ML18101A696: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 21: Line 21:
**--9505110144  
**--9505110144  
-950502 -.-PDR ADOCK 05000272 p PDR ATTACHMENT 2 MARKED UP PAGES c z --t .... w ...... ... f :I t :I ..+ :z 0 . TABLE 3.3-3 (Continued*
-950502 -.-PDR ADOCK 05000272 p PDR ATTACHMENT 2 MARKED UP PAGES c z --t .... w ...... ... f :I t :I ..+ :z 0 . TABLE 3.3-3 (Continued*
ENGINEEREQ SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION FUNCTIQNAL UNIT 8. AUXILIARY FBBDWA'f&R  
ENGINEEREQ SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION FUNCTIQNAL UNIT 8. AUXILIARY FBBDWA'f&R
: a. Automatic Actuation Logic** /\Jen-U f>c D *b. Manaal Initiation TOTAL NO. OF CHANNELS 2 1/p,Hllp c. Steam Generator Water Level--Low-Low  
: a. Automatic Actuation Logic** /\Jen-U f>c D *b. Manaal Initiation TOTAL NO. OF CHANNELS 2 1/p,Hllp c. Steam Generator Water Level--Low-Low
: i. Start Motor Driven Pump* ii. Start Turbine Driven Pumps d. Undervoltage  
: i. Start Motor Driven Pump* ii. Start Turbine Driven Pumps d. Undervoltage  
-RCP Start 1\lrbin* -Driven Pump 3/etm. gen. 3/atm. gen. 4-1/bue CHANNELS TO TRIP 1 l/pt111&p MINIMUM CHANNELS OPERABLE 2 l/pt1111p 2/atm. gen. 2/etm. gen .. any atm. gen. 2/atm. gen. any.2 atm. gen. 1/2 x 2 2/etm. gen. 3 APPLICABLE MODES 1,2,3 2 3 I 1,2,3 1,2,3 1,2 ACTION 20 19* 19* 19 e. S.I. Start Motor-Driven Pump* See 1 above (All S.I. initiating functions and requirements)  
-RCP Start 1\lrbin* -Driven Pump 3/etm. gen. 3/atm. gen. 4-1/bue CHANNELS TO TRIP 1 l/pt111&p MINIMUM CHANNELS OPERABLE 2 l/pt1111p 2/atm. gen. 2/etm. gen .. any atm. gen. 2/atm. gen. any.2 atm. gen. 1/2 x 2 2/etm. gen. 3 APPLICABLE MODES 1,2,3 2 3 I 1,2,3 1,2,3 1,2 ACTION 20 19* 19* 19 e. S.I. Start Motor-Driven Pump* See 1 above (All S.I. initiating functions and requirements)
: f. Trip of Main. Feedwater Pump* start Motor Driven Pump* g. Station Blackout 2/pump 1/pump l/pump See 6 and 7 above (SEC and U/V Vital Bus) 1,2 21*
: f. Trip of Main. Feedwater Pump* start Motor Driven Pump* g. Station Blackout 2/pump 1/pump l/pump See 6 and 7 above (SEC and U/V Vital Bus) 1,2 21*
ACTION 19 -ACTION 20 -ACTION 21 -ACTION 22 ACTION 23 -SALEM -UHIT l e e TABLE 3.3-3 <Continued)
ACTION 19 -ACTION 20 -ACTION 21 -ACTION 22 ACTION 23 -SALEM -UHIT l e e TABLE 3.3-3 <Continued)
With the number of OPERABLE Channels one leas than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:  
With the number of OPERABLE Channels one leas than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
: a. The inoperable channel is placed in the tripped condition within 6 hours. b. The Minimum Channels OPERABLE requirements is met; however, the inoperable channel may be bypassed for up to 4 hours for surveillance testing of other channels per Specification 4.3.2.1.1.
: a. The inoperable channel is placed in the tripped condition within 6 hours. b. The Minimum Channels OPERABLE requirements is met; however, the inoperable channel may be bypassed for up to 4 hours for surveillance testing of other channels per Specification 4.3.2.1.1.
With the number of OPERABLE channels one lees than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 6 hours or, be in at least HOT STANDBY within the next 6 hours and in at leaat HOT SHUTDOWN within the following 6 hours; however, one channel may be bypassed for up to 4 hours for surveillance testing per Specification 4.3.2.1.1 provided the other channel is OPERABLE.
With the number of OPERABLE channels one lees than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 6 hours or, be in at least HOT STANDBY within the next 6 hours and in at leaat HOT SHUTDOWN within the following 6 hours; however, one channel may be bypassed for up to 4 hours for surveillance testing per Specification 4.3.2.1.1 provided the other channel is OPERABLE.
With the number of OPERABLE channel* one less than the Minimum Number of Channels, operation may proceed provided that either: a. The inoperable channel i* reatored to OPERABLE within 72 hours, or b. If the affected Main Feedwater Pump i* expected to be out of service for more than 72 hour*, the inoperable channel is jumpered *o a* to enable th* Start Circuit of the Auxiliary Feedwater Pump* upon the lo** of the other Main Feedwater Pump. With t.he number of OPBRABLB.
