{{#Wiki_filter:~CCKr,Kju.r
{{#Wiki_filter:~CCKr,Kju.r oOCv~m arses mrs SVSrmm REGULA Y INFORMATION DISTRIBUTIO YSTEM (RIDS)DEACCESSION NBR:9302240109 DOC.DATE: 93/02/ll NOTARIZED:
oOCv~m arses mrs SVSrmm REGULA Y INFORMATION
NO DOCKET ACIL:50-397 WPPSS.Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.
DISTRIBUTIO
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B., Region 5 (Post 820201)
YSTEM (RIDS)DEACCESSION
 
NBR:9302240109
==SUBJECT:==
DOC.DATE: 93/02/ll NOTARIZED:
Responds to NRC 930112 Enforcement Conference re violations noted in insp rept 50-397/92-41.Corrective actions:RW personnel did not enter"0" values but entered positively identified nuclides a allowed computer codes to be used.DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: D RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DEIB AEOD/TTC NRR MORISSEAUi D--NRR/DOEA/OEAB NRR/DRIL/RPEB10 NRR/PMAS/ILPB 2 NUDOCS-ABSTRACT OGC/HDS1 RGN5 FILE 01 EXTERNAL: EG6G/BRYCEiJ.H.
NO DOCKET ACIL:50-397
NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CLIFFORD,J 02 NRC PDR AEOD AEOD/DSP/TPAB DEDRO NRR/DLPQ/LHFBPT NRR/DREP/PEPB9H NRR/PMAS/ILPB 1 NRR/PMAS/ILRB12
WPPSS.Nuclear Project, Unit 2, Washington
Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION
SORENSEN,G.C.
Washington
Public Power Supply System RECIP.NAME
RECIPIENT AFFILIATION
MARTIN,J.B., Region 5 (Post 820201)SUBJECT: Responds to NRC 930112 Enforcement
Conference
re violations
noted in insp rept 50-397/92-41.Corrective
actions:RW
personnel did not enter"0" values but entered positively
identified
nuclides a allowed computer codes to be used.DISTRIBUTION
CODE: IE01D COPIES RECEIVED:LTR
ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
of Violation Response NOTES: D RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DEIB AEOD/TTC NRR MORISSEAUi
D--NRR/DOEA/OEAB
NRR/DRIL/RPEB10
NRR/PMAS/ILPB
2 NUDOCS-ABSTRACT
OGC/HDS1 RGN5 FILE 01 EXTERNAL: EG6G/BRYCEiJ.H.
NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CLIFFORD,J
02 NRC PDR AEOD AEOD/DSP/TPAB
DEDRO NRR/DLPQ/LHFBPT
NRR/DREP/PEPB9H
NRR/PMAS/ILPB
1 NRR/PMAS/ILRB12
'R REG FILE COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 A NOTE TO ALL"RIDS" RECIPIENTS:
'R REG FILE COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 A NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!CONTACI" TIIE DOCUME!"I COY I'I'OI.U!'.ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME f'f<OM 1)IS'fR!I!
PLEASE HELP US TO REDUCE WASTE!CONTACI" TIIE DOCUME!"I COY I'I'OI.U!'.ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME f'f<OM 1)IS'fR!I!
UTlt3N LISTS FOR DOCUMENTS YOU DON'T NEED!II TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25  
UTlt3N LISTS FOR DOCUMENTS YOU DON'T NEED!II TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25 A WASHINGTON PUBLIC POWER SUPPLY SYSTEM"" (~/t r P.O.Bax'968
A WASHINGTON
~5OOOGeotge Wasbtngton Way~Rtcbland, Wasbtngton 99352-0968
PUBLIC POWER SUPPLY SYSTEM"" (~/t r P.O.Bax'968
~5OOOGeotge
Wasbtngton
Way~Rtcbland, Wasbtngton
99352-0968
~O9)97&5te!p.
~O9)97&5te!p.
3 February 11, 1993 G02-93-030
3 February 11, 1993 G02-93-030 Docket No.50-397 Mr.J.B.Martin, Regional Administrator U.S.Nuclear Regulatory Commission Region V 1450 Maria Lane Walnut Creek, CA 94596-5368
Docket No.50-397 Mr.J.B.Martin, Regional Administrator
 
