Letter Sequence RAI |
---|
EPID:L-2023-LLA-0008, Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis (Open) |
|
|
|
---|
Category:E-Mail
MONTHYEARML23328A0132023-11-22022 November 2023 Supplement - Security Rule Exemption Request ISFSI Docket No. Reference (L-2023-LLE-0028) ML23304A0162023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - LaSalle 1 & 2 - Exemption from Security Rule (L-2023-LLE-0028) ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23153A1562023-06-0202 June 2023 NRR E-mail Capture - RAI LaSalle pressure-temperature Limits Report (PTLR) Amendment Request ML23151A6602023-05-31031 May 2023 NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Acceptance of I4R-14 ML23150A2482023-05-25025 May 2023 NRR E-mail Capture - RAI Re LaSalle Downcomer Analysis Amendment Request ML23095A1892023-04-0505 April 2023 NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Audit Plan PTLR Amendment Request ML23074A0372023-03-14014 March 2023 NRR E-mail Capture - (External_Sender) Implementation of Exigent Amendment ML23044A0452023-02-13013 February 2023 NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Acceptance of Requested Licensing Action License Amendment Request to Revise Lower Downcomer Braces Analysis ML23046A1132023-02-13013 February 2023 Transmittal Email, Paul Bessette to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23052A2042023-01-10010 January 2023 E-mail from Paul Bessette Dated 01/10/2023 Regarding Diablo Canyon ML22357A0382022-12-23023 December 2022 NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Acceptance of Requested Licensing Action License Amendment Request to Relocate the Pressure and Temperature Limit Curves ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22256A0112022-09-12012 September 2022 NRR E-mail Capture - Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22138A4112022-05-18018 May 2022 NRR E-mail Capture - Lasalle 1 and 2 - (RAI) License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Changes to TS Sections 4.3.1 and 5.6.5 (EPID-L-2021-LLA-0124) ML22126A0392022-05-0606 May 2022 NRR E-mail Capture - Lasalle 1 and 2 Draft (RAI) License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to TS Sections 4.3.1 and 5.6.5 ML22066A7622022-03-0707 March 2022 NRR E-mail Capture - Verbal Authorization - EPID-L-2022-LLR-0028, LaSalle Unit 1 Request for Alternative Examination for Repairs of Flow Control Valves 1B33-F060A and 1B33-F060B ML22062B0232022-03-0303 March 2022 NRR E-mail Capture - EPID-L-2022-LLR-0028, LaSalle Unit 1, Request for Additional Information (Rai), LaSalle Unit 1, Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0692022-01-14014 January 2022 NRR E-mail Capture - (External_Sender) IEMA Response: State Consultation - LaSalle 1 and 2: License Amendment Request Re; Revision of Technical Specifications to Incorporate GNF CRDA Methodology ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21361A2982021-12-0606 December 2021 NRR E-mail Capture - (External_Sender) Control Rod Drop Accident (CRDA) Implementation Schedule ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21210A0942021-07-29029 July 2021 NRR E-mail Capture - La Salle, 1 & 2 - Acceptance of Licensing Action License Amendment Request New Fuel Storage Vault and Spent Fuel Pool Criticality Methodologies, with Changes to TS Sections 4.3.1 and 5.6.5 (EPID-L-2021-LLA-0124) ML21207A0072021-07-26026 July 2021 NRR E-mail Capture - La Salle Units 1 and 2 - Request for Additional Information (RAI) License Amendment Request to Incorporate Licensing Topical Report NEDE-33885P-A, Revision 1, GNF CRDA Application Methodology(EPID-L-2021-LLA-0016) ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21119A2282021-04-29029 April 2021 NRR E-mail Capture - Request for Additional Information (RAI) - LaSalle, EPID-L-2020-LLA-0018, License Amendment Request (LAR) TSTF-505 ML21120A0552021-04-29029 April 2021 NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Closeout of Bulletin 2012-01, Design Vulnerability in Electric Power System ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21089A0562021-03-30030 March 2021 NRR E-mail Capture - LaSalle Unit 2 - Verbal Authorization of LaSalle Unit 2 Request for an Alternative I4R-12, Revision 2 Valve Repairs on Valves 2B33-F060A and 2B33-F060B ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21082A0252021-03-22022 March 2021 Email to Licensee for Delay in Completion of LAR LAR TSTF-505 ML21084A1292021-03-22022 March 2021 NRR E-mail Capture - Delay in Issuance of the LaSalle TSTF-505 LAR (L-2020-LLA-0018) ML21077A1902021-03-18018 March 2021 NRR E-mail Capture - Lasalle Units 1 and 2 - Request for