verified no proprietary information was retained or documented in this report.
The inspectors verified no proprietary information was retained or documented in this report.


On September 14, 2018, the inspectors presented a debrief of the CAL follow-up inspection results to Mr. Brian Sullivan, Site Vice President and other members of PNPS staff. On October 17, 2018, inspectors conducted a telephonic exit meeting and presented the final results for the CAL follow-up inspection items documented in this report to Mr. Brian Sullivan, Site Vice President and other members of PNPS staff.
On September 14, 2018, the inspectors presented a debrief of the CAL follow-up inspection results to Mr. Brian Sullivan, Site Vice President and other members of PNPS staff.
 
On October 17, 2018, inspectors conducted a telephonic exit meeting and presented the final results for the CAL follow-up inspection items documented in this report to Mr. Brian Sullivan, Site Vice President and other members of PNPS staff.


=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


CAL Item Closure Packages
CAL Item Closure Packages
CAP-1.3
CAP-1.3                           RRDM-1.3                        EP-4.1
CAP-1.8
CAP-1.8                            RRDM-2.1                        ER-1.3
OPS-1.1
OPS-1.1                            RRDM-3.1                         ER-2.1
OPS-1.2
OPS-1.2                           RRDM-3.2                        ER-2.2
OPS-1.4
OPS-1.4                           RRDM-3.3                         ER-3.1
OPS-1.6 OPS-1.7 OPS-2.2
OPS-1.6                            RRDM-4.8                        ER-3.2
OPS-3.1
OPS-1.7                            RRDM-4.9                        ER-3.3
OPS-3.2
OPS-2.2                            PQ-1.1                          WM-1.1
OPS-4.1 OPS-4.2 OPS-5.3
OPS-3.1                            PQ-5.2                           WM-1.2
RRDM-1.1
OPS-3.2                           EP-1.2                           WM-1.3
RRDM-1.2 RRDM-1.3 RRDM-2.1
OPS-4.1                            EP-2.1                           WM-2.1
RRDM-3.1
OPS-4.2                            EP-2.2                          WM-2.2
RRDM-3.2
OPS-5.3                           EP-2.3                           WM-3.1
RRDM-3.3
RRDM-1.1                          EP-2.4                          WM-3.3
RRDM-4.8 RRDM-4.9 PQ-1.1
RRDM-1.2                           EP-3.1                           WM-4.2
PQ-5.2
Procedures
EP-1.2
1.13.2, Vendor and Technical Information Review, Revision 1
EP-2.1 EP-2.2 EP-2.3
1.3.142, Critical Decision Process, Revision 7
EP-2.4
EP-3.1 EP-4.1 ER-1.3
ER-2.1
ER-2.2
ER-3.1
ER-3.2 ER-3.3 WM-1.1
WM-1.2
WM-1.3
WM-2.1 WM-2.2 WM-3.1
WM-3.3
WM-4.2 Procedures 1.13.2, Vendor and Technical Information Review, Revision 1 1.3.142, Critical Decision Process, Revision 7
1.3.142, Critical Decision Process, Revision 8
1.3.142, Critical Decision Process, Revision 8
1.3.142, PNPS Risk Review and Disposition, Revision 6
1.3.142, PNPS Risk Review and Disposition, Revision 6
Line 192: Line 153:
1.3.34, Operations Administration Policies and Processes, Revision 162
1.3.34, Operations Administration Policies and Processes, Revision 162
1.4.80, PNPS Monthly Performance Review Meeting, Revision 0
1.4.80, PNPS Monthly Performance Review Meeting, Revision 0
2.1.14, Station Power Changes, Revision 120 3.M.3-47, Load Shed Relay Operational/Functional Test - Critical Maintenance, Revision 94 3.M.3-47.1, "A" Train Functional Test of Individual Load Shed Components - Critical
2.1.14, Station Power Changes, Revision 120
Maintenance, Revision 41 3.M.3-47.2, "B" Train Functional Test of Individual Load Shed Components - Critical
3.M.3-47, Load Shed Relay Operational/Functional Test - Critical Maintenance, Revision 94
Maintenance, Revision 38 3.M.3-61.3, Emergency Diesel Generator Quarterly Preventative Maintenance - Critical
3.M.3-47.1, "A" Train Functional Test of Individual Load Shed Components - Critical
Maintenance, Revision 32 3.M.4-14.2, Salt Service Water Pumps: Routine Maintenance, Revision 69
Maintenance, Revision 41
3.M.3-47.2, "B" Train Functional Test of Individual Load Shed Components - Critical
Maintenance, Revision 38
3.M.3-61.3, Emergency Diesel Generator Quarterly Preventative Maintenance - Critical
Maintenance, Revision 32
3.M.4-14.2, Salt Service Water Pumps: Routine Maintenance, Revision 69
3.M.4-9, Inspection of the Drywell and Suppression Chamber, Revision 22
3.M.4-9, Inspection of the Drywell and Suppression Chamber, Revision 22
8.5.2.13, RHR Keepfill Valve Leak Test, Revision 8
8.5.2.13, RHR Keepfill Valve Leak Test, Revision 8
8.9.8.4, 125 Vdc Station 650 Primary Battery Acceptance, Performance, or Service Test - Critical Maintenance, Revision 13 8.C.40, Seasonal Weather Surveillance, Revision 38
8.9.8.4, 125 Vdc Station 650 Primary Battery Acceptance, Performance, or Service Test -
Critical Maintenance, Revision 13
8.C.40, Seasonal Weather Surveillance, Revision 38
8.C.40, Seasonal Weather Surviellance, Revision 42
8.C.40, Seasonal Weather Surviellance, Revision 42
8.E.24, Heating, Ventilation, and Air Conditioning (HVAC) System "Q" Instrument Calibration and Functional Test, Revision 15
8.E.24, Heating, Ventilation, and Air Conditioning (HVAC) System "Q" Instrument Calibration
8.E.24, Heating, Ventilation, and Air Conditioning (HVAC) System "Q" Instrument Calibration and Functional Test, Revision 15 8.F.38.1, Diesel Generator Instrumentation Calibration and Functional Test - Critical
and Functional Test, Revision 15
Maintenance, Revision 47 8.I.11.3, Residual Heat Removal A Loop Valve Cold Shutdown Operability, Revision 10
8.E.24, Heating, Ventilation, and Air Conditioning (HVAC) System Q Instrument Calibration
8.M.2-2.10.12, HPCI High Water Trip Logic, Revision 22 8.M.2-2.10.8.6, Diesel Generator "B" Initiation by Loss of Offsite Power Logic - Critical
and Functional Test, Revision 15
Maintenance, Revision 53 EN-DC-329, Engineering Programs Control and Oversight, Revision 6 EN-DC-351, Inservice Inspection Program, Revision 3
8.F.38.1, Diesel Generator Instrumentation Calibration and Functional Test - Critical
Maintenance, Revision 47
8.I.11.3, Residual Heat Removal A Loop Valve Cold Shutdown Operability, Revision 10
8.M.2-2.10.12, HPCI High Water Trip Logic, Revision 22
8.M.2-2.10.8.6, Diesel Generator B Initiation by Loss of Offsite Power Logic - Critical
Maintenance, Revision 53
EN-DC-329, Engineering Programs Control and Oversight, Revision 6
EN-DC-351, Inservice Inspection Program, Revision 3
EN-FAP-DC-003, Fleet Engineering Morning Call, Revision 16
EN-FAP-DC-003, Fleet Engineering Morning Call, Revision 16
EN-FAP-OM-016, Performance Management Processes and Practices, Revision 9
EN-FAP-OM-016, Performance Management Processes and Practices, Revision 9
EN-FAP-OM-021, Critical Decision Procedure, Revision 6
EN-FAP-OM-021, Critical Decision Procedure, Revision 6
EN-FAP-OM-023, Entergy Nuclear Change Management, Revision 7 EN-FAP-WM-002, Critical Evolutions, Revision 5 EN-FAP-WM-011, Work Planning Standard, Revision 4
EN-FAP-OM-023, Entergy Nuclear Change Management, Revision 7
EN-FAP-WM-002, Critical Evolutions, Revision 5
EN-FAP-WM-011, Work Planning Standard, Revision 4
EN-OP-115, Conduct of Operations, Revision 25
EN-OP-115, Conduct of Operations, Revision 25
EN-OP-116, Infrequently Performed Tests or Evolutions, Revision 14
EN-OP-116, Infrequently Performed Tests or Evolutions, Revision 14
EN-OP-117, Operations Assessment Resources, Revision 14 EN-WM-100, Work Request (WR) Generation, Screening and Classification, Revision 14 EN-WM-101, Online Work Management Process, Revision 16
EN-OP-117, Operations Assessment Resources, Revision 14
EN-WM-104, On Line Risk Assessment, Revision 18  
EN-WM-100, Work Request (WR) Generation, Screening and Classification, Revision 14
 
