ML16256A249: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16256A249
| number = ML16256A249
| issue date = 08/25/2016
| issue date = 08/25/2016
| title = Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Appendix 5.4A, Figures 5.4A-1 Through 5.4A-16
| title = Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Appendix 5.4A, Figures 5.4A-1 Through 5.4A-16
| author name =  
| author name =  
| author affiliation = Entergy Operations, Inc
| author affiliation = Entergy Operations, Inc
Line 14: Line 14:
| document type = Final Safety Analysis Report (FSAR)
| document type = Final Safety Analysis Report (FSAR)
| page count = 16
| page count = 16
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:IN-CORE INSTRUMENT GUIDE TUBE\42" ID OUTLET OUTLET NOZZLE NOZZLE I I I 150" 150" LENGTH LENGTH IN-CORE INSTRUMENTATION SUPPORTPLATE
--INSTRUMENTATION NOZZLE STRUCTURE FLOW LOWER SUPPORT STRUCTURE NOZZLE-CORE SUPPORT BARREL CORE-SHROUD'FUEL ASSEMBLY LOUISIANA POWER  LIGHT CO.
Waterford SteamElectricStation ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL ARRANGEMENT Figure STEAM GENERATOR I I I LOUISIANA Figure POWER  LIGHT CO.
RV ASYMMETRIC LOADS ANALYSIS PRIMARY COOLANT PIPE BREAK Waterford Steam AT REACTOR INLET NOZZLE 5.4A-2 LOUISIANA Figure POWER  LIGHT CO.
RV ASYMMETRIC LOADS ANALYSIS Waterford Steam ASYMMEJRIC HYDRAULIC LOADS INTERNAL TO THE VESSEL Electric Station a..,. . .  , ,                                          LOUISIANA POWER  LIGHT CO.
Waterford Steam Electric Station RV ASYMMETRIC LOADS ANALYSIS REACTOR CAVITY PRESSURE LOADS Figure LOUISIANA POWER & LIGHT CO.
Figure RV ASYMMETRIC LOADS ANALYSIS Waterford SteamPIPE THRUST LOAD Electric Station PT = PIPE BREAKTHRUST ON INTERNALS =HORIZONTALHYDRAULICFORCES CAVITY PRESSURE = VERTICALHYDRAULIC FORCES LOUISIANA Figure POWER  LIGHT CO.
RV ASYMMETRIC  ANALYSIS Waterford Steam REACTOR VESSEL FORCES FOLLOWING LOCA Electric Station 412 COAXIAL STEAM ----GENE R AT OR V PUMP PUMP TYPICAL 4 PUMPS 408 STEAM GENERATO R 1 1103 PUMP IA C II LOUISIANA POWER  LIGHT CO.
Waterford Steam Electric Station RV ASYMMETRIC LOADS ANALYSISDETAILED REAGTOR COOLANT SYSTEM MODEL Figure 3412 COAXIAL STEAM GENERATOR INTERNALS PUMP 2A REACTOR 4580 VESSEL X COMPONENT NAME REACTOR MASS POINT NUMBER 9995 DEGREES OF COMPONENT FREEDOM SUPPORT POINT NAME NUMBER RESTRAIN1  REACTOR FX, FZ FIXED STEAM  409.3409 STEAM.FY, FZ 408.3406 211,221 PUMPS GENERATORS X, Y, Z FZ  REACTOR COO PIPING REACTOR 800.3800 FY  11, 15, COOLANT X,  PUMPS (TYPICAL)FX, FZ 75 FX, FZ 28 27 26 25 FUEL 24 23 22 21 20 UGS 34 33 32 31 30 29 2 I 19 LOUISIANA POWER  LIGHT CO.
Waterford Steam RV ASYMMETRIC LOADS ANALYSIS DETAILED REACTOR INTERNALS MODEL Figure 18 16 12 10 CORE SHROUD 6 4 14 17 INTERFACE 15 11 9 7 CSB 5 3 CSBSNUBBERS 13 RV O-J ww a W\\0\\C RV ASYMMETRIC LOADS ANALYSIS REDUCED MODEL OF REACTOR COOLANT SYSTEM UGS X 32 X-DIR IS TO OUTLET NOZZLES 29 CORE SHROUD 16 9 5 14 18 T A CSB LEGEND SEE u re 9 FOR DETAILS AND PIPING  = HORIZONTALGAP = PRELOADED COUPLING = GAP COUPLING = COLINEAR CONNECTOR LOUISIANA POWER  LIGHT CO.
Waterford Steam Electric Station RV ASYMMETRIC LOADS ANALYSIS REDUCED MODEL OF REACTOR INTERNALS Figure LOUISIANA POWER  LIGHT CO.
Waterford Steam Electric Station RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL SUPPORT REACTIONS SIMPLIFIED INTERNALS AND VESSEL Figure LOUISIANA POWER  LIGHT CO.
Waterford Steam Electric Station RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL SUPPORT REACTIONS DETAILED INTERNALS, SIMPLIFIED VESSEL
SECTION A-A COLD LEG NOZZLE SECTION B-B SECTION C-C LOUISIANA POWER  LIGHT CO.
Waterford Steam Electric Station V (PAD)RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL SUPPORT LOADS I
0 -1000  -3000 -4000 -5000        0 100200300 400 TIME (MILLISECONDS)
--- INTERNAL LOADS TENSION, ALL BOLTS, PER EXTERNAL LOADS ONLY COMPRESSION, 1 PAD NOTE: PLOT IS FOR PIPE RUPTURELOADS ONLY. FOR PIPE OP., SUBTRACT880 KIPS BOLTLOADANDADD IT
, , , ,.-C LOUISIANA POWER & LIGHT CO.
Waterford Steam Electric Station RV  LOADS ANALYSIS 350  IN. COLD LEG GUILLOTINE AT RV NOZZLE MAX. RV HORIZONTAL SUPPORT LOAD vs TIME}}

