{{#Wiki_filter:April 29, 2019 | {{#Wiki_filter:April 29, 2019 | ||
Mr. Bryan C. Hanson | |||
Senior VP, Exelon Generation Company, LLC | |||
President and CNO, Exelon Nuclear | |||
4300 Winfield Road | |||
Warrenville, IL 60555 | |||
SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2REQUEST FOR | |||
INFORMATION FOR AN NRC TRIENNIAL BASELINE DESIGN BASES | |||
ASSURANCE INSPECTION (TEAM); INSPECTION REPORT 05000373/2019012; | |||
05000374/2019012 | |||
Dear Mr. Hanson: | |||
On July 22, 2019, the U. S. Nuclear Regulatory Commission (NRC) will begin a Triennial | |||
Baseline Design Bases Assurance Inspection (Team) at LaSalle County Station, Units 1 | |||
and 2. This inspection will be performed in accordance with NRC Baseline Inspection | |||
and 2. | Procedure 71111.21M. | ||
of risk-significant components | The Design Bases Assurance Inspection focuses on the design, maintenance, and operation | ||
of risk-significant components with low margin, or associated with an accident scenario, or a | |||
an accident scenario , or a specific system. | specific system. The inspection also monitors the implementation of modifications to structures, | ||
systems, and components as modifications to one system may also affect the design bases and | |||
functioning of interfacing systems as well as introduce the potential for common cause failures. | |||
The components and modifications to be reviewed during this baseline inspection will be | |||
identified as part of the preparation for the inspection and finalized during the inoffice | |||
2 weeks onsite. | preparation week that occurs prior to the first onsite inspection week. In addition, operating | ||
experience issues, associated with the component samples, will also be selected for review. | |||
/operations | The inspection team may request scenarios to be performed on the simulator. This request | ||
would require support from your simulator staff to validate scenarios, simulator time, and a crew | |||
to perform the actions which would most likely occur during the second onsite week. The team | |||
-19, 2019; Onsite weeks: | will work closely with your staff early on during the inspection process to ensure this activity can | ||
be accomplished with minimal impact. | |||
B. Hanson -2- | The inspection will include 2 weeks onsite. The inspection team will consist of six NRC | ||
inspectors who will focus on engineering/maintenance/operations of the selected components | |||
and modifications. The current inspection schedule is as follows: | |||
* Preparation week: July 15-19, 2019; | |||
-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. | * Onsite weeks: July 22-26, 2019, and August 5-9, 2019. | ||
B. Hanson -2- | |||
Experience with previous baseline design/modification inspections of similar depth and length | |||
has shown that this type of inspection is extremely resource intensive, both for the NRC | |||
in-office preparation activities. | inspectors and the licensee staff. In order to minimize the inspection impact on the site and to | ||
ensure a productive inspection for both parties, we have enclosed a request for information | |||
needed for the inspection. | |||
It is important that all of these documents are up-to-date and complete in order to minimize the | |||
. | number of additional documents requested during the preparation and/or the onsite portions of | ||
-office preparation activities, the team may identify additional information needed to support the inspection. | the inspection. Insofar as possible, this information should be provided electronically to the lead | ||
inspector. The information request has been divided into three groups: | |||
* The first group lists information necessary for our initial inspection scoping activities. | |||
This information should be provided to the lead inspector no later than June 10 2019. | |||
By June 24, 2019, the lead inspector will communicate the initial selected set of | |||
approximately seven components and seven modifications. | |||
* The second group of documents requested is those items needed to support our | |||
in-office preparation activities. This set of documents, including the calculations | |||
associated with the initially selected components and the modification packages | |||
-829-9745 or via e-mail at Michael.Jones@nrc.gov. | associated with the initially selected modifications, should be provided to the lead | ||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). | inspector at the Regional Office no later than July 8, 2019. During the in-office | ||
-0011. | preparation activities, the team may identify additional information needed to support | ||
the inspection. | |||
B. Hanson -3- | * The last group includes the additional information above as well as plant specific | ||
-rm/adams.html | reference material. This information should be available to the team onsite on | ||
July 22, 2019. It is also requested that corrective action documents and/or questions | |||
developed during the inspection be provided to the lead inspector as the documents | |||
are generated. | |||