With the number of OPERABLE channel* one less than the Minimum Number of Channels, operation may proceed provided that either: a. The inoperable channel i* reatored to OPERABLE within 72 hours, or b. If the affected Main Feedwater Pump i* expected to be out of service for more than 72 hour*, the inoperable channel is jumpered *o a* to enable th* Start Circuit of the Auxiliary Feedwater Pump* upon the lo** of the other Main Feedwater Pump. With t.he number of OPBRABLB.
chanuei. relating directly numbex of OPERABLE auxilia.iy feedwater pump*, *ACTION* af L.e.o. J.7.1.2 NOi C/Se:r} With the number of OPERABLE channel* one l*** than the Total Humber of Channel*, re*tor* th* inoperable channel to OPERABLE atatu* within 48 hour* or be in HOT STANDBY within the next 6 hour* and in at least HOT SHUTDOWN within th* following 6 hours. 3/4 3-22 Amendment No. 142 TABLI J,J-4 (f.ontinued)
chanuei. relating directly numbex of OPERABLE auxilia.iy feedwater pump*, *ACTION* af L.e.o. J.7.1.2 NOi C/Se:r} With the number of OPERABLE channel* one l*** than the Total Humber of Channel*, re*tor* th* inoperable channel to OPERABLE atatu* within 48 hour* or be in HOT STANDBY within the next 6 hour* and in at least HOT SHUTDOWN within th* following 6 hours. 3/4 3-22 Amendment No. 142 TABLI J,J-4 (f.ontinued)
INQINllRIQ SAflTX fll\TURI ftCTUAJ'IQH SXSTIM INSTRUMIJ!TATIQI TRIP SITPQINTS FUNCTIONAL UNIT 5, TURBINI TRIP AND PllDWATIR ISOLATION . 6. A. St*-Generator Water Level Hi9h-Hi9h SAFIGUARDS IQUIPMBNT CONTROL SXSTBll (SSCt 1. UNDBRVOLTAGS, VITAL BUS ** Lo** of Voltage b. Su*tained Degraded Voltage 8. AUXILIARY PIBDWATBR  
INQINllRIQ SAflTX fll\TURI ftCTUAJ'IQH SXSTIM INSTRUMIJ!TATIQI TRIP SITPQINTS FUNCTIONAL UNIT 5, TURBINI TRIP AND PllDWATIR ISOLATION . 6. A. St*-Generator Water Level Hi9h-Hi9h SAFIGUARDS IQUIPMBNT CONTROL SXSTBll (SSCt 1. UNDBRVOLTAGS, VITAL BUS ** Lo** of Voltage b. Su*tained Degraded Voltage 8. AUXILIARY PIBDWATBR
: a. Auta11atic Actuation Logic No-I vS"* D b. MaAUal IAlthtloA  
: a. Auta11atic Actuation Logic No-I vS"* D b. MaAUal IAlthtloA
: c. St*-Generator Water Level--Low-Low d. Und*r*olta9*  
: c. St*-Generator Water Level--Low-Low d. Und*r*olta9*  
-RCP e. s.1. f, Trip of Main reedwater Pumpn g. station Blackout TRIP SITPQINT $ 67\ of narrow range in*trument  
-RCP e. s.1. f, Trip of Main reedwater Pumpn g. station Blackout TRIP SITPQINT $ 67\ of narrow range in*trument  
Line 39: Line 39:
*pan each *teaa generator 2 70\ RCP bu* voltage see 1 above (All s.I. *etpolnt*)
*pan each *teaa generator 2 70\ RCP bu* voltage see 1 above (All s.I. *etpolnt*)
ALLOWULI YALUES $ 68\ of narrow range instrument span each *team generator Not ApPllcable . 2 65\ of bus voltage 2 91\ of bu* voltage for $ 15 *econd* Not Applicable llot Applhable 2 14.8\ of narrow range ln*trument span each steam generator 2 65\ RCP bus voltage llot Applicable . Not Applicable See 6 and 7 above (SIC and Undervoltage, Vital Bua) c ::z --t ... w ....... .... er' w w f :I i :I ..+ ::z 0 . TABLE 4.3-2 <<Continued)
ALLOWULI YALUES $ 68\ of narrow range instrument span each *team generator Not ApPllcable . 2 65\ of bus voltage 2 91\ of bu* voltage for $ 15 *econd* Not Applicable llot Applhable 2 14.8\ of narrow range ln*trument span each steam generator 2 65\ RCP bus voltage llot Applicable . Not Applicable See 6 and 7 above (SIC and Undervoltage, Vital Bua) c ::z --t ... w ....... .... er' w w f :I i :I ..+ ::z 0 . TABLE 4.3-2 <<Continued)
ENGINEERED SAFETX FEATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLABCE REOUIREK&#xa3;NTS FUNCIIONAL UNIT 8. AUXILIARY PllDNATD a. Automatlc icQeie tJo-r ...>se.D b. ll*au*l Iattfatfnn  
ENGINEERED SAFETX FEATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLABCE REOUIREK&#xa3;NTS FUNCIIONAL UNIT 8. AUXILIARY PllDNATD a. Automatlc icQeie tJo-r ...>se.D b. ll*au*l Iattfatfnn
: c. Steam Generator Water Level--Low-Low d
: c. Steam Generator Water Level--Low-Low d
* Undervoltage  
* Undervoltage  
-RCP CHANNEL CHECK ..... M a s s CHANNEL CALIBRATION  
-RCP CHANNEL CHECK ..... M a s s CHANNEL CALIBRATION  
.. .*. M A R R CHANNEL FUNCTIONAL TEST H(2) N(5) MODES IN WHICH SURVEILLANCE REOUIR&#xa3;D 1,2,3 1, ;;i, l 1,2,3 1,2 e. s. I. See 1 above (All S.I.* surveillance requirements)  