EN-WM-101, Online Work Management Process, Revision 16
Audits/Self Assessments/Surveillances CR-PNP-2016-09147 CA09, Project Plan for: Preventive Maintenance Program Improvements, Revision 1, 6/2017 CR-PNP-2016-2054 CA-88, Final Effectiveness Review of Decision Making / Risk Recogntion for July 2017 to April 2018, 05/18 LO-PNPLO-2016-00039 CA-01, Pre-NRC Preventive Maintenance Program Implementation
EN-WM-104, On Line Risk Assessment, Revision 18
Audits/Self Assessments/Surveillances
CR-PNP-2016-09147 CA09, Project Plan for: Preventive Maintenance Program Improvements,
Revision 1, 6/2017
CR-PNP-2016-2054 CA-88, Final Effectiveness Review of Decision Making / Risk Recogntion
for July 2017 to April 2018, 05/18
LO-PNPLO-2016-00039 CA-01, Pre-NRC Preventive Maintenance Program Implementation
Self-Assessment, 12/16/2016
Self-Assessment, 12/16/2016
LO-PNPLO-2016-0031, Perform Assessment of
LO-PNPLO-2016-0031, Perform Assessment of Core Business Expectations Execution,
Core Business Expectations Execution, 6/16/2016 LO-PNPLO-2016-0093,Snapshot Assessment Core Business Staffing, Man Hours, 9/28/2016 LO-PNPLO-2018-0035, Focused Self-Assessment - Pre-NRC / Engineering Programs AAP
6/16/2016
LO-PNPLO-PNP-2016-00002 CA-21, Decision Making / Risk Recognition Fundamental Problem Area, CR-PNP-2016-2054 Effectiveness Review for January 2017 to July 2017, 8/25/17 Pilgrim Periodic Maintenance Effectiveness Assessment, A Requirement of 10CFR50.65 (a)(3), Operating Cycle 21 Pre-NRC / Risk Recognition & Decision-Making (RRDM) AAP Self-Assessment Report, 7/16/18
LO-PNPLO-2016-0093,Snapshot Assessment Core Business Staffing, Man Hours, 9/28/2016
Condition ReportsCR-PNP-2014-01990 CR-PNP-2016-02054
LO-PNPLO-2018-0035, Focused Self-Assessment - Pre-NRC / Engineering Programs AAP
CR-PNP-2016-02056
LO-PNPLO-PNP-2016-00002 CA-21, Decision Making / Risk Recognition Fundamental
CR-PNP-2016-02057 CR-PNP-2016-02061 CR-PNP-2016-07115
Problem Area, CR-PNP-2016-2054 Effectiveness Review for January 2017 to July 2017,
CR-PNP-2016-07486
8/25/17
CR-PNP-2016-08957
Pilgrim Periodic Maintenance Effectiveness Assessment, A Requirement of 10CFR50.65 (a)(3),
CR-PNP-2016-09147
Operating Cycle 21
CR-PNP-2016-09805 CR-PNP-2016-09844 CR-PNP-2016-10130
Pre-NRC / Risk Recognition & Decision-Making (RRDM) AAP Self-Assessment Report, 7/16/18
CR-PNP-2016-10148
Condition Reports
CR-PNP-2017-00403 CR-PNP-2017-02785 CR-PNP-2017-05075
CR-PNP-2014-01990                   CR-PNP-2017-02785                CR-PNP-2017-12230
CR-PNP-2017-05861
CR-PNP-2016-02054                  CR-PNP-2017-05075                CR-PNP-2017-12299
CR-PNP-2017-09271 CR-PNP-2017-11505 CR-PNP-2017-11506
CR-PNP-2016-02056                  CR-PNP-2017-05861                CR-PNP-2018-00800
CR-PNP-2017-11989
CR-PNP-2016-02057                  CR-PNP-2017-09271                CR-PNP-2018-01734
CR-PNP-2017-12124*
CR-PNP-2016-02061                  CR-PNP-2017-11505                CR-PNP-2018-02195
CR-PNP-2017-12160
CR-PNP-2016-07115                  CR-PNP-2017-11506                CR-PNP-2018-03017
CR-PNP-2017-12166 CR-PNP-2017-12188 CR-PNP-2017-12193
CR-PNP-2016-07486                  CR-PNP-2017-11989                CR-PNP-2018-03230
CR-PNP-2017-12194
CR-PNP-2016-08957                  CR-PNP-2017-12124*                CR-PNP-2018-03392
CR-PNP-2017-12212 CR-PNP-2017-12230 CR-PNP-2017-12299
CR-PNP-2016-09147                  CR-PNP-2017-12160                CR-PNP-2018-03531
CR-PNP-2018-00800
CR-PNP-2016-09805                  CR-PNP-2017-12166                CR-PNP-2018-03711
CR-PNP-2018-01734 CR-PNP-2018-02195 CR-PNP-2018-03017
CR-PNP-2016-09844                  CR-PNP-2017-12188                CR-PNP-2018-03881*
CR-PNP-2018-03230
CR-PNP-2016-10130                  CR-PNP-2017-12193                CR-PNP-2018-03943*
CR-PNP-2018-03392
CR-PNP-2016-10148                  CR-PNP-2017-12194                CR-PNP-2018-04204
CR-PNP-2018-03531
CR-PNP-2017-00403                  CR-PNP-2017-12212                CR-PNP-2018-04234
CR-PNP-2018-03711 CR-PNP-2018-03881* CR-PNP-2018-03943*
CR-PNP-2018-05156                 CR-PNP-2018-06998                CR-PNP-2018-07299*
CR-PNP-2018-04204
CR-PNP-2018-05401                CR-PNP-2018-07211*                CR-PNP-2018-07305*
CR-PNP-2018-04234
CR-PNP-2018-05752                CR-PNP-2018-07234*                CR-PNP-2018-07311*
CR-PNP-2018-05156 CR-PNP-2018-05401
CR-PNP-2018-05887                CR-PNP-2018-07245*                CR-PNP-2018-07314*
CR-PNP-2018-05752 CR-PNP-2018-05887 CR-PNP-2018-05893
CR-PNP-2018-05893                CR-PNP-2018-07257*               CR-PNP-2018-07337*
CR-PNP-2018-06160
CR-PNP-2018-06160                CR-PNP-2018-07262*               CR-PNP-2018-07339*
CR-PNP-2018-06216
CR-PNP-2018-06216                CR-PNP-2018-07262*               CR-PNP-2018-07340*
CR-PNP-2018-06309
CR-PNP-2018-06309                CR-PNP-2018-07266*               CR-PNP-2018-07428*
CR-PNP-2018-06922 CR-PNP-2018-06964 CR-PNP-2018-06998 CR-PNP-2018-07211*
CR-PNP-2018-06922                CR-PNP-2018-07271*               CR-PNP-2018-07493*
CR-PNP-2018-07234* CR-PNP-2018-07245* CR-PNP-2018-07257*
CR-PNP-2018-06964                CR-PNP-2018-07286*
CR-PNP-2018-07262*
CR-PNP-2018-07262*
CR-PNP-2018-07266*
CR-PNP-2018-07271* CR-PNP-2018-07286* CR-PNP-2018-07299* CR-PNP-2018-07305*
CR-PNP-2018-07311* CR-PNP-2018-07314* CR-PNP-2018-07337*
CR-PNP-2018-07339*
CR-PNP-2018-07340*
CR-PNP-2018-07428*
CR-PNP-2018-07493*
Work Orders
Work Orders
00013084
00013084                 00466738                  00485527              52649098
00092887 00259360 00286314
00092887                 00466738                  00490635              52649105
00313485
259360                00467103                  00490636              52653058
00313485
286314                00467210                   00490727              52653058
00329669 00329669 00403797
00313485                00468499                   00490730              52662931
00403797
00313485                00468499                   00490732              52662931
00412785
00329669                00471446                   00490733              52664405
00427869
00329669                00473476                   00490734              52676925
00443044 00443925 00448923
00403797                00474060                   00491994              52696125
00459539
00403797                00475406                   00491994              52696125
00461042 00466738 00466738 00467103 00467210
00412785                00475817                   00496992              52696239
00468499
00427869                00475818                   00497735              52696239
00468499
00443044                00475836                   00504777              52711773
00471446 00473476 00474060
00443925                00477494                   00507282              52790888
00475406
00448923                00479744                   51531885              52800356
00475817
00459539                00479744                   52374132              52814878
00475818
00461042                00484413                   52580453
00475836 00477494 00479744
Miscellaneous
00479744
2016 General Supervisor Training Plan
00484413 00485527 00490635 00490636 00490727
2017 General Supervisor Training Plan
00490730
00490732
00490733 00490734 00491994
00491994
00496992
00497735
00504777 00507282 51531885
2374132
2580453 52649098 52649105 52653058 52653058
2662931
2662931
2664405 52676925 52696125
2696125
2696239
2696239
2711773 52790888 52800356
2814878  Miscellaneous 2016 General Supervisor Training Plan 2017 General Supervisor Training Plan
2018 General Supervisor Training Plan
2018 General Supervisor Training Plan
Backlog Estimate Spreadsheet and Estimate Scope Summary Sheet
Backlog Estimate Spreadsheet and Estimate Scope Summary Sheet
Comprehensive Recovery Plan (CRP) Equipment Reliability Area Action Plan Closure Report, 8/10/2018 CR-PNP-2016-2061, Supervisor Workload Analysis Time Estimates for Recurring and Non-Recurring Tasks, 9/29/2016 EC-73073, Marotta Scientific Controls Pressure Reducer Valves, Revision 3
Comprehensive Recovery Plan (CRP) Equipment Reliability Area Action Plan Closure Report,
EC-72119, Evaluation of Acceptability of Level Selector Switch 640-302 Entergy 3/16/2017 Fleet Memo, 3/16/2017 Entergy Employee Handbook Achieving and Sustaining Excellence, 4/2018
8/10/2018
CR-PNP-2016-2061, Supervisor Workload Analysis Time Estimates for Recurring and Non-
Recurring Tasks, 9/29/2016
EC-73073, Marotta Scientific Controls Pressure Reducer Valves, Revision 3
EC-72119, Evaluation of Acceptability of Level Selector Switch 640-302
Entergy 3/16/2017 Fleet Memo, 3/16/2017
Entergy Employee Handbook Achieving and Sustaining Excellence, 4/2018
GBM22591, ABB Induced Voltage Test April 2017 Entergy Three Phase Transformer, Revision 1
GBM22591, ABB Induced Voltage Test April 2017 Entergy Three Phase Transformer, Revision 1
GSU Transformer Test Report, 5/2015 and 4/2017
GSU Transformer Test Report, 5/2015 and 4/2017
Line 312: Line 275:
LO-PNPLO-2018-0034
LO-PNPLO-2018-0034
LO-PNPLO-2018-0049
LO-PNPLO-2018-0049
Maintenance Backlog Performance Indicator May 2017 through August 2018 Mentor Report of 01/15/18 to 02/15/18 Mentor Report of 02/16/18 to 03/31/18
Maintenance Backlog Performance Indicator May 2017 through August 2018
Mentor Report of 01/15/18 to 02/15/18
Mentor Report of 02/16/18 to 03/31/18
Mentor Report of 04/01/18 to 05/15/18
Mentor Report of 04/01/18 to 05/15/18
Mentor Report of 05/16/18 to 06/30/18
Mentor Report of 05/16/18 to 06/30/18
Mentor Report of 09/24/16
