Letter from R. Dodds, We Energies, to J. Crawford, Wisconsin Department of Natural Resources, Regarding Annual Compliance Certification Report for Point Beach Nuclear Plant Dated 1/24/2002
ML041970078
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/24/2002
From: Dodds R
Wisconsin Electric, Wisconsin Gas
To: Crawford J
Office of Nuclear Reactor Regulation, State of WI, Dept of Natural Resources
References
Download: ML041970078 (5)


Text

,~ (, D. 1.

WIscons.inElectric Wisconsin Electric-Wisconsin Gas W ISCONSIN ENERGYCOMPANIES 231 W.-Michigan St.

WISCONSIN ENERGY COMPANIES Mihwaukee. WI 53290-0001 W1ISCONSIINLGJMS Phone 414 221-2345 January 24, 2002 Mr. Jim Crawford Wisconsin Department of Natural Resources Northeast Region Air Program 1125 N. Military Ave.

P. 0. Box 10448 Green Bay, WI 54307-0448

Dear Mr. Crawford:

ANNUAL COMPLIANCE CERTIFICATION REPORT POINT BEACH NUCLEAR PLANT Operation permit number 436034500-POI, condition IH.(l)(b) for the Point Beach Nuclear Plant, requires the company to submit an annual compliance certification report by January 31 for the period January 1 through December 31 of the previous year. The report consists:

1. Compliance Certification
2. Responsible Official Certification.

COMPLIANCE CERTIFICATION A. Operation permit number 436034500-POI, identifies all the applicable emissions limitations; the compliance demonstration methods; and the reference tests methods, record keeping, and monitoring requirements that apply to the Point Beach plant. The attached table entitled "Permit Summary" reiterates the applicable emissions limitations

("Requirements") that are the basis of the compliance certification.

B. The company has identified the monitoring methods used to certify compliance and whether the data was continuous or periodic. See the attached "Permit Summary" table columns entitled, "Monitoring Methods" and "Data Type", respectively.

C. Point Beach Nuclear Plant is in continuous compliance with each of the permit conditions identified in A. above, with one minor exception.

Mr. Crawford 124t2002 Page 2 RESPONSIB3LE OFFICIAL CERTIFCATION I certify based on information and belief formed after reasonable inquiry, the statements and the information in this document are true, accurate, and complete.

Signature of Responsible Offic ial:_ _ _ _Date: //8/

o Printed Name of Responsible Official: Tom Taylor

Title:

Plant Manager If you have any questions or need additional information, please contact me at 414/221-2174.

Si n6ey, Ro~ Dodds, P.E.

Sen r Engineer Environmental Department attachment cc: U.S. EPA - Region 5 Air and Radiation Division Compliance Data - Wisconsin 77 W. Jackson Chicago, IL 60604 bcc: Terry Coughlin Kjell Johansen Tom Taylor

File: .1.8.1.1 F:\DATA\WinWord\COMPRPTG\PBNP\PBNPCERTOOI .DOC

Permit Summary Operation Permit #436034500-POl Point Beach Nuclear Plant t Rc(( &M ni I0l-ogtusd--6.

I__-_t___el____ItRE [ RM;Ii It e$ 2 Stack S0l/Process Emission limits: A. Keep records of the type and amount of fuel burned '1 A. IT P01 - Stattonary A. Particulate matter CC In the CT on a monthly basis Combustion 0.60 Ib/million BTU B. Keep records of the dates and times the CT is B. IT Turbine started up and shut down.

Other limits: C. Keep records of the number of hours the CT is '1 C. IT

1. Fuel use limited to: CC operated each month and current 12 month average.
  1. 1 and #2 fuel oil
2. Restriction on concurrent IC D operation with one or more diesel generators(P02, P03, P04 or P05)
3. Hours of operation: CC s 228.83 hrs/mon. roiling 12 month average B. Opacity: 40% CC Same as for particulate matter T IT C. Sulfur dioxide: CC Keep records of the fuel supplier certification that each T IT Sulfur content of the fuel oil limited to batch of fuel to be burned in the CT met the sulfur s 0.178% by weight and 65 lb content limitation.

SO2Thr.