.. .*. M A R R CHANNEL FUNCTIONAL TEST H(2) N(5) MODES IN WHICH SURVEILLANCE REOUIR&#xa3;D 1,2,3 1, ;;i, l 1,2,3 1,2 e. s. I. See 1 above (All S.I.* surveillance requirements)
: f. Trip of Main Feedwater Pumps N.A. R 1 CJ* Station Blackout See 6b and 7 above (SEC and U/V Vital Bus) ..   
: f. Trip of Main Feedwater Pumps N.A. R 1 CJ* Station Blackout See 6b and 7 above (SEC and U/V Vital Bus) ..   
... TABLE 4.3-2 IContinuedl TABLE NOTATION
... TABLE 4.3-2 IContinuedl TABLE NOTATION
* Output* are up to, but not including, the output relay*. * (l) Each logic channel *hall be te*ted at least once per 62 day* on a STAGGERED TEST BASIS. Th* CHANNEL FUNCTION TEST Of eAch logic channel *hall that it* a**ociated die**l generator automatic load **qu*nce timer i* OPERABLE with the interval between each load block within l **cond of it* de*ign interval.  
* Output* are up to, but not including, the output relay*. * (l) Each logic channel *hall be te*ted at least once per 62 day* on a STAGGERED TEST BASIS. Th* CHANNEL FUNCTION TEST Of eAch logic channel *hall that it* a**ociated die**l generator automatic load **qu*nce timer i* OPERABLE with the interval between each load block within l **cond of it* de*ign interval.
(2) Each train or logic channel *hall be t**ted at l*a*t every 62 day* on & ata99ered ba*i*. (3) The CHAHHEL FUNCTIONAL TEST *hall include exerci*ing the tran*mitter by applying either a vacuum or pr***ure to the appropriate  
(2) Each train or logic channel *hall be t**ted at l*a*t every 62 day* on & ata99ered ba*i*. (3) The CHAHHEL FUNCTIONAL TEST *hall include exerci*ing the tran*mitter by applying either a vacuum or pr***ure to the appropriate  
*id* of the tran*mitter.  
*id* of the tran*mitter.
(4) HOT USEC 15) Th* ellMftfEl.
(4) HOT USEC 15) Th* ellMftfEl.
PUNC'f'IGNM.
PUNC'f'IGNM.
HS'l' *hall i&*
HS'l' *hall i&*
in eh* I SmwililmAffe!l R!QUIRl!M!!H'l' er 4a7ala2aaa NOT llSEiJ (6) Input* from Undervoltage, Vital Bu*, *hall be t**t*d monthly. Input* frcm Solid State Protection Sy*tem *hall be t**t*d every 62 day* on a STAGGERED TEST BASIS. SALEH -OMIT 1 3/4 3-34 Amenctm.nt Ro. 138 c: :z .... ..... N w I N -f f :I .. z 0 . .... N .... TABLE 3.3-3 <<Continued)
in eh* I SmwililmAffe!l R!QUIRl!M!!H'l' er 4a7ala2aaa NOT llSEiJ (6) Input* from Undervoltage, Vital Bu*, *hall be t**t*d monthly. Input* frcm Solid State Protection Sy*tem *hall be t**t*d every 62 day* on a STAGGERED TEST BASIS. SALEH -OMIT 1 3/4 3-34 Amenctm.nt Ro. 138 c: :z .... ..... N w I N -f f :I .. z 0 . .... N .... TABLE 3.3-3 <<Continued)
ENGINEERED SAFETY FEAIUR&#xa3; ACTUATION SYSTEM INSTRUMENTATION MINIMUM FUNCIIONAL UNIT 8. AUXILIARY PESDWATER  
ENGINEERED SAFETY FEAIUR&#xa3; ACTUATION SYSTEM INSTRUMENTATION MINIMUM FUNCIIONAL UNIT 8. AUXILIARY PESDWATER
: a. Aut011Atic Logic** N &>r Vs"S> b. Manual  
: a. Aut011Atic Logic** N &>r Vs"S> b. Manual
: c. St*. Gen. Water Level-Low-Low  
: c. St*. Gen. Water Level-Low-Low
: i. Start Motor Driven Pwnp* ii. Start Turbin* Driven Pumpa r d. Undervoltag*  
: i. Start Motor Driven Pwnp* ii. Start Turbin* Driven Pumpa r d. Undervoltag*  
-RCP Start Turbin* -Driven Pump TOTAL NO. or CHMNILS 2 l/pt11Dp 3/atm. gen. l/atra. gen. 4-1/bu* CHANNELS TO TRIP 1 1/pttmp 2/atm. gen. any atm. gen. 2/atm. gen. any 2 atm. gen. 1/2*.X 2 CHANNELS OPERABLE 2 l/pt1111p 2/stm. gen. 2/stm. gen. 3 APPLICABLE HOPES ACIION 1,2,3 20 1,2,l 22 1,2,3 19* 1,2,3 19* 1,2 19 e. S.I *. Start Motor-Driven Pwapa See 1 above (All S.I. initiating functions and requirements)  
-RCP Start Turbin* -Driven Pump TOTAL NO. or CHMNILS 2 l/pt11Dp 3/atm. gen. l/atra. gen. 4-1/bu* CHANNELS TO TRIP 1 1/pttmp 2/atm. gen. any atm. gen. 2/atm. gen. any 2 atm. gen. 1/2*.X 2 CHANNELS OPERABLE 2 l/pt1111p 2/stm. gen. 2/stm. gen. 3 APPLICABLE HOPES ACIION 1,2,3 20 1,2,l 22 1,2,3 19* 1,2,3 19* 1,2 19 e. S.I *. Start Motor-Driven Pwapa See 1 above (All S.I. initiating functions and requirements)
: f. Trip of Main Feedwater Pwap* Start Motor-Driven Pump* 9. Station Blackout 9. &BllIAUTOHATIC TRAHSFER TO RECIRCULATION  
: f. Trip of Main Feedwater Pwap* Start Motor-Driven Pump* 9. Station Blackout 9. &BllIAUTOHATIC TRAHSFER TO RECIRCULATION