The lead inspector for this inspection is Mr. Michael A. Jones Jr. We understand that our | |||
licensing contact for this inspection is James Patterson of your organization. If there are any | |||
-373; 50-374 License Nos. NPF | questions about the inspection or the material requested in the enclosure, please contact the | ||
-11; NPF-18 | lead inspector at 630-829-9745 or via e-mail at Michael.Jones@nrc.gov. | ||
This letter does not contain new or amended information collection requirements subject | |||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, Control | |||
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | |||
B. Hanson -4- | respond to, a request for information or an information collection requirement unless the | ||
29, 2019. | requesting document displays a currently valid Office of Management and Budget Control | ||
Number. | |||
B. Hanson -3- | |||
This letter and its enclosure will be made available for public inspection and copying at | |||
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in | |||
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, | |||
Exemptions, Requests for Withholding. | |||
Sincerely, | |||
/RA/ | |||
Michael A. Jones Jr., Reactor Engineer | |||
Engineering Branch 2 | |||
Division of Reactor Safety | |||
Docket Nos. 50-373; 50-374 | |||
License Nos. NPF-11; NPF-18 | |||
Enclosure: | |||
OFFICE RIII | Document Request for Design Bases | ||
Assurance Inspection | |||
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION | cc: Distribution via LISTSERV | ||
: 05000373/2019012; 05000374/2019012 | B. Hanson -4- | ||
Letter to Bryan C. Hanson from Michael A. Jones Jr. dated April 29, 2019. | |||
: July 22-26, 2019, and August 5-9, 2019 | SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2REQUEST FOR | ||
: 71111. | INFORMATION FOR AN NRC TRIENNIAL BASELINE DESIGN BASES | ||
ASSURANCE INSPECTION (TEAM); INSPECTION REPORT 05000373/2019012; | |||
: Michael A. Jones Jr. | 05000374/2019012 | ||
DISTRIBUTION: | |||
Michael McCoppin | |||
RidsNrrDorlLpl3 | |||
RidsNrrPMLaSalle | |||
, or sooner, to facilitate inspection preparation. | RidsNrrDirsIrib Resource | ||
Darrell Roberts | |||
John Giessner | |||
Jamnes Cameron | |||
Allan Barker | |||
DRPIII | |||
-Achievement Worth. | DRSIII | ||
-Reduction Worth, and Fussell | ADAMS Accession Number: ML19120A230 | ||
-Veseley (as applicable). | OFFICE RIII | ||
NAME MJones:cl | |||
-related components (i.e., Large Early | DATE 04/29/19 | ||
OFFICIAL RECORD COPY | |||
Worth. | DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION | ||
Inspection Report: 05000373/2019012; 05000374/2019012 | |||
Inspection Dates: July 22-26, 2019, and August 5-9, 2019 | |||
Inspection Procedure: 71111.21M, Design Bases Assurance Inspection (Team) | |||
Lead Inspector: Michael A. Jones Jr. | |||
630-829-9745 | |||
Michael.Jones@nrc.gov | |||
-sets from your PSA. | I. Information Requested for Selection of Components/Modifications | ||
The following information is requested by June 10, 2019, or sooner, to facilitate | |||
inspection preparation. If you have any questions regarding this information, please call | |||
the lead inspector as soon as possible. (Please provide the information electronically in | |||
pdf files, Excel, or other searchable formats, preferably on some portable electronic | |||
media (e.g., CD-ROM, DVD, etc.). The portable electronic media should contain | |||
descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information | |||
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION | in lists should contain enough information to be easily understood by someone who | ||
has knowledge of light water reactor technology). | |||
1. Risk-ranking of top 250 components from your site specific probabilistic safety | |||
open and closed direction (identify safety | analysis (PSA) sorted by Risk-Achievement Worth. Include values for Birnbaum | ||
-related direction) for valves | Importance, Risk-Reduction Worth, and Fussell-Veseley (as applicable). | ||
2. Risk-ranking of top 100 containment-related components (i.e., Large Early Release | |||
Frequency) from your site specific PSA sorted by Risk-Achievement Worth. See | |||
. | examples in Inspection Manual Chapter 0609, Appendix H, Table 4.1, Containment- | ||
Related SSCs [Structures, Systems, and Components] Considered for LERF [Large | |||
Early Release Frequency] Implications. | |||
3 years. | 3. Provide a list of the top 200 cut-sets from your PSA. | ||
4. Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that | |||
3 years. | contributes more than 5 percent to the baseline plant core damage frequency. | ||
5 years at your facility | 5. Copies of PSA system notebooks and latest PSA summary document. | ||
6. Provide copies of the emergency operating procedures. | |||
5 years. | 7. If you have an External Events or Fire PSA Model, provide the information requested | ||
in Items 1 and 2 for external events and fire. Provide narrative description of each | |||
-conforming. | coded event (including fire, flood zone description). | ||
Enclosure | |||
in the last 3 years. | |||
/date, and the affected system. | DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION | ||
