ML041970208
| ML041970208 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 02/16/2004 |
| From: | Dodds R We Energies |
| To: | Crawford J Office of Nuclear Reactor Regulation, State of WI, Dept of Natural Resources |
| References | |
| Download: ML041970208 (5) | |
Text
'
/7. di7 3.4'/.o, we energies 4
231 W. Michigan Street, Milwaukee. WI 53203 www.we-energies.com February 16, 2004 Mr. Jim Crawford Wisconsin Department of Natural Resources Northeast Region Air Program 1125 N. Military Ave.
I p
rE\\f£t)
P. 0. Box 10448 GreenBay, WI 54307-0448 FEB 2 4 2004
Dear Mr. Crawford:
ANNUAL COMPLIANCE CERTflFCATION REPORT POINT BEACH NUCLEAR PLANT Operation permit number 436034500-F10, condition IL.L(a)(2) for the Point Beach Nuclear Plant, requires the company to submit an annual compliance certification report by March 1 for the period January 1 through December31 of the previous year. The report consists:
- 1. Compliance Certification
- 2. Responsible Official Certification.
COMPLIANCE CERTIFICATION A. Operation permit number 436034500-F10, identifies all the applicable emissions limitations; the compliance demonstration methods; and the reference tests methods, record keeping, and monitoring requirements that apply to the Point Beach plant. The attached table entitled "Permit Summary" reiterates the applicable emissions limitations
("Requirements") that are the basis of the compliance certification.
B. The company has identified the monitoring methods used to certify compliance and whether the data was continuous or periodic. See the attached "Permit Summary" table columns entitled, "Monitoring Methods" and "Data Type", respectively.
C. Point Beach Nuclear Plant is in continuous compliance with each of the permit conditions identified in A. above.
Mr. Crawford 2/16/2004 Page 2 RESPONSIBLE OFFICIAL CERTIFICATION I certify based on information and belief formed after reasonable inquiry, the statements and,the information in this document are true, accurate, and complete.
Signature of Responsible Official:
Date:
Printed Name of Responsible Official:
ary Van Middlesworth
Title:
Site Vice President If you have any questions or need additional information, please contact me at 414/221-2174.
Si ely, Roget Dodds, P.E.
Senior Engineer Environmental Department attachment cc:
U.S. EPA - Region 5 Air and Radiation Division
.Compliance Data - Wisconsin 77 W. Jackson Chicago, IL 60604 bcc:
Terry Coughlin Kjell Johansen Gary Van Middlesworth File: 19.23.21.001 F:\\DATA\\WinWord\\COMPRPTG\\PBNP\\PBNPCERT2003.doc Vt
Permit Summary Operation Permit #436034500-POl Point Beach Nuclear Plant
.Etac.ltX:"*.ege lo00St~
MgR(
EXc'g ms9.;
Stack S01/Process Emission limits:
A. Keep records of the type and amount of fuel burned 4
A. IT P01 - Stationary A. Particulate matter CC in the CT on a monthly basis Combustion 7.6 poundsthour B. Keep records of the dates and times the CT is 4
B. IT Turbine started up and shut down.
Other limits:.
C. Keep records of the number of hours the CT is 4
C. IT
- 1. Fuel use limited to:
CC operated each month and current 12 month average.
distillate fuel oil'
- 2. Restriction on concurrent CC operation with one or more diesel generators(P02, P03, P04 or P05)
- 3. Hours of operation:
- 228.83 hrs/mon. rolling 12 month average B. Opacity: 40%
CC Same as for particulate matter IT C. Sulfur dioxide:
CC Document and verify that the fuel oil sulfur content of 4
IT Sulfur content of the fuel oil limited to fuel burned In the CT did not exceed the sulfur content
- 0.178% by weight and 65 lb limitation.
SO2Ihr.