: a. RW&T Level I.OW b. Auta11&tic Actuation Logic 2/purap 1/pump l/pump see 6 and 7 above (SEC and UV Vital Bus) 4 2 3 2 1 2 1,2 21* 1,2,3 16 1,2,3 20 e   
: a. RW&T Level I.OW b. Auta11&tic Actuation Logic 2/purap 1/pump l/pump see 6 and 7 above (SEC and UV Vital Bus) 4 2 3 2 1 2 1,2 21* 1,2,3 16 1,2,3 20 e   
.,_ ACTION 19 -ACTION 20 -ACTION 21 -ACTION 22 -ACTION 23 -SALEM -UNIT 2 TABLE 3.3-3 !Continued)
.,_ ACTION 19 -ACTION 20 -ACTION 21 -ACTION 22 -ACTION 23 -SALEM -UNIT 2 TABLE 3.3-3 !Continued)
With the number of OPERABLE Channel* one l*** than th* Total Number of Channels, STARTUP andior POWER OPERATION may proceed provided the following condition*
With the number of OPERABLE Channel* one l*** than th* Total Number of Channels, STARTUP andior POWER OPERATION may proceed provided the following condition*
are *atigfied:  
are *atigfied:
: a. The inoperable channel is placed in the tripped condition within 6 hours. b. The Minimum Channels OPERABLE requirements.is met; however, the inoperable channel may be bypaaaed for up to 4 hours for surveillance tauting of other channel* per Specification 4.3.2.l.l.
: a. The inoperable channel is placed in the tripped condition within 6 hours. b. The Minimum Channels OPERABLE requirements.is met; however, the inoperable channel may be bypaaaed for up to 4 hours for surveillance tauting of other channel* per Specification 4.3.2.l.l.
With the number of OPERABLE chann*l* one l*** than tho Total Number of Channel*, re*tor* th* inoperable channel to operable statue within 6 hour* or, be in at l*a*t HOT STANDBY within the next 6 hour* and, in at lea*t HO'l' SHUTDOWN within th* following 6 hours; however, one channel may be bypa**ed for up to 4 hours for te*ting per Specification 4.3.2.l.l provided the other channel i* OPERABLE.
With the number of OPERABLE chann*l* one l*** than tho Total Number of Channel*, re*tor* th* inoperable channel to operable statue within 6 hour* or, be in at l*a*t HOT STANDBY within the next 6 hour* and, in at lea*t HO'l' SHUTDOWN within th* following 6 hours; however, one channel may be bypa**ed for up to 4 hours for te*ting per Specification 4.3.2.l.l provided the other channel i* OPERABLE.
Line 69: Line 69:
eharm*l* ralatin9 directly with th* number ef OPSRABLB Auxili*r}
eharm*l* ralatin9 directly with th* number ef OPSRABLB Auxili*r}
Peedwater Pmnp*, th* Ae!!SNS 'of L.e.e. J.1.1.2 applJ. With the Number of OPERABLI:
Peedwater Pmnp*, th* Ae!!SNS 'of L.e.e. J.1.1.2 applJ. With the Number of OPERABLI:
chann*l* one 14** than th* Total Number of Channel*, re*tor* the inoperable channel to OPERABLE *tatu* within 48 hour* or be in at l*a*t HOT STANDBY within 6 hour* and in HOT SHUTDOWR within the following 6 hour* * .... 3/4 3-23 Amendment No.121 ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS FUNCTIONAL UNIT 7. UNDERVOLTAG!, VITAL BUS a. Loas of Voltage b. Suatalned Degraded Voltage 8. AUXILIARY F!EDWATER  
chann*l* one 14** than th* Total Number of Channel*, re*tor* the inoperable channel to OPERABLE *tatu* within 48 hour* or be in at l*a*t HOT STANDBY within 6 hour* and in HOT SHUTDOWR within the following 6 hour* * .... 3/4 3-23 Amendment No.121 ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS FUNCTIONAL UNIT 7. UNDERVOLTAG!, VITAL BUS a. Loas of Voltage b. Suatalned Degraded Voltage 8. AUXILIARY F!EDWATER
: a. b. c. d. e. f. Automatic Actuation Logic U$Q ;::> Manual Inltlat!en Steam Generator Water Low-Low Undervoltage  
: a. b. c. d. e. f. Automatic Actuation Logic U$Q ;::> Manual Inltlat!en Steam Generator Water Low-Low Undervoltage  
-RCP 8.1. 1rip of Main Feedwater Punp TRIP SETPOINT 70\ of hue voltage 91.6\ of hue voltage for !O: 1 J seconds Not Applicable Net Applleahle 16\ of narrow range instrument apan each steam generator 70\ RCP hue voltage See 1 above (all S.I. setpoints>
-RCP 8.1. 1rip of Main Feedwater Punp TRIP SETPOINT 70\ of hue voltage 91.6\ of hue voltage for !O: 1 J seconds Not Applicable Net Applleahle 16\ of narrow range instrument apan each steam generator 70\ RCP hue voltage See 1 above (all S.I. setpoints>
Not Applicable ALLOWABLE VALUES 65\ of bue voltage 91\ of bue voltage for !O: 15 111econde Not Applicable Net Applleahle 14.8 \ of narrow range instrument epan each steam generator 65\ RCP bus voltage Not Applicable  
