- ML17053B004 + (Urges Firm Maint of Schedule for Implementation of All Mods Associated W/General Design Criterion 3 Re Fire Protection. Requests That Any Outstanding Info Re Open Items & Required Design Details Be Submitted on Expedited Basis)
- ML18043B018 + (Urges Firm Maint of Schedule for Implementation of All Mods Associated W/General Design Criterion 3 Re Fire Protection. Requests That Outstanding Info Re Open Items & Required Design Details Be Submitted on Expedited Basis)
- ML20031B406 + (Urges Fulfillment of Responsibility for NEPA Review of Util 801126 Application for CP Extension.Plans & Schedule for Implementing NEPA Requested.Further Delay Could Affect Extension Application & OL Proceedings)
- ML19345D457 + (Urges Full & Public Investigation of Plant Accident History & Failure to Meet Safety Stds.Requests Closure Until Safety Guaranteed.Concerns Include Water Cleanup Sys & Reactor Discharge & Turbine Generator Decay)
- ML20076K005 + (Urges Full Hearing Re Adequacy & Safety of Steam Generator Repairs.Proposed NRC Determination That Repairs Do Not Involve Significant Hazards Considerations,Contrary to Congressional Intent)
- ML20079H865 + (Urges Full Investigation of Allegations of Potential Safety Problems Be Undertaken Before Granting Util License to Operate)
- ML20153G043 + (Urges Full Public Hearing on Health & Safety Concerns Raised by R Robarge & E Dienethal,Relative to Zion Nuclear Power Station in Zion,Il.With Certificate of Svc.Served on 980924)
- ML20153E337 + (Urges Full Public Hearing on Health & Safety Concerns Raised by R Robarge & E Dienethal,Relative to Zion Nuclear Power Station in Zion,Il.With Certificate of Svc.Served on 980924)
- ML19309E013 + (Urges Funding So That Independent Specialists Can Review & Comment on All Eis.Comments on NUREG-0662:EIS Was Announced Eight Months After Facility Accident.Alternative to Venting Should Have Been Developed in Apr 1979)
- ML19282B889 + (Urges Further NRC Review of 790201 Denial of J Allens Show Cause Petition)
- ML19320D052 + (Urges Govt Financing of Research Projects to Resolve Nuclear Waste Disposal,Generate Synthetic Fuels & Nuclear Fusion)
- ML20054F587 + (Urges Granting of Licensee 820510 Petition for Directed Certification Immediately to Prevent Inquiry from Exceeding Intended Scope.Commission Never Intended Some Admitted Contentions to Be Heard by ASLB)
- ML19296A807 + (Urges Halt in Const of Nuclear Reactors Located Near Large Population Ctrs)
- ML20125B181 + (Urges Halt to Nuclear Power Plant Const Until TMI Investigation Is Completed.Newly Discovered Safeguards Should Be Included in Facilities)
- ML19259A856 + (Urges Halting of Power Plant Operation)
- ML20032D132 + (Urges Hearing Be Held in Westchester,Ny)
- ML20126C022 + (Urges Hearing in Tulsa,Ok Re Emergency Evacuation Plans Around Facility.Nrc Should Develop an Effective Plan in Case of Meltdown)
- ML20214J778 + (Urges Hearing to Air Concerns of Humboldt County Residents Re Util Safestor & Release Plans & 30-yr Dismantling Per Des (NUREG-0166).Rate of Cancer in Area Already Higher than Other Areas in State of CA)
- ML20042A064 + (Urges Hearings Be Held Expeditiously Due to to Mounting Danger Plants Present)
- ML19210D961 + (Urges Hearings Be Held Re Health,Safety & Environ Issues Posed by Proposed Export of Nuclear Reactor to Philippines. NRC Has Jurisdiction Due to Us Citizens Living in Philippines & Possibility of Large Dispersion of Fallout)
- ML20032C975 + (Urges Hearings Be Held in Facility Vicinity.Facility Should Be Shut Down)
- ML19331C402 + (Urges Hearings for Public Comment on Plan to Vent Krypton Gas at Tmi.Requests Performance of EIS)
- ML19345C067 + (Urges Holding of Public Hearings Re TMI-2 Cleanup.Hearings Only Way to Restore Public Confidence in Nrc.Advisory Panel on TMI-2 Cleanup Should Include Substantial Percentage of Private Citizens)
- ML19296A157 + (Urges Immediate & Permanent Halt to All Work at Site Due to Poor Workmanship & Uselessness of Plant in General)
- ML19343A362 + (Urges Immediate Action Be Taken to Institute Long Overdue Formal Hearings on Cp.Related Correspondence)
