ML19003A381: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Code of Federal | {{#Wiki_filter:December 31, 2018 | ||
Regulations | Mr. Eric Larson, Site Vice President | ||
Entergy Operations, Inc. | |||
Grand Gulf Nuclear Station | |||
P.O. Box 756 | |||
Port Gibson, MS 39150 | |||
SUBJECT: GRAND GULF NUCLEAR STATION, UNIT 1 - NOTIFICATION OF | |||
CYBER SECURITY INSPECTION (05000416/2019410) AND | |||
REQUEST FOR INFORMATION | |||
Dear Mr. Larson: | |||
On April 29, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in | |||
accordance with Inspection Procedure (IP) 71130.10P, Cyber Security, Revision 0, at the | |||
Grand Gulf Nuclear Station. This inspection evaluates and verifies your ability to meet the full | |||
implementation requirements of the NRCs Cyber Security Rule, Title 10, Code of Federal | |||
Regulations (CFR), Part 73, Section 54, Protection of Digital Computer and Communication | |||
Systems and Networks. The onsite portion of the inspection will take place during the weeks | |||
of April 29 and May 13, 2019. | |||
Experience has shown that these inspections are extremely resource intensive, both for the | |||
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site | |||
and to ensure a productive inspection for both parties, we have enclosed a request for | |||
documents needed for the inspection. The document request has been divided into | |||
four groups. The first group specifies information necessary to assist the team in choosing | |||
the focus areas (i.e., sample set) to be inspected in accordance with the cyber security | |||
inspection procedure. This information should be made available using passive media | |||
(i.e. CD, DVD) and delivered to the regional office no later than March 1, 2019. The inspection | |||
team will review this information and by the end of the planned information gathering visit, | |||
March 21, 2019, will identify the specific items that should be provided for review. | |||
The second group of requested documents will assist the team in their evaluation of the | |||
critical systems and critical digital assets, defensive architecture, and the areas of the cyber | |||
security plan selected for inspection. This information will be requested for review in the | |||
regional office prior to the inspection by April 5, 2019. | |||
The third group of requested documents consists of those items that the team will review or | |||
need access to, during the inspection. Please have this information available by the first day of | |||
the onsite inspection, April 29, 2019. | |||
The fourth group of information is necessary to aid the team in tracking issues identified as a | |||
result of the inspection. It is requested that this information be provided to the lead inspector | |||
as the information is generated during the inspection. It is important that all of these | |||
E. Larson 2 | |||
documents are up to date and complete in order to minimize the number of additional | |||
documents requested during the preparation and/or the onsite portions of the inspection. The | |||
lead inspector for this inspection is Nnaerika Okonkwo. We understand that our regulatory | |||
contact for this inspection is Sheryl Sweet. If there are any questions about the inspection or | |||
the material requested, please contact the lead inspector at 817-200-1114 or by e-mail at | |||
Nnaerika.Okonkwo@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject | |||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget under control | |||
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | |||
respond to, a request for information or an information collection requirement unless the | |||
requesting document displays a currently valid Office of Management and Budget control | |||
number. | |||
This letter and its enclosure will be made available for public inspection and copying at | |||
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in | |||
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
Sincerely, | |||
/RA James Drake for/ | |||
Gregory. E. Werner, Chief | |||
Engineering Branch 2 | |||
Division of Reactor Safety | |||
Docket No. 50-416 | |||
License No. NPF-29 | |||
Enclosure: | |||
Request for Information - | |||
Cyber Security Inspection Document | |||
cc: w/ encl: Electronic Distribution | |||
Request for Information - Cyber Security Inspection Document | |||
Grand Gulf Nuclear Station, Unit 1 | |||
Inspection Report: 05000416/2019410 | |||