Not Applicable ALLOWABLE VALUES 65\ of bue voltage 91\ of bue voltage for !O: 15 111econde Not Applicable Net Applleahle 14.8 \ of narrow range instrument epan each steam generator 65\ RCP bus voltage Not Applicable
: g. Station Blackout See 6 and 7 above (SEC and Undervoltage, Vital Bue) 9. SEMIAUTOMATIC TRANSFER TO RECIRCULATION  
: g. Station Blackout See 6 and 7 above (SEC and Undervoltage, Vital Bue) 9. SEMIAUTOMATIC TRANSFER TO RECIRCULATION
: a. RWST Low Level b. Automatic Actuation Logic 15.25 ft. above Instrument tape Not Applicable 15.25 +/- 1 ft. above instrument tape Not Applicable
: a. RWST Low Level b. Automatic Actuation Logic 15.25 ft. above Instrument tape Not Applicable 15.25 +/- 1 ft. above instrument tape Not Applicable
* c: z -N w ....... .... f i :II .... . TABLE 4.3-2 (Continued*
* c: z -N w ....... .... f i :II .... . TABLE 4.3-2 (Continued*
ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION . SURVEILLANCE REQUIREMENTS FUNctIONAL UNIT CHANNEL CHECK CHANNEL CALIBRATION CHANNEL FUNCTIONAL TEST 8. AUXILIARY  
ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION . SURVEILLANCE REQUIREMENTS FUNctIONAL UNIT CHANNEL CHECK CHANNEL CALIBRATION CHANNEL FUNCTIONAL TEST 8. AUXILIARY
: a. Aut011Atic actue,1on Logic ,J<!>r  
: a. Aut011Atic actue,1on Logic ,J<!>r  
&-.-MARHal  
&-.-MARHal
: c. Ste .. Generator Water Level--1.c>w-Low  
: c. Ste .. Generator Water Level--1.c>w-Low
: d.  
: d.  
-RCP N.A. N.A. H(2) N1A1 Na A a Hf 5) s R Q s R Q HODES IN WHICH SURVEILLANCE REQUIRED 1,2,3 1,2,3 1,2,3 1,2 ** s.1. See 1 above (Ail s. I. surveillance requirements)  
-RCP N.A. N.A. H(2) N1A1 Na A a Hf 5) s R Q s R Q HODES IN WHICH SURVEILLANCE REQUIRED 1,2,3 1,2,3 1,2,3 1,2 ** s.1. See 1 above (Ail s. I. surveillance requirements)
: f. Trip of Hain Feedwater PWlp* g. Station Blackout 9. SEKIAUTOHATIC TRAHSPl!:R TO RBCIRCULATION  
: f. Trip of Hain Feedwater PWlp* g. Station Blackout 9. SEKIAUTOHATIC TRAHSPl!:R TO RBCIRCULATION
: a. llllST Low IAvel b. Aut011Atic Initiation Logic N.A. N.A. _S/U(4) 1,2 See 6 and 7 above (SEC and U/V Vital Bua) s R Q 1,2,3 N.A. N.A. N.A. 1,2,3,4 e Ii. .. l TABLE 4. 3-2 (Continued*)
: a. llllST Low IAvel b. Aut011Atic Initiation Logic N.A. N.A. _S/U(4) 1,2 See 6 and 7 above (SEC and U/V Vital Bua) s R Q 1,2,3 N.A. N.A. N.A. 1,2,3,4 e Ii. .. l TABLE 4. 3-2 (Continued*)
TABLE NOTATION
TABLE NOTATION
* Outputs are up to, but not including, the Output Relays. (l} Each logic channel shall be tested at least once per 62 days on a STAGGERED TEST BASIS. The CHANNEL FUNCTION TEST of each logic channel shall verify that its associated diesel generator automatic load sequence timer is OPERABLE with the interval between each load block within 1 second of its design interval.  
* Outputs are up to, but not including, the Output Relays. (l} Each logic channel shall be tested at least once per 62 days on a STAGGERED TEST BASIS. The CHANNEL FUNCTION TEST of each logic channel shall verify that its associated diesel generator automatic load sequence timer is OPERABLE with the interval between each load block within 1 second of its design interval.
(2) Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST BASIS. (3) The CHANNEL FUNCTIONAL TEST shall include exercising the transmitter by either a vacuum or pressure to the appropriate side of the tran*mitter.  
(2) Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST BASIS. (3) The CHANNEL FUNCTIONAL TEST shall include exercising the transmitter by either a vacuum or pressure to the appropriate side of the tran*mitter.
(4) If not performed in the previous 92 days. /\)o-r l) SE: D (S) *Tbe iUNCTIONAl.
(4) If not performed in the previous 92 days. /\)o-r l) SE: D (S) *Tbe iUNCTIONAl.
TEST shall be coa4ucted iA coajuactioA witb tbe SUR'IEILLA:NOE REQUIREMENT ef (6) Inputs from undervoltage, Vital Bus, shall be tested monthly. Inputs from Solid State Protection System, shall be tested every 62 days on a STAGGERED TEST BASIS. SALEM -UNIT 2 3/4 3-37 Amendment No. 116}}
TEST shall be coa4ucted iA coajuactioA witb tbe SUR'IEILLA:NOE REQUIREMENT ef (6) Inputs from undervoltage, Vital Bus, shall be tested monthly. Inputs from Solid State Protection System, shall be tested every 62 days on a STAGGERED TEST BASIS. SALEM -UNIT 2 3/4 3-37 Amendment No. 116}}

