ML072980072: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML072980072
| number = ML072980072
| issue date = 10/26/2007
| issue date = 10/26/2007
| title = Comanche Peak Steam Electric Station, Units 1 and 2 - (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables (TAC No. MD6415)
| title = (Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables
| author name = Singal B K
| author name = Singal B K
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV

Revision as of 07:40, 10 February 2019

(Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved Tables
ML072980072
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/26/2007
From: Singal B K
NRC/NRR/ADRO/DORL/LPLIV
To: Blevins M R
Luminant Power
singal, balwant NRR/DORL 301-415-3016
Shared Package
ML072980068 List:
References
TAC MD6415
Download: ML072980072 (4)


Text

Rml .... Aiim AgmAIm UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 26, 2007 Mr. M. R. Blevins Senior Vice President& Chief Nuclear Officer Luminant Power ATTN: Regulatory Affairs P- O_ Box -1002- -Glen Rose, TX 76043

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 -DISTRIBUTION OF REVISION 2 OF THE NRC'S SIGNIFICANCE DETERMINATION PROCESS RISK-INFORMED INSPECTION NOTEBOOKS, AND ACCOMPANYING PHASE 2 PRE-SOLVED TABLES (TAC NO. MD6415)

Dear Mr. Blevins:

In 2004, the U.S. Nuclear Regulatory Commission (NRC) requested information from licensees to support the Significance Determination Process (SDP) Risk-Informed Inspection Notebook (notebook) enhancement/standardization effort. The NRC has completed this effort and has issued Revision 2 of the notebook for Comanche Peak Steam Electric Station, Units 1 and 2.The NRC developed these notebooks to facilitate Phase 2 of the NRC inspection finding significance determination process detailed in Inspection Manual Chapter 0609, "Significance Determination Process," Appendix A, "Determining the Significance of Reactor Inspection Findings for At-Power Situations." SECY-99-007A, "Recommendations for Reactor Oversight Process Improvements," sets forth this process and additional details are included in the NRC Inspection Manual Chapter 0308, "Reactor Oversight Process Basis Document." NRC inspectors and risk analysts, who have extensive understanding of plant-specific design features and operation, are expected to use these notebooks.

The notebooks will be updated on a case-by-case basis, as needed, to reflect changes to the facilities.

Revision 2 of the notebooks is accompanied by the Site Specific Pre-Solved Spreadsheet (the Spreadsheet).

The NRC added the Spreadsheet to help reduce the time it takes to process inspection findings.

The NRC benchmarked the notebooks against licensee Probability Risk Assessments and plant configurations.

The enclosed compact disk containing the above documents is provided for your use to facilitate your understanding of the SDP in Inspection Manual Chapter 0609.The enclosure transmitted herewith contains Security-Related information.

When separated from enclosure, this document is decontrolled.

61FFlil!, _62 SW EGUfITRA RlJ96DIM-0MAl-

_01 I IAL! USE ON.3znr' lLTDI~rn.A~r M.R. Blevins-2-The information on the enclosed compact disk is designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of Federal. Regulations since it contains security-related information.

If you have any questions, please contact me at (301) 415-3016.Sincerely,-

Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos., 50-445, 50-446

Enclosure:

Compact Disk with Comanche Peak Steam Electric Station, Units 1 and 2 SDP Revision 2 and Site Specific Pre-Solved Spreadsheet Official Use Only -Security Related Information cc w/o encl: See next page Wi I USE 0 -z- unr __RqflRE!ATED lirNr;@RMTIOM Comanche Peak Steam Electric Station cc: Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 2159 Glen Rose, TX 76403-2159 Regional Administrator, Region IV U.S. -Nuclear.

Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. Fred W. Madden, Director Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 Timothy P. Matthews, Esq.Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 County Judge P.O. Box 851 Glen Rose, TX 76043 Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 Mr. Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189-Mr,-Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Ms. Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Anthony P. Jones Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Division E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711 October 2007 1.ICA 1U31-tWE OUL-' 8-6O1111 1 WlEAT ED ....fUATIO M.R. Blevins-2-ýctober 26,'2007 The information on the enclosed compact disk is designated exempt from public disclosure pursuant to Section 2.390(d)(1) of Title 10 of the Code of Federal Regulations since it contains security-related information..

If you have any questions, please contact me at (301) 415-3016......-Sincerely,/RA by Carl F. Lyon for/Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-445, 50-446

Enclosure:

Compact Disk with Comanche Peak Steam Electric Station, Units 1 and 2 SDP Revision 2 and Site Specific Pre-Solved Spreadsheet Official Use Only -Security Related Information cc w/o encl: See next page DISTRIBUTION:

w/o encl PUBLIC LPLIV Reading RidsAcrsAcnwMailCenter RidsNrrDirsltsb RidsNrrDorlDpr-RidsNrrDorlLpl4 RidsNrrPMBSingal RidsNrrLAJBurkhardt RidsOgcRp RidsRgn4MailCenter RidsNrrPMJWiebe RidsNrrDraApob ADAMS Accession Nos.: Public PKG: ML072980068, Public Letter ML072980072, Non-Public Pkg ML071700105, Non-Public Letter ML072610202, Non-Public Notebook ML071700107, NON-Public Spreadsheet ML071700111 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME BSingal ,IA JBurkhardt ,L.I-' THiltz p"<1 (,f (DATE 0'1 67 Io7 Q_ (0r7 OFFICIAL AGENCY RECORD-IICA o--emU3E OrIL'. CECURIT.'IL.TE rrflATQ