ML16256A128: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML16256A128
| number = ML16256A128
| issue date = 08/25/2016
| issue date = 08/25/2016
| title = Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.6
| title = Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.6
| author name =  
| author name =  
| author affiliation = Entergy Operations, Inc
| author affiliation = Entergy Operations, Inc
Line 50: Line 50:


February 1991 3.6 (DRN 03-2054, R14)
February 1991 3.6 (DRN 03-2054, R14)
    (EC-13881, R304)
(EC-13881, R304)
WCAP-11596-P-A Westinghouse Electric Company, Qualification of the PHOENIX -   
WCAP-11596-P-A Westinghouse Electric Company, Qualification of the PHOENIX -   


Line 71: Line 71:
April 1989 4.2, 4.3A, 15.1 WCAP-16045-P-A Westinghouse Electric Company, Qualification of the Two-  
April 1989 4.2, 4.3A, 15.1 WCAP-16045-P-A Westinghouse Electric Company, Qualification of the Two-  


Dimensional Transport Code  
Dimensional Transport Code
: PARAGON,  
: PARAGON,  


Line 99: Line 99:


WSES-FSAR-UNIT-3 1.6-6 Revision 305 (11/11)
WSES-FSAR-UNIT-3 1.6-6 Revision 305 (11/11)
  (EC-13881, R304)
(EC-13881, R304)
Report Number Author and Title
Report Number Author and Title


Line 126: Line 126:


of Uncertainties, May 1988 4.2, 4.3A (EC-13881, R304)
of Uncertainties, May 1988 4.2, 4.3A (EC-13881, R304)
    (EC-19087, R305)
(EC-19087, R305)
WCAP-17817-P Technical Justification for Eliminating Pressurizer Surge Line Rupture as the  
WCAP-17817-P Technical Justification for Eliminating Pressurizer Surge Line Rupture as the  



Latest revision as of 01:03, 27 April 2019

Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.6
ML16256A128
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16256A128 (6)


Text

WSES-FSAR-UNIT-31.6-11.6MATERIAL INCORPORATED BY REFERENCEThe following topical reports are incorporated by reference.ReportFSARNumberAuthor and Title Date to NRCSectionCENPD-26Combustion Engineering, Inc.August 19713.6, 6.2(with Suppl."Description of Combustion 1 through 5)Engineering Loss of CoolantCalculational Procedures"CENPD-42Combustion Engineering, Inc.August 19723.6"Dynamic Analysis of Reactor Vessel Internals Under Loss of Coolant Accident Conditions with Application to C-E 800 Mwe Class Reactors"CENPD-67Combustion Engineering, Inc.September 197310.3(with Suppl."Iodine Decontamination 1 and 2 andFactors During PWR Steam Addenda 1Generation and Steam Venting" and 2)CENPD-87"Safety Related Research Development1.5for CE PWRs, Program Summaries"CENPD-98Combustion Engineering, Inc.July 19734.4, 15.0"Coast Code Description"CENPD-105Combustion Engineering, Inc.June 19734.3"Fast Neutron Attenuation by the ANISN-SHADRAC Analytical Method"CENPD-107Combustion Engineering, Inc.August 197415.0(with Suppl."CESEC" 1 through 4)CENPD-118Combustion Engineering, Inc.September 19744.3"Densification of CombustionEngineering Fuel"CENPD-132Combustion Engineering, Inc.September 19746.2, 15.6(with Suppl."Calculative Methods for the6.3 1 and 2)C-E Large Break LOCA Evaluation Model" WSES-FSAR-UNIT-3 1.6-2 Revision 11-A (02/02)

Report FSARNumberAuthor and Title Date to NRC Section CENPD-133 Combustion Engineering, Inc.

September 1974 6.2, 15.6 (with"CEFLASH-4A Fortran IV6.3Suppl. 2)Digital Computer Program for Reactor Blowdown Analysis" CENPD-134 Combustion Engineering, Inc.