U.S.Nuclear Regulatory
==Dear Mr.Martin:==
Commission
 
Region V 1450 Maria Lane Walnut Creek, CA 94596-5368
==Subject:==
Dear Mr.Martin: Subject: WNP-2, OPERATING LICENSE NPF-21 NRC INSPECTION
WNP-2, OPERATING LICENSE NPF-21 NRC INSPECTION REPORT 50-397/92-41 At the conclusion of the January 12, 1993 Enforcement Conference held in the NRC regional office to discuss the subject inspection report findings, Mr.Faulkenberry requested that the Supply System provide specifics on areas where the Supply System felt that the report required clarification.
REPORT 50-397/92-41
The attachment to this letter provides the requested information.
At the conclusion
In addition, the material provided to the NRC at the January 12 Enforcement Conference provided details on each of the apparent violations and the Supply System's basis for concluding that certain of the apparent violations were not, in our view, violations of NRC regulations or Supply System Technical Specifications, Policies or Procedures.
of the January 12, 1993 Enforcement
9302240109 9302ii PDR ADOCK 05000397 Q PDR 0 , f 5 ij~,i, j Page Two NRC INSPECTION REPORT 50-397/92-41 We appreciated the opportunity to meet with members of your staff and provide our perspective on the issues raised in the subject inspection report.As stated in the enforcement conference, the issues raised in the inspection report are of concern to us and we are taking aggressive actions to resolve the issues.We expect that our performance in the forthcoming refueling outage (R-8)and ensuing reactor startup will reflect the results of the actions we have been taking to improve procedural compliance in all areas, including adherence to health physics policies.Sincerely, G.C.Sorensen, Manager Regulatory Programs (Mail Drop 280)r GCS/bk Attachments CC: JB Martin-NRC RV NS Reynolds-Winston&Strawn JW Clifford-NRC R Copeland-Siemens DL Williams-BPA/399 NRC Site Inspector-901A 0'0 1!It ATTACHMi22IT The following items reflect areas where the Supply System feels clarification to NRC Inspection Report 50-397/92-41 is needed: 1)Page 4, first paragraph, states: "The audit identijfed approximately 90 adverse ftndings in this area,..." Supply System comment: The report by our consultant, Mr.Deltete contained 91 recommendation, many of which were organization and efficiency related and were not characterized as"adverse findings".
Conference
2)Page 4, seventh paragraph, states: "As one example, an HP technician involved in RW activities was not properly trained or qualtfted.
held in the NRC regional office to discuss the subject inspection
" Supply System comment: The HP technician was properly trained and qualified to perform a survey, the task he was sent to perform.He was not trained or qualified to perform radwaste shipping, nor was he asked to perform this task.3)Page 5;item (d)(ii)states: "One of the HP supervisors had not received training in accordance with IEB 79-19." Supply System comment: The HP supervisor had received training in accordance with IEB 79-19 as a technician prior to his promotion to supervisor.
report findings, Mr.Faulkenberry
However, retraining was not current.4)Page 8, second paragraph of item (b)(ii)states'."RW personnel did not review MDA results, nor did anyone assess whether the LLD achieved for directly measured radionuclides was reasonable pursuant to the BTP." Supply System comment: We believe the LLD's achieved were consistent with the BTP and standard industry practice.They were reviewed in establishing our classification program to ensure they were adequate to meet regulatory requirements.
requested that the Supply System provide specifics on areas where the Supply System felt that the report required clarification.
The attachment
to this letter provides the requested information.
In addition, the material provided to the NRC at the January 12 Enforcement
Conference
provided details on each of the apparent violations
and the Supply System's basis for concluding
that certain of the apparent violations
were not, in our view, violations
of NRC regulations
or Supply System Technical Specifications, Policies or Procedures.
9302240109
9302ii PDR ADOCK 05000397 Q PDR  
0 , f 5 ij~,i,  
j Page Two NRC INSPECTION
REPORT 50-397/92-41
We appreciated
the opportunity
to meet with members of your staff and provide our perspective
on the issues raised in the subject inspection
report.As stated in the enforcement
conference, the issues raised in the inspection
report are of concern to us and we are taking aggressive
actions to resolve the issues.We expect that our performance
in the forthcoming
