Letter from R. Dodds, We Energies, to J. Crawford, Wisconsin Department of Natural Resources, Regarding Monitoring Report for Point Beach Nuclear Plant Dated 1/24/2002
ML041970073
Person / Time
Site: Point Beach  
Issue date: 01/24/2002
From: Dodds R
Wisconsin Electric
To: Crawford J
Office of Nuclear Reactor Regulation, State of WI, Dept of Natural Resources
References
Download: ML041970073 (3)


Text

Wisconsin Electric-Wisconsin Gas ISCONSIN ENERG COMPANIES 231W.MichiganSt.

WISC NERG PNIES Milwaukee, WI 53290 0001 WISCONSIN GrACS Phone 414 221-2345 January 24, 2002 Mr. Jim Crawford Wisconsin Department of Natural Resources Northeast Region Air Program 1125 N. Military Ave.

P. O. Box 10448 Green Bay, WI 54307-0448

Dear Mr. Crawford:

MONITORING REPORT POINT BEACH NUCLEAR PLANT Permit # 436034500-PO I requires the company to submit a summary of the results of monitoring required by the permit. This report covers the six-month period of the current year ending December 31. The enclosed table, entitled "Parameters That Are Recorded Intermittently,"

shows a summary of the parameters monitored.

During the reporting period, there was one minor deviation from the permit requirements. We did operate the combustion turbine (CT), permit designation P01, concurrently with one of the emergency diesel generators on August 9, 2001, to meet system generation load demand. The two units ran together for only 31 minutes. There was no other permit deviations during the reporting period.

The combustion turbine is fired with a #1 and #2 fuel oil blend; The sulfur content of that fuel is

< 0.178%. The emergency diesel generators (P02, P03, P04 and P05) are fired with a low sulfur,

  1. 2 fuel oil. The sulfur content of that fuel is < 0.287%.

We analyze the sulfur content in each oil delivery following ASTM D1552-95 procedures. We maintain records of each analysis at the plant.

The CT and the emergency diesel generators (permit designations P04 and P05) were operated less than 228.83 and 20.67 hours7.75463e-4 days <br />0.0186 hours <br />1.107804e-4 weeks <br />2.54935e-5 months <br /> per month, on 12-month rolling average basis, respectively.

Mr. Crawford 1/24/2002 Page 2 Responsible Official Certification I certify based on information and belief formed after reasonable inquiry, the statements and the information in this document are true, accurate, and complete.

Signature of Responsible Official:

Printed Name of Responsible Official:

Title:

PlantManager Tom Tayor Date: /72k' o2 If you have any questions or need additional information, please contact me at 414/221-2174.

Sincerely, Ro D.

ds Senior Engineer Environmental Department bcc:

Terry Coughlin Kjell Johansen Tom Taylor File: 1.8.1.1 F:\\DATA\\WinWord\\COMPRPTG\\PBNP\\Pbnp 12312001.doc

I Mr. Crawford 1/24/2002 Page 3 PARAMETERS THAT ARE RECORDED INTERMIIENTLY Emission Parameters Recorded(# readings taken in the Total #

Percent of Unit reporting period) readings readings showing showing deviations deviations Date & time Run Time

%S in the oil of SU/SD P01 (CT) 15 0

0 PO1 (CT) 6 1° 0

PO (CT) 12 02 0

P02 & P03 20 0

0 (EDGs)

NA NA NA 0_

]

0 P04 & P05 28 0

0 (EDGs)

_6 04 0

1 05 0

B01 & B02 NA NA 1

0 0

(Boilers) 7 P06, P07, &

NA NA 1

0 0

P09 lCT - plant designation, GOS - is limited to

  • 228.83 hrs/mon, on a 12 mon. rolling ave.

2 CT is limited to oil with

4 Emergency diesel generators - plant designations, EDG G03 & G04 - (P04 & P05) are limited to <

20.67 hrshnon, on a 12 mon. rolling ave.

5 Emergency diesel generators - plant designations, EDG G03 & G04 (P04 & P05) are limited to oil with

  • 0.287% sulfur by wgt. and analyzed by WEPCo 6Heating boilers BOl & B02 are limited to oil with