ML070780491: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:CONDITION REPORT CR-PNP-2001-04238 - En-zzY I ~ Originator: CONVERTED DATA Originator Group: CONVERTED DATA Supervisor Name: CONVERTED DATA Discovered Date:
09/27/200 1 0O:OO Originator Phone: 0 Operability Required:
N Reportability Required:
N Initiated Date: 09/27/2001 0O:OO Condition
 
== Description:==
TOUR OPR REPORTED THAT HCU 50-3 1 LEAK APPEARS WORSE. INVESTIGATED AND FOUND WATER LEAKING ACROSS JUNCTION BOX AND INTO CATCH CONTAINMENT BENEATH HCU. DETERMINED THAT WATER LEAKING PAST JUNCTION BOX UNACCEPTABLE POSSIBILITY OF FLOODING JUNCTION BOX. CONTACTED HP AND REROUTED LEAKAGE USING A RAG AND DUCT TAPE. IT DOES THE TRICK BUT LOOKS VERY UNPROFESSIONAL.
REPAIR HCU DIRECTIONAL CONTROL VALVE ASAP Immediate Action
 
== Description:==
 
Suggested Action
 
== Description:==
 
EQUIPMENT:
Tag Name Tag Suffi Name Component Code Process System Code 03 REFERENCE ITEMS: Type Code Description CONVERTED PR PR.01.4238 REACTIVITY - RELATED PNP-2001-4238 ADMIN EnteiEY I Initiated Date: 9/27/2001 0:OO Owner Group
:Plan Sched Outage Staff Current Contact: MILLER, R. Current Significance:
C - CORRECTION Closed by: MILLER, R. 10/4/2001 0:OO CR-PNP-2001-04238 Summary
 
== Description:==
TOUR OPR REPORTED THAT HCU 50-3 1 LEAK APPEARS WORSE. INVESTIGATED AND FOUND WATER LEAKING ACROSS JUNCTION BOX AND INTO CATCH CONTAINMENT BENEATH HCU. DETERMINED THAT WATER LEAKING PAST JUNCTION BOX UNACCEPTABLE POSSIBILITY OF FLOODING JUNCTION BOX. CONTACTED HP AND REROUTED LEAKAGE USING A RAG AND DUCT TAPE. IT DOES THE TRICK BUT LOOKS VERY UNPROFESSIONAL. REPAIR HCU DIRECTIONAL CONTROL VALVE ASAP Remarks
 
== Description:==
 
PR=EF HCU 50-31 LEAK WATER CATCH CONTAINMENT RADIATION PROTECTION M. MCDONNELL Closure
 
== Description:==
 
SEE EVALUATION RESPONSE.
E72teqg-y ASSIGNMENTS Version: 1 Significance Code: C - CORRECTION Classification Code: NON-SIGNIFICANT Owner Group: Plan Sched Outage Staff Performed By: Edelhauser,James E Assignment
 
==
Description:==
 
EVALUATE SCHEDULING THE REPAIRS FOR HCU 50-3 1. CR-PNP-2001-04238 10/04/200 1 0O:OO Entefgy CA Number: 1 I - - - - __. - . __- -- - __-~--__ - I Group Name Assigned By: Plan Sched Outage Staff Assigned To:
Maint Plant Production Staff EDELHAUSER, J. Edelhauser,James E CORRECTIVE ACTION CR-PNP-2001-04238 Subassigned To : ~~ ~~ Originated By:
EDELHAUSER, J. Performed By:
EDELHAUSER, J. Subperformed By:
Approved By: Closed By: EDELHAUSER, J. 9/27/2001 0O:OO:OO 10/4/2001 0O:OO:OO 10/4/2001 0O:OO:OO Current Due Date: 12/03/2001 Initial Due Date:
12/03/2001 CA Type: GENERAL Plant Constraint:
NONE CA
 
== Description:==
EVALUATE SCHEDULING THE REPAJRS FOR HCU 50-3 1. Response:
Subresponse
: CONVERTED DATA Closure Comments:
MEMO DETAILING THE RESULTS OF THE REVIEW AND THE CORRECTIVE ACTIONS TAKEN. [ 10/04/2001; J.Edelhauser] Problem Report relates to leaking HCU 50-3 1 Direction Control Valve Block. The priority of related Maintenance Request 01 117275 was elevated and the work was schedule earlier.
The work has now been completed and the maintenance request is in Post Work Test status.
No further action is required to close the Problem Report.
Jim Edelhauser Scheduling Supervisor X8059}}