Additional Information (RAI) Request for License Amendment Regarding Ultimate Heat Sink, (EPID-L-2020-LLA-0165) ML21089A0542021-03-15015 March 2021 NRR E-mail Capture - LaSalle Unit 2 - Verbal Authorization of LaSalle Unit 2 Relief Request I4R-12, Revision 1 Valve Repairs on Valves 2B33-F060A and 2B33-F060B ML21068A2762021-03-0909 March 2021 NRR E-mail Capture - La Salle Units 1 and 2 - Request for Additional Information (RAI) Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair (EPID-L-2020-LLA-0016) ML21067A6752021-03-0808 March 2021 NRR E-mail Capture - La Salle Units 1 and 2 - Request for Additional Information (RAI) UHS Amendment Request (EPID-L-2020-LLA-0165) ML21062A2022021-03-0303 March 2021 NRR E-mail Capture - La Salle, - Acceptance of Requested Licensing Action License Amendment Application to Incorporate Licensing Topical Report NEDE-33885P-A, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016) 2023-09-22
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23360A6082023-12-27027 December 2023 County Station Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000373/2024010 and 05000374/2024010 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23208A3182023-07-27027 July 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI ML23153A1562023-06-0202 June 2023 NRR E-mail Capture - RAI LaSalle pressure-temperature Limits Report (PTLR) Amendment Request ML23150A2482023-05-25025 May 2023 NRR E-mail Capture - RAI Re LaSalle Downcomer Analysis Amendment Request ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML22361A0792022-12-27027 December 2022 Notification of NRC Baseline Inspection and Request for Information (05000374/2023001) ML22256A0112022-09-12012 September 2022 NRR E-mail Capture - Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage ML22138A4112022-05-18018 May 2022 NRR E-mail Capture - Lasalle 1 and 2 - (RAI) License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Changes to TS Sections 4.3.1 and 5.6.5 (EPID-L-2021-LLA-0124) ML22126A0392022-05-0606 May 2022 NRR E-mail Capture - Lasalle 1 and 2 Draft (RAI) License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to TS Sections 4.3.1 and 5.6.5 ML22097A0832022-04-0707 April 2022 County Station Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000373/2022403 and 05000374/2022403 ML22062B0232022-03-0303 March 2022 NRR E-mail Capture - EPID-L-2022-LLR-0028, LaSalle Unit 1, Request for Additional Information (Rai), LaSalle Unit 1, Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21292A1782021-10-19019 October 2021 Information Request for a NRC Post-Approval Site Inspection for License Renewal 05000373/2022010 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21207A0072021-07-26026 July 2021 NRR E-mail Capture - La Salle Units 1 and 2 - Request for Additional Information (RAI) License Amendment Request to Incorporate Licensing Topical Report NEDE-33885P-A, Revision 1, GNF CRDA Application Methodology(EPID-L-2021-LLA-0016) ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21187A2972021-07-0707 July 2021 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests, and Experiments) Baseline Inspection ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21119A2282021-04-29029 April 2021 NRR E-mail Capture - Request for Additional Information (RAI) - LaSalle, EPID-L-2020-LLA-0018, License Amendment Request (LAR) TSTF-505 ML21077A1902021-03-18018 March 2021 NRR E-mail Capture - Lasalle Units 1 and 2 - Request for Additional Information (RAI) Request for License Amendment Regarding Ultimate Heat Sink, (EPID-L-2020-LLA-0165) ML21068A2762021-03-0909 March 2021 NRR E-mail Capture - La Salle Units 1 and 2 - Request for Additional Information (RAI) Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair (EPID-L-2020-LLA-0016) ML21067A6752021-03-0808 March 2021 NRR E-mail Capture - La Salle Units 1 and 2 - Request for Additional Information (RAI) UHS Amendment Request (EPID-L-2020-LLA-0165) ML21060B4352021-03-0101 March 2021 NRR E-mail Capture - Second Round - Request for Additional Information (Rais) EPID-L-2020-LLA-0018, LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2 ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21053A0252021-02-20020 February 2021 NRR E-mail Capture - Request for Additional Information (Rais) - LaSalle Request for Exemption from Pre-Access Drug and Alcohol Testing ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21048A0432021-02-16016 February 2021 County Station - Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information - Inspection Report 05000373/2021011 and 05000374/2021011 ML20364A2452020-12-29029 December 2020 