September 1974 6.2, 15.6 (with"COMPERC-II A Program for6.3 Suppl. 1)Emergency Refill-Reflood of the Core" CENPD-135Combustion Engineering, Inc.September 19744.2, 6.3, (with"STRIKIN-II A Cylindrical 15.6 Suppl.Geometry Fuel Rod Heat2 and 4)Transfer Program" CENPD-136 Combustion Engineering, Inc.

September 1974 4.2, 15.6"High Temperature Properties

of Zircaloy and UO 2 , for use in LOCA Evaluation Model" CENPD-137 Combustion Engineering, Inc.

September 1974 6.3, 15.6 (with"Calculative Methods for theSuppl. 1)C-E Small Break LOCA Evaluation Model"(DRN 01-758)

CENPD-138"PARCH, A FORTAN IV Digital Program February 1975 15.6 to Evaluate Pool Boiling, Axial Rod and Coolant Heatup" (with Supplement 1)(DRN 01-758)

CENPD-139Combustion Engineering, Inc.September 19744.1, 4.2, (with"C-E Fuel Evaluation Model" 4.3, 6.3 Suppl. 1)CENPD-145Combustion Engineering, Inc.April 1975 4.3, 7.7"A Method of Analyzing

In-Core Detector Data in Power Reactors" CENPD-148 Combustion Engineering, Inc.November 19744.6"Review of Reactor Shutdown

System (PPS Design) for Common Mode Failure Susceptibility" CENPD-153 Combustion Engineering, Inc.August 19744.3"Evaluation Uncertainty in

the Nuclear Form Factor WSES-FSAR-UNIT-3ReportFSARNumberAuthor and Title Date to NRCSection1.6-3CENPD-153Measured by Self Powered(cont)Fixed In-Core DetectorSystems"CENPD-155Combustion Engineering, Inc.October 19745.3"C-E Procedure for Design, Fabrication, Installation and Inspection of Surveillance Specimen Brackets Attached toReactor Vessel Beltline Region"CENPD-161Combustion Engineering, Inc,June 19754.1, 4.2,"TORC - A Computer Code for4.4, 15.0 Determining the Thermal Marginof a Reactor Core"CENPD-162Combustion Engineering, Inc.May 19754.4(with"CHF Correlation for C-E FuelSuppl. 1)Assemblies with StandardSpacer Grids - Part 1; Uniform Axial Power Distribution"CENPD-168Combustion Engineering, Inc.September 19763.6, 6.2Rev. 1"Design Basis Pipe Breaksfor the Combustion Engineering Two Loop Reactor Coolant System"CENPD-169Combustion Engineering, Inc.August 19754.3, 7.2"Assessment of the Accuracy7.7 of PWR Operating Limits as Determined by Core Operating Limit SupervisorySystem"CENPD-170Combustion Engineering, Inc.August 19757.2"Assessment of the Accuracy of the PWR Safety System Actuation as Performed by the Core Protection Calculators"CENPD-178PCombustion Engineering, Inc.October 19763.9, 4.2and 178"Structural Analysis of the16 x 16 Fuel Assembly for Combined Seismic and Loss-of-Coolant-Accident Loadings" WSES-FSAR-UNIT-3ReportFSARNumberAuthor and Title Date to NRCSection1.6-4CENPD-179Combustion Engineering, Inc.April 19764.2"C-E Thermo-Structural Fuel

Evaluation Method"CENPD-183Combustion Engineering, Inc.August 197515.0"C-E Methods for Loss of15.3 Flow Analysis"CENPD-187Combustion Engineering, Inc.October 19754.2(with"Method of Analyzing CreepSuppl. 1)Collapse of Oval Cladding"CENPD-190Combustion Engineering, Inc.January 197615.4"C-E Method for Control Element Assembly Ejection Analysis"CENPD-198PCombustion Engineering, Inc.December 19754.2and 198"Zircaloy Growth-In-ReactorDimensional Changes in Zircaloy-4 Fuel Assemblies"CENPD-206Combustion Engineering, Inc.December 19764.4"Comparison of TORC Code Predictions with Experimental

