LR-N94212 ATTACHMENT 2 MARKED UP PAGES

    • -- 9505110144 -950502 -.- -~\

PDR ADOCK 05000272 p PDR

TABLE 3.3-3 (Continued*

ENGINEEREQ SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION c

z

-t FUNCTIQNAL UNIT TOTAL NO.

OF CHANNELS CHANNELS TO TRIP MINIMUM CHANNELS OPERABLE APPLICABLE MODES ACTION

8. AUXILIARY FBBDWA'f&R
a. Automatic Actuation Logic** 2 1 2 1,2,3 20

/\Jen- U f>c D

  • b. Manaal Initiation 1/p,Hllp l/pt111&p l/pt1111p 2I 3
c. Steam Generator Water Level--Low-Low
i. Start Motor Driven Pump* 3/etm. gen. 2/atm. gen. 2/etm. gen .. 1,2,3 19*

w any atm. gen.

ii. Start Turbine Driven Pumps 3/atm. gen. 2/atm. gen. 2/etm. gen. 1,2,3 19*

any.2 atm.

gen.

d. Undervoltage - RCP Start 4-1/bue 1/2 x 2 3 1,2 19 1\lrbin* - Driven Pump
e. S.I. Start Motor-Driven Pump* See 1 above (All S.I. initiating functions and requirements)
f. Trip of Main. Feedwater Pump* 2/pump 1/pump l/pump 1,2 21*

start Motor Driven Pump*

g. Station Blackout See 6 and 7 above (SEC and U/V Vital Bus) f
I t
I

..+

z 0

~

e e TABLE 3.3-3 <Continued)

ACTION 19 - With the number of OPERABLE Channels one leas than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a. The inoperable channel is placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. The Minimum Channels OPERABLE requirements is met; however, the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels per Specification 4.3.2.1.1.

ACTION 20 - With the number of OPERABLE channels one lees than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at leaat HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1.1 provided the other channel is OPERABLE.

ACTION 21 - With the number of OPERABLE channel* one less than the Minimum Number of Channels, operation may proceed provided that either:

a. The inoperable channel i* reatored to OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or
b. If the affected Main Feedwater Pump i* expected to be out of service for more than 72 hour*, the inoperable channel is jumpered *o a* to enable th* Start Circuit of the Auxiliary Feedwater Pump* upon the lo** of the other Main Feedwater Pump.

ACTION 22 With t.he number of OPBRABLB. chanuei. relating directly with-

~* numbex of OPERABLE auxilia.iy feedwater pump*, th~

  • ACTION* af L.e.o. J.7.1.2 aeah*~ NOi C/Se:r}

ACTION 23 - With the number of OPERABLE channel* one l*** than the Total Humber of Channel*, re*tor* th* inoperable channel to OPERABLE atatu* within 48 hour* or be in HOT STANDBY within the next 6 hour* and in at least HOT SHUTDOWN within th*

following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SALEM - UHIT l 3/4 3-22 Amendment No. 142

TABLI J,J-4 (f.ontinued)

INQINllRIQ SAflTX fll\TURI ftCTUAJ'IQH SXSTIM INSTRUMIJ!TATIQI TRIP SITPQINTS FUNCTIONAL UNIT TRIP SITPQINT ALLOWULI YALUES 5, TURBINI TRIP AND PllDWATIR ISOLATION A. St*- Generator Water Level -- $ 67\ of narrow range $ 68\ of narrow range Hi9h-Hi9h in*trument *pan each instrument span each

  • team generator *team generator

. 6. SAFIGUARDS IQUIPMBNT CONTROL Rot Applicable Not ApPllcable .

SXSTBll (SSCt

1. UNDBRVOLTAGS, VITAL BUS
    • Lo** of Voltage 2 70\ of bu* voltag* 2 65\ of bus voltage
b. Su*tained Degraded Voltage 2 91.6\ of bu* voltage for 2 91\ of bu* voltage for

$ 13 **cond* $ 15 *econd*

8. AUXILIARY PIBDWATBR
a. Auta11atic Actuation Logic Not Applicable Not Applicable No-I vS"* D
b. MaAUal IAlthtloA Mot applicable llot Applhable
c. St*- Generator Water Level-- 2 16\ of narrow range 2 14.8\ of narrow range Low-Low ln*trument *pan each ln*trument span each
d. Und*r*olta9* - RCP 2 70\ RCP bu* voltage 2 65\ RCP bus voltage
e. s.1. see 1 above (All s.I. *etpolnt*)

f, Trip of Main reedwater Pumpn llot Applicable . Not Applicable

g. station Blackout See 6 and 7 above (SIC and Undervoltage, Vital Bua)

TABLE 4.3-2 <<Continued)