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000373/2021002; 05000374/2021002 ML20346A1042020-12-11011 December 2020 NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Request for Additional Information Regarding the License Amendment Request to Adopt 10 CFR 50.69 ML20330A1892020-11-25025 November 2020 Request for Information for an NRC Post-Approval Site Inspection for License Renewal; Inspection Report 05000374/2021010 ML20321A0852020-11-16016 November 2020 Notification of NRC Baseline Inspection and Request for Information (05000374/2021001) ML20247J4082020-09-29029 September 2020 Apla Request for Additional Information LAR 50.69 and TSTF-505 (Epids L-2020-LLA-0017) and ML20253A3422020-09-17017 September 2020 Correction to Request for Additional Information Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (EPID-2020-LLA-0017) ML20253A2272020-09-16016 September 2020 Correction to Request for Additional Information Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20240A2182020-09-0303 September 2020 Request for Additional Information Regarding Amendment Request for Amendments to Renewed Facility Operating Licenses to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Co ML20239A7262020-08-27027 August 2020 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Request for a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML19120A2302019-04-29029 April 2019 Ltr. 04/29/19 LaSalle County Station, Units 1 and 2 - Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000373/2019012; 05000374/2019012 (DRS-M.Jones) ML19087A2682019-03-28028 March 2019 NRR E-mail Capture - Request for Additional Information (RAI) - LaSalle 1 and 2, EPID-L-2018-LLA-0162, LAR Removal of Operating Mode Restrictions for Performing Surveillance Testing of the Div 3 Battery and HPCS DG ML19065A0902019-03-0505 March 2019 NRR E-mail Capture - LaSalle 1 and 2, EPID-L-2018-LLR-0162, LAR Removal of Operating Mode Restrictions for Performing Surveillance Testing of the Div 3 Battery and HPCS DG, Additional Draft Request for Additional Information (RAI) ML19058A2392019-02-27027 February 2019 Information Request to Support Upcoming Problem Identification and Resolution Inspection at LaSalle County Station, Units 1 and 2 ML19036A6562019-02-0505 February 2019 NRR E-mail Capture - LaSalle 1 and 2, EPID-L-2018-LLR-0123, Relief Request I3R-15, Third Inservice Inspection Interval, Request for Additional Information (RAI) ML19022A2552019-01-22022 January 2019 NRR E-mail Capture - LaSalle Units 1 and 2, EPID-L-2018-LLA-0035, Amendment Request to Adopt TSTF-334-A, Status of Revised Draft RAIs Sent to You on December 13, 2018 ML19050A0042019-01-22022 January 2019 NRR E-mail Capture - LaSalle 1 and 2, EPID-L-2018-LLR-0162, LAR Removal of Operating Mode Restrictions for Performing Surveillance Testing of the Div 3 Battery and HPCS DG, Draft Request for Additional Information (RAI) ML19022A0292018-12-13013 December 2018 NRR E-mail Capture - Draft Request for Additional Information for LaSalle License Amendment Request to Adopt TSTF-334-A, Revision 2 2023-09-21
[Table view] |
Text
From: Robert Kuntz Sent: Thursday, May 25, 2023 1:07 PM To: Taken, Jason C.:(Exelon Nuclear)
Subject:
RAI RE: LaSalle Downcomer analysis amendment request (EPID L-2023-LLA-0008)
Mr. Taken, By letter dated January 12, 2023, Constellation Energy Generation, LLC, (Constellation) proposed to revise the design basis for lower downcomer braces at LaSalle County Station, Units 1 and 2. The Nuclear Regulatory Commission (NRC) staff has determined that additional information is required to complete its review. The NRC staffs request for additional information (RAI) is included. During a clarification discussion on May 22, 2023 a 60 day response was requested. The staff therefore expects a response to this RAI by July 24, 2023. The NRC staff notes that a 60-day response could result in a challenge to complete the review as requested in the amendment request.
The staff has revised items b), c), and d) in the draft RAI to clarify the request based on the discussion held May 22, 2023. The draft RAI stated the following for these items which have been revised in the enclosed RAI:
b) Confirm whether the steel gusset plates, as plate-elements, can be modeled as integral part of downcomer piping using the PIPSYS program. Is there a three-dimensional element in PIPSYS program that can characterize the gusset-plates in a mathematical model?
c) Justify applicability of using plastic section property(ies) in analytical analyses to qualify seismic Category I SSCs.
d) Calculate the elastic and plastic section properties of gusset plate in orthogonal directions.