Inspection Dates: Weeks of April 29, 2019, and May 13, 2019 | |||
Inspection Procedure: IP 71130.10P, Cyber Security, Revision 0 | |||
Reference 1: ML17156A215 - Guidance Document for Development of the | |||
Request for Information (RFI) and Notification Letter for | |||
Full-Implementation of the Cyber Security Inspection, | |||
Revision 1, dated October 26, 2017 | |||
NRC Inspectors: Nnaerika Okonkwo, Lead Greg Pick, | |||
817-200-1114 817-200-1270 | |||
Nnaerika.Okonkwo@nrc.gov Greg.Pick@nrc.gov | |||
NRC Contractors: Alan Konkal Alexander Prada | |||
561-859-5232 240-449-5791 | |||
Alan.Konkal@nrc.gov Alexander.Prada@nrc.gov | |||
I. Information Requested for In-Office Preparation | |||
The initial request for information (i.e., first RFI) provides the team with the general | |||
information necessary to select appropriate components and cyber security plan elements | |||
to develop a site-specific inspection plan. The team will use the first set of information | |||
requested to identify the list of critical systems and critical digital assets plus operational | |||
and management security control portions of the Cyber Security Plan to be chosen as the | |||
sample set required to be inspected during this inspection. The first information request | |||
is specified in Table RFI #1. | |||
The required Table RFI #1 information shall be provided on passive media (i.e. CD or DVD) | |||
to the lead inspector by March 1, 2019, or sooner to facilitate the selection of the specific | |||
items that will be reviewed during the onsite inspection weeks. Please provide four copies | |||
of each media submitted (i.e., one for each inspector/contractor). The preferred file format | |||
for all lists is a searchable Excel spreadsheet file on a CD or DVD. The files should be | |||
indexed and hyperlinked to facilitate efficient review. If you have any questions regarding | |||
this information, please contact the inspection team lead as soon as possible. | |||
Table RFI #1 | |||
Par Section 3: Initial Documentation Requests (See Reference 1) Items | |||
No. Number/Title: | |||
1 List all identified critical systems and critical digital assets All | |||
List critical digital asset facility and site ethernet - transmission control | |||
2 protocol/internet protocol (TCP/IP) based local area networks (LANs) and All | |||
identify those LANs that have non-critical digital assets on them | |||
Enclosure | |||
Table RFI #1 | |||
Par Section 3: Initial Documentation Requests (See Reference 1) Items | |||
No. Number/Title: | |||
List critical digital asset facility and site non-ethernet TCP/IP based LANs | |||
3 including those industrial networks and identify LANs that have non-critical All | |||
digital assets on them | |||
Network topology diagrams (be sure to include all network intrusion | |||
detection systems and security information and event management | |||
4 All | |||
(SIEM) for emergency preparedness (EP) networks and security level | |||
3 and 4 networks) | |||
List all network security boundary devices for EP networks and all network | |||
8 All | |||
security boundary devices for levels 3 and 4 | |||
9 List critical digital asset wireless Industrial networks All | |||
Network Intrusion detection system documentation for critical systems that 11.a.1) | |||
11 | |||
have critical digital assets associated with them 11.a.2) | |||
SIEM documentation for critical systems that have critical digital assets 12.a.1) | |||
12 | |||
associated with them 12.a.2) | |||
14 List EP and security onsite and offsite digital communication systems All | |||
25 Cyber security assessment and cyber security incident response teams All | |||
Copy of current cyber security plan and copy of any 50.54(p) analysis to | |||
28 All | |||
support changes to that plan | |||
Copy of any licensee identified violations and associated corrective | |||
All | |||
29 action program documentation to resolve issue(s). | |||
In addition to the above information please provide the following: | |||
(1) Electronic copy of the updated safety analysis report and technical specifications | |||
(2) Name(s) and phone number(s) for the regulatory and technical contacts | |||
(3) Current management and engineering organizational charts | |||
(4) Cyber Security Program Procedures | |||
Based on this information, the team will identify and select specific systems and | |||
equipment (e.g., critical systems and critical digital assets) from the information requested | |||