ENGINEERED SAFETX FEATURE ACTUATION SYSTEM INSTRUMENTATION c SURVEILLABCE REOUIREK£NTS

z

-t CHANNEL MODES IN WHICH CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE FUNCIIONAL UNIT CHECK CALIBRATION TEST REOUIR£D

8. AUXILIARY PllDNATD
a. Automatlc JP~M*~~~n tJo-r ...>se.D icQeie ..... . .*. H(2) 1,2,3
b. ll*au*l Iattfatfnn Ma MA N(5) 1, ;;i, l
c. Steam Generator Water s R 1,2,3 Level--Low-Low w

....... s

.... d* Undervoltage - RCP R 1,2 er' w

w e. s. I. See 1 above (All S.I.* surveillance requirements)

f. Trip of Main Feedwater Pumps N.A. R 1 CJ* Station Blackout See 6b and 7 above (SEC and U/V Vital Bus) f:I i:I

..+

.::z 0

TABLE 4.3-2 IContinuedl TABLE NOTATION

  • Output* are up to, but not including, the output relay*.
  • (l) Each logic channel *hall be te*ted at least once per 62 day* on a STAGGERED TEST BASIS. Th* CHANNEL FUNCTION TEST Of eAch logic channel
  • hall ve~ify that it* a**ociated die**l generator automatic load
    • qu*nce timer i* OPERABLE with the interval between each load block within l **cond of it* de*ign interval.

(2) Each train or logic channel *hall be t**ted at l*a*t every 62 day* on &

ata99ered ba*i*.

(3) The CHAHHEL FUNCTIONAL TEST *hall include exerci*ing the tran*mitter by applying either a vacuum or pr***ure to the appropriate *id* of the tran*mitter.

(4) HOT USEC

15) Th* ellMftfEl. PUNC'f'IGNM. HS'l' *hall i&* eendue~*d in eenjune~ien vi~h eh* I SmwililmAffe!l R!QUIRl!M!!H'l' er 4a7ala2aaa NOT llSEiJ (6) Input* from Undervoltage, Vital Bu*, *hall be t**t*d monthly. Input*

frcm Solid State Protection Sy*tem *hall be t**t*d every 62 day* on a STAGGERED TEST BASIS.

SALEH - OMIT 1 3/4 3-34 Amenctm.nt Ro. 138

TABLE 3.3-3 <<Continued)

ENGINEERED SAFETY FEAIUR£ ACTUATION SYSTEM INSTRUMENTATION MINIMUM c: TOTAL NO. CHANNELS CHANNELS APPLICABLE

z FUNCIIONAL UNIT or CHMNILS TO TRIP OPERABLE HOPES ACIION N
8. AUXILIARY PESDWATER
a. Aut011Atic ~~ Logic** 2 1 2 1,2,3 20 N &>r Vs"S>
b. Manual Init~tma l/pt11Dp 1/pttmp l/pt1111p 1,2,l 22
c. St*. Gen. Water Level-Low-Low e
i. Start Motor Driven Pwnp* 3/atm. gen. 2/atm. gen. 2/stm. gen. 1,2,3 19*

any atm. gen.

ii. Start Turbin* Driven Pumpa l/atra. gen. 2/atm. gen. 2/stm. gen. 1,2,3 19*

r any 2 atm.

gen.

w I

N 4-1/bu* 1/2*.X 2 3 1,2 19

d. Undervoltag* - RCP Start Turbin* - Driven Pump
e. S.I *. Start Motor-Driven Pwapa See 1 above (All S.I. initiating functions and requirements) 2/purap 1/pump l/pump 1,2 21*
f. Trip of Main Feedwater Pwap*

Start Motor-Driven Pump*

see 6 and 7 above (SEC and UV Vital Bus)

9. Station Blackout
9. &BllIAUTOHATIC TRAHSFER TO RECIRCULATION 2 3 1,2,3 16 4

f a. RW&T Level I.OW f.

I
b. Auta11&tic Actuation Logic 2 1 2 1,2,3 20 z

0 N

TABLE 3.3-3 !Continued)

ACTION 19 - With the number of OPERABLE Channel* one l*** than th* Total Number of Channels, STARTUP andior POWER OPERATION may proceed provided the following condition* are *atigfied:

a. The inoperable channel is placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b. The Minimum Channels OPERABLE requirements.is met; however, the inoperable channel may be bypaaaed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance tauting of other channel*

per Specification 4.3.2.l.l.

ACTION 20 - With the number of OPERABLE chann*l* one l*** than tho Total Number of Channel*, re*tor* th* inoperable channel to operable statue within 6 hour* or, be in at l*a*t HOT STANDBY within the next 6 hour* and, in at lea*t HO'l' SHUTDOWN within th*

following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypa**ed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for s~rveillance te*ting per Specification 4.3.2.l.l provided the other channel i* OPERABLE.