Revision as of 14:19, 25 April 2019

Proposed Tech Specs Re Elimination of Manual Start of Auxiliary FW for Licenses DPR-70 & DPR-75
ML18101A696
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/02/1995
From:
Public Service Enterprise Group
To:
Shared Package
ML18101A695 List:
References
NUDOCS 9505110144
Download: ML18101A696 (11)


Text

' *,

  • LR-N94212
    • --9505110144

-950502 -.-PDR ADOCK 05000272 p PDR ATTACHMENT 2 MARKED UP PAGES c z --t .... w ...... ... f :I t :I ..+ :z 0 . TABLE 3.3-3 (Continued*

ENGINEEREQ SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION FUNCTIQNAL UNIT 8. AUXILIARY FBBDWA'f&R

a. Automatic Actuation Logic** /\Jen-U f>c D *b. Manaal Initiation TOTAL NO. OF CHANNELS 2 1/p,Hllp c. Steam Generator Water Level--Low-Low
i. Start Motor Driven Pump* ii. Start Turbine Driven Pumps d. Undervoltage

-RCP Start 1\lrbin* -Driven Pump 3/etm. gen. 3/atm. gen. 4-1/bue CHANNELS TO TRIP 1 l/pt111&p MINIMUM CHANNELS OPERABLE 2 l/pt1111p 2/atm. gen. 2/etm. gen .. any atm. gen. 2/atm. gen. any.2 atm. gen. 1/2 x 2 2/etm. gen. 3 APPLICABLE MODES 1,2,3 2 3 I 1,2,3 1,2,3 1,2 ACTION 20 19* 19* 19 e. S.I. Start Motor-Driven Pump* See 1 above (All S.I. initiating functions and requirements)

f. Trip of Main. Feedwater Pump* start Motor Driven Pump* g. Station Blackout 2/pump 1/pump l/pump See 6 and 7 above (SEC and U/V Vital Bus) 1,2 21*

ACTION 19 -ACTION 20 -ACTION 21 -ACTION 22 ACTION 23 -SALEM -UHIT l e e TABLE 3.3-3 <Continued)

With the number of OPERABLE Channels one leas than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a. The inoperable channel is placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. b. The Minimum Channels OPERABLE requirements is met; however, the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels per Specification 4.3.2.1.1.

With the number of OPERABLE channels one lees than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at leaat HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1.1 provided the other channel is OPERABLE.

With the number of OPERABLE channel* one less than the Minimum Number of Channels, operation may proceed provided that either: a. The inoperable channel i* reatored to OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or b. If the affected Main Feedwater Pump i* expected to be out of service for more than 72 hour*, the inoperable channel is jumpered *o a* to enable th* Start Circuit of the Auxiliary Feedwater Pump* upon the lo** of the other Main Feedwater Pump. With t.he number of OPBRABLB.

chanuei. relating directly numbex of OPERABLE auxilia.iy feedwater pump*, *ACTION* af L.e.o. J.7.1.2 NOi C/Se:r} With the number of OPERABLE channel* one l*** than the Total Humber of Channel*, re*tor* th* inoperable channel to OPERABLE atatu* within 48 hour* or be in HOT STANDBY within the next 6 hour* and in at least HOT SHUTDOWN within th* following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. 3/4 3-22 Amendment No. 142 TABLI J,J-4 (f.ontinued)

INQINllRIQ SAflTX fll\TURI ftCTUAJ'IQH SXSTIM INSTRUMIJ!TATIQI TRIP SITPQINTS FUNCTIONAL UNIT 5, TURBINI TRIP AND PllDWATIR ISOLATION . 6. A. St*-Generator Water Level Hi9h-Hi9h SAFIGUARDS IQUIPMBNT CONTROL SXSTBll (SSCt 1. UNDBRVOLTAGS, VITAL BUS ** Lo** of Voltage b. Su*tained Degraded Voltage 8. AUXILIARY PIBDWATBR

a. Auta11atic Actuation Logic No-I vS"* D b. MaAUal IAlthtloA
c. St*-Generator Water Level--Low-Low d. Und*r*olta9*