Stack S02/Process Emission limits: A. Keep records of the type and amount of fuel burned T A. IT P02 and Stack A. Particulate matter CC in each diesel on a monthly basis S03/Process P03 - 0.60 lb/million BTU B. Keep records of the dates and times each diesel is 4 B. IT Stationary Diesel . started up and shut down.

Generators Other limits:

Installed In 1969 1. Fuel use limited to: CC

  1. 1 and #2 fuel oil
2. Restriction on concurrent IC D operation with the CT(P01)

B. Opacity: 40%

C. Sulfur dioxide:

CC cc Same as for particulate matter T IT Fuel sampling and analysis according to methods IT Sulfur content of the fuel oil limited to specified in the permit whenever requested by DNR

_ 0.5% by weight CC - continuous compliance, IC- Intermittent compliance, OPNA - operational flexibility not applied 2D - deviations, EE - excess emissions, XR - excursions 3 - the method was used throughout the reporting period, NA - the method was not applied during the reporting period CX - continuous, IT- intermittent

\Epsbaqfoaiev96255EDATAIWlnWord\COMPRPTGVPBNPIPBNPEUS2001 .DOC 112412X02 Page 1 of 3

Permit Summary Operation Permit #436034500-POl Point Beach Nuclear Plant Stack S041Process Emission limits: A. Keep records of the type and amount of fuel burned A. IT P04 and Stack A. Particulate matter CC in each diesel on a monthly basis S05/Process P05 - 0.15 lb/million BTU B. Keep records of the dates and times each diesel is IT.

IT Stationary Diesel started up and shut down.

Generators Other limits: C. Keep records of the number of hours each diesel Is 4 C. IT Installed In 1994 1. Fuel use limited to: CC operated each month and current 12 month average.

  1. 1 and #2 fuel oil
2. Restriction on concurrent CC operation with the CT(POI)
3. Hours of operation: CC 5 20.67 hrs/mon. rolling 12 month average _

B. Opacity: 20% CC Same as for particulate matter 7 IT C. Sulfur dioxide: CC Keep records of the fuel supplier certification that each v IT Sulfur content of the fuel oil limited to batch of fuel to be burned In the diesel generators met S 0.287% by weight and 7.2 lb the sulfur content limitation.

SO2/hr. __ _

Stack S08/Boilers Emission limits: Keep records of the type and amount of fuel burned In T IT B01 and B02 - A. Particulate matter CC each diesel on a monthly basis Heating Boilers 0.60 lb/million BTU Other limits:

Fuel use limited to: CC

  1. 1 and #2 fuel oil B. Opacity: 40% CC Same as for particulate matter T IT C. Sulfur dioxide: CC Fuel sampling and analysis according to methods 4 IT Sulfur content of the fuel oil limited to specified In the permit whenever requested by DNR 0.5% by weight Stack S06/Process Emission limits: Keep records of the type and amount of fuel burned in IT P06 - Starting A. Particulate matter CC each diesel on a monthly basis Diesel 0.60 lb/million BTU Other limits:

Fuel use limited to: CC

  1. 1 and #2 fuel oil :______

\\psbaqfoauev6255\ATA\WMnWord\COMPRPTG\PBlflP\PBNPEUS2001 .DOC 1l2412002 Page 2 of 3

Permit Summary Operation Permit #436034500-P01 Point Beach Nuclear Plant B. Opacity: 40% CC Same as for particulate matter 4 IT C. Sulfur dioxide: CC Fuel sampling and analysis according to methods IT Sulfur content of the fuel oil limited to specified In the permit whenever requested by DNR

  • 0.5% by weight Stack S07/Process Emission limits: Keep records of the type and amount of fuel burned In IT P07 and Stack A. Particulate matter CC each diesel on a monthly basis 09/Process P09 - 0.60 lb/million BTU Auxiliary Diesel and Diesel Fire Pump, Other limits:

respectively. Fuel use limited to: CC

  1. 1 and #2 fuel oil B. Opacity: 40% CC Same as for particulate matter IT C. Sulfur dioxide: CC Fuel sampling and analysis according to methods T IT Sulfur content of the fuel oil limited to specified in the permit whenever requested by DNR S_0.5% by weight_

I I I.I .I I

\\psbaqtoa~ev96255U>ATA\V\AnWord\COMPRPTG'\PBNP\PBNPEUS200 1.DOC n14no200 Page 3 of 3