If you have any questions contact me.
Robert Kuntz Senior Project Manager NRC/NRR/DORL/LPL3 (301) 415-3733 Request for Additional Information LaSalle County Station, Units 1 and 2 License Amendment Request:
Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis
RAI-1
Requirements:
- 10 CFR 50.55a, Codes and Standards, requires that SSCs be designed, fabricated, erected, constructed, tested, and inspected to quality standards commensurate with the importance of the safety function to be performed.
- 10 CFR 50, Appendix A, General Design Criterion (GDC) 1, Quality standards and records, with respect to ensuring that the structures important to safety other than containment are designed, fabricated, erected, constructed, tested, and inspected to quality standards commensurate with the safety function to be performed.
- 10 CFR Part 50, Appendix A, GDC 2, Design bases for protection against natural phenomena, as it relates to the design of seismic Category I structures, systems, and components (SSCs), requires, in part, that the SSCs important to safety shall be designed to withstand the effects of natural phenomena such as tornadoes and hurricanes without loss of capability to perform their safety functions.
- 10 CFR 50, Appendix A, GDC 16, "Containment Design," requires that reactor containment and associated systems shall be provided to establish an essentially leak-tight barrier against the uncontrolled release of radioactivity to the environment and to assure that the containment design conditions important to safety are not exceeded for as long as postulated accident conditions require.
- 10 CFR 50, Appendix A, GDC 50, Containment Design Basis," requires that the reactor containment structure, including access openings, penetrations, and the containment heat removal system shall be designed so that the containment structure and its internal compartments can accommodate, without exceeding the design leakage rate and with sufficient margin, the calculated pressure and temperature conditions resulting from any loss-of-coolant accident. This margin shall reflect consideration of (1) the effects of potential energy sources which have not been included in the determination of the peak conditions, such as energy in steam generators and as required by § 50.44 energy from metal-water and other chemical reactions that may result from degradation but not total failure of emergency core cooling functioning, (2) the limited experience and experimental data available for defining accident phenomena and containment responses, and (3) the conservatism of the calculational model and input parameters.
Background:
The license amendment request dated January 12, 2023, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23013A076), states:
a) In Section 2.0, Design Input, on Page 4 of Attachment 3, Based on discussion with Exelon on 5/18/2020, the reduction in thickness for an operating life of 40 years is to be used herein and that redcorr = 1 mil/year. In Section 3.0, Assumptions & Engineering Considerations, on Page 9 of Attachment 3, There are no unverified assumptions used in the preparation of this analysis.
b) In Section 6.1, Methodology, on Page 12 of Attachment 3, The loads on the downcomer vents ... are put into the PIPSYS model to determine the moments and axial loads at a joint.
c) In Section 6.2, Acceptance Criteria, on Page 25 of Attachment 3, However, for the lower downcomer braces and gusset plate section, Licensing Action LI 0215 allows the use of plastic section properties.
d) In Section 2.0, Design Input, on Page 8, in Item 3, Lower Downcomer Brace Plate, of Attachment 3, Elastic section modulus of effective gusset section (Sgp), and Plastic section modulus of effective gusset section were calculated to be 184 in3 and 29.54 in3, respectively.
e) Based on the review of the calculations in Attachment 3, the staff did not find any calculations qualifying the welds at the connection of lower downcomer bracing members.
f) In Section 6.2 Acceptance Criteria, on Page 25 of Attachment 3, As previously discussed, LC #7 controls for the bracing members based on the existing analyses and is considered in this evaluation. The allowable stresses for this LC (abnormal extreme environmental) are defined per Table 4.3-2 of the LaSalle DAR (Ref. 1c) and are provided below:
S7 = 1.6*AISC allowable not to exceed 0.95Fy Consistent with the existing evaluations, the maximum allowable stress of 0.95Fy is applicable to axial tension and bending, as well as axial compression. Section 1.7 of Cale.
187 (Ref. 3a) states that an allowable stress of 0.95Fy is acceptable for axial compression loads since the loads are dynamic in nature and last only a short time.
g) In Section 6.2 Acceptance Criteria, on Page 25 of Attachment 3, Additionally, per SRP Section 3.6.2 (Ref. 8b), Subsection III.2.a, a 10% increase of the minimum specified design yield strength may be used in the analysis to account
for strain rate effects under dynamic loading. This increase is considered for the axial and bending allowables only.