Mentor Report of 09/24/16
Mentor Report of 10/7/16 Mentor Report of 11/30/16 Mentor Report of April 2017
Mentor Report of 10/7/16
Mentor Report of 11/30/16
Mentor Report of April 2017
Mentor Report of July 2017
Mentor Report of July 2017
Mentor Report of May 2017
Mentor Report of May 2017
Observation Database, March through August 2018 OFM Meeting Observation 05/30/17 One-on-One Spreadsheets, January through July 2018
Observation Database, March through August 2018
OFM Meeting Observation 05/30/17
One-on-One Spreadsheets, January through July 2018
PCBT-ADM-PROCTECHREV2018, Procedure Quality Technical Review
PCBT-ADM-PROCTECHREV2018, Procedure Quality Technical Review
PDCR 81-38, HPCI/RCIC Self-Contained Type Pressure Regulating Valves, 10/14/1981
PDCR 81-38, HPCI/RCIC Self-Contained Type Pressure Regulating Valves, 10/14/1981
Performance indicators for Scope Survival, Schedule Completion, and Critical Preventive Maintenance September 2017 through August 2018 Pilgrim NSP Organization Chart, 9/12/2016
Performance indicators for Scope Survival, Schedule Completion, and Critical Preventive
Maintenance September 2017 through August 2018
Pilgrim NSP Organization Chart, 9/12/2016
Pilgrim Nuclear Power Plant Work Order Backlog, 8/28/2018
Pilgrim Nuclear Power Plant Work Order Backlog, 8/28/2018
Pilgrim Nuclear Power Station Comprehensive Recovery Plan, Revision 0
Pilgrim Nuclear Power Station Comprehensive Recovery Plan, Revision 0
Pilgrim Nuclear Safety Culture Performance Improvement Risk Recognition, Decision Making and Corrective Action Program, 9/9/2018 PLP-ESPP-RISK2016, PNP 1.3.142 Risk Re
Pilgrim Nuclear Safety Culture Performance Improvement Risk Recognition, Decision Making
view & Disposition, Revision 1 PLP-SUPC-DECISION RISK, Risk Recognition and Decision Making Leadership Training (2017) and Instructor Documents PM 50079951, 8.C.40 (Sec 8.1) Cold Weather Surv, 2017
and Corrective Action Program, 9/9/2018
PM 50079953, 8.C.40 (Sec 8.3) Warm Weather Surv, 2017 PNP-ENG-All, Email, "Engineering Document NE16-007, Assignment of Corrective Actions,"
PLP-ESPP-RISK2016, PNP 1.3.142 Risk Review & Disposition, Revision 1
6/13/2016 PNPS 95003 Recovery Metrics, 7/2018
PLP-SUPC-DECISION RISK, Risk Recognition and Decision Making Leadership Training
    (2017) and Instructor Documents
PM 50079951, 8.C.40 (Sec 8.1) Cold Weather Surv, 2017
PM 50079953, 8.C.40 (Sec 8.3) Warm Weather Surv, 2017
PNP-ENG-All, Email, Engineering Document NE16-007, Assignment of Corrective Actions,
6/13/2016
PNPS 95003 Recovery Metrics, 7/2018
Procedure Quality Briefing Sheet, December 19, 2017, CR-2017, 21117, CA 6
Procedure Quality Briefing Sheet, December 19, 2017, CR-2017, 21117, CA 6
Q2-2017, Program Health Report, Pilgrim Nuclear Station, AOV (KPI) - Air Operated Valve
Q2-2017, Program Health Report, Pilgrim Nuclear Station, AOV (KPI) - Air Operated Valve
Program Q2-2017, Program Health Report, Pilgrim Nuclear Station, APP-J (KPI) - Containment Leakage Rate and Testing Program (Appendix J) Q2-2017, Program Health Report, Pilgrim Nuclear Station, FAC - Flow Accelerated Corrosion
Program
Program Q2-2017, Program Health Report, Pilgrim Nuclear Station, ISI - Inservice Inspection Program (ASME Section XI) Q2-2017, Program Health Report, Pilgrim Nuclear Station, MOV (KPI) - Motor Operated Valve
Q2-2017, Program Health Report, Pilgrim Nuclear Station, APP-J (KPI) - Containment Leakage
Program Q2-2018, Program Health Report, Pilgrim Nuclear Station, EQ (KPI) - Equipment Qualification
Rate and Testing Program (Appendix J)
Program Q2-2018, Program Health Report, Pilgrim Nuclear Station, ISI - Inservice Testing Program Q4-2017, Program Health Report, Pilgrim Nuclear Station, BPT (KPI) - Buried Piping and Tank
Q2-2017, Program Health Report, Pilgrim Nuclear Station, FAC - Flow Accelerated Corrosion
Program Risk to generation work orders week of 2/26/2018
Program
Q2-2017, Program Health Report, Pilgrim Nuclear Station, ISI - Inservice Inspection Program
    (ASME Section XI)
Q2-2017, Program Health Report, Pilgrim Nuclear Station, MOV (KPI) - Motor Operated Valve
Program
Q2-2018, Program Health Report, Pilgrim Nuclear Station, EQ (KPI) - Equipment Qualification
Program
Q2-2018, Program Health Report, Pilgrim Nuclear Station, ISI - Inservice Testing Program
Q4-2017, Program Health Report, Pilgrim Nuclear Station, BPT (KPI) - Buried Piping and Tank
Program
Risk to generation work orders week of 2/26/2018
Roster of Entergy Maintenance technicians 10/2017 and 9/2018
Roster of Entergy Maintenance technicians 10/2017 and 9/2018
Scope Survival, Scope Completion, Critical PMs deferred, late, and in second half of grace, January through August 2018 SEP-ISI-PNPS-002, PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) Program Plan, Revision 5 SES-2010-09, Simulator Scenario, Revision 4
Scope Survival, Scope Completion, Critical PMs deferred, late, and in second half of grace,
January through August 2018
SEP-ISI-PNPS-002, PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) Program Plan,
Revision 5
SES-2010-09, Simulator Scenario, Revision 4
SES-2014-03, Simulator Scenario, Revision 3
SES-2014-03, Simulator Scenario, Revision 3
Supply and Demand Model for Maintenance Technicians, 2016 through 2018
Supply and Demand Model for Maintenance Technicians, 2016 through 2018
SUT CCVT PM Evaluation, September 13, 2018
SUT CCVT PM Evaluation, September 13, 2018
Targeted Performance Improvement Plans for 14 Managers and Supervisors Technical Conscience Mentor Weekly Summary Report, Week Ending 2/2/2018 Technical Conscience Mentor Weekly Summary Report, Week Ending 2/9/2018
Targeted Performance Improvement Plans for 14 Managers and Supervisors
Technical Conscience Mentor Weekly Summary Report, Week Ending 2/2/2018
Technical Conscience Mentor Weekly Summary Report, Week Ending 2/9/2018
Technical Conscience Mentor Weekly Summary Report, Week Ending 8/11/2017
Technical Conscience Mentor Weekly Summary Report, Week Ending 8/11/2017
Technical Conscience Mentor Weekly Summary Report, Week Ending 8/4/2017
Technical Conscience Mentor Weekly Summary Report, Week Ending 8/4/2017
Template for 0705 Engineering Manager Meeting Agenda Timesheets for contract technicians for the week of August 13, 2018 WT-WTPNP-2016-0207
Template for 0705 Engineering Manager Meeting Agenda
Attachment Confirmatory Action Letter Item Status
Timesheets for contract technicians for the week of August 13, 2018
Line Item Area Action Plan CAL Item Inspection Report Number Closed 1 Nuclear Safety Culture NSC-1.1
WT-WTPNP-2016-0207
Nuclear Safety Culture NSC-1.2
Confirmatory Action Letter Item Status
Nuclear Safety Culture NSC-1.3
Line     Area Action Plan       CAL Item     Inspection Report Number   Closed
Nuclear Safety Culture NSC-1.4
Item
Nuclear Safety Culture NSC-1.5
Nuclear Safety Culture     NSC-1.1
Nuclear Safety Culture NSC-1.6
Nuclear Safety Culture     NSC-1.2
Nuclear Safety Culture NSC-1.7
Nuclear Safety Culture     NSC-1.3
Nuclear Safety Culture NSC-1.8
Nuclear Safety Culture     NSC-1.4
Nuclear Safety Culture NSC-1.10
Nuclear Safety Culture     NSC-1.5
Nuclear Safety Culture NSC-2.2
Nuclear Safety Culture     NSC-1.6
Nuclear Safety Culture NSC-2.3
Nuclear Safety Culture     NSC-1.7
Nuclear Safety Culture NSC-3.1
Nuclear Safety Culture     NSC-1.8
Nuclear Safety Culture NSC-3.2
Nuclear Safety Culture   NSC-1.10
Nuclear Safety Culture NSC-3.3
Nuclear Safety Culture     NSC-2.2
Nuclear Safety Culture NSC-3.4
Nuclear Safety Culture     NSC-2.3
Nuclear Safety Culture NSC-3.5
Nuclear Safety Culture     NSC-3.1
Nuclear Safety Culture NSC-3.6
Nuclear Safety Culture     NSC-3.2
Nuclear Safety Culture NSC-3.7
Nuclear Safety Culture     NSC-3.3
Nuclear Safety Culture NSC-3.8
Nuclear Safety Culture     NSC-3.4
Nuclear Safety Culture NSC-4.1
Nuclear Safety Culture     NSC-3.5
Nuclear Safety Culture NSC-4.2
Nuclear Safety Culture     NSC-3.6
Nuclear Safety Culture NSC-5.1
Nuclear Safety Culture     NSC-3.7
Nuclear Safety Culture NSC-5.2
Nuclear Safety Culture     NSC-3.8
Nuclear Safety Culture NSC-5.3
Nuclear Safety Culture     NSC-4.1
Nuclear Safety Culture NSC-5.4
Nuclear Safety Culture     NSC-4.2
Nuclear Safety Culture NSC-6.1
Nuclear Safety Culture     NSC-5.1
Nuclear Safety Culture NSC-7.1
Nuclear Safety Culture     NSC-5.2
Nuclear Safety Culture NSC-8.1
Nuclear Safety Culture     NSC-5.3
Nuclear Safety Culture NSC-8.6
Nuclear Safety Culture     NSC-5.4
Nuclear Safety Culture NSC-8.8
Nuclear Safety Culture     NSC-6.1
Nuclear Safety Culture NSC-8.9
Nuclear Safety Culture     NSC-7.1
Nuclear Safety Culture NSC-8.10
Nuclear Safety Culture     NSC-8.1
Nuclear Safety Culture NSC-8.21
Nuclear Safety Culture     NSC-8.6
Nuclear Safety Culture NSC-8.22
Nuclear Safety Culture     NSC-8.8
Nuclear Safety Culture NSC-8.25
Nuclear Safety Culture     NSC-8.9
Nuclear Safety Culture NSC-8.26
Nuclear Safety Culture   NSC-8.10
Nuclear Safety Culture NSC-8.27
Nuclear Safety Culture   NSC-8.21
Nuclear Safety Culture NSC-8.28
Nuclear Safety Culture   NSC-8.22
Nuclear Safety Culture NSC-8.29
Nuclear Safety Culture   NSC-8.25
Corrective Action Program CAP-1.1 05000293/2017010 Y 41 Corrective Action Program CAP-1.2 05000293/2018011 Y
Nuclear Safety Culture   NSC-8.26
Line Item Area Action Plan CAL Item Inspection Report Number Closed 42 Corrective Action Program CAP-1.3 Reviewed - 05000293/2018011
Nuclear Safety Culture   NSC-8.27
Nuclear Safety Culture   NSC-8.28
Nuclear Safety Culture   NSC-8.29
Corrective Action Program   CAP-1.1         05000293/2017010           Y
Corrective Action Program   CAP-1.2         05000293/2018011           Y
 
