Letter from R. Dodds, We Energies, to J. Crawford, Wisconsin Department of Natural Resources, Regarding Monitoring Report for Point Beach Nuclear Plant Dated 1/28/2003
ML041970115
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/28/2003
From: Dodds R
We Energies
To: Crawford J
Office of Nuclear Reactor Regulation, State of WI, Dept of Natural Resources
References
Download: ML041970115 (3)


Text

a tc\\, -A, s.

j_ l t U C) -

we energies 231 W. Michigan St.

Milwaukee. WI 53290-0001 www.we-energies.com January 28, 2003 Mr. Jim Crawford Wisconsin Department of Natural Resources Northeast Region Air Program 1125 N. Military Ave.

P. O. Box 10448 Green Bay, WI 54307-0448

Dear Mr. Crawford:

MONITORING REPORT POINT BEACH NUCLEAR PLANT Permit # 436034500-POI requires the company to submit a summary of the results of monitoring required by the permit. This report covers the six-month period of the current year ending December 3 1. The enclosed table, entitled "Parameters That Are Recorded Intermittently,"

shows a summary of the parameters monitored.

We did not operate the combustion turbine (CT), permit designation PO0, concurrently with any of the four emergency diesel generators during the reporting period.

The combustion turbine is fired with a #1 and #2 fuel oil blend. The sulfur content of that fuel is

< 0.178%. The emergency diesel generators (P02, P03, P04 and P05) are fired with a low sulfur,

  1. 2 fuel oil. The sulfur content of that fuel is < 0.287%.

We analyze the sulfur content in each oil delivery following ASTM D1552-95 procedures. We maintain records of each analysis at the plant.

The CT and the emergency diesel generators (permit designations P04 and P05) were operated less than 228.83 and 20.67 hours7.75463e-4 days <br />0.0186 hours <br />1.107804e-4 weeks <br />2.54935e-5 months <br /> per month, on 12-month rolling average basis, respectively.

rams Mr. Crawford 1/2812003 Page 2 Responsible Official Certification I certify based on information and belief formed after reasonable inquiry, the statements and the information in this document are true, accurate, and complete.

Signature of Responsible Official:

Printed Name of Responsible Officip

)Joe Jensen

Title:

Plant Manager I

Date:

If you have any questions or need additional information, please contact me at 414/221-2174.

Sin(

Rog

p. Dodds Senior Engineer Environmental Department bcc:

Terry Coughlin Kjell Johansen Joe Jensen File: 1.8.1.1 F:\\DATA\\WinWord\\COMPRPTG\\PBNP\\Pbnp 1231 2002.doc

Mr. Crawford 1/28/2003 Page 3 PARAMETERS THAT ARE RECORDED INTERNITTENTLY Emission Parameters Recorded(# readings taken in the Total #

Percent of Unit reporting period) readings readings showing showing deviations deviations Date & time Run Time

%S in the oil of SU/SD PO1 (CT) 18 0

0 Po0 (CT) 18 01 0

P01 (CT) 14 02 0

P02 &P03 20 0

0 (EDGs) 20 0

20 NA NA 5

03 0

P04 & P05 23 0

0 (EDGs) is423 04 0

_5 0

BOI & B02 NA NA 14 o

0 (Boilers)

P06, P07, &

NA NA 14 0

0 P09 CT - plant designation, G05 - is limited to < 228.83 hrs/mon, on a 12 mon. rolling ave.

2 CT is limited to oil with < 0.178% sulfur by wgt. and analyzed by WEPCo 3 Emergency diesel generators -- plant designations, EDG GOI & G02 -- (P02 & P03) are limited to oil with < 0.5% sulfur by wgt.

4 Emergency diesel generators -- plant designations, EDG G03 & G04 -- (P04 & P05) are limited to

  • 20.67 hrs/mon, on a 12 mon. rolling ave.

S Emergency diesel generators - plant designations, EDG G03 & G04 (P04 & P05) are limited to oil with

  • 0.287% sulfur by wgt. and analyzed by WEPCo 6 Heating boilers BO 1 & B02 are limited to oil with

' Starting diesel G500 (P06), aux. diesel G501 (P07), and diesel fire pump (P09) are limited to oil with