Text

~'t-.

WAmeren Callaway Plant MISSOURI June 5, 2012 ULNRC-05874 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 AMENDMENT 3 TO APPLICATION FOR RENEWED OPERATING LICENSE

Reference:

ULNRC-05830 dated December 15, 2011 By the referenced letter, Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. This letter transmits Amendment 3 to the Callaway LRA.

The changes being made by Amendment 3 are contained in Enclosure 1. These changes include updates to Aging Management Programs (AMPs) identified during recent audits of the Callaway LRA Program.

It should be noted that changes to one commitment (Item #31) are reflected in Table A4-1 (within Enclosure 1).

If you have any questions on LRA Amendment 3, please contact me at (573) 823-9286 or Ms. Sarah Kovaleski at (314) 225-1134.

PO Box 620 Fulton, MD 65251 AmerenMissouri.com

ULNRC-05874 June 5, 2012 Page2 I declare under penalty of perjury that the foregoing is true and correct.

Sincerely, Executed on: J l.:\ n e 5 >20 f 2 Les H. Kanuckel Manager, Engineering Design DS/SGK/nls : AMP Changes for Callaway Plant Unit 1 License Renewal Application Amendment No.3

ULNRC-05874 June 5, 2012 Page 3 cc: U.S. Nuclear Regulatory Commission (Original)

Attn: Document Control Desk Washington, DC 20555-0001 Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Samuel Cuadrado De Jesus Project Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Andrew Hon Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. Gregory A. Pick U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511

ULNRC-05874 June 5, 2012 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:

A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle J. S. Geyer S. A. Maglio R. Holmes-Bobo NSRB Secretary S. G. Kovaleski T. B. Elwood G. G. Yates E. Blocher (STARS PAM COB)

Mr. Bill Muilenburg (WCNOC)

Mr. Tim Hope (Luminant Power)

Mr. Ron Barnes (APS)

Mr. Tom Baldwin (PG&E)

Mr. Mike Murray (STPNOC)

Ms. Linda Conklin (SCE)

Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission Mr. Dru Buntin (DNR)