ML091520257: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Proposed Operating Test Comments | {{#Wiki_filter:Proposed Operating Test Comments | ||
: 1. Change SRO JPM ADM 2 so we can perform in the simulator or classroom. | : 1. Change SRO JPM ADM 2 so we can perform in the simulator or classroom. | ||
Done 2. Change the SRO system JPM from Placing the Zero Power Mode Bypass in Operation (SYS F) to Sampling Containment for Hydrogen (SYS D). Done | Done 2. Change the SRO system JPM from Placing the Zero Power Mode Bypass in Operation (SYS F) to Sampling Containment for Hydrogen (SYS D). Done | ||
: 3. Change the Containment Air Cooler Fan Trip malfunction in Scenario 1. The Tech Spec call is weak. Added a slow pressure leak malfunction on Safety Injection Tank T-82A. | : 3. Change the Containment Air Cooler Fan Trip malfunction in Scenario 1. The Tech Spec call is weak. Added a slow pressure leak malfunction on Safety Injection Tank T-82A. | ||
: 4. Remove the Tech Spec call for failure of the primary reactor trip push button on panel C-02. The NRC can't evaluate the spec. It will be completed before the applicant recognizes the spec and can only be evaluated by follow-up questions. Done.}} | : 4. Remove the Tech Spec call for failure of the primary reactor trip push button on panel C-02. The NRC can't evaluate the spec. It will be completed before the applicant recognizes the spec and can only be evaluated by follow-up questions. Done.}} |
Revision as of 23:07, 11 July 2019
ML091520257 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 07/07/2008 |
From: | NRC/RGN-III |
To: | Entergy Nuclear Palisades |
Shared Package | |
ML082200310 | List: |
References | |
Download: ML091520257 (1) | |
Text
Proposed Operating Test Comments
Done 2. Change the SRO system JPM from Placing the Zero Power Mode Bypass in Operation (SYS F) to Sampling Containment for Hydrogen (SYS D). Done
- 3. Change the Containment Air Cooler Fan Trip malfunction in Scenario 1. The Tech Spec call is weak. Added a slow pressure leak malfunction on Safety Injection Tank T-82A.
- 4. Remove the Tech Spec call for failure of the primary reactor trip push button on panel C-02. The NRC can't evaluate the spec. It will be completed before the applicant recognizes the spec and can only be evaluated by follow-up questions. Done.