Data"CENPD-207Combustion Engineering, Inc.June 19764.4"Critical Heat Flux Corre-lation for C-E Fuel Assemblies with Standard Spacer Grids, Part 2, Non-Uniform Axial PowerDistributions"CENPD-213Combustion Engineering, Inc.February 19766.3, 15.6"Application of FLECHT Reflood Heat Transfer Coefficients to Combustion Engineering 16 x 16 Fuel Bundles"CENPD-225PCombustion Engineering, Inc.October 19764.2, 4.4and 225"Fuel and Poison Rod Bowing"CENPD-252"Method for the Analysis of BlowdownJuly 19793.9E WSES-FSAR-UNIT-3 1.6-5 Revision 304 (06/10)

Report Number Author and Title Date to NRC FSAR Section WCAP 7709-L Electric Hydrogen Recombiners for PWR Containments

April 1972 6.2.5 (DRN 03-2054, R14)

CEN-367-A Combustion Engineering, Inc.

Leak-Before-Break of Primary

Coolant Loop Piping in Combustion

Engineering Designed Nuclear

Steam Supply System

February 1991 3.6 (DRN 03-2054, R14)

(EC-13881, R304)

WCAP-11596-P-A Westinghouse Electric Company, Qualification of the PHOENIX -

P/ANC Nuclear Design System for

Pressurized Water Reactor Cores

June 1988 4.2, 4.3A, 15.1 WCAP-10965-P-A Westinghouse Electric Company, ANC: A Westinghouse Advanced Nodal

Computer Code

September 1986 4.2, 4.3A, 15.1 WCAP-10965-P-A Addendum 1 Westinghouse Electric Company, ANC: A Westinghouse Advanced Nodal

Computer Code:

Enhancements to ANC Rod Power

Recovery

April 1989 4.2, 4.3A, 15.1 WCAP-16045-P-A Westinghouse Electric Company, Qualification of the Two-

Dimensional Transport Code

PARAGON,

August 2004 4.3A WCAP-16072-P-A Westinghouse Electric Company, Implementation of Zirconium

Diboride Burnable Absorber

Coatings in CE Nuclear Power

Fuel Assembly Designs

August 2004 4.2, 4.3A CENPD-404-P-A Combustion Engineering, Inc., Implementation of ZIRLO Material

Cladding in CE Nuclear Power

Fuel Assembly Designs,

November 2001 4.2, 4.3A, 15.0 WCAP-16500-P-A Westinghouse Electric Company, CE 16 x 16 Next Generation Fuel

Core Reference Report,

August 2007 4.2, 4.3A WCAP-12610-P-A and CENPD-404-

P-A Addendum 1-

A Westinghouse Electric Company, Optimized ZIRLO TM , July 2006 4.2, 4.3A, 15.0 EC-13881, R304)

WSES-FSAR-UNIT-3 1.6-6 Revision 305 (11/11)

(EC-13881, R304)

Report Number Author and Title

Date to NRC FSAR Section WCAP-16523-P-

A Westinghouse Electric Company,

"Westinghouse Correlations

WSSV and WSSV-T for Predicting

Critical Heat Flux in Rod Bundles

with Side-Supported Mixing

Vanes,"

August 2007 4.4, 15.0, 15.1, 15.2, 15.3, 15.4 CENPD-387-P-A Combustion Engineering, Inc., "ABB Critical Heat Flux Correlations for PWR Fuel,"

May 2000 4.3A, 15.0 WCAP-15996-P-

A, Rev. 1 Westinghouse Electric Company, "Technical Manual for the CENTS

Code,"

March 2005 15.0, 15.1, 15.2, 15.3, 15.4 CEN-356(V)-P-A, Revision 01-P-A Combustion Engineering, Inc.,

"Modified Statistical Combination

of Uncertainties, May 1988 4.2, 4.3A (EC-13881, R304)

(EC-19087, R305)

WCAP-17817-P Technical Justification for Eliminating Pressurizer Surge Line Rupture as the

Structural Design Basis for Waterford Steam

Electric Station, Unit 3 Using Leak-Before-

Break Methdology February 2010 3.6.3 (EC-19087, R305)