-RCP e. s.1. f, Trip of Main reedwater Pumpn g. station Blackout TRIP SITPQINT $ 67\ of narrow range in*trument

  • pan each *team generator Rot Applicable 2 70\ of bu* voltag* 2 91.6\ of bu* voltage for $ 13 **cond* Not Applicable Mot applicable 2 16\ of narrow range ln*trument
  • pan each *teaa generator 2 70\ RCP bu* voltage see 1 above (All s.I. *etpolnt*)

ALLOWULI YALUES $ 68\ of narrow range instrument span each *team generator Not ApPllcable . 2 65\ of bus voltage 2 91\ of bu* voltage for $ 15 *econd* Not Applicable llot Applhable 2 14.8\ of narrow range ln*trument span each steam generator 2 65\ RCP bus voltage llot Applicable . Not Applicable See 6 and 7 above (SIC and Undervoltage, Vital Bua) c ::z --t ... w ....... .... er' w w f :I i :I ..+ ::z 0 . TABLE 4.3-2 <<Continued)

ENGINEERED SAFETX FEATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLABCE REOUIREK£NTS FUNCIIONAL UNIT 8. AUXILIARY PllDNATD a. Automatlc icQeie tJo-r ...>se.D b. ll*au*l Iattfatfnn

c. Steam Generator Water Level--Low-Low d
  • Undervoltage

-RCP CHANNEL CHECK ..... M a s s CHANNEL CALIBRATION

.. .*. M A R R CHANNEL FUNCTIONAL TEST H(2) N(5) MODES IN WHICH SURVEILLANCE REOUIR£D 1,2,3 1, ;;i, l 1,2,3 1,2 e. s. I. See 1 above (All S.I.* surveillance requirements)

f. Trip of Main Feedwater Pumps N.A. R 1 CJ* Station Blackout See 6b and 7 above (SEC and U/V Vital Bus) ..

... TABLE 4.3-2 IContinuedl TABLE NOTATION

  • Output* are up to, but not including, the output relay*. * (l) Each logic channel *hall be te*ted at least once per 62 day* on a STAGGERED TEST BASIS. Th* CHANNEL FUNCTION TEST Of eAch logic channel *hall that it* a**ociated die**l generator automatic load **qu*nce timer i* OPERABLE with the interval between each load block within l **cond of it* de*ign interval.

(2) Each train or logic channel *hall be t**ted at l*a*t every 62 day* on & ata99ered ba*i*. (3) The CHAHHEL FUNCTIONAL TEST *hall include exerci*ing the tran*mitter by applying either a vacuum or pr***ure to the appropriate

  • id* of the tran*mitter.

(4) HOT USEC 15) Th* ellMftfEl.

PUNC'f'IGNM.

HS'l' *hall i&*

in eh* I SmwililmAffe!l R!QUIRl!M!!H'l' er 4a7ala2aaa NOT llSEiJ (6) Input* from Undervoltage, Vital Bu*, *hall be t**t*d monthly. Input* frcm Solid State Protection Sy*tem *hall be t**t*d every 62 day* on a STAGGERED TEST BASIS. SALEH -OMIT 1 3/4 3-34 Amenctm.nt Ro. 138 c: :z .... ..... N w I N -f f :I .. z 0 . .... N .... TABLE 3.3-3 <<Continued)

ENGINEERED SAFETY FEAIUR£ ACTUATION SYSTEM INSTRUMENTATION MINIMUM FUNCIIONAL UNIT 8. AUXILIARY PESDWATER

a. Aut011Atic Logic** N &>r Vs"S> b. Manual
c. St*. Gen. Water Level-Low-Low
i. Start Motor Driven Pwnp* ii. Start Turbin* Driven Pumpa r d. Undervoltag*

-RCP Start Turbin* -Driven Pump TOTAL NO. or CHMNILS 2 l/pt11Dp 3/atm. gen. l/atra. gen. 4-1/bu* CHANNELS TO TRIP 1 1/pttmp 2/atm. gen. any atm. gen. 2/atm. gen. any 2 atm. gen. 1/2*.X 2 CHANNELS OPERABLE 2 l/pt1111p 2/stm. gen. 2/stm. gen. 3 APPLICABLE HOPES ACIION 1,2,3 20 1,2,l 22 1,2,3 19* 1,2,3 19* 1,2 19 e. S.I *. Start Motor-Driven Pwapa See 1 above (All S.I. initiating functions and requirements)

f. Trip of Main Feedwater Pwap* Start Motor-Driven Pump* 9. Station Blackout 9. &BllIAUTOHATIC TRAHSFER TO RECIRCULATION
a. RW&T Level I.OW b. Auta11&tic Actuation Logic 2/purap 1/pump l/pump see 6 and 7 above (SEC and UV Vital Bus) 4 2 3 2 1 2 1,2 21* 1,2,3 16 1,2,3 20 e

.,_ ACTION 19 -ACTION 20 -ACTION 21 -ACTION 22 -ACTION 23 -SALEM -UNIT 2 TABLE 3.3-3 !Continued)

With the number of OPERABLE Channel* one l*** than th* Total Number of Channels, STARTUP andior POWER OPERATION may proceed provided the following condition*

are *atigfied:

a. The inoperable channel is placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. b. The Minimum Channels OPERABLE requirements.is met; however, the inoperable channel may be bypaaaed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance tauting of other channel* per Specification 4.3.2.l.l.