Line     Area Action Plan     CAL Item Inspection Report Number   Closed
Item
Corrective Action Program CAP-1.3 Reviewed - 05000293/2018011   Y
And 05000293/2018012
And 05000293/2018012
Y 43 Corrective Action Program CAP-1.4 05000293/2018011 Y 44 Corrective Action Program CAP-1.5 05000293/2018011 Y 45 Corrective Action Program CAP-1.7 05000293/2018011 Y 46 Corrective Action Program CAP-1.8 Reviewed - 05000293/2018011
Corrective Action Program CAP-1.4       05000293/2018011         Y
Corrective Action Program CAP-1.5       05000293/2018011         Y
Corrective Action Program CAP-1.7       05000293/2018011         Y
Corrective Action Program CAP-1.8 Reviewed - 05000293/2018011   Y
And 05000293/2018012
And 05000293/2018012
Y 47 Corrective Action Program CAP-1.9 05000293/2018011 Y
Corrective Action Program CAP-1.9       05000293/2018011         Y
Corrective Action Program CAP-1.10 05000293/2018011
Corrective Action Program CAP-1.10     05000293/2018011         Y
Y 49 Corrective Action Program CAP-1.11 05000293/2018011
Corrective Action Program CAP-1.11     05000293/2018011         Y
Y 50 Corrective Action Program CAP-2.1 05000293/2018011 Y 51 Corrective Action Program CAP-2.2 05000293/2018011 Y 52 Corrective Action Program CAP-2.3 05000293/2018011 Y 53 Corrective Action Program CAP-3.1 05000293/2018011 Y 54 Corrective Action Program CAP-3.2 05000293/2018011 Y 55 Corrective Action Program CAP-4.2 05000293/2018011 Y 56 Corrective Action Program CAP-4.3 05000293/2018011 Y 57 Procedure Use and
Corrective Action Program CAP-2.1       05000293/2018011         Y
Adherence PUA-1.1 05000293/2017010 Y 58 Procedure Use and
Corrective Action Program CAP-2.2       05000293/2018011         Y
Adherence PUA-1.2 05000293/2017010 Y 59 Procedure Use and
Corrective Action Program CAP-2.3       05000293/2018011         Y
Adherence PUA-1.3 05000293/2017010 Y 60 Procedure Use and
Corrective Action Program CAP-3.1       05000293/2018011         Y
Adherence PUA-1.4 05000293/2017010 Y 61 Procedure Use and
Corrective Action Program CAP-3.2       05000293/2018011         Y
Adherence PUA-1.6 05000293/2018011 Y 62 Procedure Use and
Corrective Action Program CAP-4.2       05000293/2018011         Y
Adherence PUA-2.2 05000293/2018011 Y 63 Procedure Use and
Corrective Action Program CAP-4.3       05000293/2018011         Y
Adherence PUA-2.3 05000293/2018011 Y 64 Procedure Use and
Procedure Use and     PUA-1.1       05000293/2017010         Y
Adherence PUA-2.4 05000293/2018011 Y 65 Procedure Use and
Adherence
Adherence PUA-2.5 05000293/2018011 Y 66 Procedure Use and
Procedure Use and     PUA-1.2       05000293/2017010         Y
Adherence PUA-3.1 05000293/2018011 Y 67 Procedure Use and
Adherence
Adherence PUA-3.2 05000293/2018011 Y 68 Procedure Use and
Procedure Use and     PUA-1.3       05000293/2017010         Y
Adherence PUA-3.3 05000293/2018011 Y 69 Procedure Use and
Adherence
Adherence PUA-3.4 05000293/2018011 Y
Procedure Use and     PUA-1.4       05000293/2017010         Y
Line Item Area Action Plan CAL Item Inspection Report Number Closed 70 Procedure Use and
Adherence
Adherence PUA-4.1 05000293/2018011 Y 71 Procedure Use and
Procedure Use and     PUA-1.6       05000293/2018011         Y
Adherence PUA-4.2 Reviewed - 05000293/2018011 N 72 Procedure Use and
Adherence
Adherence PUA-4.3 05000293/2018011 Y 73 Procedure Use and
Procedure Use and     PUA-2.2       05000293/2018011         Y
Adherence PUA-5.1 05000293/2018011 Y 74 Procedure Use and
Adherence
Adherence PUA-5.2 05000293/2018011 Y 75 Procedure Use and
Procedure Use and     PUA-2.3       05000293/2018011         Y
Adherence PUA-5.7 05000293/2018011 Y 76 Procedure Use and
Adherence
Adherence PUA-5.8 05000293/2018011 Y 77 Procedure Use and
Procedure Use and     PUA-2.4       05000293/2018011         Y
Adherence PUA-5.9 05000293/2018011 Y 78 Operability Determinations and Functionality Assessments
Adherence
ODFA-1.1 05000293/2017010 Y 79 Operability Determinations and Functionality Assessments
Procedure Use and     PUA-2.5       05000293/2018011         Y
ODFA-1.2 05000293/2018010 Y 80 Operability Determinations and Functionality Assessments
Adherence
ODFA-1.3 05000293/2018010 Y 81 Operability Determinations and Functionality Assessments
Procedure Use and     PUA-3.1       05000293/2018011         Y
ODFA-1.4 05000293/2018010 Y 82 Operability Determinations and Functionality Assessments
Adherence
ODFA-1.5 05000293/2018010 Y 83 Operability Determinations and Functionality Assessments
Procedure Use and     PUA-3.2       05000293/2018011         Y
ODFA-1.6 05000293/2018010 Y 84 Operability Determinations and Functionality Assessments
Adherence
ODFA-2.2 05000293/2018010 Y 85 Operability Determinations and Functionality Assessments
Procedure Use and     PUA-3.3       05000293/2018011         Y
ODFA-3.1 05000293/2018010 Y 86 Operability Determinations and Functionality Assessments
Adherence
ODFA-5.1 05000293/2018010 Y
Procedure Use and     PUA-3.4       05000293/2018011         Y
Line Item Area Action Plan CAL Item Inspection Report Number Closed 87 Operability Determinations and Functionality Assessments
Adherence
ODFA-5.2 05000293/2018010 Y 88 Operability Determinations and Functionality Assessments
Line   Area Action Plan       CAL Item Inspection Report Number   Closed
ODFA-5.3 05000293/2018010 Y 89 Operability Determinations and Functionality Assessments
Item
ODFA-5.4 05000293/2018010 Y 90 Operability Determinations and Functionality Assessments
Procedure Use and       PUA-4.1       05000293/2018011         Y
ODFA-5.5 05000293/2018010 Y 91 Operability Determinations and Functionality Assessments
Adherence
ODFA-5.6 05000293/2018010 Y 92 Operability Determinations and Functionality Assessments
Procedure Use and       PUA-4.2 Reviewed - 05000293/2018011   N
ODFA-5.7 05000293/2018010 Y
Adherence
Operability Determinations and Functionality Assessments
Procedure Use and       PUA-4.3       05000293/2018011         Y
ODFA-5.8 05000293/2018010
Adherence
Y 94 Operations Department Standards and Leadership OPS-1.1 05000293/2018012 Y 95 Operations Department Standards and Leadership OPS-1.2 05000293/2018012 Y 96 Operations Department Standards and Leadership OPS-1.4 05000293/2018012 Y 97 Operations Department Standards and Leadership OPS-1.6 05000293/2018012 Y 98 Operations Department Standards and Leadership OPS-1.7 05000293/2018012 Y 99 Operations Department Standards and Leadership OPS-2.2 05000293/2018012 Y 100 Operations Department Standards and Leadership OPS-3.1 05000293/2018012 Y 101 Operations Department Standards and Leadership OPS-3.2 05000293/2018012 Y 102 Operations Department Standards and Leadership OPS-4.1 05000293/2018012 Y 103 Operations Department Standards and Leadership OPS-4.2 05000293/2018012 Y 104 Risk Recognition and Decision Making RRDM-1.1 05000293/2018012 Y
Procedure Use and       PUA-5.1       05000293/2018011         Y
Line Item Area Action Plan CAL Item Inspection Report Number Closed 105 Risk Recognition and Decision Making RRDM-1.2 05000293/2018012 Y 106 Risk Recognition and Decision Making RRDM-1.3 05000293/2018012 Y 107 Risk Recognition and Decision Making RRDM-2.1 05000293/2018012 Y 108 Risk Recognition and Decision Making RRDM-3.1 05000293/2018012 Y 109 Risk Recognition and Decision Making RRDM-3.2 05000293/2018012 Y 110 Risk Recognition and Decision Making RRDM-3.3 05000293/2018012 Y 111 Risk Recognition and Decision Making RRDM-4.3 05000293/2018012 Y 112 Risk Recognition and Decision Making RRDM-4.8 05000293/2018012 Y 113 Risk Recognition and Decision Making RRDM-4.9 05000293/2018012 Y 114 Procedure Quality PQ-1.1 Reviewed - 05000293/2017010
Adherence
Procedure Use and       PUA-5.2       05000293/2018011         Y
Adherence
Procedure Use and       PUA-5.7       05000293/2018011         Y
Adherence
Procedure Use and       PUA-5.8       05000293/2018011         Y
Adherence
Procedure Use and       PUA-5.9       05000293/2018011         Y
Adherence
Operability Determinations ODFA-       05000293/2017010         Y
and Functionality       1.1
Assessments
Operability Determinations  ODFA-       05000293/2018010         Y
and Functionality       1.2
Assessments
Operability Determinations  ODFA-       05000293/2018010         Y
and Functionality       1.3
Assessments
Operability Determinations  ODFA-       05000293/2018010         Y
and Functionality       1.4
Assessments
Operability Determinations  ODFA-       05000293/2018010         Y
and Functionality       1.5
Assessments
Operability Determinations  ODFA-       05000293/2018010         Y
and Functionality       1.6
Assessments
Operability Determinations  ODFA-       05000293/2018010         Y
and Functionality       2.2
Assessments
Operability Determinations  ODFA-       05000293/2018010         Y
and Functionality       3.1
Assessments
Operability Determinations  ODFA-       05000293/2018010         Y
and Functionality        5.1
Assessments
Line     Area Action Plan       CAL Item Inspection Report Number Closed
Item
Operability Determinations ODFA-      05000293/2018010        Y
and Functionality       5.2
Assessments
Operability Determinations  ODFA-       05000293/2018010       Y
and Functionality       5.3
Assessments
Operability Determinations  ODFA-       05000293/2018010       Y
and Functionality       5.4
Assessments
Operability Determinations  ODFA-       05000293/2018010       Y
and Functionality       5.5
Assessments
Operability Determinations  ODFA-       05000293/2018010       Y
and Functionality       5.6
Assessments
Operability Determinations  ODFA-       05000293/2018010       Y
and Functionality       5.7
Assessments
Operability Determinations  ODFA-       05000293/2018010       Y
and Functionality       5.8
Assessments
Operations Department     OPS-1.1     05000293/2018012       Y
Standards and Leadership
Operations Department    OPS-1.2     05000293/2018012       Y
Standards and Leadership
Operations Department    OPS-1.4     05000293/2018012       Y
Standards and Leadership
Operations Department    OPS-1.6     05000293/2018012       Y
Standards and Leadership
Operations Department    OPS-1.7     05000293/2018012       Y
Standards and Leadership
Operations Department    OPS-2.2     05000293/2018012       Y
Standards and Leadership
100 Operations Department     OPS-3.1     05000293/2018012       Y
Standards and Leadership
101 Operations Department     OPS-3.2     05000293/2018012       Y
Standards and Leadership
2  Operations Department    OPS-4.1     05000293/2018012       Y
Standards and Leadership
103 Operations Department     OPS-4.2     05000293/2018012       Y
Standards and Leadership
104   Risk Recognition and     RRDM-       05000293/2018012       Y
Decision Making          1.1
Line   Area Action Plan   CAL Item Inspection Report Number   Closed
Item
105 Risk Recognition and RRDM-       05000293/2018012         Y
Decision Making    1.2
106 Risk Recognition and RRDM-       05000293/2018012         Y
Decision Making    1.3
107 Risk Recognition and RRDM-       05000293/2018012         Y
Decision Making    2.1
108 Risk Recognition and RRDM-       05000293/2018012         Y
Decision Making    3.1
109 Risk Recognition and RRDM-       05000293/2018012         Y
Decision Making    3.2
110 Risk Recognition and RRDM-       05000293/2018012         Y
Decision Making    3.3
111 Risk Recognition and RRDM-       05000293/2018012         Y
Decision Making    4.3
2 Risk Recognition and RRDM-       05000293/2018012         Y
Decision Making    4.8
113 Risk Recognition and RRDM-       05000293/2018012         Y
Decision Making    4.9
114   Procedure Quality   PQ-1.1 Reviewed - 05000293/2017010   Y
And 05000293/2018012
And 05000293/2018012
Y 115 Procedure Quality PQ-2.1 05000293/2017010 Y 116 Procedure Quality PQ-2.2 05000293/2017010 Y 117 Procedure Quality PQ-3.1 05000293/2017010 Y 118 Procedure Quality PQ-3.2 05000293/2017010 Y 119 Procedure Quality PQ-3.3 05000293/2017010 Y 120 Procedure Quality PQ-5.1 05000293/2017010 Y 121 Procedure Quality PQ-5.2 Reviewed - 05000293/2017010
115   Procedure Quality   PQ-2.1       05000293/2017010         Y
116   Procedure Quality   PQ-2.2       05000293/2017010         Y
117   Procedure Quality   PQ-3.1       05000293/2017010         Y
118   Procedure Quality   PQ-3.2       05000293/2017010         Y
119   Procedure Quality   PQ-3.3       05000293/2017010         Y
20  Procedure Quality   PQ-5.1       05000293/2017010         Y
21  Procedure Quality   PQ-5.2 Reviewed - 05000293/2017010   Y
And 05000293/2018012
And 05000293/2018012
Y 122 SRV White Finding SRV-1.1 05000293/2018010 Y 123 SRV White Finding SRV-1.2 05000293/2018010 Y 124 SRV White Finding SRV-1.3 05000293/2017010 Y 125 SRV White Finding SRV-2.1 05000293/2017010 Y 126 SRV White Finding SRV-3.1 05000293/2018010 Y 127 SRV White Finding SRV-3.2 05000293/2018010 Y 128 SRV White Finding SRV-3.3 05000293/2018010 Y 129 SRV White Finding SRV-3.4 05000293/2018010 Y 130 SRV White Finding SRV-4.1 05000293/2018010 Y 131 SRV White Finding SRV-5.1 05000293/2018010 Y 132 SRV White Finding SRV-5.2 05000293/2018010 Y 133 Engineering Programs EP-1.1 05000293/2017010 Y 134 Engineering Programs EP-1.2 05000293/2018012 Y 135 Engineering Programs EP-2.1 05000293/2018012 Y 136 Engineering Programs EP-2.2 05000293/2018012 Y 137 Engineering Programs EP-2.3 05000293/2018012 Y
SRV White Finding   SRV-1.1       05000293/2018010         Y
Line Item Area Action Plan CAL Item Inspection Report Number Closed 138 Engineering Programs EP-2.4 05000293/2018012 Y 139 Engineering Programs EP-3.1 05000293/2018012 Y 140 Engineering Programs EP-4.1 05000293/2018012 Y 141 Equipment Reliability ER-1.1 05000293/2017010 Y 142 Equipment Reliability ER-1.2 05000293/2017010 Y 143 Equipment Reliability ER-1.3 05000293/2018012 Y 144 Equipment Reliability ER-2.1 05000293/2018012 Y 145 Equipment Reliability ER-2.2 05000293/2018012 Y 146 Equipment Reliability ER-3.1 05000293/2018012 Y 147 Equipment Reliability ER-3.2 05000293/2018012 Y 148 Equipment Reliability ER-3.3 05000293/2018012 Y 149 Work Management WM-1.1 05000293/2018012 Y 150 Work Management WM-1.2 05000293/2018012 Y 151 Work Management WM-1.3 05000293/2018012 Y 152 Work Management WM-2.1 05000293/2018012 Y 153 Work Management WM-2.2 05000293/2018012 Y 154 Work Management WM-3.1 05000293/2018012 Y 155 Work Management WM-3.3 05000293/2018012 Y 156 Work Management WM-4.2 05000293/2018012 Y
23  SRV White Finding   SRV-1.2       05000293/2018010         Y
24  SRV White Finding   SRV-1.3       05000293/2017010         Y
25  SRV White Finding   SRV-2.1       05000293/2017010         Y
26  SRV White Finding   SRV-3.1       05000293/2018010         Y
27  SRV White Finding   SRV-3.2       05000293/2018010         Y
28  SRV White Finding   SRV-3.3       05000293/2018010         Y
29  SRV White Finding   SRV-3.4       05000293/2018010         Y
130 SRV White Finding   SRV-4.1       05000293/2018010         Y
131 SRV White Finding   SRV-5.1       05000293/2018010         Y
SRV White Finding   SRV-5.2       05000293/2018010         Y
133 Engineering Programs EP-1.1       05000293/2017010         Y
134 Engineering Programs EP-1.2       05000293/2018012         Y
135 Engineering Programs EP-2.1       05000293/2018012         Y
136 Engineering Programs EP-2.2       05000293/2018012         Y
137 Engineering Programs EP-2.3       05000293/2018012         Y
Line   Area Action Plan   CAL Item Inspection Report Number Closed
Item
138 Engineering Programs   EP-2.4     05000293/2018012       Y
139 Engineering Programs   EP-3.1     05000293/2018012       Y
140 Engineering Programs   EP-4.1     05000293/2018012       Y
141 Equipment Reliability ER-1.1     05000293/2017010       Y
2 Equipment Reliability ER-1.2     05000293/2017010       Y
143 Equipment Reliability ER-1.3     05000293/2018012       Y
144 Equipment Reliability ER-2.1     05000293/2018012       Y
145 Equipment Reliability ER-2.2     05000293/2018012       Y
146 Equipment Reliability ER-3.1     05000293/2018012       Y
147 Equipment Reliability ER-3.2     05000293/2018012       Y
148 Equipment Reliability ER-3.3     05000293/2018012       Y
149 Work Management       WM-1.1     05000293/2018012       Y
150 Work Management       WM-1.2     05000293/2018012       Y
151 Work Management       WM-1.3     05000293/2018012       Y
Work Management       WM-2.1     05000293/2018012       Y
153 Work Management       WM-2.2     05000293/2018012       Y
154 Work Management       WM-3.1     05000293/2018012       Y
155 Work Management       WM-3.3     05000293/2018012       Y
156 Work Management       WM-4.2     05000293/2018012       Y
}}
}}