by Table RFI #1, and submit a list of specific systems and equipment to your staff by the | |||
end of the information gathering visit, March 21, 2019, for the second information request | |||
(i.e., Table RFI #2). | |||
2 | |||
II. Additional Information Requested to be Available Prior to Inspection | |||
As stated in Section I, the team will examine the documents from the initial information | |||
request, and submit the list of specific systems and equipment to your staff by the end of | |||
the information gathering visit, March 21, 2019. This second information request | |||
(i.e., Table RFI #2) obtains additional documents required to evaluate the critical systems | |||
and critical digital assets, defensive architecture, and the areas of the cyber security | |||
program selected for the cyber security inspection. The additional information requested | |||
for the specific systems and equipment is identified in Table RFI #2. All requested | |||
information shall follow the guidance document Reference 1. | |||
The Table RFI #2 information shall be provided on passive media to the lead inspector by | |||
April 5, 2019. Please provide four copies of each CD/DVD submitted (i.e., one for each | |||
inspector/contractor). The preferred file format for all lists is a searchable Excel | |||
spreadsheet file on a CD/DVD. These passive media should be indexed and hyperlinked | |||
to facilitate efficient review. If you have any questions regarding this information, please | |||
call the inspection team lead as soon as possible. | |||
Table RFI #2 | |||
Par Section 3: Initial Documentation Requests (See Reference 1) Items | |||
No. Number/Title: | |||
5 Plant computer system block diagram (if plant computer system is All | |||
selected for inspection) | |||
Plant security system block diagram (if security computer system is | |||
6 All | |||
selected for inspection) | |||
Block diagrams for distributed systems (for systems selected for | |||
7 All | |||
inspection) | |||
Host-based intrusion detection system documentation for critical 10.a.1) | |||
10 | |||
digital assets (for systems selected for inspection) 10.a.2) | |||
List all maintenance and test equipment (M&TE) used on critical | |||
13 All | |||
digital assets (for systems selected for inspection) | |||
15 Configuration management All | |||
Network Intrusion detection system documentation for critical systems 11.a.1) | |||
11 | |||
that have critical digital assets associated with them 11.a.2) | |||
16.a | |||
16 Supply chain management | |||
16.b | |||
17 Portable media and mobile device control All | |||
18 Software management All | |||
3 | |||
Table RFI #2 | |||
Par Section 3: Initial Documentation Requests (See Reference 1) Items | |||
No. Number/Title: | |||
20 Vendor access and monitoring All | |||
21 Work control All | |||
22 Device access and key control All | |||
23 Password/authenticator policy All | |||
24 User account/credential policy All | |||
26 Corrective actions since last NRC inspection All | |||
27 Cyber security assessments for selected systems All | |||
III. Information Requested to be Available on First Day of Inspection | |||
For the specific systems and equipment identified in Section II, provide the following | |||
request for information (i.e., Table 1st Week Onsite) on passive media by April 29, 2019, | |||
the first day of the inspection. All requested information shall follow the guidance in | |||
Reference 1. | |||
Please provide four copies of each CD submitted (i.e., one for each inspector/contactor). | |||
The preferred file format for all lists is a searchable Excel spreadsheet file on a CD/DVD. | |||
These passive media files should be indexed and hyperlinked to facilitate ease of use. If | |||
you have any questions regarding this information, please call the inspection team lead as | |||
soon as possible. | |||
Table 1st Week Onsite | |||
Par Section 3: Initial Documentation Requests (See Reference 1) Items | |||
No. Number/Title: | |||
10.a.3) | |||
Host-based intrusion detection system documentation for critical | |||
10 thru | |||
digital assets (for systems selected for inspection) | |||
10.a.12) | |||
11.a.3) | |||
Network Intrusion detection system documentation for critical systems | |||
11 thru | |||
that have critical digital assets associated with them | |||
11.a.15) | |||
SIEM documentation for critical systems that have critical digital 12.a.3) | |||
12 thru | |||
assets associated with them | |||
12.a.14 | |||