refueling outage (R-8)and ensuing reactor startup will reflect the results of the actions we have been taking to improve procedural
compliance
in all areas, including adherence to health physics policies.Sincerely, G.C.Sorensen, Manager Regulatory
Programs (Mail Drop 280)r GCS/bk Attachments
CC: JB Martin-NRC RV NS Reynolds-Winston&Strawn JW Clifford-NRC R Copeland-Siemens DL Williams-BPA/399 NRC Site Inspector-901A  
0'0 1!It  
ATTACHMi22IT
The following items reflect areas where the Supply System feels clarification
to NRC Inspection
Report 50-397/92-41
is needed: 1)Page 4, first paragraph, states: "The audit identijfed
approximately
90 adverse ftndings in this area,..." Supply System comment: The report by our consultant, Mr.Deltete contained 91 recommendation, many of which were organization
and efficiency
related and were not characterized
as"adverse findings".
2)Page 4, seventh paragraph, states: "As one example, an HP technician
involved in RW activities
was not properly trained or qualtfted.
" Supply System comment: The HP technician
was properly trained and qualified to perform a survey, the task he was sent to perform.He was not trained or qualified to perform radwaste shipping, nor was he asked to perform this task.3)Page 5;item (d)(ii)states: "One of the HP supervisors
had not received training in accordance
with IEB 79-19." Supply System comment: The HP supervisor
had received training in accordance
with IEB 79-19 as a technician
prior to his promotion to supervisor.
However, retraining
was not current.4)Page 8, second paragraph of item (b)(ii)states'."RW personnel did not review MDA results, nor did anyone assess whether the LLD achieved for directly measured radionuclides
was reasonable
pursuant to the BTP." Supply System comment: We believe the LLD's achieved were consistent
with the BTP and standard industry practice.They were reviewed in establishing
our classification
program to ensure they were adequate to meet regulatory
requirements.
5)Page 9, second paragraph of item (b)(iii)states: "...RW personnel had entered"0" as the concentration....
5)Page 9, second paragraph of item (b)(iii)states: "...RW personnel had entered"0" as the concentration....
" Supply System comment: RW personnel did not enter"0" values, they entered the positively
" Supply System comment: RW personnel did not enter"0" values, they entered the positively identified nuclides and allowed the computer code's default value (0)to be used.
identified
nuclides and allowed the computer code's default value (0)to be used.  
4'l', 0  
4'l', 0  
'6)Page 9, item (iv)states: "...licensee's
'6)Page 9, item (iv)states: "...licensee's RW personnel...had insisted that WNP-2, as a matter of policy, did not use secondary ratios for waste classification.
RW personnel...had
" Supply System comment: RW personnel stated that second order scaling was not routinely used, as a matter of practice, (not policy).7)Page 9, item (v)last two sentences state: "...the CS-137 LLD had been approximate-ly...these LLDs had been unacceptably high in relation to the BTP-referenced values....
insisted that WNP-2, as a matter of policy, did not use secondary ratios for waste classification.
" Supply System comment;The values quoted are MDAs, not LLDs.We believe that the a priori LLDs do meet the BTP guidance.8)Page 10, second paragraph of item (vii)states: "These condensate resin samples showed Ce-144 concentrations slightly higher....
" Supply System comment: RW personnel stated that second order scaling was not routinely used, as a matter of practice, (not policy).7)Page 9, item (v)last two sentences state: "...the CS-137 LLD had been approximate-
"9)Supply System comment: As reported at the enforcement conference, the apparent Ce-144 in the Condensate resin samples was determined to be from a misidentified minor peak of La-140.Therefore, there was no significant shift in concentrations, and classification of liner 338 would still have been incorrect had MDA values for Ce-144 been used.(Note that the information related to the minor peak of La-140 was not available when the inspection report was prepared.)
ly...these
Page 11, item (c)(ii)states: "...Prerequisite 4.2, requires that the waste classification will be determined prior to using the shipping cask for RW shipments...the licensee had been unable to comply with this prerequisite....
LLDs had been unacceptably
" Supply System comment: The Supply System has applied this prerequisite as requiring 8 b I ifiKp'igS kf R~Whi, p'hus the prerequisite was met for this and all other shipments.
high in relation to the BTP-referenced