Latest revision as of 11:23, 20 October 2019

Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018012
ML18305A834
Person / Time
Site: Pilgrim
Issue date: 11/01/2018
From: Anthony Dimitriadis
NRC/RGN-I/DRP/PB5
To: Brian Sullivan
Entergy Nuclear Operations
Dimitriadis A
References
EA-17-086 IR 2018012
Download: ML18305A834 (20)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 1, 2018

SUBJECT:

PILGRIM NUCLEAR POWER STATION - CONFIRMATORY ACTION LETTER (EA-17-086) FOLLOW-UP INSPECTION REPORT 05000293/2018012

Dear Mr. Sullivan:

On September 14, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an on-site team inspection at Pilgrim Nuclear Power Station (PNPS). The NRC inspectors discussed the results of this inspection with you and other members of your staff during an onsite debrief on September 14, 2018, and via teleconference exit on October 17, 2018. The results of this inspection are documented in the enclosed report.

The NRC inspection team reviewed PNPSs progress in implementing the actions from the PNPS Recovery Plan that were committed to in the Confirmatory Action Letter (CAL) dated August 2, 2017 (NRCs Agencywide Documents Access and Management System (ADAMS)

Accession No. ML17214A088) (EA-17-086). Specifically, for this inspection the team reviewed the adequacy of the corrective actions PNPS completed to address 45 individual CAL items in the Corrective Action Program, Operations Standards and Site Leadership, Risk Recognition and Decision Making, Procedure Quality, Engineering Programs, Equipment Reliability, and Work Management Area Action Plans. The team also reviewed site performance to determine whether the actions completed for these plans, in aggregate, achieved the safety performance improvement objectives stated in the PNPS Recovery Plan for those seven Area Action Plans.

Finally, the team conducted a targeted site safety culture assessment to properly assess individual CAL items with actions tied to safety culture and gather preliminary information for the final CAL follow-up inspection.

The team determined that all 45 individual CAL items reviewed and the 7 associated Area Action Plans were adequately completed and effective in achieving the associated PNPS Recovery Plan performance improvement objectives. As a result, the 45 CAL items and the Area Action Plans for Corrective Action Program, Operations Standards and Site Leadership, Risk Recognition and Decision Making, Procedure Quality, Engineering Programs, Equipment Reliability, and Work Management are closed.

No findings or violations of NRC requirements were identified during this inspection. In accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, PNPS will remain within the Multiple/Repetitive Degraded Cornerstone column of the NRCs Reactor Oversight Process Action Matrix pending completion of all actions needed to close the CAL. To review the remaining CAL actions and Area Action Plans, the NRC currently plans to complete one additional quarterly CAL follow-up inspection in addition to the four already completed. The NRC staff will assess the effectiveness of Entergys implementation of these corrective actions and evaluate whether the safety performance of PNPS has demonstrated sustained improvement warranting transition of PNPS out of Column 4 in accordance with Inspection Manual Chapter 0305, Section 10.02d, paragraph 7. The final on-site CAL follow-up inspection is currently scheduled to be completed in December 2018, and the report documenting the results of that inspection to be issued shortly thereafter.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Anthony Dimitriadis, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No. 50-293 License No. DPR-35

Enclosure:

Inspection Report 05000293/2018012 w/Attachment: Confirmatory Action Letter Item Status

Inspection Report

Docket Number: 50-293 License Number: DPR-35 Report Number: 05000293/2018012 Enterprise Identifier: I-2018-012-0014 Licensee: Entergy Nuclear Operations, Inc. (Entergy)

Facility: Pilgrim Nuclear Power Station (PNPS)

Location: Plymouth, MA Inspection Dates: 09/10/2018 - 09/14/2018 Team Lead: S. Rutenkroger, PhD, Senior Resident Inspector Inspectors: L. Cline Jr., Senior Project Engineer Z. Hollcraft, Senior Resident Inspector J. Krafty, Senior Resident Inspector M. Keefe-Forsyth, Human Factors Specialist S. Morrow, Human Factors Engineer J. Dolecki, Resident Inspector M. Hardgrove, Project Engineer C. Roettgen, Resident Inspector C. Safouri, Project Engineer Approved By: Anthony Dimitriadis, Chief Reactor Projects Branch 5 Division of Reactor Projects Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Entergys performance at PNPS by conducting the fourth confirmatory action letter (CAL) follow-up inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

The team reviewed 45 of the 156 items that Entergy committed to complete in the PNPS CAL (EA-17-086). The items reviewed were associated with the Corrective Action Program (CAP),

Operations Standards and Site Leadership (OPS), Risk Recognition and Decision Making (RRDM), Procedure Quality (PQ), Engineering Programs (EP), Equipment Reliability (ER), and Work Management (WM) Area Action Plans. The team determined that all 45 individual CAL items reviewed and the associated Area Action Plans were adequately completed and effective in achieving the associated PNPS Recovery Plan performance improvement objectives. As a result, the 45 CAL items and these 7 Area Action Plans are closed.

No findings or more-than-minor violations were identified.