8. Any pre-existing evaluation or list of components and associated calculations with | |||
low design margins, (i.e., pumps closest to the design limit for flow or pressure, | |||
diesel generator close to design required output, heat exchangers close to rated | |||
design heat removal etc.).Electronic copy of the site Individual Plant Examination of | |||
External Events, if available. | |||
9. List of available design (setup) margins in both the open and closed direction | |||
(identify safety-related direction) for valves in the Motor-Operated Valve and | |||
Air-Operated Valve Programs. Identify the basis for how the margin was determined. | |||
10. List of high risk Maintenance Rule systems/components based on engineering or | |||
expert panel judgment (i.e., those systems/components not identified high risk in the | |||
PSA). | |||
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION | 11. SSCs in the Maintenance Rule (a)(1) category for the last 3 years. | ||
12. Site top ten issues list (if applicable). | |||
13. A list of operating experience evaluations for the last 3 years. | |||
14. Information of any common cause failure of components experienced in the last | |||
5 years at your facility. | |||
15. List of Root Cause Evaluations associated with component failures or design issues | |||
initiated/completed in the last 5 years. | |||
16. List of open operability evaluations. | |||
17. List of SSCs considered operable but degraded/non-conforming. | |||
18. List of permanent plant modifications to SSCs that are field work complete in the | |||
.). | last 3 years. (For the purpose of this inspection, permanent plant modifications | ||
include permanent: plant changes, design changes, set point changes, equivalency | |||
evaluations, suitability analyses, and commercial grade dedications.) The list should | |||
6 years. | contain the number of each document, title, revision/date, and the affected system. | ||
19. A list of calculation changes that have been issued for use in the last 3 years. | |||
20. Copies of procedures addressing the following: modifications, design changes, set | |||
point changes, equivalency evaluations or suitability analyses, commercial grade | |||
dedications, and post-modification testing. | |||
21. A list of corrective action documents (open and closed) in the last 3 years that | |||
-around evaluations associated with each of the selected components and plans for resolution, if applicable. | address permanent plant modifications issues, concerns, or processes. These | ||
documents should also include the corrective action documents associated with the | |||
modification implementation. | |||
3 years (For example, pumps | 22. Current management and engineering organizational chart. | ||
-service testing, other vibration monitoring, oil sample results, etc., for valves: | 23. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, | ||
Technical Specifications Bases, and Technical Requirements Manual. | |||
2 | |||
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION | |||
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION | |||
24. Major one line electrical drawings (ac and dc) and key diagrams (paper copies). | |||
25. Electronic copy of Piping and Instrumentation Drawings (if available). | |||
II. Information Requested (for the approximate 7 selected components and | |||
7 selected modifications) to be Available by July 8, 2019, (will be reviewed by | |||
: | the team in the Regional office during the week of July 15, 2019). | ||
This information should be separated for each selected component or modification, | |||
especially if provided electronically (e.g., folder with component or modification name | |||
that includes calculations, condition reports, maintenance history, etc.). Items 1-12 are | |||
associated with the selected components and item 13 for the selected modifications. | |||
as modification package, engineering changes, 50.59 screening or evaluation, calculations, post | 1. List of condition reports (corrective action documents) associated with each of the | ||
-modification test packages, corrective action documents, design drawings, preventive maintenance requirements and procedures, etc. | selected components for the last 6 years. | ||
-assessments and associated corrective action documents generated in preparation for the inspection. | 2. The maintenance history (corrective, preventive, and elective) associated with each | ||
of the selected components for the last 10 years. Identify frequency of preventive | |||
maintenance activities. | |||
Provided on July 22, 2019 | 3. Copies of calculations associated with each of the selected components (if not | ||
, | previously provided), excluding data files. Please review the calculations and also | ||
provide copies of important referenced material (such as drawings, engineering | |||
requests, and vendor letters). [Pipe stress calculations excluded from this request] | |||
-office preparation | 4. System Health Reports, System Descriptions, Design Basis Documents, and/or | ||
Training Lesson Plans associated with each of the selected components. | |||