10)Page 11, item (d)(i)states: "The chemistry laboratory analyses of samples 5750 and 5751 had not achieved an acceptable LLD as described in the BTP." Supply System comment: As discussed previously in items (4)and (7)above, we believe that an acceptable LLD was achieved as described in the BTP.Page 11, item (d)(ii)states: "The practice of entering'0'or scaling radionuclides with no accompanying evaluation of MDA indicated either carelessness or a lack of understanding of the BTP and 10CFR61.55.
values....
" Supply System comment: As discussed at the enforcement conference, zero's were not"entered" by the RW personnel, but were allowed to be used as default values by the computer code.Plant RW staff have a clear understanding of the BTP and 10CFR61.55 and are not careless in the performance of their duties related to classification of waste.C  
" Supply System comment;The values quoted are MDAs, not LLDs.We believe that the a priori LLDs do meet the BTP guidance.8)Page 10, second paragraph of item (vii)states: "These condensate
, I I It~i 12)Page 12, item (iv)states: "The presence of Cs-137 and Ce-144 in unusually high concentrations...
resin samples showed Ce-144 concentrations
The licensee had not analyzed the reason for the abnormal levels of Cs-137 and Ce-144 in the condensate resin." As noted above (item 8), the Ce-144 was actually a misidentified peak of La-140.13)Page 12, third paragraph states: "...failure to classify the waste for shipment 92-61-02 prior to using the shipping cask for RW shipments....
slightly higher....
" The waste for shipment 92-61-02 was classified prior to using the cask for a RW shipment.14)Page 17, third paragraph states: "...periodicities were not included in the procedure.
"9)Supply System comment: As reported at the enforcement
" 15)The frequency (periodicity) for performing a procedure is maintained in our Scheduled Maintenance System, not in the procedure itself, I Page 21, fifth paragraph under Timeline states: "...he became so disruptive that the instructor jfnally called his supervisor.
conference, the apparent Ce-144 in the Condensate
" This sentence should be revised to read"...the instructor finally called her, (the instructor's) supervisor." 16)Page 21, last line and page 22 first line states"An NRC inspector observed an auxiliary operator enter...." The Supply System designation is an"equipment operator" versus an"auxiliary operator".
resin samples was determined
to be from a misidentified
minor peak of La-140.Therefore, there was no significant
shift in concentrations, and classification
of liner 338 would still have been incorrect had MDA values for Ce-144 been used.(Note that the information
related to the minor peak of La-140 was not available when the inspection
report was prepared.)
Page 11, item (c)(ii)states: "...Prerequisite
4.2, requires that the waste classification
will be determined
prior to using the shipping cask for RW shipments...the
licensee had been unable to comply with this prerequisite....
" Supply System comment: The Supply System has applied this prerequisite
as requiring 8 b I ifiKp'igS kf R~Whi, p'hus the prerequisite
was met for this and all other shipments.
10)Page 11, item (d)(i)states: "The chemistry laboratory
analyses of samples 5750 and 5751 had not achieved an acceptable
LLD as described in the BTP." Supply System comment: As discussed previously
in items (4)and (7)above, we believe that an acceptable
LLD was achieved as described in the BTP.Page 11, item (d)(ii)states: "The practice of entering'0'or scaling radionuclides
with no accompanying
evaluation
of MDA indicated either carelessness
or a lack of understanding
of the BTP and 10CFR61.55.
" Supply System comment: As discussed at the enforcement
conference, zero's were not"entered" by the RW personnel, but were allowed to be used as default values by the computer code.Plant RW staff have a clear understanding
of the BTP and 10CFR61.55
and are not careless in the performance
of their duties related to classification
of waste.C  
, I I It~i  
12)Page 12, item (iv)states: "The presence of Cs-137 and Ce-144 in unusually high concentrations...
The licensee had not analyzed the reason for the abnormal levels of Cs-137 and Ce-144 in the condensate
resin." As noted above (item 8), the Ce-144 was actually a misidentified
peak of La-140.13)Page 12, third paragraph states: "...failure
to classify the waste for shipment 92-61-02 prior to using the shipping cask for RW shipments....
" The waste for shipment 92-61-02 was classified
prior to using the cask for a RW shipment.14)Page 17, third paragraph states: "...periodicities
