[ 9 -23.-2, BACK) I we energies 231 W. Michigan St.
Milwaukee, WI 53290-0001 www.we-energies.Com January 28, 2003 Mr. Jim Crawford Wisconsin Department of Natural Resources Northeast Region Air Program 1125 N. Military Ave.
P. O. Box 10448 Green Bay, WI 54307-0448
Dear Mr. Crawford:
ANNUAL COMPLLANCE CERTIFICATION REPORT POINT BEACH NUCLEAR PLANT Operation permit number 436034500-PO1, condition IH.(1)(b) for the Point Beach Nuclear Plant, requires the company to submit an annual compliance certification report by January 31 for the period January I through December 31 of the previous year. The report consists:
- 1. Compliance Certification
- 2. Responsible Official Certification.
COMPLIANCE CERTIFCATION A. Operation permit number 436034500-POI, identifies all the applicable emissions limitations; the compliance demonstration methods; and the reference tests methods, record keeping, and monitoring requirements that apply to the Point Beach plant. The attached table entitled "Permit Summary" reiterates the applicable emissions limitations.
("Requirements") that are the basis of the complianc e certification.
B. The company has identified the monitoring methods used to certify compliance and whether the data was continuous or periodic. See the attached "Permit Summary" table columns entitled, "Monitoring Methods" and "Data Type", respectively.
C. Point Beach Nuclear Plant is in continuous compliance with each of the permit conditions identified in A. above.
Mr. Crawford 1128/2003 Page 2 RESPONSIBLE OFFICIAL CERTIFICATION I certify based on information and belief formed after reasonable inquiry, the statements and the information in this document are true, accurate, and complete.
Signature of Responsible Official:
Date:
%*2 C Printed Name of Responsible Offici Joe Jensen
Title:
Plant Manager
(
I If you have any questions or need additional information, please contact me at 414/221-2174.
Sinky Roget odds, P.E.
Senior Engineer Environmental Department attachment cc:
U.S. EPA - Region 5 Air and Radiation Division Compliance Data - Wisconsin 77 W. Jackson Chicago, IL 60604 bcc:
Terry Coughlin Kjell Johansen Joe Jensen File: 1.8.1.1 F:\\DATA\\WinWord\\COMPRPTG\\PBNP\\PBNPCERT2002.DOC
Permit Summary Operation Permit #436034500-POI Point Beach Nuclear Plant
~oEV t 4bId onltorinci~~tos T\\
~
3:
aaTp 4
Stack S01/Process Emission limits:
eep records of the type and amount of fuel burned v
A. IT P01 - Stationary A. Particulate matter.
CC in the CT on a monthly basis Combustion 0.60 Ib/million BTU B. Keep records of the dates and times the CT is
/B.
IT Turbine started up and shut down.
Other limits:
C. Keep records of the number of hours the CT is 1
C. IT
- 1. Fuel use limited to:
CC operated each month and current 12 month average.
- 1 and #2 fuel oil
- 2. Restriction on concurrent CC operation with one or more diesel generatois(P02, P03, P04 or P05)
- 3. Hours of operation:
CC S 228.83 hrslmon. rolling 12 month average B. Opacity: 40%
CC Same as for particulate matter IT C. Sulfur dioxide:
CC Document and verify that the fuel oil sulfur content of v
IT Sulfur content of the fuel oil limited to fuel burned in the CT did not exceed the sulfur content s 0.178% by weight and 65 lb limitation.
S02/hr.
Stack S02lProcess Emission limits:
A. Keep records of the type and amount of fuel burned A. IT P02 and Stack A. Particulate matter CC in each diesel on a monthly basis S03[Process P03 -
0.60 Ib/million BTU B. Keep records of the dates and times each diesel is 1
B. IT Stationary Diesel started up and shut down.
Generators Other limits:
installed In 1969
- 1. Fuel use limited to:
- 1 and #2 fuel oil
- 2. Restriction on concurrent CC
_ operation with the CT(P01)
_ B. Opacity: 40%
CC Same as for particulate matter
CC Fuel sampling and analysis according to methods 1
IT Sulfur content of the fuel oil limited to specified in the permit whenever requested by DNR 0.5% by weight CC - continuous compliance, IC - Intermittent compliance, OPNA - operational flexibility not applied 2 D - deviations, EE - excess emissions, XR - excursions
' - the method was used throughout the reporting period, NA - the method was not applied during the reporting period CX - continuous, IT - intermittent F:VDATA\\WmWorMCOMPRPTG\\PBNP\\PBNPEUS2002.DOC 112812003 Page 1 of 3
Permit Summary Operation Permit #436034500-Pol Point Beach Nuclear Plant Stack S04/Process Emission limits:
A. Keep records of the type and amount of fuel burned 4
A. IT P04 and Stack A. Particulate matter CC in each diesel on a monthly basis S05/Process P05 -
0.15 lb/million BTU B. Keep records of the dates and times each diesel is 4
B. IT Stationary Diesel started up and shut down.
Generators Other limits:
C. Keep records of the number of hours each diesel is v
C. IT Installed in 1994
- 1. Fuel use limited to:
CC operated each month and current 12 month average.
- 1 and #2 fuel oil
- 3. Hours of operation:
CC 5 20.67 hrs/mon. rolling 12 month average B. Opacity: 20%
CC Same as for particulate matter IT C. Sulfur dioxide:
CC Document and verify that the fuel oil sulfur content of IT Sulfur content of the fuel oil limited to fuel burned in the diesel generators did not exceed the 5 0.287% by weight and 7.2 lb sulfur content limitation.
S02/hr.
Stack S08/Boilers Emission limits:
Keep records of the type and amount of fuel burned in 4
IT B01 and B02 -
A. Particulate matter CC each diesel on a monthly basis Heating Boilers 0.60 lb/million BTU Other limits:
Fuel use limited to:
- 1 and #2 fuel oil B. Opacity: 40%
CC Same as for particulate matter IT C. Sulfur dioxide:
CC Fuel sampling and analysis according to methods IT Sulfur content of the fuel oil limited to specified in the permit whenever requested by DNR s 0.5% by weight Stack S06/Process Emission limits:
Keep records of the type and amount of fuel burned in IT P06 - Starting A. Particulate matter CC each diesel on a monthly basis Diesel 0.60 tb/million BTU Other limits:
Fuel use limited to:
- 1 and #2 fuel oil F:\\OATA\\WlnWordNCOMPRPTG1PBNP\\PBNPEUS2002.DOC 1n28n2o3 Page 2of 3
Permit Summary Operation Permit #436034500-POl Point Beach Nuclear Plant I'
B. Opacity: 40%
CC Same as for particulate matter IT C. Sulfur dioxide:
CC Fuel sampling and analysis according to methods 1
IT Sulfur content of the fuel oil limited to specified in the permit whenever requested by DNR
- 0.5% by weight Stack S07/Process Emission limits:
Keep records of the type and amount of fuel burned in v
IT P07 and Stack A. Particulate matter CC each diesel on a monthly basis 09/Process P09 -
0.60 lb/million BTU Auxiliary Diesel and Diesel Fire Pump, Other limits:
respectively.
Fuel use limited to:
- 1 and #2 fuel oil B. Opacity: 40%
CC Same as for particulate matter 1
CC Fuel sampling and analysis according to methods J.
IT Sulfur content of the fuel oil limited to specified in the permit whenever requested by DNR 5 0.5% by weight F:\\OATA\\WnWord\\COMPRPTG\\PBNPWPBNPEUS2002.DOC U2812003 Page 3 of 3