ML17290A494: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 06/24/1993
| issue date = 06/24/1993
| title = Forwards LER 92-034-02.Supplemental Rept Describes Completion of Penetration Seal Rework & Changes to Flood Watch Requirements
| title = Forwards LER 92-034-02.Supplemental Rept Describes Completion of Penetration Seal Rework & Changes to Flood Watch Requirements
| author name = PARRISH J V
| author name = Parrish J
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  

Revision as of 23:37, 18 June 2019

Forwards LER 92-034-02.Supplemental Rept Describes Completion of Penetration Seal Rework & Changes to Flood Watch Requirements
ML17290A494
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/24/1993
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17290A491 List:
References
GO2-93-167, NUDOCS 9307010121
Download: ML17290A494 (2)


Text

ACCKLE D DOCUMENT DIST UTION SYSTEM REGULAl.RY INFORMATION DISTRIBUTI SYSTEM (RIDS)'CCESSION NBR:9307010121 DOC.DATE: 93/06/24 NOTARIZED:

NO DOCKET FACIL':50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION PARRISHJ.V.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards LER 92-034-02.Supplemental rept describes completion of penetration seal rework a changes to flood watch requirements.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR 3 ENCL r SIZE (&TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.NOTES: RECIPIENT ID CODE/NAME PDV LA CLIFFORD,J INTERNAL: ACNW AEOD/DOA AEOD/ROAB/DSP NRR/DE/EMEB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRSS/PRPB NRR/DSSA/SRXB RES/DSIR/EIB EXTERNAL: EGSG BRYCE,J.H NRC PDR NSIC POOREPW.COPIES LTTR ENCL 1 1 1 1 2 2 1 1 2 2 1 1 1 1 1 1 2 2 1 1 1 1 2 2 1 1 1 1 RECIPIENT ID CODE/NAME PDV PD ACRS AEOD/DSP/TPAB NRR/DE/EELB NRR/DORS/OEAB NRR/DRCH/HICB NRR/DRIL/RPEB RR7/QS4S SPLB REG FILE 02 FILE 01 L ST LOBBY WARD NSIC MURPHY,G.A NUDOCS FULL TXT COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 32 ENCL 32 ai WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 June 24, 1993 G02-93-167 Docket No.50-397 Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.20555

Subject:

NUCLEAR PLANT WNP-2, OPERATING LICENSE NPF-21 LICENSEE EVENT REPORT NO.92-034-02 Transmitted herewith is Licensee Event Report No.92-034-02 for the WNP-2 Plant.This supplemental report describes the completion of the penetration seal rework and changes to the flood watch requirements.

This report is submitted in response to the report requirements of 10CFR50.73 and discusses the items of reportability, corrective action taken, and action taken to preclude recurrence.

Sincerely, J.V.Pamsh (Mail Drop 1023)Assistant Managing Director, Operations JVP/REF/jd Enclosure CC: Mr.B.H.Faulkenberry, NRC-Region V Mr.R.Barr, NRC Resident Inspector (Mail Drop 901A, 2 Copies)INPO Records Center-Atlanta, GA Mr.D.L.Williams, BPA (Mail Drop 399)93070iOi2i 930624 PDR ADQCK 05000397 S PDR