Additional Tracking Items Type Issue Title Report Status number Section CAL EA-17-086 PNPS Confirmatory Action letter Inspection Discussed Results 92702

INSPECTION SCOPES

This inspection was conducted using the appropriate portions of the applicable inspection procedure in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the NRC website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess Entergys performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT, AND ABNORMAL 92702 - Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders The inspectors reviewed the status of the corrective actions that Entergy had reported complete for 45 of the 156 items listed on Enclosure 2 of the PNPS CAL (EA-17-086)

(ADAMS Accession No. ML17214A088). The inspectors also conducted a targeted safety culture assessment to review the current status of PNPS corrective actions intended to improve site safety culture in these areas.

All 45 items reviewed for this inspection are identified in the Confirmatory Action Letter Item Status summary table included as an Attachment to this report. The inspectors also reviewed the status of the Area Action Plans associated with these 45 items, which in accordance with Enclosure 2 of the PNPS CAL included the CAP, OPS, RRDM, PQ, EP, ER, and WM Area Action Plans. Entergy had reported these seven Area Action Plans were complete and effective.

The inspectors evaluated these items to determine if:

(1) CAL item corrective actions were completed in a timely manner consistent with their safety significance.
(2) Area Action Plans were effective at addressing the performance issues identified in the CAL.
(3) CAL performance metrics were appropriate and accurate.
(4) Closure of each CAL item and Area Action Plan was completed in accordance with established PNPS procedural guidance.
(5) PNPS corrected NRC-identified problems in PNPS implementation of actions taken for PQ-1.1 and PQ-5.2 (see NRC Inspection Report (IR) 05000293/2017010 (ADAMS Accession No. ML18032A463)), and the adverse impact of these problems on the effectiveness of the PQ Area Action Plan.
(6) PNPS safety culture actions to date had caused a sustained positive change in safety culture, specifically related to the CAP (see NRC IR 05000293/2018011 (ADAMS Accession No. ML18282A039)) and RRDM Area Action Plans.

During this review, the inspectors completed the following specific activities:

(1) Reviewed Entergys closure packages for each of the CAL action items.
(2) Reviewed Entergys closure reports for each of the Area Action Plans.
(3) Reviewed Entergys interim and final effectiveness reviews and self-assessments completed for the Area Action Plans.
(4) Reviewed Entergys performance indicators and recovery metrics for the Area Action Plans through August 2018.
(5) Overall, conducted 72 individual interviews, 8 focus group panel discussions, and multiple as-needed follow-up discussions with 117 PNPS staff, supervisors, managers, and directors from Plant Operations, Engineering, Maintenance, Production, Training, Security, Human Resources, Regulatory and Performance Improvement, Chemistry, Radiation Protection, and Recovery (including contract personnel such as Subject Matter Experts and Mentors in operations, corrective actions, and risk decision making).
(6) Reviewed Organizational Health Index survey results, Nuclear Safety Culture Leadership Team and Monitoring Panel meeting minutes, Nuclear Safety Culture Advocate reports, and CAP subject matter expert assessment reports from 2016 through 2018.
(7) Performed numerous walk-downs and independent field observations of the conduct of operations, in-progress training, and maintenance planning.
(8) Observed site meetings associated with engineering reviews, work planning (multiple T-weeks), and daily/weekly production.
(9) Reviewed procedures, procedure change requests and revisions, training presentations, case study presentations, training attendance records, critical decision making documents, what it looks like (WILL) sheets, backlog status reports, self-assessments, operating crew training performance and feedback records, final written and simulator examinations, operating crew event critiques, individual targeted performance improvement plans, coaching feedback records, work planning man-hour estimates, timesheets, critical and non-critical corrective and deficient backlog records, critical preventive maintenance deferred (and/or in grace) records, single-point and aging vulnerability assessments and records, and work orders.

INSPECTION RESULTS

Observation 92702 CAL Items Closed The team closed all of the following 45 CAL items (a narrative description of each item is listed in Enclosure 1 to the PNPS CAL (ADAMS Accession No. ML17214A088):

Corrective Action Program (CAP) - 1.3 and 1.8 Operations Standards and Site Leadership (OPS) - 1.1, 1.2, 1.4, 1.6, 1.7, 2.2, 3.1, 3.2, 4.1, 4.2, and 5.3 Risk Recognition and Decision Making (RRDM) - 1.1, 1.2, 1.3, 2.1, 3.1, 3.2, 3.3, 4.8, and 4.9 Procedure Quality (PQ) - 1.1 and 5.2 Engineering Programs (EP) - 1.2, 2.1, 2.2, 2.3, 2.4, 3.1, and 4.1 Equipment Reliability (ER) - 1.3, 2.1, 2.2, 3.1, 3.2, and 3.3 Work Management (WM) - 1.1, 1.2, 1.3, 2.1, 2.2, 3.1, 3.3, and 4.2 CAL Area Action Plan Summary Review The inspectors concluded that the individual CAL items described above and the associated Area Action Plans were adequately completed and effective in achieving the associated performance improvement objectives described in the PNPS Recovery Plan.

Therefore, the following Area Action Plans listed in Enclosure 2 to the PNPS CAL are closed based on the reviews completed during this inspection:

Operations Standards and Site Leadership (OPS)

Risk Recognition and Decision Making (RRDM)

Engineering Programs (EP)

Equipment Reliability (ER)

Work Management (WM)

Actions associated with the PQ and CAP Area Action Plans were reviewed during previous inspections and these Area Action Plans were held open because additional action and review was required as documented in NRC IR 05000293/2017010 (ADAMS Accession No.

ML18032A463) and NRC IR 05000293/2018011 (ADAMS Accession No. ML18282A039).

The basis for closure for these two Area Action Plans, considering the problems described in these resports, is described below:

PQ Area Action Plan:

The inspectors determined that PNPSs WILL sheet revisions, PQ training presentation, and extent of condition corrective actions adequately corrected the problems the inspectors previously identified with PNPS implementation of PQ-1.1 and PQ-5.2 per NRC IR 05000293/2017010. Combined with the adequate completion of the other PQ Area Action Plan CAL items per NRC IR 05000293/2017010, the inspectors concluded that the PQ Area Action Plan was adequately completed and effective in achieving the associated performance improvement objectives described in the PNPS Recovery Plan.

CAP Area Action Plan:

The inspectors concluded that based on the adequate completion of the CAP Area Action Plan CAL items documented in NRC IR 05000293/2018011 (ADAMS Accession No. ML18282A039)) and the results of safety culture assessment activities conducted during the onsite week of this inspection (described below), the CAP Area Action Plan was adequately completed and effective in achieving the associated performance improvement objectives described in the PNPS Recovery Plan.

Targeted Safety Culture Assessment The inspectors conducted interviews and focus groups with 72 staff, first line supervisors, and managers, which represented about 14% of the workforce. The eight focus groups conducted were representative of the major departments at PNPS, including maintenance, operations, security, and engineering. The focus group discussions and interviews conducted as part of the scope of this inspection focused on the traits of a positive safety culture, with emphasis on leadership safety values and actions, problem identification and resolution, decision making, and work processes. Insights were also gathered by reviewing various subject matter expert reports, contractor-conducted surveys, and PNPS nuclear safety culture monitoring panel meeting minutes.

During the focus groups, PNPS staff indicated work management process changes had improved interdepartmental coordination and communication and had increased the recognition of the risk impact of planned work activities; while CAP changes had improved feedback to staff who initiate condition reports, increased the focus on taking timely action to correct safety concerns, and increased accountability at all levels of the organization for completing corrective actions.

The results of the focus group discussions indicated that most PNPS staff believe management places an appropriate level of emphasis on safety and makes conservative decisions that appropriately consider risk. PNPS staff also stated that they feel free to raise safety concerns without fear of retaliation and believe management would support stopping work to resolve safety concerns.

Based on the targeted scope of this assessment and the employee perceptions communicated during the interviews and focus groups, the inspectors noted a marked improvement in safety culture since the previous round of focus groups and interviews conducted in February 2017 and confirmed a sustained positive change in safety culture.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On September 14, 2018, the inspectors presented a debrief of the CAL follow-up inspection results to Mr. Brian Sullivan, Site Vice President and other members of PNPS staff.

On October 17, 2018, inspectors conducted a telephonic exit meeting and presented the final results for the CAL follow-up inspection items documented in this report to Mr. Brian Sullivan, Site Vice President and other members of PNPS staff.

DOCUMENTS REVIEWED

CAL Item Closure Packages

CAP-1.3 RRDM-1.3 EP-4.1

CAP-1.8 RRDM-2.1 ER-1.3

OPS-1.1 RRDM-3.1 ER-2.1

OPS-1.2 RRDM-3.2 ER-2.2

OPS-1.4 RRDM-3.3 ER-3.1

OPS-1.6 RRDM-4.8 ER-3.2

OPS-1.7 RRDM-4.9 ER-3.3

OPS-2.2 PQ-1.1 WM-1.1

OPS-3.1 PQ-5.2 WM-1.2

OPS-3.2 EP-1.2 WM-1.3

OPS-4.1 EP-2.1 WM-2.1

OPS-4.2 EP-2.2 WM-2.2

OPS-5.3 EP-2.3 WM-3.1

RRDM-1.1 EP-2.4 WM-3.3

RRDM-1.2 EP-3.1 WM-4.2

Procedures

1.13.2, Vendor and Technical Information Review, Revision 1

1.3.142, Critical Decision Process, Revision 7

1.3.142, Critical Decision Process, Revision 8

1.3.142, PNPS Risk Review and Disposition, Revision 6

1.3.145, PNPS Recovery Procedure, Revision 3

1.3.145, PNPS Recovery Procedure, Revision 4

1.3.145, PNPS Recovery Procedure, Revision 5

1.3.34, Operations Administration Policies and Processes, Revision 162

1.4.80, PNPS Monthly Performance Review Meeting, Revision 0

2.1.14, Station Power Changes, Revision 120

3.M.3-47, Load Shed Relay Operational/Functional Test - Critical Maintenance, Revision 94

3.M.3-47.1, "A" Train Functional Test of Individual Load Shed Components - Critical

Maintenance, Revision 41

3.M.3-47.2, "B" Train Functional Test of Individual Load Shed Components - Critical

Maintenance, Revision 38

3.M.3-61.3, Emergency Diesel Generator Quarterly Preventative Maintenance - Critical

Maintenance, Revision 32

3.M.4-14.2, Salt Service Water Pumps: Routine Maintenance, Revision 69

3.M.4-9, Inspection of the Drywell and Suppression Chamber, Revision 22

8.5.2.13, RHR Keepfill Valve Leak Test, Revision 8

8.9.8.4, 125 Vdc Station 650 Primary Battery Acceptance, Performance, or Service Test -

Critical Maintenance, Revision 13

8.C.40, Seasonal Weather Surveillance, Revision 38

8.C.40, Seasonal Weather Surviellance, Revision 42

8.E.24, Heating, Ventilation, and Air Conditioning (HVAC) System "Q" Instrument Calibration

and Functional Test, Revision 15

8.E.24, Heating, Ventilation, and Air Conditioning (HVAC) System Q Instrument Calibration

and Functional Test, Revision 15

8.F.38.1, Diesel Generator Instrumentation Calibration and Functional Test - Critical

