Similar Documents at Salem |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 ML18102B6081997-10-0606 October 1997 Proposed Tech Specs Revising LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys. ML18102B5571997-08-27027 August 1997 Proposed Tech Specs,Providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, Which States That Three CCW Pumps Required to Meet LCO ML18102B5301997-08-19019 August 1997 Proposed Tech Specs,Providing Addl Operational Flexibility to Allow Orderly Resumption of Startup & Preclude Unwarranted Power Transients at Salem Unit 2 ML18102B5341997-08-18018 August 1997 Proposed Tech Specs,Incorporating Plant Computer (P-250) Into TS Bases for Movable Control Assemblies ML18102B4891997-08-0101 August 1997 Proposed Tech Specs Section 4.2.1 Rewording Section to State Util Will Adhere to Section 7,Incidental Take Statement Approved by Natl Maring Fisheries Svc ML18102B3911997-06-12012 June 1997 Proposed Tech Specs,Representing Addition of New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B3061997-05-14014 May 1997 Proposed Tech Specs,Revising SR 4.7.6.1.d.1,to Indicate That Specified Acceptable Filter Dp Is to Be Measured Across Filter Housing & Reflecting Filter Dp Acceptance Value Greater than 2.70 Water Gauge ML18102B2631997-05-0101 May 1997 Proposed Tech Specs,Adding New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B2601997-05-0101 May 1997 Proposed Tech Specs 3/4.7.7 Revising Certain Allowed Outage Times & Creating 3/4.7.11 to Address Switchgear & Penetration Area Ventilation Sys ML18102B0341997-04-25025 April 1997 Proposed Tech Specs 3.5.2 Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2 1999-08-25
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 1999-09-10
[Table view] |
Text
' *,
LR-N94212 ATTACHMENT 2 MARKED UP PAGES
- -- 9505110144 -950502 -.- -~\
PDR ADOCK 05000272 p PDR
TABLE 3.3-3 (Continued*
ENGINEEREQ SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION c
z
-t FUNCTIQNAL UNIT TOTAL NO.
OF CHANNELS CHANNELS TO TRIP MINIMUM CHANNELS OPERABLE APPLICABLE MODES ACTION
- 8. AUXILIARY FBBDWA'f&R
- a. Automatic Actuation Logic** 2 1 2 1,2,3 20
/\Jen- U f>c D
- b. Manaal Initiation 1/p,Hllp l/pt111&p l/pt1111p 2I 3
- c. Steam Generator Water Level--Low-Low
- i. Start Motor Driven Pump* 3/etm. gen. 2/atm. gen. 2/etm. gen .. 1,2,3 19*
w any atm. gen.
ii. Start Turbine Driven Pumps 3/atm. gen. 2/atm. gen. 2/etm. gen. 1,2,3 19*
any.2 atm.
gen.
- d. Undervoltage - RCP Start 4-1/bue 1/2 x 2 3 1,2 19 1\lrbin* - Driven Pump
- e. S.I. Start Motor-Driven Pump* See 1 above (All S.I. initiating functions and requirements)
- f. Trip of Main. Feedwater Pump* 2/pump 1/pump l/pump 1,2 21*
start Motor Driven Pump*
- g. Station Blackout See 6 and 7 above (SEC and U/V Vital Bus) f
- I t
- I
..+
- z 0
~
e e TABLE 3.3-3 <Continued)
ACTION 19 - With the number of OPERABLE Channels one leas than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
- a. The inoperable channel is placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- b. The Minimum Channels OPERABLE requirements is met; however, the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels per Specification 4.3.2.1.1.
ACTION 20 - With the number of OPERABLE channels one lees than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at leaat HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1.1 provided the other channel is OPERABLE.
ACTION 21 - With the number of OPERABLE channel* one less than the Minimum Number of Channels, operation may proceed provided that either:
- a. The inoperable channel i* reatored to OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or
- b. If the affected Main Feedwater Pump i* expected to be out of service for more than 72 hour*, the inoperable channel is jumpered *o a* to enable th* Start Circuit of the Auxiliary Feedwater Pump* upon the lo** of the other Main Feedwater Pump.
ACTION 22 With t.he number of OPBRABLB. chanuei. relating directly with-
~* numbex of OPERABLE auxilia.iy feedwater pump*, th~
- ACTION* af L.e.o. J.7.1.2 aeah*~ NOi C/Se:r}
ACTION 23 - With the number of OPERABLE channel* one l*** than the Total Humber of Channel*, re*tor* th* inoperable channel to OPERABLE atatu* within 48 hour* or be in HOT STANDBY within the next 6 hour* and in at least HOT SHUTDOWN within th*
following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SALEM - UHIT l 3/4 3-22 Amendment No. 142
TABLI J,J-4 (f.ontinued)
INQINllRIQ SAflTX fll\TURI ftCTUAJ'IQH SXSTIM INSTRUMIJ!TATIQI TRIP SITPQINTS FUNCTIONAL UNIT TRIP SITPQINT ALLOWULI YALUES 5, TURBINI TRIP AND PllDWATIR ISOLATION A. St*- Generator Water Level -- $ 67\ of narrow range $ 68\ of narrow range Hi9h-Hi9h in*trument *pan each instrument span each
- team generator *team generator
. 6. SAFIGUARDS IQUIPMBNT CONTROL Rot Applicable Not ApPllcable .
SXSTBll (SSCt
- 1. UNDBRVOLTAGS, VITAL BUS
- Lo** of Voltage 2 70\ of bu* voltag* 2 65\ of bus voltage
- b. Su*tained Degraded Voltage 2 91.6\ of bu* voltage for 2 91\ of bu* voltage for
$ 13 **cond* $ 15 *econd*
- 8. AUXILIARY PIBDWATBR
- a. Auta11atic Actuation Logic Not Applicable Not Applicable No-I vS"* D
- b. MaAUal IAlthtloA Mot applicable llot Applhable
- c. St*- Generator Water Level-- 2 16\ of narrow range 2 14.8\ of narrow range Low-Low ln*trument *pan each ln*trument span each
- d. Und*r*olta9* - RCP 2 70\ RCP bu* voltage 2 65\ RCP bus voltage
- e. s.1. see 1 above (All s.I. *etpolnt*)
f, Trip of Main reedwater Pumpn llot Applicable . Not Applicable
- g. station Blackout See 6 and 7 above (SIC and Undervoltage, Vital Bua)
TABLE 4.3-2 <<Continued)
ENGINEERED SAFETX FEATURE ACTUATION SYSTEM INSTRUMENTATION c SURVEILLABCE REOUIREK£NTS
- z
-t CHANNEL MODES IN WHICH CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE FUNCIIONAL UNIT CHECK CALIBRATION TEST REOUIR£D
- 8. AUXILIARY PllDNATD
- a. Automatlc JP~M*~~~n tJo-r ...>se.D icQeie ..... . .*. H(2) 1,2,3
- b. ll*au*l Iattfatfnn Ma MA N(5) 1, ;;i, l
- c. Steam Generator Water s R 1,2,3 Level--Low-Low w
....... s
.... d* Undervoltage - RCP R 1,2 er' w
w e. s. I. See 1 above (All S.I.* surveillance requirements)
- f. Trip of Main Feedwater Pumps N.A. R 1 CJ* Station Blackout See 6b and 7 above (SEC and U/V Vital Bus) f:I i:I
..+
.::z 0
TABLE 4.3-2 IContinuedl TABLE NOTATION
- Output* are up to, but not including, the output relay*.
- (l) Each logic channel *hall be te*ted at least once per 62 day* on a STAGGERED TEST BASIS. Th* CHANNEL FUNCTION TEST Of eAch logic channel
- hall ve~ify that it* a**ociated die**l generator automatic load
- qu*nce timer i* OPERABLE with the interval between each load block within l **cond of it* de*ign interval.
(2) Each train or logic channel *hall be t**ted at l*a*t every 62 day* on &
ata99ered ba*i*.
(3) The CHAHHEL FUNCTIONAL TEST *hall include exerci*ing the tran*mitter by applying either a vacuum or pr***ure to the appropriate *id* of the tran*mitter.
(4) HOT USEC
- 15) Th* ellMftfEl. PUNC'f'IGNM. HS'l' *hall i&* eendue~*d in eenjune~ien vi~h eh* I SmwililmAffe!l R!QUIRl!M!!H'l' er 4a7ala2aaa NOT llSEiJ (6) Input* from Undervoltage, Vital Bu*, *hall be t**t*d monthly. Input*
frcm Solid State Protection Sy*tem *hall be t**t*d every 62 day* on a STAGGERED TEST BASIS.
SALEH - OMIT 1 3/4 3-34 Amenctm.nt Ro. 138
TABLE 3.3-3 <<Continued)
ENGINEERED SAFETY FEAIUR£ ACTUATION SYSTEM INSTRUMENTATION MINIMUM c: TOTAL NO. CHANNELS CHANNELS APPLICABLE
- z FUNCIIONAL UNIT or CHMNILS TO TRIP OPERABLE HOPES ACIION N
- 8. AUXILIARY PESDWATER
- a. Aut011Atic ~~ Logic** 2 1 2 1,2,3 20 N &>r Vs"S>
- b. Manual Init~tma l/pt11Dp 1/pttmp l/pt1111p 1,2,l 22
- c. St*. Gen. Water Level-Low-Low e
- i. Start Motor Driven Pwnp* 3/atm. gen. 2/atm. gen. 2/stm. gen. 1,2,3 19*
any atm. gen.
ii. Start Turbin* Driven Pumpa l/atra. gen. 2/atm. gen. 2/stm. gen. 1,2,3 19*
r any 2 atm.
gen.
w I
N 4-1/bu* 1/2*.X 2 3 1,2 19
- d. Undervoltag* - RCP Start Turbin* - Driven Pump
- e. S.I *. Start Motor-Driven Pwapa See 1 above (All S.I. initiating functions and requirements) 2/purap 1/pump l/pump 1,2 21*
- f. Trip of Main Feedwater Pwap*
Start Motor-Driven Pump*
see 6 and 7 above (SEC and UV Vital Bus)
- 9. Station Blackout
- 9. &BllIAUTOHATIC TRAHSFER TO RECIRCULATION 2 3 1,2,3 16 4
f a. RW&T Level I.OW f.
- I
- b. Auta11&tic Actuation Logic 2 1 2 1,2,3 20 z
0 N
TABLE 3.3-3 !Continued)
ACTION 19 - With the number of OPERABLE Channel* one l*** than th* Total Number of Channels, STARTUP andior POWER OPERATION may proceed provided the following condition* are *atigfied:
- a. The inoperable channel is placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- b. The Minimum Channels OPERABLE requirements.is met; however, the inoperable channel may be bypaaaed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance tauting of other channel*
per Specification 4.3.2.l.l.
ACTION 20 - With the number of OPERABLE chann*l* one l*** than tho Total Number of Channel*, re*tor* th* inoperable channel to operable statue within 6 hour* or, be in at l*a*t HOT STANDBY within the next 6 hour* and, in at lea*t HO'l' SHUTDOWN within th*
following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypa**ed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for s~rveillance te*ting per Specification 4.3.2.l.l provided the other channel i* OPERABLE.
ACTION 21 - With the number of OPERASI.& channel* one l*** than the Minimum Number of Channel*, operation may proceed provided that either:
- a. The inoperable channel i* r**tored to OPERABLE within 72 hour*.
- b. If the affected Main Feedwater Pump i* expected to be out of **rvice for more than 72 hour*, th* inoperable channel i* jumpered *o a* to enable the Start Circuit of th*
Auxiliary Feedwater Pump* upon lo** of th* other Main Feedwater Pump.
N crl U~ l;!>
ACTION 22 - With th* Ntmlb*r of OP!RJdiLi! eharm*l* ralatin9 directly with th* number ef OPSRABLB Auxili*r} Peedwater Pmnp*, th* Ae!!SNS
'of L.e.e. J.1.1.2 applJ.
ACTION 23 - With the Number of OPERABLI: chann*l* one 14** than th* Total Number of Channel*, re*tor* the inoperable channel to OPERABLE
- tatu* within 48 hour* or be in at l*a*t HOT STANDBY within 6 hour* and in HOT SHUTDOWR within the following 6 hour*
- SALEM - UNIT 2 3/4 3-23 Amendment No.121
ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES
- 7. UNDERVOLTAG!, VITAL BUS
- a. Loas of Voltage ~ 70\ of hue voltage ~ 65\ of bue voltage
- b. Suatalned Degraded Voltage ~ 91.6\ of hue voltage for ~ 91\ of bue voltage for
!O: 1 J seconds !O: 15 111econde
- 8. AUXILIARY F!EDWATER
- a. Automatic Actuation Logic Not Applicable Not Applicable tJ~r U$Q ;::>
- b. Manual Inltlat!en Net Applleahle Net Applleahle
- c. Steam Generator Water Level-- ~ 16\ of narrow range ~ 14.8 \ of narrow range Low-Low instrument apan each instrument epan each steam generator steam generator
- d. Undervoltage - RCP ~ 70\ RCP hue voltage ~ 65\ RCP bus voltage
- e. 8.1. See 1 above (all S.I. setpoints>
- f. 1rip of Main Feedwater Punp Not Applicable Not Applicable 9.
- g. Station Blackout SEMIAUTOMATIC TRANSFER TO RECIRCULATION
- a. RWST Low Level See 6 and 7 above (SEC and Undervoltage, Vital Bue) 15.25 ft. above 15.25 +/- 1 ft. above Instrument tape instrument tape
- b. Automatic Actuation Logic Not Applicable Not Applicable
TABLE 4.3-2 (Continued*
ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION
. SURVEILLANCE REQUIREMENTS c:
z
~
N CHANNEL CHANNEL CHANNEL FUNCTIONAL HODES IN WHICH SURVEILLANCE FUNctIONAL UNIT CHECK CALIBRATION TEST REQUIRED
- 8. AUXILIARY PESO~
- a. Aut011Atic actue,1on Logic N.A. N.A. H(2) 1,2,3
,J<!>r Us~.!>
MARHal IR1'1~1en N1A1 Na Aa Hf 5) 1,2,3 e
- c. Ste. . Generator Water s R Q 1,2,3 Level--1.c>w-Low w d. Undervol~age - RCP s R Q 1,2
- s.1. See 1 above (Ail s. I. surveillance requirements)
- f. Trip of Hain N.A. N.A. _S/U(4) 1,2 Feedwater PWlp*
- g. Station Blackout See 6 and 7 above (SEC and U/V Vital Bua)
- 9. SEKIAUTOHATIC TRAHSPl!:R TO RBCIRCULATION
- a. llllST Low IAvel s R Q 1,2,3
- b. Aut011Atic Initiation Logic N.A. N.A. N.A. 1,2,3,4 f
i....
- II
.~
Ii. ..
l TABLE 4. 3-2 (Continued*)
TABLE NOTATION
- Outputs are up to, but not including, the Output Relays.
(l} Each logic channel shall be tested at least once per 62 days on a STAGGERED TEST BASIS. The CHANNEL FUNCTION TEST of each logic channel shall verify that its associated diesel generator automatic load sequence timer is OPERABLE with the interval between each load block within 1 second of its design interval.
(2) Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST BASIS.
(3) The CHANNEL FUNCTIONAL TEST shall include exercising the transmitter by a~plying either a vacuum or pressure to the appropriate side of the tran*mitter.
(4) If not performed in the previous 92 days.
/\)o-r l) SE: D (S) *Tbe CHJNNE~ iUNCTIONAl. TEST shall be coa4ucted iA coajuactioA witb tbe SUR'IEILLA:NOE REQUIREMENT ef 4,7,1.~.a (6) Inputs from undervoltage, Vital Bus, shall be tested monthly. Inputs from Solid State Protection System, shall be tested every 62 days on a STAGGERED TEST BASIS.
SALEM - UNIT 2 3/4 3-37 Amendment No. 116