With the number of OPERABLE chann*l* one l*** than tho Total Number of Channel*, re*tor* th* inoperable channel to operable statue within 6 hour* or, be in at l*a*t HOT STANDBY within the next 6 hour* and, in at lea*t HO'l' SHUTDOWN within th* following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypa**ed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for te*ting per Specification 4.3.2.l.l provided the other channel i* OPERABLE.

With the number of OPERASI.&

channel* one l*** than the Minimum Number of Channel*, operation may proceed provided that either: a. The inoperable channel i* r**tored to OPERABLE within 72 hour*. b. If the affected Main Feedwater Pump i* expected to be out of **rvice for more than 72 hour*, th* inoperable channel i* jumpered *o a* to enable the Start Circuit of th* Auxiliary Feedwater Pump* upon lo** of th* other Main Feedwater Pump. N crl U l;!> With th* Ntmlb*r of OP!RJdiLi!

eharm*l* ralatin9 directly with th* number ef OPSRABLB Auxili*r}

Peedwater Pmnp*, th* Ae!!SNS 'of L.e.e. J.1.1.2 applJ. With the Number of OPERABLI:

chann*l* one 14** than th* Total Number of Channel*, re*tor* the inoperable channel to OPERABLE *tatu* within 48 hour* or be in at l*a*t HOT STANDBY within 6 hour* and in HOT SHUTDOWR within the following 6 hour* * .... 3/4 3-23 Amendment No.121 ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS FUNCTIONAL UNIT 7. UNDERVOLTAG!, VITAL BUS a. Loas of Voltage b. Suatalned Degraded Voltage 8. AUXILIARY F!EDWATER

a. b. c. d. e. f. Automatic Actuation Logic U$Q ;::> Manual Inltlat!en Steam Generator Water Low-Low Undervoltage

-RCP 8.1. 1rip of Main Feedwater Punp TRIP SETPOINT 70\ of hue voltage 91.6\ of hue voltage for !O: 1 J seconds Not Applicable Net Applleahle 16\ of narrow range instrument apan each steam generator 70\ RCP hue voltage See 1 above (all S.I. setpoints>

Not Applicable ALLOWABLE VALUES 65\ of bue voltage 91\ of bue voltage for !O: 15 111econde Not Applicable Net Applleahle 14.8 \ of narrow range instrument epan each steam generator 65\ RCP bus voltage Not Applicable

g. Station Blackout See 6 and 7 above (SEC and Undervoltage, Vital Bue) 9. SEMIAUTOMATIC TRANSFER TO RECIRCULATION
a. RWST Low Level b. Automatic Actuation Logic 15.25 ft. above Instrument tape Not Applicable 15.25 +/- 1 ft. above instrument tape Not Applicable
  • c: z -N w ....... .... f i :II .... . TABLE 4.3-2 (Continued*

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION . SURVEILLANCE REQUIREMENTS FUNctIONAL UNIT CHANNEL CHECK CHANNEL CALIBRATION CHANNEL FUNCTIONAL TEST 8. AUXILIARY

a. Aut011Atic actue,1on Logic ,J<!>r

&-.-MARHal

c. Ste .. Generator Water Level--1.c>w-Low
d.

-RCP N.A. N.A. H(2) N1A1 Na A a Hf 5) s R Q s R Q HODES IN WHICH SURVEILLANCE REQUIRED 1,2,3 1,2,3 1,2,3 1,2 ** s.1. See 1 above (Ail s. I. surveillance requirements)

f. Trip of Hain Feedwater PWlp* g. Station Blackout 9. SEKIAUTOHATIC TRAHSPl!:R TO RBCIRCULATION
a. llllST Low IAvel b. Aut011Atic Initiation Logic N.A. N.A. _S/U(4) 1,2 See 6 and 7 above (SEC and U/V Vital Bua) s R Q 1,2,3 N.A. N.A. N.A. 1,2,3,4 e Ii. .. l TABLE 4. 3-2 (Continued*)

TABLE NOTATION

  • Outputs are up to, but not including, the Output Relays. (l} Each logic channel shall be tested at least once per 62 days on a STAGGERED TEST BASIS. The CHANNEL FUNCTION TEST of each logic channel shall verify that its associated diesel generator automatic load sequence timer is OPERABLE with the interval between each load block within 1 second of its design interval.

(2) Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST BASIS. (3) The CHANNEL FUNCTIONAL TEST shall include exercising the transmitter by either a vacuum or pressure to the appropriate side of the tran*mitter.

(4) If not performed in the previous 92 days. /\)o-r l) SE: D (S) *Tbe iUNCTIONAl.

TEST shall be coa4ucted iA coajuactioA witb tbe SUR'IEILLA:NOE REQUIREMENT ef (6) Inputs from undervoltage, Vital Bus, shall be tested monthly. Inputs from Solid State Protection System, shall be tested every 62 days on a STAGGERED TEST BASIS. SALEM -UNIT 2 3/4 3-37 Amendment No. 116