Category:Letter
MONTHYEARML24295A1142024-10-31031 October 2024 Suppl Env Audit Summary Letter W/Enclosure 1 ML24295A0862024-10-21021 October 2024 Notification of NRC Baseline Inspection and Request for Information Inspection Report 0500026/2025002 L-2024-160, Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41)2024-10-21021 October 2024 Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41) L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-120, LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization2024-10-0808 October 2024 LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000266/2024011 and 05000301/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-145, Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency2024-09-0909 September 2024 Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency ML24207A0202024-08-28028 August 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Point Beach Nuclear Plant, Units 1 and 2 (Docket Numbers: 50-0266 and 50-0301) IR 05000266/20240052024-08-21021 August 2024 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2024005 and 05000301/2024005) IR 05000266/20240022024-08-13013 August 2024 Integrated Inspection Report 05000266/2024002 and 05000301/2024002 L-2024-131, Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-08-0909 August 2024 Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24214A3092024-08-0202 August 2024 Confirmation of Initial License Examination L-2024-113, License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections2024-07-24024 July 2024 License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections ML24194A1802024-07-24024 July 2024 – Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20244012024-07-23023 July 2024 Public - Point Beach Nuclear Plant Cyber Security Inspection Report 05000266/2024401 and 05000301/2024401 ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal IR 05000266/20240102024-07-10010 July 2024 Age-Related Degradation Inspection Report 05000266/2024010 and 05000301/2024010 L-2024-105, License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-06-26026 June 2024 License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-107, Schedule for Subsequent License Renewal Environmental Review2024-06-25025 June 2024 Schedule for Subsequent License Renewal Environmental Review ML24176A2242024-06-24024 June 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-093, Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision2024-06-10010 June 2024 Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision IR 05000266/20244202024-06-0505 June 2024 Security Baseline Inspection Report 05000266/2024420 and 05000301/2024420 ML24149A1922024-05-28028 May 2024 Notification of NRC Baseline Inspection and Request for Information ML24141A1382024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection.Docx ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000266/2024301; 05000301/2024301 L-2024-067, Annual Monitoring Report2024-04-26026 April 2024 Annual Monitoring Report ML24116A0402024-04-23023 April 2024 Periodic Update of the Updated Final Safety Analysis Report ML24071A0912024-04-22022 April 2024 Issuance of Relief Request I6-RR-03 - Extension of the Unit 2 Steam Generator Primary Nozzle Dissimilar Metal Welds Sixth 10-Year Inservice Inspection Program Interval IR 05000266/20240012024-04-11011 April 2024 Integrated Inspection Report 05000266/2024001 and 05000301/2024001 L-2024-030, Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-03-27027 March 2024 Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-043, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-03-25025 March 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications IR 05000266/20230062024-02-28028 February 2024 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2023006 and 05000301/2023006) L-2024-020, Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections2024-02-22022 February 2024 Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 ML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 2024-09-09
[Table view] |
Text
- ,~ (, D. 1.
WIscons.inElectric Wisconsin Electric-Wisconsin Gas W ISCONSIN ENERGYCOMPANIES 231 W.-Michigan St.
WISCONSIN ENERGY COMPANIES Mihwaukee. WI 53290-0001 W1ISCONSIINLGJMS Phone 414 221-2345 January 24, 2002 Mr. Jim Crawford Wisconsin Department of Natural Resources Northeast Region Air Program 1125 N. Military Ave.
P. 0. Box 10448 Green Bay, WI 54307-0448
Dear Mr. Crawford:
ANNUAL COMPLIANCE CERTIFICATION REPORT POINT BEACH NUCLEAR PLANT Operation permit number 436034500-POI, condition IH.(l)(b) for the Point Beach Nuclear Plant, requires the company to submit an annual compliance certification report by January 31 for the period January 1 through December 31 of the previous year. The report consists:
- 1. Compliance Certification
- 2. Responsible Official Certification.
COMPLIANCE CERTIFICATION A. Operation permit number 436034500-POI, identifies all the applicable emissions limitations; the compliance demonstration methods; and the reference tests methods, record keeping, and monitoring requirements that apply to the Point Beach plant. The attached table entitled "Permit Summary" reiterates the applicable emissions limitations
("Requirements") that are the basis of the compliance certification.
B. The company has identified the monitoring methods used to certify compliance and whether the data was continuous or periodic. See the attached "Permit Summary" table columns entitled, "Monitoring Methods" and "Data Type", respectively.
C. Point Beach Nuclear Plant is in continuous compliance with each of the permit conditions identified in A. above, with one minor exception.
Mr. Crawford 124t2002 Page 2 RESPONSIB3LE OFFICIAL CERTIFCATION I certify based on information and belief formed after reasonable inquiry, the statements and the information in this document are true, accurate, and complete.
Signature of Responsible Offic ial:_ _ _ _Date: //8/
o Printed Name of Responsible Official: Tom Taylor
Title:
Plant Manager If you have any questions or need additional information, please contact me at 414/221-2174.
Si n6ey, Ro~ Dodds, P.E.
Sen r Engineer Environmental Department attachment cc: U.S. EPA - Region 5 Air and Radiation Division Compliance Data - Wisconsin 77 W. Jackson Chicago, IL 60604 bcc: Terry Coughlin Kjell Johansen Tom Taylor
- File: .1.8.1.1 F:\DATA\WinWord\COMPRPTG\PBNP\PBNPCERTOOI .DOC
Permit Summary Operation Permit #436034500-POl Point Beach Nuclear Plant t Rc(( &M ni I0l-ogtusd--6.
