Text
I
~I -
.A we energies 231 W. Michigan St.
Milwaukee. WI 53290-0001 www.we-energies.com July 22, 2002 Mr. Jim Crawford Wisconsin Department of Natural Resources Northeast Region Air Program 1125 N. Military Ave.
P. 0. Box 10448 Green Bay, WI 54307-0448
Dear Mr. Crawford:
MONITORING REPORT POINT BEACH NUCLEAR PLANT Permit # 436034500-POI requires the company to submit a summary of the results of monitoring required by the permit. This report covers the six-month period of the current year ending June
- 30. The enclosed table, entitled "Parameters That Are Recorded Intermittently," shows a summary of the parameters monitored.
We did not operate the combustion turbine (CT), permit designation P01, concurrently with any of the emergency diesel generators - permit designations P02,*P03, P04, and P05 - during the reporting time.
The combustion turbine is fired with a #1 and #2 fuel oil blend. The sulfur content of that fuel is
< 0.178%. The emergency diesel generators (P02, P03, P04 and P05) are fired with a low sulfur,
- 2 fuel oil. The sulfur content of that fuel is < 0.287%.
We analyze the sulfur content in each oil delivery following either ASTM D1552-95 or ASTM D2622-98 procedures. We maintain records of each analysis at the plant.
The CT and the emergency diesel generators (permit designations P04 and P05) were operated less than 228.83 and 20.67 hours7.75463e-4 days <br />0.0186 hours <br />1.107804e-4 weeks <br />2.54935e-5 months <br /> per month, on 12-month rolling average basis, respectively.
I Mr. Crawford 7/2212002 Page 2 Responsible Official Certification I certify based on information and belief formed after reasonable inquiry, the statements and the information in this document are true, accurate, and c plete.
I Signature of Responsible Official: _
Date: )1/k
&/m Printed Name of Responsible Official:
Tom Tayl/r
Title:
Plant Manager If you have any questions or need additional information, please contact me at 414/221-2174.
Rog6TD. Dodds Senior Engineer Environmental Department bcc:
Terry Coughlin Kjell Johansen Tom Taylor File: 1.8.1.1
\\\\psbaqfoa\\ev9625$\\DATA\\WinWord\\COMPRPTG\\PBNP\\PbnpO6302002.doc
- Is Mr. Crawford 7/22/2002 Page 3 PARAMETERS THAT ARE RECORDED I1NTERMITTENTLY Emission Parameters Recorded(# readings taken in the Total i Percent of Unit reporting period) readings readings showing showing deviations deviations Date & time Run Time
%S in the oil of SU/SD P01 (CT) 14 0
0 PO1 (CT) 14
_1 0
P01 (CT) 3 2
0 P02 & P03 65 0
0 (EDGs)
_ _ _65 NA NA
'4 5
03 0
P04 & P05 20 0
0 (EDGs)
Ca
_20 04
_0 44
_5 05 0
BOI & B02 NA NA 5
0 (Boilers)
P06, P07, &
NA NA 5
0 P09
'CT - plant designation, GOS - is limited to *228.83 hrs/mon, on a 12 month rolling aveerage 2 CT is limited to oil with
- 0.178% sulfur by wgt. and analyzed by WEPCo or US Oil.
' Emergency diesel generators - plant designations, EDG G01 & G02 - (P02 & P03) are limited to oil with 5 0.5% sulfur by wgt.
Emergency diesel generators - plant designations, EDG G03 & G04 - (P04 & P05) are limited to
- 20.67 hrs/mon, on a 12 month rolling aveerage.
5 Emergency diesel generators - plant designations, EDG G03 & G04 (P04 & P05) are limited to oil with
- 0.287% sulfur by wgt. and analyzed by WEPCo or US Oil.
'Heating boilers BOI & B02 are limited to oil with
- 0.5% sulfur by wgt.
7 Starting diesel G500 (P06), aux. diesel G501 (P07), and diesel fire pump (P09) are limited to oil with
- 0.5% sulfur by wet.
NA - Not Applicable permit requirement