Maintenance, Revision 47

8.I.11.3, Residual Heat Removal A Loop Valve Cold Shutdown Operability, Revision 10

8.M.2-2.10.12, HPCI High Water Trip Logic, Revision 22

8.M.2-2.10.8.6, Diesel Generator B Initiation by Loss of Offsite Power Logic - Critical

Maintenance, Revision 53

EN-DC-329, Engineering Programs Control and Oversight, Revision 6

EN-DC-351, Inservice Inspection Program, Revision 3

EN-FAP-DC-003, Fleet Engineering Morning Call, Revision 16

EN-FAP-OM-016, Performance Management Processes and Practices, Revision 9

EN-FAP-OM-021, Critical Decision Procedure, Revision 6

EN-FAP-OM-023, Entergy Nuclear Change Management, Revision 7

EN-FAP-WM-002, Critical Evolutions, Revision 5

EN-FAP-WM-011, Work Planning Standard, Revision 4

EN-OP-115, Conduct of Operations, Revision 25

EN-OP-116, Infrequently Performed Tests or Evolutions, Revision 14

EN-OP-117, Operations Assessment Resources, Revision 14

EN-WM-100, Work Request (WR) Generation, Screening and Classification, Revision 14

EN-WM-101, Online Work Management Process, Revision 16

EN-WM-104, On Line Risk Assessment, Revision 18

Audits/Self Assessments/Surveillances

CR-PNP-2016-09147 CA09, Project Plan for: Preventive Maintenance Program Improvements,

Revision 1, 6/2017

CR-PNP-2016-2054 CA-88, Final Effectiveness Review of Decision Making / Risk Recogntion

for July 2017 to April 2018, 05/18

LO-PNPLO-2016-00039 CA-01, Pre-NRC Preventive Maintenance Program Implementation

Self-Assessment, 12/16/2016

LO-PNPLO-2016-0031, Perform Assessment of Core Business Expectations Execution,

6/16/2016

LO-PNPLO-2016-0093,Snapshot Assessment Core Business Staffing, Man Hours, 9/28/2016

LO-PNPLO-2018-0035, Focused Self-Assessment - Pre-NRC / Engineering Programs AAP

LO-PNPLO-PNP-2016-00002 CA-21, Decision Making / Risk Recognition Fundamental

Problem Area, CR-PNP-2016-2054 Effectiveness Review for January 2017 to July 2017,

8/25/17

Pilgrim Periodic Maintenance Effectiveness Assessment, A Requirement of 10CFR50.65 (a)(3),

Operating Cycle 21

Pre-NRC / Risk Recognition & Decision-Making (RRDM) AAP Self-Assessment Report, 7/16/18

Condition Reports

CR-PNP-2014-01990 CR-PNP-2017-02785 CR-PNP-2017-12230

CR-PNP-2016-02054 CR-PNP-2017-05075 CR-PNP-2017-12299

CR-PNP-2016-02056 CR-PNP-2017-05861 CR-PNP-2018-00800

CR-PNP-2016-02057 CR-PNP-2017-09271 CR-PNP-2018-01734

CR-PNP-2016-02061 CR-PNP-2017-11505 CR-PNP-2018-02195

CR-PNP-2016-07115 CR-PNP-2017-11506 CR-PNP-2018-03017

CR-PNP-2016-07486 CR-PNP-2017-11989 CR-PNP-2018-03230

CR-PNP-2016-08957 CR-PNP-2017-12124* CR-PNP-2018-03392

CR-PNP-2016-09147 CR-PNP-2017-12160 CR-PNP-2018-03531

CR-PNP-2016-09805 CR-PNP-2017-12166 CR-PNP-2018-03711

CR-PNP-2016-09844 CR-PNP-2017-12188 CR-PNP-2018-03881*

CR-PNP-2016-10130 CR-PNP-2017-12193 CR-PNP-2018-03943*

CR-PNP-2016-10148 CR-PNP-2017-12194 CR-PNP-2018-04204

CR-PNP-2017-00403 CR-PNP-2017-12212 CR-PNP-2018-04234

CR-PNP-2018-05156 CR-PNP-2018-06998 CR-PNP-2018-07299*

CR-PNP-2018-05401 CR-PNP-2018-07211* CR-PNP-2018-07305*

CR-PNP-2018-05752 CR-PNP-2018-07234* CR-PNP-2018-07311*

CR-PNP-2018-05887 CR-PNP-2018-07245* CR-PNP-2018-07314*

CR-PNP-2018-05893 CR-PNP-2018-07257* CR-PNP-2018-07337*

CR-PNP-2018-06160 CR-PNP-2018-07262* CR-PNP-2018-07339*

CR-PNP-2018-06216 CR-PNP-2018-07262* CR-PNP-2018-07340*

CR-PNP-2018-06309 CR-PNP-2018-07266* CR-PNP-2018-07428*

CR-PNP-2018-06922 CR-PNP-2018-07271* CR-PNP-2018-07493*

CR-PNP-2018-06964 CR-PNP-2018-07286*

Work Orders

00013084 00466738 00485527 52649098

00092887 00466738 00490635 52649105

259360 00467103 00490636 52653058

286314 00467210 00490727 52653058

00313485 00468499 00490730 52662931

00313485 00468499 00490732 52662931

00329669 00471446 00490733 52664405

00329669 00473476 00490734 52676925

00403797 00474060 00491994 52696125

00403797 00475406 00491994 52696125

00412785 00475817 00496992 52696239

00427869 00475818 00497735 52696239

00443044 00475836 00504777 52711773

00443925 00477494 00507282 52790888

00448923 00479744 51531885 52800356

00459539 00479744 52374132 52814878

00461042 00484413 52580453

Miscellaneous

2016 General Supervisor Training Plan

2017 General Supervisor Training Plan

2018 General Supervisor Training Plan

Backlog Estimate Spreadsheet and Estimate Scope Summary Sheet

Comprehensive Recovery Plan (CRP) Equipment Reliability Area Action Plan Closure Report,

8/10/2018

CR-PNP-2016-2061, Supervisor Workload Analysis Time Estimates for Recurring and Non-

Recurring Tasks, 9/29/2016

EC-73073, Marotta Scientific Controls Pressure Reducer Valves, Revision 3

EC-72119, Evaluation of Acceptability of Level Selector Switch 640-302

Entergy 3/16/2017 Fleet Memo, 3/16/2017

Entergy Employee Handbook Achieving and Sustaining Excellence, 4/2018

GBM22591, ABB Induced Voltage Test April 2017 Entergy Three Phase Transformer, Revision 1

GSU Transformer Test Report, 5/2015 and 4/2017

INPO 15-011, Principles for Excellence in Integrated Risk Management, Revision 0

LO-PNPLO-2015-0020

LO-PNPLO-2015-0097

LO-PNPLO-2016-0002

LO-PNPLO-2017-0009

LO-PNPLO-2018-0034

LO-PNPLO-2018-0034

LO-PNPLO-2018-0049

Maintenance Backlog Performance Indicator May 2017 through August 2018

Mentor Report of 01/15/18 to 02/15/18

Mentor Report of 02/16/18 to 03/31/18

Mentor Report of 04/01/18 to 05/15/18

Mentor Report of 05/16/18 to 06/30/18

Mentor Report of 09/24/16

Mentor Report of 10/7/16

Mentor Report of 11/30/16

Mentor Report of April 2017

Mentor Report of July 2017

Mentor Report of May 2017

Observation Database, March through August 2018

OFM Meeting Observation 05/30/17

One-on-One Spreadsheets, January through July 2018

PCBT-ADM-PROCTECHREV2018, Procedure Quality Technical Review

PDCR 81-38, HPCI/RCIC Self-Contained Type Pressure Regulating Valves, 10/14/1981

Performance indicators for Scope Survival, Schedule Completion, and Critical Preventive

Maintenance September 2017 through August 2018

Pilgrim NSP Organization Chart, 9/12/2016

Pilgrim Nuclear Power Plant Work Order Backlog, 8/28/2018

Pilgrim Nuclear Power Station Comprehensive Recovery Plan, Revision 0

Pilgrim Nuclear Safety Culture Performance Improvement Risk Recognition, Decision Making

and Corrective Action Program, 9/9/2018

PLP-ESPP-RISK2016, PNP 1.3.142 Risk Review & Disposition, Revision 1

PLP-SUPC-DECISION RISK, Risk Recognition and Decision Making Leadership Training

(2017) and Instructor Documents

PM 50079951, 8.C.40 (Sec 8.1) Cold Weather Surv, 2017

PM 50079953, 8.C.40 (Sec 8.3) Warm Weather Surv, 2017

PNP-ENG-All, Email, Engineering Document NE16-007, Assignment of Corrective Actions,

6/13/2016

PNPS 95003 Recovery Metrics, 7/2018

Procedure Quality Briefing Sheet, December 19, 2017, CR-2017, 21117, CA 6

Q2-2017, Program Health Report, Pilgrim Nuclear Station, AOV (KPI) - Air Operated Valve

Program

Q2-2017, Program Health Report, Pilgrim Nuclear Station, APP-J (KPI) - Containment Leakage

Rate and Testing Program (Appendix J)

Q2-2017, Program Health Report, Pilgrim Nuclear Station, FAC - Flow Accelerated Corrosion

Program

Q2-2017, Program Health Report, Pilgrim Nuclear Station, ISI - Inservice Inspection Program

(ASME Section XI)

Q2-2017, Program Health Report, Pilgrim Nuclear Station, MOV (KPI) - Motor Operated Valve

Program

Q2-2018, Program Health Report, Pilgrim Nuclear Station, EQ (KPI) - Equipment Qualification

Program

Q2-2018, Program Health Report, Pilgrim Nuclear Station, ISI - Inservice Testing Program

Q4-2017, Program Health Report, Pilgrim Nuclear Station, BPT (KPI) - Buried Piping and Tank

Program

Risk to generation work orders week of 2/26/2018

Roster of Entergy Maintenance technicians 10/2017 and 9/2018

Scope Survival, Scope Completion, Critical PMs deferred, late, and in second half of grace,

January through August 2018

SEP-ISI-PNPS-002, PNPS Fifth Ten-Year Interval Inservice Inspection (ISI/IWE) Program Plan,

