ML041970083

From kanterella
Jump to navigation Jump to search
Letter from R. Dodds, We Energies, to J. Crawford, Wisconsin Department of Natural Resources, Regarding Monitoring Report for Point Beach Nuclear Plant Dated 7/22/2002
ML041970083
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/22/2002
From: Dodds R
We Energies
To: Crawford J
Office of Nuclear Reactor Regulation, State of WI, Dept of Natural Resources
References
Download: ML041970083 (3)


Text

I ~I - .A& .

we energies 231 W.Michigan St.

Milwaukee. WI 53290-0001 www.we-energies.com July 22, 2002 Mr. Jim Crawford Wisconsin Department of Natural Resources Northeast Region Air Program 1125 N. Military Ave.

P. 0. Box 10448 Green Bay, WI 54307-0448

Dear Mr. Crawford:

MONITORING REPORT POINT BEACH NUCLEAR PLANT Permit # 436034500-POI requires the company to submit a summary of the results of monitoring required by the permit. This report covers the six-month period of the current year ending June

30. The enclosed table, entitled "Parameters That Are Recorded Intermittently," shows a summary of the parameters monitored.

We did not operate the combustion turbine (CT), permit designation P01, concurrently with any of the emergency diesel generators - permit designations P02,*P03, P04, and P05 - during the reporting time.

The combustion turbine is fired with a #1 and #2 fuel oil blend. The sulfur content of that fuel is

< 0.178%. The emergency diesel generators (P02, P03, P04 and P05) are fired with a low sulfur,

  1. 2 fuel oil. The sulfur content of that fuel is < 0.287%.

We analyze the sulfur content in each oil delivery following either ASTM D1552-95 or ASTM D2622-98 procedures. We maintain records of each analysis at the plant.

The CT and the emergency diesel generators (permit designations P04 and P05) were operated less than 228.83 and 20.67 hours7.75463e-4 days <br />0.0186 hours <br />1.107804e-4 weeks <br />2.54935e-5 months <br /> per month, on 12-month rolling average basis, respectively.

I

Mr. Crawford 7/2212002 Page 2 Responsible Official Certification I certify based on information and belief formed after reasonable inquiry, the statements and the information in this document are true, accurate, and c plete. I Signature of Responsible Official
_ _ _ _ _ _ Date: &/m

)1/k Printed Name of Responsible Official: Tom Tayl/r

Title:

Plant Manager If you have any questions or need additional information, please contact me at 414/221-2174.

Rog6TD. Dodds Senior Engineer Environmental Department bcc: Terry Coughlin Kjell Johansen Tom Taylor File: 1.8.1.1

\\psbaqfoa\ev9625$\DATA\WinWord\COMPRPTG\PBNP\PbnpO6302002.doc

  • Is Mr. Crawford 7/22/2002 Page 3 PARAMETERS THAT ARE RECORDED I1NTERMITTENTLY Emission Parameters Recorded(# readings taken in the Total i Percent of Unit reporting period) readings readings showing showing deviations deviations Date & time Run Time %S in the oil of SU/SD P01 (CT) 14 0 0 PO1 (CT) 14 _1 0 P01 (CT) 3 2 0 P02 & P03 65 0 0 (EDGs)

_ _ _65 NA NA

'4 5 03 0 P04 & P05 20 0 0 (EDGs)

_ Ca_ __ _20 _ 04 _ __ _0

_ 44_ __ _ _ __ _ _ _ _5 05 0 BOI & B02 NA NA 5 0 (Boilers)

P06, P07, & NA NA 5 0 P09

'CT - plant designation, GOS- is limited to *228.83 hrs/mon, on a 12 month rolling aveerage 2

CT is limited to oil with

  • 0.178% sulfur by wgt. and analyzed by WEPCo or US Oil.

' Emergency diesel generators - plant designations, EDG G01 & G02 - (P02 & P03) are limited to oil with 5 0.5% sulfur by wgt.

Emergency diesel generators - plant designations, EDG G03 & G04 - (P04 & P05) are limited to

  • 20.67 hrs/mon, on a 12 month rolling aveerage.

5 Emergency diesel generators - plant designations, EDG G03 & G04 (P04 & P05) are limited to oil with

  • 0.287% sulfur by wgt. and analyzed by WEPCo or US Oil.

'Heating boilers BOI & B02 are limited to oil with

7 Starting diesel G500 (P06), aux. diesel G501 (P07), and diesel fire pump (P09) are limited to oil with

NA - Not Applicable permit requirement