Stack S02/Process Emission limits:
A. Keep records of.the type and amount of fuel burned A. IT P02 and Stack A. Particulate matter:
CC in each diesel on a monthly basis S03/Process P03 -
11.5 pounds/hour B. Keep records of the dates and times each diesel is a
B. IT Stationary Diesel started up and shut down.
Generators Other limits:
installed in 1969
- 1. Fuel use limited to:
CC distillate fuel oil
B. Opacity: 40%
CC Same as for particulate matter IT C. Sulfur dioxide:
CC Fuel sampling and analysis according to methods IT Sulfur content of the fuel oil limited to specified in the permit whenever requested by DNR
__ 0.5% by weight I CC - continuous compliance, IC - Intermittent compliance, OPNA - operational flexibility not applied 2 D - deviations, EE - excess emissions, XR - excursions 3 4-the method was used throughout the reporting period, NA - the method was not applied during the reporting period 4CX - continuou's, IT - IntermitthnLt F.\\OATANWInWordACOMPRPTGAPBNP\\PI3NPE6S2003.DO)C 21620 Pg 2/16=204 Page 1 of 3
Permit Summary Operation Permit #436034500-Pal Point Beach Nuclear Plant Stack S04/Process Emission limits:
A. Keep records of the type and amount of fuel burned 4
A. IT P04 and Stack A. Particulate matter:
CC in each diesel on a monthly basis S05/Process P05 -
11.5 pounds/hour B. Keep records of the dates and times each diesel Is 4
B. IT Stationary Diesel started up and shut down.
Generators Other limits:
C. Keep records of the number of hours each diesel is 4
C. IT Installed In 1994
- 1. Fuel use limited to:
CC operated each month and current 12 month average.
distillate fuel oil
- 3. Hours of operation:
- 20.67 hrs/mon. rolling 12 month average B. Opacity: 20%
CC Same as for particulate matter 4
cc Document and verify that the fuel oil sulfur content of 4
IT Sulfur content of the fuel 611 limited to fuel burned In the diesel generators did not exceed the
- 0.287% by weight and 7.2 lb sulfur content limitation.
SO2/hr.
Stack S08/Boilers Emission limits:
Keep records of the type and amount of fuel burned In
'4 IT B01 and B02 -
A. Particulate matter:
CC each diesel on a monthly basis Heating Boilers 1.7 pounds/hour Other limits:
Fuel use limited to:
CC distillate fuel oil B. Opacity: 40%
CC Same as for particulate matter IT C. Sulfur dioxide:
CC Fuel sampling and analysis according to methods T
IT Sulfur content of the fuel oil limited to specified In the permit whenever requested by DNR
_ *0.5% by weight Stack S06/Process Emission limits:
Keep records of the type and amount of fuel burned In T_ IT P06 - Starting A. Particulate matter:
CC each diesel on a monthly basis Diesel 6.3 pounds/hour Other limits:
Fuel use limited to:
CC distillate fuel oil B. Opacity: 40%
CC Same as for particulate matter
CC Fuel sampling and analysis according to methods T
IT Sulfur content of the fuel bil limited to specified in the permit whenever requested by DNR F.IDATAWlnWord\\COMPRPTG\\PBNP\\PBNPEUS2003.DOC 21620Pae2c
.2/1MG04 Page 2 of 3
Permit Summary Operation Permit #436034500-POl Point Beach Nuclear Plant s_ 0.5% by weight Stack S07/Process Emission limits:
records of the type and amount of fuel bumed in IT P07 and Stack A. Particulate matter:
CC each diesel on a monthly basis 09/Process P09 -.
3.3 pounds/hour (S07) and 1.6 Auxiliary Diesel and pounds/hour (S09)
Diesel Fire Pump, respectively.
Other limits:
Fuel use limited to:
CC distillate oil B. Opacity: 40%
CC Same as for particulate matter T
Fuel sampling and analysis according to methods V
IT Sulfur content of the fuel oil limited to specified In the permit whenever requested by DNR
_ 0.5% by weight Stack S10/Process Emission limits:
Visual inspect the over-spray filter Integrity each day the IT P10 - Paint Spray A.
Particulate matter:
spray booth Is used and keep a log of all inspections, Booth 2.9 pounds/hour CC maintenance on the filter system, Including dates of filter B.
Opacity: 20%
CC media replacement.
F:\\OATA\\WinWord\\COMPRPTG\\PBNP\\PBNPEUS2003.DOC 2M1/2004 Page 3 of 3