were not included in the procedure.
" 15)The frequency (periodicity)
for performing
a procedure is maintained
in our Scheduled Maintenance
System, not in the procedure itself, I Page 21, fifth paragraph under Timeline states: "...he became so disruptive
that the instructor
jfnally called his supervisor.
" This sentence should be revised to read"...the instructor
finally called her, (the instructor's)
supervisor." 16)Page 21, last line and page 22 first line states"An NRC inspector observed an auxiliary operator enter...." The Supply System designation
is an"equipment
operator" versus an"auxiliary
operator".
17)Page 24, item (c).states:
17)Page 24, item (c).states:
"...the licensee's
"...the licensee's program for recording dose depended on...." It is our program for daily dose control, not our program for recording dose that was at issue.Our program for recording doses comes from analysis of workers'LD's, not the pencil dosimeters which are used for recording the daily dose information on the REC cards.
program for recording dose depended on...." It is our program for daily dose control, not our program for recording dose that was at issue.Our program for recording doses comes from analysis of workers'LD's, not the pencil dosimeters
Oi I W 0 During the Enforcement Conference, there were questions about the composition of the Incident Review Boards (IRB)which the Supply System convenes to investigate plant events.An IRB is convened to immediately investigate WNP-2 Plant events where human performance is suspected to be a main contributor.
which are used for recording the daily dose information
The IRB Chairman is a rotating duty position assigned on a weekly basis by the Plant Manager.Eligible personnel are department managers within the Plant and Quality Assurance organizations.
on the REC cards.  
The chairman then selects the appropriate board membership.
Oi I W 0  
Minimum size of the IRB is the chairman and the"Duty Event Analysis Engineer", who is trained in root cause and Human Performance Enhancement System (HPES)techniques.
During the Enforcement
Since the IRB chairman is determined by a weekly rotation, it is expected that the chairman will, due to the random nature of this assignment, be independent from the organization involved in the event.Through questions raised in the inspection report, a further review of the IRB process has caused us to consider the need to make the following two changes to the IRB process: 1)Develop a two-tier IRB to address the following issues: Low-level issues should be reviewed and documented by line-management who are trained in HPES.Significant issues as presently described in the purpose statement of PPM 1.1.8"Incident Review Board".2)For those items which reach the category of"significant", ensure that there is organizational independence on the IRB.That is, ensure that at least one member (other than the Duty Event Analysis Engineer)is not from the organization whose functional area is being evaluated.  
Conference, there were questions about the composition
'}}
of the Incident Review Boards (IRB)which the Supply System convenes to investigate
plant events.An IRB is convened to immediately
investigate
WNP-2 Plant events where human performance
is suspected to be a main contributor.
The IRB Chairman is a rotating duty position assigned on a weekly basis by the Plant Manager.Eligible personnel are department
managers within the Plant and Quality Assurance organizations.
The chairman then selects the appropriate
board membership.
Minimum size of the IRB is the chairman and the"Duty Event Analysis Engineer", who is trained in root cause and Human Performance
Enhancement
System (HPES)techniques.
Since the IRB chairman is determined
by a weekly rotation, it is expected that the chairman will, due to the random nature of this assignment, be independent
from the organization
involved in the event.Through questions raised in the inspection
report, a further review of the IRB process has caused us to consider the need to make the following two changes to the IRB process: 1)Develop a two-tier IRB to address the following issues: Low-level issues should be reviewed and documented
by line-management
who are trained in HPES.Significant
issues as presently described in the purpose statement of PPM 1.1.8"Incident Review Board".2)For those items which reach the category of"significant", ensure that there is organizational
independence
on the IRB.That is, ensure that at least one member (other than the Duty Event Analysis Engineer)is not from the organization
whose functional
area is being evaluated.  
'
}}

Revision as of 12:56, 17 August 2019

Responds to NRC 930112 Enforcement Conference Re Violations Noted in Insp Rept 50-397/92-41.Disputes Violation.Rw Personnel Did Not Enter 0 Values But Entered Positively Identified Nuclides & Allowed Computer Codes to Be Used
ML17289B172
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/11/1993
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GO2-93-030, GO2-93-30, NUDOCS 9302240109
Download: ML17289B172 (13)


Text

~CCKr,Kju.r oOCv~m arses mrs SVSrmm REGULA Y INFORMATION DISTRIBUTIO YSTEM (RIDS)DEACCESSION NBR:9302240109 DOC.DATE: 93/02/ll NOTARIZED:

NO DOCKET ACIL:50-397 WPPSS.Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B., Region 5 (Post 820201)

SUBJECT:

Responds to NRC 930112 Enforcement Conference re violations noted in insp rept 50-397/92-41.Corrective actions:RW personnel did not enter"0" values but entered positively identified nuclides a allowed computer codes to be used.DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: D RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DEIB AEOD/TTC NRR MORISSEAUi D--NRR/DOEA/OEAB NRR/DRIL/RPEB10 NRR/PMAS/ILPB 2 NUDOCS-ABSTRACT OGC/HDS1 RGN5 FILE 01 EXTERNAL: EG6G/BRYCEiJ.H.

NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CLIFFORD,J 02 NRC PDR AEOD AEOD/DSP/TPAB DEDRO NRR/DLPQ/LHFBPT NRR/DREP/PEPB9H NRR/PMAS/ILPB 1 NRR/PMAS/ILRB12

'R REG FILE COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 A NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACI" TIIE DOCUME!"I COY I'I'OI.U!'.ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME f'f<OM 1)IS'fR!I!

UTlt3N LISTS FOR DOCUMENTS YOU DON'T NEED!II TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25 A WASHINGTON PUBLIC POWER SUPPLY SYSTEM"" (~/t r P.O.Bax'968

~5OOOGeotge Wasbtngton Way~Rtcbland, Wasbtngton 99352-0968

~O9)97&5te!p.

3 February 11, 1993 G02-93-030 Docket No.50-397 Mr.J.B.Martin, Regional Administrator U.S.Nuclear Regulatory Commission Region V 1450 Maria Lane Walnut Creek, CA 94596-5368

Dear Mr.Martin:

Subject:

WNP-2, OPERATING LICENSE NPF-21 NRC INSPECTION REPORT 50-397/92-41 At the conclusion of the January 12, 1993 Enforcement Conference held in the NRC regional office to discuss the subject inspection report findings, Mr.Faulkenberry requested that the Supply System provide specifics on areas where the Supply System felt that the report required clarification.

The attachment to this letter provides the requested information.

In addition, the material provided to the NRC at the January 12 Enforcement Conference provided details on each of the apparent violations and the Supply System's basis for concluding that certain of the apparent violations were not, in our view, violations of NRC regulations or Supply System Technical Specifications, Policies or Procedures.

9302240109 9302ii PDR ADOCK 05000397 Q PDR 0 , f 5 ij~,i, j Page Two NRC INSPECTION REPORT 50-397/92-41 We appreciated the opportunity to meet with members of your staff and provide our perspective on the issues raised in the subject inspection report.As stated in the enforcement conference, the issues raised in the inspection report are of concern to us and we are taking aggressive actions to resolve the issues.We expect that our performance in the forthcoming refueling outage (R-8)and ensuing reactor startup will reflect the results of the actions we have been taking to improve procedural compliance in all areas, including adherence to health physics policies.Sincerely, G.C.Sorensen, Manager Regulatory Programs (Mail Drop 280)r GCS/bk Attachments CC: JB Martin-NRC RV NS Reynolds-Winston&Strawn JW Clifford-NRC R Copeland-Siemens DL Williams-BPA/399 NRC Site Inspector-901A 0'0 1!It ATTACHMi22IT The following items reflect areas where the Supply System feels clarification to NRC Inspection Report 50-397/92-41 is needed: 1)Page 4, first paragraph, states: "The audit identijfed approximately 90 adverse ftndings in this area,..." Supply System comment: The report by our consultant, Mr.Deltete contained 91 recommendation, many of which were organization and efficiency related and were not characterized as"adverse findings".

2)Page 4, seventh paragraph, states: "As one example, an HP technician involved in RW activities was not properly trained or qualtfted.

" Supply System comment: The HP technician was properly trained and qualified to perform a survey, the task he was sent to perform.He was not trained or qualified to perform radwaste shipping, nor was he asked to perform this task.3)Page 5;item (d)(ii)states: "One of the HP supervisors had not received training in accordance with IEB 79-19." Supply System comment: The HP supervisor had received training in accordance with IEB 79-19 as a technician prior to his promotion to supervisor.

However, retraining was not current.4)Page 8, second paragraph of item (b)(ii)states'."RW personnel did not review MDA results, nor did anyone assess whether the LLD achieved for directly measured radionuclides was reasonable pursuant to the BTP." Supply System comment: We believe the LLD's achieved were consistent with the BTP and standard industry practice.They were reviewed in establishing our classification program to ensure they were adequate to meet regulatory requirements.

5)Page 9, second paragraph of item (b)(iii)states: "...RW personnel had entered"0" as the concentration....

" Supply System comment: RW personnel did not enter"0" values, they entered the positively identified nuclides and allowed the computer code's default value (0)to be used.

4'l', 0

'6)Page 9, item (iv)states: "...licensee's RW personnel...had insisted that WNP-2, as a matter of policy, did not use secondary ratios for waste classification.

" Supply System comment: RW personnel stated that second order scaling was not routinely used, as a matter of practice, (not policy).7)Page 9, item (v)last two sentences state: "...the CS-137 LLD had been approximate-ly...these LLDs had been unacceptably high in relation to the BTP-referenced values....

" Supply System comment;The values quoted are MDAs, not LLDs.We believe that the a priori LLDs do meet the BTP guidance.8)Page 10, second paragraph of item (vii)states: "These condensate resin samples showed Ce-144 concentrations slightly higher....

"9)Supply System comment: As reported at the enforcement conference, the apparent Ce-144 in the Condensate resin samples was determined to be from a misidentified minor peak of La-140.Therefore, there was no significant shift in concentrations, and classification of liner 338 would still have been incorrect had MDA values for Ce-144 been used.(Note that the information related to the minor peak of La-140 was not available when the inspection report was prepared.)