Latest revision as of 19:28, 6 February 2019

Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Appendix 5.4A, Figures 5.4A-1 Through 5.4A-16
ML16256A249
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16256A249 (16)


Text

IN-CORE INSTRUMENT GUIDE TUBE\42" ID OUTLET OUTLET NOZZLE NOZZLE I I I 150" 150" LENGTH LENGTH IN-CORE INSTRUMENTATION SUPPORTPLATE

--INSTRUMENTATION NOZZLE STRUCTURE FLOW LOWER SUPPORT STRUCTURE NOZZLE-CORE SUPPORT BARREL CORE-SHROUD'FUEL ASSEMBLY LOUISIANA POWER LIGHT CO.

Waterford SteamElectricStation ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL ARRANGEMENT Figure STEAM GENERATOR I I I LOUISIANA Figure POWER LIGHT CO.

RV ASYMMETRIC LOADS ANALYSIS PRIMARY COOLANT PIPE BREAK Waterford Steam AT REACTOR INLET NOZZLE 5.4A-2 LOUISIANA Figure POWER LIGHT CO.

RV ASYMMETRIC LOADS ANALYSIS Waterford Steam ASYMMEJRIC HYDRAULIC LOADS INTERNAL TO THE VESSEL Electric Station a..,. . . , , LOUISIANA POWER LIGHT CO.

Waterford Steam Electric Station RV ASYMMETRIC LOADS ANALYSIS REACTOR CAVITY PRESSURE LOADS Figure LOUISIANA POWER & LIGHT CO.

Figure RV ASYMMETRIC LOADS ANALYSIS Waterford SteamPIPE THRUST LOAD Electric Station PT = PIPE BREAKTHRUST ON INTERNALS =HORIZONTALHYDRAULICFORCES CAVITY PRESSURE = VERTICALHYDRAULIC FORCES LOUISIANA Figure POWER LIGHT CO.

RV ASYMMETRIC ANALYSIS Waterford Steam REACTOR VESSEL FORCES FOLLOWING LOCA Electric Station 412 COAXIAL STEAM ----GENE R AT OR V PUMP PUMP TYPICAL 4 PUMPS 408 STEAM GENERATO R 1 1103 PUMP IA C II LOUISIANA POWER LIGHT CO.

Waterford Steam Electric Station RV ASYMMETRIC LOADS ANALYSISDETAILED REAGTOR COOLANT SYSTEM MODEL Figure 3412 COAXIAL STEAM GENERATOR INTERNALS PUMP 2A REACTOR 4580 VESSEL X COMPONENT NAME REACTOR MASS POINT NUMBER 9995 DEGREES OF COMPONENT FREEDOM SUPPORT POINT NAME NUMBER RESTRAIN1 REACTOR FX, FZ FIXED STEAM 409.3409 STEAM.FY, FZ 408.3406 211,221 PUMPS GENERATORS X, Y, Z FZ REACTOR COO PIPING REACTOR 800.3800 FY 11, 15, COOLANT X, PUMPS (TYPICAL)FX, FZ 75 FX, FZ 28 27 26 25 FUEL 24 23 22 21 20 UGS 34 33 32 31 30 29 2 I 19 LOUISIANA POWER LIGHT CO.

Waterford Steam RV ASYMMETRIC LOADS ANALYSIS DETAILED REACTOR INTERNALS MODEL Figure 18 16 12 10 CORE SHROUD 6 4 14 17 INTERFACE 15 11 9 7 CSB 5 3 CSBSNUBBERS 13 RV O-J ww a W\\0\\C RV ASYMMETRIC LOADS ANALYSIS REDUCED MODEL OF REACTOR COOLANT SYSTEM UGS X 32 X-DIR IS TO OUTLET NOZZLES 29 CORE SHROUD 16 9 5 14 18 T A CSB LEGEND SEE u re 9 FOR DETAILS AND PIPING = HORIZONTALGAP = PRELOADED COUPLING = GAP COUPLING = COLINEAR CONNECTOR LOUISIANA POWER LIGHT CO.

Waterford Steam Electric Station RV ASYMMETRIC LOADS ANALYSIS REDUCED MODEL OF REACTOR INTERNALS Figure LOUISIANA POWER LIGHT CO.

Waterford Steam Electric Station RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL SUPPORT REACTIONS SIMPLIFIED INTERNALS AND VESSEL Figure LOUISIANA POWER LIGHT CO.

Waterford Steam Electric Station RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL SUPPORT REACTIONS DETAILED INTERNALS, SIMPLIFIED VESSEL

SECTION A-A COLD LEG NOZZLE SECTION B-B SECTION C-C LOUISIANA POWER LIGHT CO.

Waterford Steam Electric Station V (PAD)RV ASYMMETRIC LOADS ANALYSIS REACTOR VESSEL SUPPORT LOADS I

0 -1000 -3000 -4000 -5000 0 100200300 400 TIME (MILLISECONDS)

--- INTERNAL LOADS TENSION, ALL BOLTS, PER EXTERNAL LOADS ONLY COMPRESSION, 1 PAD NOTE: PLOT IS FOR PIPE RUPTURELOADS ONLY. FOR PIPE OP., SUBTRACT880 KIPS BOLTLOADANDADD IT

, , , ,.-C LOUISIANA POWER & LIGHT CO.

Waterford Steam Electric Station RV LOADS ANALYSIS 350 IN. COLD LEG GUILLOTINE AT RV NOZZLE MAX. RV HORIZONTAL SUPPORT LOAD vs TIME