ML18135A084: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML18135A084
| number = ML18135A084
| issue date = 04/25/2018
| issue date = 04/25/2018
| title = Units 1 and 2, Surry, Units 1 and 2, NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations
| title = NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations
| author name = Sartain M D
| author name = Sartain M D
| author affiliation = Dominion Energy Nuclear Connecticut, Inc, Dominion Energy Services, Inc, Dominion Energy Virginia, Virginia Electric & Power Co (VEPCO)
| author affiliation = Dominion Energy Nuclear Connecticut, Inc, Dominion Energy Services, Inc, Dominion Energy Virginia, Virginia Electric & Power Co (VEPCO)

Revision as of 06:17, 9 April 2019

NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations
ML18135A084
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 04/25/2018
From: Sartain M D
Dominion Energy Nuclear Connecticut, Dominion Energy Services, Dominion Energy Virginia, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18135A084 (6)


Text

Dominion Energy Services, Inc. 5000 Dominion Boulevard, Glen Allen, VA 23060 DominionEnergy.com April 25, 2018 U. S. Nuclear Regulatory Commission Attention:

Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Dominion Energy Serial No.: 18-179 NLOS/vlh Docket Nos.: 50-336/423 50-338/339 50-280/281 License Nos.: DPR-65 NPF-49 NPF-4/7 DPR-32/37 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC) VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)

MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE

SUMMARY

2018-02 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2018-02, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs). No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. Frank Winks at (804) 273-4610.

Sincerely, Mark D. Sartain Vice President

-Nuclear Engineering and Fleet Support Dominion Energy Services, Inc. for Dominion Energy Nuclear Connecticut, Inc. and Virginia Electric and Power Company

Enclosures:

NRC Form 536 for Millstone, North Anna and Surry Power Stations cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Boulevard Suite 100 King of Prussia, Pennsylvania 19406-271.3 U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Richard Guzman U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pik~ Rockville, MD 20852-2738 Mr. James R. Hall U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 81-A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton Gross U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 N,RC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station SN 18-179 Scheduling of Operator Licensing Examinations Page 2 of 2 I I ! NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

~c,.,,.RREG(t.C..>.

.. '?o OPERA TOR LICENSING Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This f s information collection is used to plan budgets and resources for operator examinations.

Send lo .. EXAMINATION DATA comments regarding burden estimate to the Information Services Branch (T-2 F43). U.S. Nuclear I Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, "+., "" and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office ....... of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION I Millstone Power Station Unit 2 11 I I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ---------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ------------NUMBER OF REACTOR 8 8 OPERATORS NUMBER OF SENIOR REACTOR 4 4 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 4 4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 09/14/20 09/12/22 ALTERNATE DATE 09/21/20 09/19/22 NRC FORM 536 (11-2017)

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

~*""""'-<

~..:J >o OPERA TOR LICENSING Estimated burden per response to comply with this voluntary infonmation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This 0 infonmation collection is used to plan budgets and resources for operator examinations.

Send /!! n .. 0 comments regarding burden estimate to the lnfonmation Services Branch (T-2 F43), U.S. Nuclear \;; .. EXAMINATION DATA I:~ Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, ...,4'.,, ~o"' and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office ...... of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonmation collection.

FACILITY NRCREGION I North Anna Power Station Units 1 & 2 11 II I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ----------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ------------NUMBER OF REACTOR 7 8 OPERATORS NUMBER OF SENIOR REACTOR 7 3 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 06/08/20 06/06/22 ALTERNATE DATE 06/15/20 06/13/22 NRC FORM 536 (11-2017)

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131

  • EXPIRES: 11/30/2020 (11-2017)

,;:,Y,$1'-f/.REG(tl..f>.

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This .. <?,. OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.

Send ti " .. 0 comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear t; : EXAMINATION DATA Regulatoiy Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, * \ # and to the Desk Officer, Office of Information and Regulatoiy Affairs, NEOB-10202, (3150-0131), Office ,s..l) +,O ....... of Management and Budge~ Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRG may not conduct or sponsor, and a person Is not required to respond to, the information collection.

FACILITY NRCREGION I Surry Power Station Units 1 & 2 11 II I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 -----------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS

8. INITIAL OPERATORLICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ------------NUMBER OF REACTOR 11 11 OPERATORS NUMBER OF SENIOR REACTOR 3 3 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 08/03/20 08/01/22 ALTERNATE DATE 08/10/20 08/08/22 NRG FORM 536 (11-2017)