I__-_t___el____ItRE [ RM;Ii It e$ 2 Stack S0l/Process Emission limits: A. Keep records of the type and amount of fuel burned '1 A. IT P01 - Stattonary A. Particulate matter CC In the CT on a monthly basis Combustion 0.60 Ib/million BTU B. Keep records of the dates and times the CT is B. IT Turbine started up and shut down.
Other limits: C. Keep records of the number of hours the CT is '1 C. IT
- 1. Fuel use limited to: CC operated each month and current 12 month average.
- 1 and #2 fuel oil
- 2. Restriction on concurrent IC D operation with one or more diesel generators(P02, P03, P04 or P05)
- 3. Hours of operation: CC s 228.83 hrs/mon. roiling 12 month average B. Opacity: 40% CC Same as for particulate matter T IT C. Sulfur dioxide: CC Keep records of the fuel supplier certification that each T IT Sulfur content of the fuel oil limited to batch of fuel to be burned in the CT met the sulfur s 0.178% by weight and 65 lb content limitation.
SO2Thr.
Stack S02/Process Emission limits: A. Keep records of the type and amount of fuel burned T A. IT P02 and Stack A. Particulate matter CC in each diesel on a monthly basis S03/Process P03 - 0.60 lb/million BTU B. Keep records of the dates and times each diesel is 4 B. IT Stationary Diesel . started up and shut down.
Generators Other limits:
Installed In 1969 1. Fuel use limited to: CC
- 1 and #2 fuel oil
- 2. Restriction on concurrent IC D operation with the CT(P01)
B. Opacity: 40%
C. Sulfur dioxide:
CC cc Same as for particulate matter T IT Fuel sampling and analysis according to methods IT Sulfur content of the fuel oil limited to specified in the permit whenever requested by DNR
_ 0.5% by weight CC - continuous compliance, IC- Intermittent compliance, OPNA - operational flexibility not applied 2D - deviations, EE - excess emissions, XR - excursions 3 - the method was used throughout the reporting period, NA - the method was not applied during the reporting period CX - continuous, IT- intermittent
\Epsbaqfoaiev96255EDATAIWlnWord\COMPRPTGVPBNPIPBNPEUS2001 .DOC 112412X02 Page 1 of 3
Permit Summary Operation Permit #436034500-POl Point Beach Nuclear Plant Stack S041Process Emission limits: A. Keep records of the type and amount of fuel burned A. IT P04 and Stack A. Particulate matter CC in each diesel on a monthly basis S05/Process P05 - 0.15 lb/million BTU B. Keep records of the dates and times each diesel is IT.
IT Stationary Diesel started up and shut down.
Generators Other limits: C. Keep records of the number of hours each diesel Is 4 C. IT Installed In 1994 1. Fuel use limited to: CC operated each month and current 12 month average.
- 1 and #2 fuel oil
- 2. Restriction on concurrent CC operation with the CT(POI)
- 3. Hours of operation: CC 5 20.67 hrs/mon. rolling 12 month average _
B. Opacity: 20% CC Same as for particulate matter 7 IT C. Sulfur dioxide: CC Keep records of the fuel supplier certification that each v IT Sulfur content of the fuel oil limited to batch of fuel to be burned In the diesel generators met S 0.287% by weight and 7.2 lb the sulfur content limitation.
SO2/hr. __ _
Stack S08/Boilers Emission limits: Keep records of the type and amount of fuel burned In T IT B01 and B02 - A. Particulate matter CC each diesel on a monthly basis Heating Boilers 0.60 lb/million BTU Other limits:
Fuel use limited to: CC
- 1 and #2 fuel oil B. Opacity: 40% CC Same as for particulate matter T IT C. Sulfur dioxide: CC Fuel sampling and analysis according to methods 4 IT Sulfur content of the fuel oil limited to specified In the permit whenever requested by DNR 0.5% by weight Stack S06/Process Emission limits: Keep records of the type and amount of fuel burned in IT P06 - Starting A. Particulate matter CC each diesel on a monthly basis Diesel 0.60 lb/million BTU Other limits:
Fuel use limited to: CC
- 1 and #2 fuel oil :______
\\psbaqfoauev6255\ATA\WMnWord\COMPRPTG\PBlflP\PBNPEUS2001 .DOC 1l2412002 Page 2 of 3
Permit Summary Operation Permit #436034500-P01 Point Beach Nuclear Plant B. Opacity: 40% CC Same as for particulate matter 4 IT C. Sulfur dioxide: CC Fuel sampling and analysis according to methods IT Sulfur content of the fuel oil limited to specified In the permit whenever requested by DNR
- 0.5% by weight Stack S07/Process Emission limits: Keep records of the type and amount of fuel burned In IT P07 and Stack A. Particulate matter CC each diesel on a monthly basis 09/Process P09 - 0.60 lb/million BTU Auxiliary Diesel and Diesel Fire Pump, Other limits:
respectively. Fuel use limited to: CC
- 1 and #2 fuel oil B. Opacity: 40% CC Same as for particulate matter IT C. Sulfur dioxide: CC Fuel sampling and analysis according to methods T IT Sulfur content of the fuel oil limited to specified in the permit whenever requested by DNR S_0.5% by weight_
I I I.I .I I
\\psbaqtoa~ev96255U>ATA\V\AnWord\COMPRPTG'\PBNP\PBNPEUS200 1.DOC n14no200 Page 3 of 3