Pages that link to "Dodds R"
← Dodds R
Jump to navigation
Jump to search
The following pages link to Dodds R:
Displayed 50 items.
- ML12152A297 (← links)
- ML12130A227 (← links)
- ML12081A015 (← links)
- ML12032A135 (← links)
- ML12003A197 (← links)
- ML061280079 (← links)
- SBK-L-15093, License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.4 (← links)
- SBK-L-15132, Response to Request for Additional Information for License Amendment Request 14-04 Revised Reactor Coolant System Pressure - Temperature Limits Applicable for 55 Effective Full Power Years (← links)
- W3F1-2005-0003, Supplement to Amendment Request NPF-38-258, Modify Technical Specification (TS) 5.3.1, Fuel Assemblies and TS 6.9.1.11.1, Core Operating Limits (← links)
- W3F1-2005-0004, Supplement to Amendment Request NPF-38-249 Extended Power Uprate Waterford Steam Electric Station, Unit 3 (← links)
- W3F1-2005-0001, Review of Draft Safety Evaluation for the Extended Power Uprate (← links)
- ML20038B029 (← links)
- ML20040C900 (← links)
- ML043280359 (← links)
- W3F1-2004-0117, Supplement to Amendment Request NPF-38-249 Extended Power Uprate (← links)
- ML043220259 (← links)
- W3F1-2004-0100, Response to Request for Additional Information Regarding Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. (← links)
- W3F1-2004-0091, Response to NRC Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections (← links)
- W3F1-2004-0103, Disposition of Requested Information Regarding Significance Determination Process Risk-Informed Inspection Notebook (← links)
- W3F1-2004-0090, Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/04 (← links)
- W3F1-2004-0093, September 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 (← links)
- W3F1-2004-0075, Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program (← links)
- W3F1-2004-0083, August 2004 Monthly Operating Report for Waterford Unit 3 (← links)
- W3F1-2004-0079, June 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 (← links)
- W3F1-2004-0072, Fitness for Duty Performance Data-Six Month Report Waterford Steam Electric Station, Unit 3 (Waterford 3) (← links)
- W3F1-2004-0067, July 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 (Waterford 3) (← links)
- ML042150151 (← links)
- W3F1-2004-0057, June 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 (← links)
- ML041970208 (← links)
- ML041970192 (← links)
- ML041970134 (← links)
- ML041970120 (← links)
- ML041970115 (← links)
- ML041970083 (← links)
- ML041970078 (← links)
- ML041970073 (← links)
- ML20076C250 (← links)
- ML20138B113 (← links)
- IR 05000344/1985037 (← links)
- IR 05000344/1985034 (← links)
- ML20137X288 (← links)
- PNO-V-85-082, on 851202,low Tide Concurrent W/High Seas Caused Kelp to Be Injected Into Condenser Circulating Water Intake Structure.Control RPI Lost & Reactor Manually Tripped.Cause Under Investigation (← links)
- PNO-V-85-080, on 851128,oscillation of Steam Flow Resulted in Reactor Trip Due to Completion of Steam Generator Low Level Coincident W/Steam Flow/Feedwater Flow Mismatch Logic. Cause Will Be Determined Prior to Resuming Operations (← links)
- IR 05000344/1986001 (← links)
- IR 05000344/1985039 (← links)
- ML20137S038 (← links)
- IR 05000344/1985026 (← links)
- IR 05000344/1984023 (← links)
- PNO-V-85-055, on 850820,initial Criticality Achieved W/Boron Concentration within Expected Acceptance Criteria for Estimated Critical Conditions.Low Power Physics Testing in Progress & Expected to Be Completed in 7 Days (← links)
- IR 05000508/1985011 (← links)