16 Supply chain management 16.c | |||
4 | |||
Table 1st Week Onsite | |||
Par Section 3: Initial Documentation Requests (See Reference 1) Items | |||
No. Number/Title: | |||
19 Cyber security event notifications All | |||
Update to licensee identified violations and corrective action program | |||
29 All | |||
actions taken since the initial request was made | |||
In addition to the above information please provide the following: | |||
(1) Copies of the following documents do not need to be solely available to the | |||
inspection team as long as the inspectors have easy and unrestrained access | |||
to them. | |||
a. Quality Assurance Plan; | |||
b. Technical Specifications, if not previously provided; | |||
c. Latest Individual Plant Examination/Probabilistic Risk Assessment Report; | |||
and, | |||
(2) Vendor Manuals, Assessments, and Corrective Actions: | |||
a. The most recent cyber security quality assurance audit and/or | |||
self-assessment; and | |||
b. Corrective action documents (e.g., condition reports, including status of | |||
corrective actions) generated as a result of the most recent cyber security | |||
quality assurance audit and/or self-assessment. | |||
IV. Information Requested To Be Provided Throughout the Inspection | |||
(1) Copies of any corrective action documents generated as a result of the | |||
inspection teams questions or queries during the inspection. | |||
(2) Copies of the list of questions submitted by the inspection team members and | |||
the status/resolution of the information requested (provided daily during the | |||
inspection to each inspection team member). | |||
If you have any questions regarding the information requested, please contact the team lead. | |||
5 | |||
ML19003A381 | |||
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002 | |||
By: NPO Yes No Publicly Available Sensitive | |||
OFFICE RI:EB2 BC:EB2 | |||
NAME N. Okonkwo G. Werner | |||
SIGNATURE /RA-e/ /RA JFD for/ | |||
DATE 12/27/2018 12/31/2018 | |||
/RA-e/ /RA JFD for/ 12/27/2018 12/31/2018 | |||
}} | }} |
Latest revision as of 07:26, 20 October 2019
ML19003A381 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 12/31/2018 |
From: | Greg Werner NRC/RGN-IV/DRS/EB-2 |
To: | Emily Larson Entergy Operations |
Werner G | |
References | |
IR 2019410 | |
Download: ML19003A381 (8) | |
See also: IR 05000416/2019410
Text
December 31, 2018
Mr. Eric Larson, Site Vice President
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS 39150
SUBJECT: GRAND GULF NUCLEAR STATION, UNIT 1 - NOTIFICATION OF
CYBER SECURITY INSPECTION (05000416/2019410) AND
REQUEST FOR INFORMATION
Dear Mr. Larson:
On April 29, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in
accordance with Inspection Procedure (IP) 71130.10P, Cyber Security, Revision 0, at the
Grand Gulf Nuclear Station. This inspection evaluates and verifies your ability to meet the full
implementation requirements of the NRCs Cyber Security Rule, Title 10, Code of Federal
Regulations (CFR), Part 73, Section 54, Protection of Digital Computer and Communication
Systems and Networks. The onsite portion of the inspection will take place during the weeks
of April 29 and May 13, 2019.
Experience has shown that these inspections are extremely resource intensive, both for the
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. The document request has been divided into
four groups. The first group specifies information necessary to assist the team in choosing
the focus areas (i.e., sample set) to be inspected in accordance with the cyber security
inspection procedure. This information should be made available using passive media
(i.e. CD, DVD) and delivered to the regional office no later than March 1, 2019. The inspection
team will review this information and by the end of the planned information gathering visit,
March 21, 2019, will identify the specific items that should be provided for review.
The second group of requested documents will assist the team in their evaluation of the
critical systems and critical digital assets, defensive architecture, and the areas of the cyber
security plan selected for inspection. This information will be requested for review in the
regional office prior to the inspection by April 5, 2019.
The third group of requested documents consists of those items that the team will review or
need access to, during the inspection. Please have this information available by the first day of
the onsite inspection, April 29, 2019.
The fourth group of information is necessary to aid the team in tracking issues identified as a
result of the inspection. It is requested that this information be provided to the lead inspector
as the information is generated during the inspection. It is important that all of these
E. Larson 2
documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection. The
lead inspector for this inspection is Nnaerika Okonkwo. We understand that our regulatory
contact for this inspection is Sheryl Sweet. If there are any questions about the inspection or
the material requested, please contact the lead inspector at 817-200-1114 or by e-mail at
Nnaerika.Okonkwo@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget under control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA James Drake for/
Gregory. E. Werner, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-416
License No. NPF-29
Enclosure:
Request for Information -
Cyber Security Inspection Document
cc: w/ encl: Electronic Distribution
Request for Information - Cyber Security Inspection Document
Grand Gulf Nuclear Station, Unit 1
Inspection Report: 05000416/2019410
Inspection Dates: Weeks of April 29, 2019, and May 13, 2019
Inspection Procedure: IP 71130.10P, Cyber Security, Revision 0
Reference 1: ML17156A215 - Guidance Document for Development of the
Request for Information (RFI) and Notification Letter for
Full-Implementation of the Cyber Security Inspection,
Revision 1, dated October 26, 2017
NRC Inspectors: Nnaerika Okonkwo, Lead Greg Pick,
817-200-1114 817-200-1270
Nnaerika.Okonkwo@nrc.gov Greg.Pick@nrc.gov
NRC Contractors: Alan Konkal Alexander Prada
561-859-5232 240-449-5791
Alan.Konkal@nrc.gov Alexander.Prada@nrc.gov
I. Information Requested for In-Office Preparation
The initial request for information (i.e., first RFI) provides the team with the general
information necessary to select appropriate components and cyber security plan elements
to develop a site-specific inspection plan. The team will use the first set of information
requested to identify the list of critical systems and critical digital assets plus operational
and management security control portions of the Cyber Security Plan to be chosen as the
sample set required to be inspected during this inspection. The first information request
is specified in Table RFI #1.
The required Table RFI #1 information shall be provided on passive media (i.e. CD or DVD)
to the lead inspector by March 1, 2019, or sooner to facilitate the selection of the specific
items that will be reviewed during the onsite inspection weeks. Please provide four copies
of each media submitted (i.e., one for each inspector/contractor). The preferred file format
for all lists is a searchable Excel spreadsheet file on a CD or DVD. The files should be
indexed and hyperlinked to facilitate efficient review. If you have any questions regarding
this information, please contact the inspection team lead as soon as possible.
Table RFI #1
Par Section 3: Initial Documentation Requests (See Reference 1) Items
No. Number/Title:
1 List all identified critical systems and critical digital assets All
List critical digital asset facility and site ethernet - transmission control
2 protocol/internet protocol (TCP/IP) based local area networks (LANs) and All
identify those LANs that have non-critical digital assets on them
Enclosure
Table RFI #1
Par Section 3: Initial Documentation Requests (See Reference 1) Items
No. Number/Title:
List critical digital asset facility and site non-ethernet TCP/IP based LANs
3 including those industrial networks and identify LANs that have non-critical All
digital assets on them
Network topology diagrams (be sure to include all network intrusion
detection systems and security information and event management
4 All
(SIEM) for emergency preparedness (EP) networks and security level
3 and 4 networks)
List all network security boundary devices for EP networks and all network
8 All
security boundary devices for levels 3 and 4
9 List critical digital asset wireless Industrial networks All
Network Intrusion detection system documentation for critical systems that 11.a.1)
11
have critical digital assets associated with them 11.a.2)
SIEM documentation for critical systems that have critical digital assets 12.a.1)
12
associated with them 12.a.2)
14 List EP and security onsite and offsite digital communication systems All
25 Cyber security assessment and cyber security incident response teams All
Copy of current cyber security plan and copy of any 50.54(p) analysis to
28 All
support changes to that plan
Copy of any licensee identified violations and associated corrective
All
29 action program documentation to resolve issue(s).
In addition to the above information please provide the following:
(1) Electronic copy of the updated safety analysis report and technical specifications
(2) Name(s) and phone number(s) for the regulatory and technical contacts
(3) Current management and engineering organizational charts
(4) Cyber Security Program Procedures
Based on this information, the team will identify and select specific systems and
equipment (e.g., critical systems and critical digital assets) from the information requested
by Table RFI #1, and submit a list of specific systems and equipment to your staff by the
end of the information gathering visit, March 21, 2019, for the second information request
(i.e., Table RFI #2).
2
II. Additional Information Requested to be Available Prior to Inspection
As stated in Section I, the team will examine the documents from the initial information
request, and submit the list of specific systems and equipment to your staff by the end of
the information gathering visit, March 21, 2019. This second information request
(i.e., Table RFI #2) obtains additional documents required to evaluate the critical systems
and critical digital assets, defensive architecture, and the areas of the cyber security
program selected for the cyber security inspection. The additional information requested
for the specific systems and equipment is identified in Table RFI #2. All requested
information shall follow the guidance document Reference 1.
The Table RFI #2 information shall be provided on passive media to the lead inspector by
April 5, 2019. Please provide four copies of each CD/DVD submitted (i.e., one for each
inspector/contractor). The preferred file format for all lists is a searchable Excel
spreadsheet file on a CD/DVD. These passive media should be indexed and hyperlinked
to facilitate efficient review. If you have any questions regarding this information, please
call the inspection team lead as soon as possible.
Table RFI #2
Par Section 3: Initial Documentation Requests (See Reference 1) Items
No. Number/Title:
5 Plant computer system block diagram (if plant computer system is All
selected for inspection)
Plant security system block diagram (if security computer system is
6 All
selected for inspection)
Block diagrams for distributed systems (for systems selected for
7 All
inspection)
Host-based intrusion detection system documentation for critical 10.a.1)
10
digital assets (for systems selected for inspection) 10.a.2)
List all maintenance and test equipment (M&TE) used on critical
13 All
digital assets (for systems selected for inspection)
15 Configuration management All
Network Intrusion detection system documentation for critical systems 11.a.1)
11
that have critical digital assets associated with them 11.a.2)
16.a
16 Supply chain management
16.b
17 Portable media and mobile device control All
18 Software management All
3
Table RFI #2
Par Section 3: Initial Documentation Requests (See Reference 1) Items
No. Number/Title:
20 Vendor access and monitoring All
21 Work control All
22 Device access and key control All
23 Password/authenticator policy All
24 User account/credential policy All
26 Corrective actions since last NRC inspection All
27 Cyber security assessments for selected systems All
III. Information Requested to be Available on First Day of Inspection
For the specific systems and equipment identified in Section II, provide the following
request for information (i.e., Table 1st Week Onsite) on passive media by April 29, 2019,
the first day of the inspection. All requested information shall follow the guidance in
Reference 1.
Please provide four copies of each CD submitted (i.e., one for each inspector/contactor).
The preferred file format for all lists is a searchable Excel spreadsheet file on a CD/DVD.
These passive media files should be indexed and hyperlinked to facilitate ease of use. If
you have any questions regarding this information, please call the inspection team lead as
soon as possible.
Table 1st Week Onsite
Par Section 3: Initial Documentation Requests (See Reference 1) Items
No. Number/Title:
10.a.3)
Host-based intrusion detection system documentation for critical
10 thru
digital assets (for systems selected for inspection)
10.a.12)
11.a.3)
Network Intrusion detection system documentation for critical systems
11 thru
that have critical digital assets associated with them
11.a.15)
SIEM documentation for critical systems that have critical digital 12.a.3)
12 thru
assets associated with them
12.a.14
16 Supply chain management 16.c
4
Table 1st Week Onsite
Par Section 3: Initial Documentation Requests (See Reference 1) Items
No. Number/Title:
19 Cyber security event notifications All
Update to licensee identified violations and corrective action program
29 All
actions taken since the initial request was made
In addition to the above information please provide the following:
(1) Copies of the following documents do not need to be solely available to the
inspection team as long as the inspectors have easy and unrestrained access
to them.
a. Quality Assurance Plan;
b. Technical Specifications, if not previously provided;
c. Latest Individual Plant Examination/Probabilistic Risk Assessment Report;
and,
(2) Vendor Manuals, Assessments, and Corrective Actions:
a. The most recent cyber security quality assurance audit and/or
self-assessment; and
b. Corrective action documents (e.g., condition reports, including status of
corrective actions) generated as a result of the most recent cyber security
quality assurance audit and/or self-assessment.
IV. Information Requested To Be Provided Throughout the Inspection
(1) Copies of any corrective action documents generated as a result of the
inspection teams questions or queries during the inspection.
(2) Copies of the list of questions submitted by the inspection team members and
the status/resolution of the information requested (provided daily during the
inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the team lead.
5
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002
By: NPO Yes No Publicly Available Sensitive
OFFICE RI:EB2 BC:EB2
NAME N. Okonkwo G. Werner
SIGNATURE /RA-e/ /RA JFD for/
DATE 12/27/2018 12/31/2018