- ML20004C493 + (Urges Immediate Cancellation of NRC Proposed Use of Route 36 to Ship Radwaste Through Pa,Due to Hazardous Road Conditions & Unsafe Transport)
- ML20037C006 + (Urges Immediate Facility Restart)
- ML20037C013 + (Urges Immediate Facility Restart)
- ML20011B257 + (Urges Immediate Investigation of Unit 1 Faulty Steam Generator Repair,Weakened Vessel from Embrittlement,Faulty Valves,Seismic Evacuation & Unit 2 Backwards Installation of Reactor Vessel)
- ML20153E098 + (Urges Immediate NRC Action to Close Plant.Failure to Close Plant Will Be Act of Extreme Negligence & Flagrant Disregard for Safety & Health of Citizens)
- ML20037C938 + (Urges Immediate Restart of Facility.Cites High Util Bills & Waste of Manpower & Equipment.Expresses Faith in Util Performance)
- ML20037C936 + (Urges Immediate Restart of Facility.Expresses Concern Re High Electric Rates)
- ML20037C948 + (Urges Immediate Restart of Facility.Expresses Concern Re Long Delay)
- ML20037C937 + (Urges Immediate Startup of Facility After Thorough Safety Check & Corrective Action)
- ML20037C940 + (Urges Immediate Startup of Facility.Expresses Concern Re Increased Electricity Rates.News Item Re Mount St Helens Radioactive Release Encl)
- ML20008F556 + (Urges Inclusion of OPS Mfg License Application in Proposed Rule Defining TMI accident-related Requirements for Pending CP & Mfg Licenses)
- ML20008F567 + (Urges Inclusion of OPS Mfg License Application in Proposed Rulemaking Defining TMI accident-related Requirements for Pending CP & Mfg Licenses)
- ML20244D054 + (Urges Independent Investigation of Issues Raised by I Yin During 840725 Briefing.Issues Include Improper Use of Quick Fix Design Changes & Possible Inadequacies in Idvp)
- ML20212E697 + (Urges Industry Response to Check Valve Issues Initially Highlighed by San Onofre Unit 1 Event in Nov 1985.Concerns Noted Re Potential Implications for All Nuclear Power Plants in Light of Surry 2 Event.Evaluation of Programs Requested)
- ML20063L240 + (Urges Initiation of Proceeding to Reopen & Reconsider CPs for Facilities.Request Based Upon Concern That No Thorough Evaluation of Point Pleasant Diversion Will Be Made W/O Change in Scope of Review)
- ML17083A609 + (Urges Initiation of Settlement Procedure Re Application for Fuel Loading & Low Power Testing.Suggests 801103 Meeting of Parties in Bethesda,Md to Develop & Discuss Stipulation)
- ML20245C707 + (Urges Intervention of NRC to Block Application to Transfer License from Lilco to State of Ny for Decommissioning & Dismantling of Plant.Plant Should Not Be Destroyed as Provided in Deal W/State of Ny)
- ML19323C492 + (Urges Investigation of Qualifications of Personnel at Facilities.Abc Investigation Alleged That Personnel at Fermi Were Unqualified)
- ML20133G211 + (Urges Investigation of Questions Raised by Sixty Minutes Broadcast Alleging Poor Workmanship & Organized Crime Involvement in Facility Const & Subsequent Remedial Action to Ensure Safe Const & Operation)
- ML19347F594 + (Urges Investigation of Wall Street Journal 810407 Article Re NRC Rept Safety Concerns Associated W/Bwr Safety Sys. Article Has Resulted in Extensive Media Coverage & High Level of Util Industry Concern Throughout World)
- ML20055B694 + (Urges Issuance of Draft Suppl to 1977 Crbr Fes)
- ML20055B013 + (Urges Issuance of Draft Suppl to Crbr Fes Due to Major Design Changes to Reactor Vessel & Fuel Core)
- ML20062B346 + (Urges Issuance of Draft Suppl to Fes for Crbr for Public Comment)
- ML19263B448 + (Urges Issuance of Fes in Jan 1979 to Avoid Necessity of Abrogation of Joint Federal-State Protocol in Favor of State Statutory Obligations)
- ML19282C853 + (Urges Issuance of License for GE to Export Neutron Detectors Containing U to India to Replace Failed Detectors Which Might Endanger Tarapur Reactor Safety)
- ML19350C939 + (Urges Issuance of OL as Soon as Possible to Make Unit Available for Meeting Electricity Requirements for Summer 1981)
- ML20055B700 + (Urges Issuance of Suppl to 1977 Fes Due to Significant New Info)