ACTION 21 - With the number of OPERASI.& channel* one l*** than the Minimum Number of Channel*, operation may proceed provided that either:

a. The inoperable channel i* r**tored to OPERABLE within 72 hour*.
b. If the affected Main Feedwater Pump i* expected to be out of **rvice for more than 72 hour*, th* inoperable channel i* jumpered *o a* to enable the Start Circuit of th*

Auxiliary Feedwater Pump* upon lo** of th* other Main Feedwater Pump.

N crl U~ l;!>

ACTION 22 - With th* Ntmlb*r of OP!RJdiLi! eharm*l* ralatin9 directly with th* number ef OPSRABLB Auxili*r} Peedwater Pmnp*, th* Ae!!SNS

'of L.e.e. J.1.1.2 applJ.

ACTION 23 - With the Number of OPERABLI: chann*l* one 14** than th* Total Number of Channel*, re*tor* the inoperable channel to OPERABLE

  • tatu* within 48 hour* or be in at l*a*t HOT STANDBY within 6 hour* and in HOT SHUTDOWR within the following 6 hour*
  • SALEM - UNIT 2 3/4 3-23 Amendment No.121

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES

7. UNDERVOLTAG!, VITAL BUS
a. Loas of Voltage ~ 70\ of hue voltage ~ 65\ of bue voltage
b. Suatalned Degraded Voltage ~ 91.6\ of hue voltage for ~ 91\ of bue voltage for

!O: 1 J seconds !O: 15 111econde

8. AUXILIARY F!EDWATER
a. Automatic Actuation Logic Not Applicable Not Applicable tJ~r U$Q ;::>
b. Manual Inltlat!en Net Applleahle Net Applleahle
c. Steam Generator Water Level-- ~ 16\ of narrow range ~ 14.8 \ of narrow range Low-Low instrument apan each instrument epan each steam generator steam generator
d. Undervoltage - RCP ~ 70\ RCP hue voltage ~ 65\ RCP bus voltage
e. 8.1. See 1 above (all S.I. setpoints>
f. 1rip of Main Feedwater Punp Not Applicable Not Applicable 9.
g. Station Blackout SEMIAUTOMATIC TRANSFER TO RECIRCULATION
a. RWST Low Level See 6 and 7 above (SEC and Undervoltage, Vital Bue) 15.25 ft. above 15.25 +/- 1 ft. above Instrument tape instrument tape
b. Automatic Actuation Logic Not Applicable Not Applicable

TABLE 4.3-2 (Continued*

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION

. SURVEILLANCE REQUIREMENTS c:

z

~

N CHANNEL CHANNEL CHANNEL FUNCTIONAL HODES IN WHICH SURVEILLANCE FUNctIONAL UNIT CHECK CALIBRATION TEST REQUIRED

8. AUXILIARY PESO~
a. Aut011Atic actue,1on Logic N.A. N.A. H(2) 1,2,3

,J<!>r Us~.!>

MARHal IR1'1~1en N1A1 Na Aa Hf 5) 1,2,3 e

c. Ste. . Generator Water s R Q 1,2,3 Level--1.c>w-Low w d. Undervol~age - RCP s R Q 1,2
    • s.1. See 1 above (Ail s. I. surveillance requirements)
f. Trip of Hain N.A. N.A. _S/U(4) 1,2 Feedwater PWlp*
g. Station Blackout See 6 and 7 above (SEC and U/V Vital Bua)
9. SEKIAUTOHATIC TRAHSPl!:R TO RBCIRCULATION
a. llllST Low IAvel s R Q 1,2,3
b. Aut011Atic Initiation Logic N.A. N.A. N.A. 1,2,3,4 f

i....

II

.~

Ii. ..

l TABLE 4. 3-2 (Continued*)

TABLE NOTATION

  • Outputs are up to, but not including, the Output Relays.

(l} Each logic channel shall be tested at least once per 62 days on a STAGGERED TEST BASIS. The CHANNEL FUNCTION TEST of each logic channel shall verify that its associated diesel generator automatic load sequence timer is OPERABLE with the interval between each load block within 1 second of its design interval.

(2) Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST BASIS.

(3) The CHANNEL FUNCTIONAL TEST shall include exercising the transmitter by a~plying either a vacuum or pressure to the appropriate side of the tran*mitter.

(4) If not performed in the previous 92 days.

/\)o-r l) SE: D (S) *Tbe CHJNNE~ iUNCTIONAl. TEST shall be coa4ucted iA coajuactioA witb tbe SUR'IEILLA:NOE REQUIREMENT ef 4,7,1.~.a (6) Inputs from undervoltage, Vital Bus, shall be tested monthly. Inputs from Solid State Protection System, shall be tested every 62 days on a STAGGERED TEST BASIS.

SALEM - UNIT 2 3/4 3-37 Amendment No. 116