Revision 5

SES-2010-09, Simulator Scenario, Revision 4

SES-2014-03, Simulator Scenario, Revision 3

Supply and Demand Model for Maintenance Technicians, 2016 through 2018

SUT CCVT PM Evaluation, September 13, 2018

Targeted Performance Improvement Plans for 14 Managers and Supervisors

Technical Conscience Mentor Weekly Summary Report, Week Ending 2/2/2018

Technical Conscience Mentor Weekly Summary Report, Week Ending 2/9/2018

Technical Conscience Mentor Weekly Summary Report, Week Ending 8/11/2017

Technical Conscience Mentor Weekly Summary Report, Week Ending 8/4/2017

Template for 0705 Engineering Manager Meeting Agenda

Timesheets for contract technicians for the week of August 13, 2018

WT-WTPNP-2016-0207

Confirmatory Action Letter Item Status

Line Area Action Plan CAL Item Inspection Report Number Closed

Item

Nuclear Safety Culture NSC-1.1

Nuclear Safety Culture NSC-1.2

Nuclear Safety Culture NSC-1.3

Nuclear Safety Culture NSC-1.4

Nuclear Safety Culture NSC-1.5

Nuclear Safety Culture NSC-1.6

Nuclear Safety Culture NSC-1.7

Nuclear Safety Culture NSC-1.8

Nuclear Safety Culture NSC-1.10

Nuclear Safety Culture NSC-2.2

Nuclear Safety Culture NSC-2.3

Nuclear Safety Culture NSC-3.1

Nuclear Safety Culture NSC-3.2

Nuclear Safety Culture NSC-3.3

Nuclear Safety Culture NSC-3.4

Nuclear Safety Culture NSC-3.5

Nuclear Safety Culture NSC-3.6

Nuclear Safety Culture NSC-3.7

Nuclear Safety Culture NSC-3.8

Nuclear Safety Culture NSC-4.1

Nuclear Safety Culture NSC-4.2

Nuclear Safety Culture NSC-5.1

Nuclear Safety Culture NSC-5.2

Nuclear Safety Culture NSC-5.3

Nuclear Safety Culture NSC-5.4

Nuclear Safety Culture NSC-6.1

Nuclear Safety Culture NSC-7.1

Nuclear Safety Culture NSC-8.1

Nuclear Safety Culture NSC-8.6

Nuclear Safety Culture NSC-8.8

Nuclear Safety Culture NSC-8.9

Nuclear Safety Culture NSC-8.10

Nuclear Safety Culture NSC-8.21

Nuclear Safety Culture NSC-8.22

Nuclear Safety Culture NSC-8.25

Nuclear Safety Culture NSC-8.26

Nuclear Safety Culture NSC-8.27

Nuclear Safety Culture NSC-8.28

Nuclear Safety Culture NSC-8.29

Corrective Action Program CAP-1.1 05000293/2017010 Y

Corrective Action Program CAP-1.2 05000293/2018011 Y

Line Area Action Plan CAL Item Inspection Report Number Closed

Item

Corrective Action Program CAP-1.3 Reviewed - 05000293/2018011 Y

And 05000293/2018012

Corrective Action Program CAP-1.4 05000293/2018011 Y

Corrective Action Program CAP-1.5 05000293/2018011 Y

Corrective Action Program CAP-1.7 05000293/2018011 Y

Corrective Action Program CAP-1.8 Reviewed - 05000293/2018011 Y

And 05000293/2018012

Corrective Action Program CAP-1.9 05000293/2018011 Y

Corrective Action Program CAP-1.10 05000293/2018011 Y

Corrective Action Program CAP-1.11 05000293/2018011 Y

Corrective Action Program CAP-2.1 05000293/2018011 Y

Corrective Action Program CAP-2.2 05000293/2018011 Y

Corrective Action Program CAP-2.3 05000293/2018011 Y

Corrective Action Program CAP-3.1 05000293/2018011 Y

Corrective Action Program CAP-3.2 05000293/2018011 Y

Corrective Action Program CAP-4.2 05000293/2018011 Y

Corrective Action Program CAP-4.3 05000293/2018011 Y

Procedure Use and PUA-1.1 05000293/2017010 Y

Adherence

Procedure Use and PUA-1.2 05000293/2017010 Y

Adherence

Procedure Use and PUA-1.3 05000293/2017010 Y

Adherence

Procedure Use and PUA-1.4 05000293/2017010 Y

Adherence

Procedure Use and PUA-1.6 05000293/2018011 Y

Adherence

Procedure Use and PUA-2.2 05000293/2018011 Y

Adherence

Procedure Use and PUA-2.3 05000293/2018011 Y

Adherence

Procedure Use and PUA-2.4 05000293/2018011 Y

Adherence

Procedure Use and PUA-2.5 05000293/2018011 Y

Adherence

Procedure Use and PUA-3.1 05000293/2018011 Y

Adherence

Procedure Use and PUA-3.2 05000293/2018011 Y

Adherence

Procedure Use and PUA-3.3 05000293/2018011 Y

Adherence

Procedure Use and PUA-3.4 05000293/2018011 Y

Adherence

Line Area Action Plan CAL Item Inspection Report Number Closed

Item

Procedure Use and PUA-4.1 05000293/2018011 Y

Adherence

Procedure Use and PUA-4.2 Reviewed - 05000293/2018011 N

Adherence

Procedure Use and PUA-4.3 05000293/2018011 Y

Adherence

Procedure Use and PUA-5.1 05000293/2018011 Y

Adherence

Procedure Use and PUA-5.2 05000293/2018011 Y

Adherence

Procedure Use and PUA-5.7 05000293/2018011 Y

Adherence

Procedure Use and PUA-5.8 05000293/2018011 Y

Adherence

Procedure Use and PUA-5.9 05000293/2018011 Y

Adherence

Operability Determinations ODFA- 05000293/2017010 Y

and Functionality 1.1

Assessments

Operability Determinations ODFA- 05000293/2018010 Y

and Functionality 1.2

Assessments

Operability Determinations ODFA- 05000293/2018010 Y

and Functionality 1.3

Assessments

Operability Determinations ODFA- 05000293/2018010 Y

and Functionality 1.4

Assessments

Operability Determinations ODFA- 05000293/2018010 Y

and Functionality 1.5

Assessments

Operability Determinations ODFA- 05000293/2018010 Y

and Functionality 1.6

Assessments

Operability Determinations ODFA- 05000293/2018010 Y

and Functionality 2.2

Assessments

Operability Determinations ODFA- 05000293/2018010 Y

and Functionality 3.1

Assessments

Operability Determinations ODFA- 05000293/2018010 Y

and Functionality 5.1

Assessments

Line Area Action Plan CAL Item Inspection Report Number Closed

Item

Operability Determinations ODFA- 05000293/2018010 Y

and Functionality 5.2

Assessments

Operability Determinations ODFA- 05000293/2018010 Y

and Functionality 5.3

Assessments

Operability Determinations ODFA- 05000293/2018010 Y

and Functionality 5.4

Assessments

Operability Determinations ODFA- 05000293/2018010 Y

and Functionality 5.5

Assessments

Operability Determinations ODFA- 05000293/2018010 Y

and Functionality 5.6

Assessments

Operability Determinations ODFA- 05000293/2018010 Y

and Functionality 5.7

Assessments

Operability Determinations ODFA- 05000293/2018010 Y

and Functionality 5.8

Assessments

Operations Department OPS-1.1 05000293/2018012 Y

Standards and Leadership

Operations Department OPS-1.2 05000293/2018012 Y

Standards and Leadership

Operations Department OPS-1.4 05000293/2018012 Y

Standards and Leadership

Operations Department OPS-1.6 05000293/2018012 Y

Standards and Leadership

Operations Department OPS-1.7 05000293/2018012 Y

Standards and Leadership

Operations Department OPS-2.2 05000293/2018012 Y

Standards and Leadership

100 Operations Department OPS-3.1 05000293/2018012 Y

Standards and Leadership

101 Operations Department OPS-3.2 05000293/2018012 Y

Standards and Leadership

2 Operations Department OPS-4.1 05000293/2018012 Y

Standards and Leadership

103 Operations Department OPS-4.2 05000293/2018012 Y

Standards and Leadership

104 Risk Recognition and RRDM- 05000293/2018012 Y

Decision Making 1.1

Line Area Action Plan CAL Item Inspection Report Number Closed

Item

105 Risk Recognition and RRDM- 05000293/2018012 Y

Decision Making 1.2

106 Risk Recognition and RRDM- 05000293/2018012 Y

Decision Making 1.3

107 Risk Recognition and RRDM- 05000293/2018012 Y

Decision Making 2.1

108 Risk Recognition and RRDM- 05000293/2018012 Y

Decision Making 3.1

109 Risk Recognition and RRDM- 05000293/2018012 Y

Decision Making 3.2

110 Risk Recognition and RRDM- 05000293/2018012 Y

Decision Making 3.3

111 Risk Recognition and RRDM- 05000293/2018012 Y

Decision Making 4.3

2 Risk Recognition and RRDM- 05000293/2018012 Y

Decision Making 4.8

113 Risk Recognition and RRDM- 05000293/2018012 Y

Decision Making 4.9

114 Procedure Quality PQ-1.1 Reviewed - 05000293/2017010 Y

And 05000293/2018012

115 Procedure Quality PQ-2.1 05000293/2017010 Y

116 Procedure Quality PQ-2.2 05000293/2017010 Y

117 Procedure Quality PQ-3.1 05000293/2017010 Y

118 Procedure Quality PQ-3.2 05000293/2017010 Y

119 Procedure Quality PQ-3.3 05000293/2017010 Y

20 Procedure Quality PQ-5.1 05000293/2017010 Y

21 Procedure Quality PQ-5.2 Reviewed - 05000293/2017010 Y

And 05000293/2018012

2 SRV White Finding SRV-1.1 05000293/2018010 Y

23 SRV White Finding SRV-1.2 05000293/2018010 Y

24 SRV White Finding SRV-1.3 05000293/2017010 Y

25 SRV White Finding SRV-2.1 05000293/2017010 Y

26 SRV White Finding SRV-3.1 05000293/2018010 Y

27 SRV White Finding SRV-3.2 05000293/2018010 Y

28 SRV White Finding SRV-3.3 05000293/2018010 Y

29 SRV White Finding SRV-3.4 05000293/2018010 Y

130 SRV White Finding SRV-4.1 05000293/2018010 Y

131 SRV White Finding SRV-5.1 05000293/2018010 Y

2 SRV White Finding SRV-5.2 05000293/2018010 Y

133 Engineering Programs EP-1.1 05000293/2017010 Y

134 Engineering Programs EP-1.2 05000293/2018012 Y

135 Engineering Programs EP-2.1 05000293/2018012 Y

136 Engineering Programs EP-2.2 05000293/2018012 Y

137 Engineering Programs EP-2.3 05000293/2018012 Y

Line Area Action Plan CAL Item Inspection Report Number Closed

Item

138 Engineering Programs EP-2.4 05000293/2018012 Y

139 Engineering Programs EP-3.1 05000293/2018012 Y

140 Engineering Programs EP-4.1 05000293/2018012 Y

141 Equipment Reliability ER-1.1 05000293/2017010 Y

2 Equipment Reliability ER-1.2 05000293/2017010 Y

143 Equipment Reliability ER-1.3 05000293/2018012 Y

144 Equipment Reliability ER-2.1 05000293/2018012 Y

145 Equipment Reliability ER-2.2 05000293/2018012 Y

146 Equipment Reliability ER-3.1 05000293/2018012 Y

147 Equipment Reliability ER-3.2 05000293/2018012 Y

148 Equipment Reliability ER-3.3 05000293/2018012 Y

149 Work Management WM-1.1 05000293/2018012 Y

150 Work Management WM-1.2 05000293/2018012 Y

151 Work Management WM-1.3 05000293/2018012 Y

2 Work Management WM-2.1 05000293/2018012 Y

153 Work Management WM-2.2 05000293/2018012 Y

154 Work Management WM-3.1 05000293/2018012 Y

155 Work Management WM-3.3 05000293/2018012 Y

156 Work Management WM-4.2 05000293/2018012 Y