5. A list of modifications, including equivalency evaluations and setpoint changes, | |||
and may identify additional information needed to support the inspection. | associated with each of the selected components. This list should include a | ||
descriptive paragraph on the purpose of the modification. Please ensure this list only | |||
includes design completed (not canceled) modifications. | |||
6. Copies of operability evaluations (open/closed for last 3 years) associated with each | |||
of the selected components and plans for restoring operability, if applicable. | |||
7. Copies of selected operator work-around evaluations associated with each of the | |||
selected components and plans for resolution, if applicable. | |||
8. Copies of any open temporary modifications associated with each of the selected | |||
components, if applicable. | |||
9. Trend data on the selected electrical/mechanical components performance for last | |||
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION | 3 years (For example, pumps performance including in-service testing, other | ||
vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate | |||
results, diagnostic trend data, etc.). | |||
and modifications selected (verify retrievable); | 10. Provide copies of the normal and abnormal operating procedures associated with the | ||
selected components and selected scenarios. | |||
3 | |||
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION | |||
11. List of time critical or risk significant operator actions associated with components. | |||
Identify those actions that do not have job performance measures. | |||
12. Copy of latest completed tests and surveillances for each component, for example: | |||
a. Pumps: comprehensive test, quarterly test, flow balance, etc. | |||
b. Valves: stroke time testing, diagnostic testing, leak testing, interlocks, etc. | |||
c. Heat exchangers/room coolers: thermal performance, clean/inspect, fan flows, | |||
etc. | |||
d. Components: Technical Specification surveillances. | |||
e. Acceptance criteria basis calculations should also be included. | |||
13. For each of the selected modifications, copies of associated documents such | |||
as modification package, engineering changes, 50.59 screening or evaluation, | |||
calculations, post-modification test packages, corrective action documents, design | |||
drawings, preventive maintenance requirements and procedures, etc. | |||
14. A copy of any internal/external self-assessments and associated corrective action | |||
documents generated in preparation for the inspection. | |||
15. A copy of engineering/operations related audits completed in the last 2 years. | |||
III. Additional Information to be Provided on July 22, 2019, Onsite (for final selected | |||
components and modifications) | |||
1. During the in-office preparation activities, the team will be making final selections | |||
and may identify additional information needed to support the inspection. The lead | |||
inspector will provide a list of the additional information needed during the week of | |||
July 15, 2019. | |||
2. Schedule of any testing/maintenance activities to be conducted on the selected | |||
components during the two onsite inspection weeks. | |||
IV. Information Requested to be Provided Throughout the Inspection | |||
1. Copies of any corrective action documents generated as a result of the teams | |||
questions or queries during this inspection. | |||
2. Copies of the list of questions submitted by the team members and the | |||
status/resolution of the information requested (provide daily by 2:00 p.m. | |||
during the inspection to each team member). | |||
3. One complete set of Piping and Instrumentation Drawings (paper copies). | |||
4 | |||
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION | |||
4. Reference materials. (make available if needed during all onsite weeks): | |||
a. Individual Plant Examination/Probabilistic Risk Assessment report; | |||
b. Procurement documents for components and modifications selected (verify | |||
retrievable); | |||
c. Plant procedures (normal, abnormal, emergency, surveillance, etc.); and | |||
d. Vendor manuals. | |||
If you have questions regarding the information requested, please contact the lead inspector. | |||
5 | |||
}} | }} |
Latest revision as of 19:45, 19 October 2019
ML19120A230 | |
Person / Time | |
---|---|
Site: | LaSalle |
Issue date: | 04/29/2019 |
From: | Michael Jones Division of Reactor Safety III |
To: | Bryan Hanson Exelon Generation Co |
References | |
IR 2019012 | |
Download: ML19120A230 (9) | |
See also: IR 05000373/2019012
Text
April 29, 2019
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2REQUEST FOR
INFORMATION FOR AN NRC TRIENNIAL BASELINE DESIGN BASES
ASSURANCE INSPECTION (TEAM); INSPECTION REPORT 05000373/2019012;
Dear Mr. Hanson:
On July 22, 2019, the U. S. Nuclear Regulatory Commission (NRC) will begin a Triennial
Baseline Design Bases Assurance Inspection (Team) at LaSalle County Station, Units 1
and 2. This inspection will be performed in accordance with NRC Baseline Inspection
Procedure 71111.21M.