Page 11, item (c)(ii)states: "...Prerequisite 4.2, requires that the waste classification will be determined prior to using the shipping cask for RW shipments...the licensee had been unable to comply with this prerequisite....

" Supply System comment: The Supply System has applied this prerequisite as requiring 8 b I ifiKp'igS kf R~Whi, p'hus the prerequisite was met for this and all other shipments.

10)Page 11, item (d)(i)states: "The chemistry laboratory analyses of samples 5750 and 5751 had not achieved an acceptable LLD as described in the BTP." Supply System comment: As discussed previously in items (4)and (7)above, we believe that an acceptable LLD was achieved as described in the BTP.Page 11, item (d)(ii)states: "The practice of entering'0'or scaling radionuclides with no accompanying evaluation of MDA indicated either carelessness or a lack of understanding of the BTP and 10CFR61.55.

" Supply System comment: As discussed at the enforcement conference, zero's were not"entered" by the RW personnel, but were allowed to be used as default values by the computer code.Plant RW staff have a clear understanding of the BTP and 10CFR61.55 and are not careless in the performance of their duties related to classification of waste.C

, I I It~i 12)Page 12, item (iv)states: "The presence of Cs-137 and Ce-144 in unusually high concentrations...

The licensee had not analyzed the reason for the abnormal levels of Cs-137 and Ce-144 in the condensate resin." As noted above (item 8), the Ce-144 was actually a misidentified peak of La-140.13)Page 12, third paragraph states: "...failure to classify the waste for shipment 92-61-02 prior to using the shipping cask for RW shipments....

" The waste for shipment 92-61-02 was classified prior to using the cask for a RW shipment.14)Page 17, third paragraph states: "...periodicities were not included in the procedure.

" 15)The frequency (periodicity) for performing a procedure is maintained in our Scheduled Maintenance System, not in the procedure itself, I Page 21, fifth paragraph under Timeline states: "...he became so disruptive that the instructor jfnally called his supervisor.

" This sentence should be revised to read"...the instructor finally called her, (the instructor's) supervisor." 16)Page 21, last line and page 22 first line states"An NRC inspector observed an auxiliary operator enter...." The Supply System designation is an"equipment operator" versus an"auxiliary operator".

17)Page 24, item (c).states:

"...the licensee's program for recording dose depended on...." It is our program for daily dose control, not our program for recording dose that was at issue.Our program for recording doses comes from analysis of workers'LD's, not the pencil dosimeters which are used for recording the daily dose information on the REC cards.

Oi I W 0 During the Enforcement Conference, there were questions about the composition of the Incident Review Boards (IRB)which the Supply System convenes to investigate plant events.An IRB is convened to immediately investigate WNP-2 Plant events where human performance is suspected to be a main contributor.

The IRB Chairman is a rotating duty position assigned on a weekly basis by the Plant Manager.Eligible personnel are department managers within the Plant and Quality Assurance organizations.

The chairman then selects the appropriate board membership.

Minimum size of the IRB is the chairman and the"Duty Event Analysis Engineer", who is trained in root cause and Human Performance Enhancement System (HPES)techniques.

Since the IRB chairman is determined by a weekly rotation, it is expected that the chairman will, due to the random nature of this assignment, be independent from the organization involved in the event.Through questions raised in the inspection report, a further review of the IRB process has caused us to consider the need to make the following two changes to the IRB process: 1)Develop a two-tier IRB to address the following issues: Low-level issues should be reviewed and documented by line-management who are trained in HPES.Significant issues as presently described in the purpose statement of PPM 1.1.8"Incident Review Board".2)For those items which reach the category of"significant", ensure that there is organizational independence on the IRB.That is, ensure that at least one member (other than the Duty Event Analysis Engineer)is not from the organization whose functional area is being evaluated.

'