Issues:
a) It is not clear why the corrosion reduction in thicknesses of the structural members were limited to 40 years, and how the annual corrosion reduction is assured to be to be a linear value of 1 mil/year for the duration of the operations where the lower downcomer bracing members are in stagnant and unrefreshed water environment.
b) It is not clear whether the steel gusset plates, as plate-elements, can be modeled as integral parts of downcomer piping using the PIPSYS program. Is there a three-dimensional element in PIPSYS program that can characterize the gusset-plates in mathematical models?
c) It is not clear how the American Institute of Steel Construction (AISC) code can be implemented to determine plastic section property(ies) to qualify the structural integrity of seismic Category I SSCs.
d) The values of elastic and plastic section modulus of effective gusset plate section are calculated in one of the orthogonal directions only. However, based on the configuration in Figure 2.1-2, Lower Downcomer Gusset Plate Dimensions, the section properties of gusset plate configuration are different and shall be calculated in both orthogonal directions.
e) It is not clear whether the stresses of welds at the connections of lower downcomer bracing members are within the weld acceptance criteria since no weld calculations are provided in the application.
f) It is not clear why the calculated shear stresses were not compared against the acceptance criterion for shear stresses (0.95 x Fy / (3)1/2 = 0.548 x Fy) as it was provided in Table 3.8-9 in Revision 13 of the LSCS UFSAR.
g) Standard Review Plan (SRP) Section 3.6.2, Determination of Rupture Locations and Dynamic Effects Associated with the Postulated Rupture of Piping, (ADAMS Accession No. ML16088A041) specifically provides information concerning break and crack location criteria and methods of analysis for evaluating the dynamic effects associated with postulated breaks and cracks in high-and moderate-energy fluid system piping, including field run piping inside and outside of containment. Then a 10 percent increase of minimum specified design yield strength (Sy) to account for strain rate effects may not be applicable for the structural members of the supports. Therefore, it is not clear whether any other industrial and/or regulatory requirement(s) allows the use of a 10 percent increase of minimum specified design yield strength (Sy) in the analyses to account for strain rate effects for the structural members of seismic Category I supports.
Requests:
a) Justify why the corrosion reduction in thicknesses of the structural members were limited to 40 years, and how the annual corrosion reduction is assured to be to be a linear value of 1 mil/year for the duration of the operations.
b) Confirm whether the steel gusset plates, as plate-elements, can be modeled as an integral part of downcomer piping using the PIPSYS program. Is there a three-dimensional element in the PIPSYS program that can characterize the gusset-plates in a mathematical model? If not, justify whether the closed pipe element behavior is representative of open-sections, like gusset-plates, in analytical mathematical models under external loading conditions.
c) Justify the use of plastic section properties under the AISC code to qualify the structural integrity of seismic Category I components.
d) Does the calculations of the elastic and plastic section properties of gusset plate provided in support of the amendment request consider forces in each orthogonal direction including combination of forces? If the provided analysis does not consider forces in each orthogonal direction justify the analysis or provide revised analyses as needed to support the amendment request.
e) Provide assurance that the as-built weld joint configuration at the connections of critical locations of the lower downcomer bracing members meets the acceptance criteria.
f) Justify why the calculated shear stresses, in the steel gusset plates, were not compared against the shear acceptance criterion as provided in Table 3.8-9 in Revision 13 of the LSCS UFSAR.
g) Indicate the engineering requirement, industry standard, or code provision that allows the use of a 10 percent increase of minimum specified design yield strength (Sy) in the analyses to account for strain rate effects for the structural members of seismic Category I supports.
Hearing Identifier: NRR_DRMA Email Number: 2105 Mail Envelope Properties (SA9PR09MB4640FE98BF8F74E0D69AD0A599469)
Subject:
RAI RE LaSalle Downcomer analysis amendment request (EPID L-2023-LLA-0008)
Sent Date: 5/25/2023 1:07:05 PM Received Date: 5/25/2023 1:07:00 PM From: Robert Kuntz Created By: Robert.Kuntz@nrc.gov Recipients:
"Taken, Jason C.:(Exelon Nuclear)" <Jason.Taken@constellation.com>
Tracking Status: None Post Office: SA9PR09MB4640.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 11704 5/25/2023 1:07:00 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: