ML091520257: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML091520257 | | number = ML091520257 | ||
| issue date = 07/07/2008 | | issue date = 07/07/2008 | ||
| title = | | title = Proposed Operating Test Comments | ||
| author name = | | author name = | ||
| author affiliation = NRC/RGN-III | | author affiliation = NRC/RGN-III |
Revision as of 01:44, 17 April 2019
ML091520257 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 07/07/2008 |
From: | NRC/RGN-III |
To: | Entergy Nuclear Palisades |
Shared Package | |
ML082200310 | List: |
References | |
Download: ML091520257 (1) | |
Text
Proposed Operating Test Comments
Done 2. Change the SRO system JPM from Placing the Zero Power Mode Bypass in Operation (SYS F) to Sampling Containment for Hydrogen (SYS D). Done
- 3. Change the Containment Air Cooler Fan Trip malfunction in Scenario 1. The Tech Spec call is weak. Added a slow pressure leak malfunction on Safety Injection Tank T-82A.
- 4. Remove the Tech Spec call for failure of the primary reactor trip push button on panel C-02. The NRC can't evaluate the spec. It will be completed before the applicant recognizes the spec and can only be evaluated by follow-up questions. Done.