The Design Bases Assurance Inspection focuses on the design, maintenance, and operation
of risk-significant components with low margin, or associated with an accident scenario, or a
specific system. The inspection also monitors the implementation of modifications to structures,
systems, and components as modifications to one system may also affect the design bases and
functioning of interfacing systems as well as introduce the potential for common cause failures.
The components and modifications to be reviewed during this baseline inspection will be
identified as part of the preparation for the inspection and finalized during the inoffice
preparation week that occurs prior to the first onsite inspection week. In addition, operating
experience issues, associated with the component samples, will also be selected for review.
The inspection team may request scenarios to be performed on the simulator. This request
would require support from your simulator staff to validate scenarios, simulator time, and a crew
to perform the actions which would most likely occur during the second onsite week. The team
will work closely with your staff early on during the inspection process to ensure this activity can
be accomplished with minimal impact.
The inspection will include 2 weeks onsite. The inspection team will consist of six NRC
inspectors who will focus on engineering/maintenance/operations of the selected components
and modifications. The current inspection schedule is as follows:
- Preparation week: July 15-19, 2019;
- Onsite weeks: July 22-26, 2019, and August 5-9, 2019.
B. Hanson -2-
Experience with previous baseline design/modification inspections of similar depth and length
has shown that this type of inspection is extremely resource intensive, both for the NRC
inspectors and the licensee staff. In order to minimize the inspection impact on the site and to
ensure a productive inspection for both parties, we have enclosed a request for information
needed for the inspection.
It is important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection. Insofar as possible, this information should be provided electronically to the lead
inspector. The information request has been divided into three groups:
- The first group lists information necessary for our initial inspection scoping activities.
This information should be provided to the lead inspector no later than June 10 2019.
By June 24, 2019, the lead inspector will communicate the initial selected set of
approximately seven components and seven modifications.
- The second group of documents requested is those items needed to support our
in-office preparation activities. This set of documents, including the calculations
associated with the initially selected components and the modification packages
associated with the initially selected modifications, should be provided to the lead
inspector at the Regional Office no later than July 8, 2019. During the in-office
preparation activities, the team may identify additional information needed to support
the inspection.
- The last group includes the additional information above as well as plant specific
reference material. This information should be available to the team onsite on
July 22, 2019. It is also requested that corrective action documents and/or questions
developed during the inspection be provided to the lead inspector as the documents
are generated.
The lead inspector for this inspection is Mr. Michael A. Jones Jr. We understand that our
licensing contact for this inspection is James Patterson of your organization. If there are any
questions about the inspection or the material requested in the enclosure, please contact the
lead inspector at 630-829-9745 or via e-mail at Michael.Jones@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
B. Hanson -3-
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
Exemptions, Requests for Withholding.
Sincerely,
/RA/
Michael A. Jones Jr., Reactor Engineer
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-373; 50-374
Enclosure:
Document Request for Design Bases
Assurance Inspection
cc: Distribution via LISTSERV
B. Hanson -4-
Letter to Bryan C. Hanson from Michael A. Jones Jr. dated April 29, 2019.
SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2REQUEST FOR
INFORMATION FOR AN NRC TRIENNIAL BASELINE DESIGN BASES
ASSURANCE INSPECTION (TEAM); INSPECTION REPORT 05000373/2019012;
DISTRIBUTION:
RidsNrrDorlLpl3
RidsNrrPMLaSalle
RidsNrrDirsIrib Resource
DRPIII
DRSIII
ADAMS Accession Number: ML19120A230
OFFICE RIII
NAME MJones:cl
DATE 04/29/19
OFFICIAL RECORD COPY
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION
Inspection Report: 05000373/2019012; 05000374/2019012
Inspection Dates: July 22-26, 2019, and August 5-9, 2019
Inspection Procedure: 71111.21M, Design Bases Assurance Inspection (Team)
Lead Inspector: Michael A. Jones Jr.
630-829-9745
Michael.Jones@nrc.gov
I. Information Requested for Selection of Components/Modifications
The following information is requested by June 10, 2019, or sooner, to facilitate
inspection preparation. If you have any questions regarding this information, please call
the lead inspector as soon as possible. (Please provide the information electronically in
pdf files, Excel, or other searchable formats, preferably on some portable electronic
media (e.g., CD-ROM, DVD, etc.). The portable electronic media should contain
descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information
in lists should contain enough information to be easily understood by someone who
has knowledge of light water reactor technology).
1. Risk-ranking of top 250 components from your site specific probabilistic safety
analysis (PSA) sorted by Risk-Achievement Worth. Include values for Birnbaum
Importance, Risk-Reduction Worth, and Fussell-Veseley (as applicable).
2. Risk-ranking of top 100 containment-related components (i.e., Large Early Release
Frequency) from your site specific PSA sorted by Risk-Achievement Worth. See
examples in Inspection Manual Chapter 0609, Appendix H, Table 4.1, Containment-
Related SSCs [Structures, Systems, and Components] Considered for LERF [Large
Early Release Frequency] Implications.
3. Provide a list of the top 200 cut-sets from your PSA.
4. Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that
contributes more than 5 percent to the baseline plant core damage frequency.
5. Copies of PSA system notebooks and latest PSA summary document.
6. Provide copies of the emergency operating procedures.
7. If you have an External Events or Fire PSA Model, provide the information requested
in Items 1 and 2 for external events and fire. Provide narrative description of each
coded event (including fire, flood zone description).
Enclosure
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION
8. Any pre-existing evaluation or list of components and associated calculations with
low design margins, (i.e., pumps closest to the design limit for flow or pressure,
diesel generator close to design required output, heat exchangers close to rated
design heat removal etc.).Electronic copy of the site Individual Plant Examination of
External Events, if available.
9. List of available design (setup) margins in both the open and closed direction
(identify safety-related direction) for valves in the Motor-Operated Valve and
Air-Operated Valve Programs. Identify the basis for how the margin was determined.
10. List of high risk Maintenance Rule systems/components based on engineering or
expert panel judgment (i.e., those systems/components not identified high risk in the
PSA).
11. SSCs in the Maintenance Rule (a)(1) category for the last 3 years.
12. Site top ten issues list (if applicable).
13. A list of operating experience evaluations for the last 3 years.
14. Information of any common cause failure of components experienced in the last
5 years at your facility.
15. List of Root Cause Evaluations associated with component failures or design issues
initiated/completed in the last 5 years.
16. List of open operability evaluations.
17. List of SSCs considered operable but degraded/non-conforming.
18. List of permanent plant modifications to SSCs that are field work complete in the
last 3 years. (For the purpose of this inspection, permanent plant modifications
include permanent: plant changes, design changes, set point changes, equivalency
evaluations, suitability analyses, and commercial grade dedications.) The list should
contain the number of each document, title, revision/date, and the affected system.
19. A list of calculation changes that have been issued for use in the last 3 years.
20. Copies of procedures addressing the following: modifications, design changes, set
point changes, equivalency evaluations or suitability analyses, commercial grade
dedications, and post-modification testing.
21. A list of corrective action documents (open and closed) in the last 3 years that
address permanent plant modifications issues, concerns, or processes. These
documents should also include the corrective action documents associated with the
modification implementation.
22. Current management and engineering organizational chart.
23. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications,
Technical Specifications Bases, and Technical Requirements Manual.
2
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION
24. Major one line electrical drawings (ac and dc) and key diagrams (paper copies).
25. Electronic copy of Piping and Instrumentation Drawings (if available).
II. Information Requested (for the approximate 7 selected components and
7 selected modifications) to be Available by July 8, 2019, (will be reviewed by
the team in the Regional office during the week of July 15, 2019).
This information should be separated for each selected component or modification,
especially if provided electronically (e.g., folder with component or modification name
that includes calculations, condition reports, maintenance history, etc.). Items 1-12 are
associated with the selected components and item 13 for the selected modifications.
1. List of condition reports (corrective action documents) associated with each of the
selected components for the last 6 years.
2. The maintenance history (corrective, preventive, and elective) associated with each
of the selected components for the last 10 years. Identify frequency of preventive
maintenance activities.
3. Copies of calculations associated with each of the selected components (if not
previously provided), excluding data files. Please review the calculations and also
provide copies of important referenced material (such as drawings, engineering
requests, and vendor letters). [Pipe stress calculations excluded from this request]
4. System Health Reports, System Descriptions, Design Basis Documents, and/or
Training Lesson Plans associated with each of the selected components.
5. A list of modifications, including equivalency evaluations and setpoint changes,
associated with each of the selected components. This list should include a
descriptive paragraph on the purpose of the modification. Please ensure this list only
includes design completed (not canceled) modifications.
6. Copies of operability evaluations (open/closed for last 3 years) associated with each
of the selected components and plans for restoring operability, if applicable.
7. Copies of selected operator work-around evaluations associated with each of the
selected components and plans for resolution, if applicable.
8. Copies of any open temporary modifications associated with each of the selected
components, if applicable.
9. Trend data on the selected electrical/mechanical components performance for last
3 years (For example, pumps performance including in-service testing, other
vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate
results, diagnostic trend data, etc.).
10. Provide copies of the normal and abnormal operating procedures associated with the
selected components and selected scenarios.
3
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION
11. List of time critical or risk significant operator actions associated with components.
Identify those actions that do not have job performance measures.
12. Copy of latest completed tests and surveillances for each component, for example:
a. Pumps: comprehensive test, quarterly test, flow balance, etc.
b. Valves: stroke time testing, diagnostic testing, leak testing, interlocks, etc.
c. Heat exchangers/room coolers: thermal performance, clean/inspect, fan flows,
etc.
d. Components: Technical Specification surveillances.
e. Acceptance criteria basis calculations should also be included.
13. For each of the selected modifications, copies of associated documents such
as modification package, engineering changes, 50.59 screening or evaluation,
calculations, post-modification test packages, corrective action documents, design
drawings, preventive maintenance requirements and procedures, etc.
14. A copy of any internal/external self-assessments and associated corrective action
documents generated in preparation for the inspection.
15. A copy of engineering/operations related audits completed in the last 2 years.
III. Additional Information to be Provided on July 22, 2019, Onsite (for final selected
components and modifications)
1. During the in-office preparation activities, the team will be making final selections
and may identify additional information needed to support the inspection. The lead
inspector will provide a list of the additional information needed during the week of
July 15, 2019.
2. Schedule of any testing/maintenance activities to be conducted on the selected
components during the two onsite inspection weeks.
IV. Information Requested to be Provided Throughout the Inspection
1. Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily by 2:00 p.m.
during the inspection to each team member).
3. One complete set of Piping and Instrumentation Drawings (paper copies).
4
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION
4. Reference materials. (make available if needed during all onsite weeks):
a. Individual Plant Examination/Probabilistic Risk Assessment report;
b. Procurement documents for components and modifications selected (verify
retrievable);
c. Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
d. Vendor manuals.
If you have questions regarding the information requested, please contact the lead inspector.