Revision as of 02:02, 11 November 2018

CR-PNP-2001-04238, HCU 50-31 Leak
ML070780491
Person / Time
Site: Pilgrim
Issue date: 09/27/2001
From:
Entergy Corp
To:
Office of Nuclear Reactor Regulation
References
CR-PNP-2001-04238
Download: ML070780491 (4)


Text

CONDITION REPORT CR-PNP-2001-04238 - En-zzY I ~ Originator: CONVERTED DATA Originator Group: CONVERTED DATA Supervisor Name: CONVERTED DATA Discovered Date:

09/27/200 1 0O:OO Originator Phone: 0 Operability Required:

N Reportability Required:

N Initiated Date: 09/27/2001 0O:OO Condition

Description:

TOUR OPR REPORTED THAT HCU 50-3 1 LEAK APPEARS WORSE. INVESTIGATED AND FOUND WATER LEAKING ACROSS JUNCTION BOX AND INTO CATCH CONTAINMENT BENEATH HCU. DETERMINED THAT WATER LEAKING PAST JUNCTION BOX UNACCEPTABLE POSSIBILITY OF FLOODING JUNCTION BOX. CONTACTED HP AND REROUTED LEAKAGE USING A RAG AND DUCT TAPE. IT DOES THE TRICK BUT LOOKS VERY UNPROFESSIONAL.

REPAIR HCU DIRECTIONAL CONTROL VALVE ASAP Immediate Action

Description:

Suggested Action

Description:

EQUIPMENT:

Tag Name Tag Suffi Name Component Code Process System Code 03 REFERENCE ITEMS: Type Code Description CONVERTED PR PR.01.4238 REACTIVITY - RELATED PNP-2001-4238 ADMIN EnteiEY I Initiated Date: 9/27/2001 0:OO Owner Group

Plan Sched Outage Staff Current Contact: MILLER, R. Current Significance:

C - CORRECTION Closed by: MILLER, R. 10/4/2001 0:OO CR-PNP-2001-04238 Summary

Description:

TOUR OPR REPORTED THAT HCU 50-3 1 LEAK APPEARS WORSE. INVESTIGATED AND FOUND WATER LEAKING ACROSS JUNCTION BOX AND INTO CATCH CONTAINMENT BENEATH HCU. DETERMINED THAT WATER LEAKING PAST JUNCTION BOX UNACCEPTABLE POSSIBILITY OF FLOODING JUNCTION BOX. CONTACTED HP AND REROUTED LEAKAGE USING A RAG AND DUCT TAPE. IT DOES THE TRICK BUT LOOKS VERY UNPROFESSIONAL. REPAIR HCU DIRECTIONAL CONTROL VALVE ASAP Remarks

Description:

PR=EF HCU 50-31 LEAK WATER CATCH CONTAINMENT RADIATION PROTECTION M. MCDONNELL Closure

Description:

SEE EVALUATION RESPONSE.

E72teqg-y ASSIGNMENTS Version: 1 Significance Code: C - CORRECTION Classification Code: NON-SIGNIFICANT Owner Group: Plan Sched Outage Staff Performed By: Edelhauser,James E Assignment

==

Description:==

EVALUATE SCHEDULING THE REPAIRS FOR HCU 50-3 1. CR-PNP-2001-04238 10/04/200 1 0O:OO Entefgy CA Number: 1 I - - - - __. - . __- -- - __-~--__ - I Group Name Assigned By: Plan Sched Outage Staff Assigned To:

Maint Plant Production Staff EDELHAUSER, J. Edelhauser,James E CORRECTIVE ACTION CR-PNP-2001-04238 Subassigned To : ~~ ~~ Originated By:

EDELHAUSER, J. Performed By:

EDELHAUSER, J. Subperformed By:

Approved By: Closed By: EDELHAUSER, J. 9/27/2001 0O:OO:OO 10/4/2001 0O:OO:OO 10/4/2001 0O:OO:OO Current Due Date: 12/03/2001 Initial Due Date:

12/03/2001 CA Type: GENERAL Plant Constraint:

NONE CA

Description:

EVALUATE SCHEDULING THE REPAJRS FOR HCU 50-3 1. Response:

Subresponse

CONVERTED DATA Closure Comments:

MEMO DETAILING THE RESULTS OF THE REVIEW AND THE CORRECTIVE ACTIONS TAKEN. [ 10/04/2001; J.Edelhauser] Problem Report relates to leaking HCU 50-3 1 Direction Control Valve Block. The priority of related Maintenance Request 01 117275 was elevated and the work was schedule earlier.

The work has now been completed and the maintenance request is in Post Work Test status.

No further action is required to close the Problem Report.

Jim Edelhauser Scheduling Supervisor X8059