Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20070J797 + (Rev 8 to Oyster Creek Nuclear Generating Station Pump & Valve Inservice Testing Program)
- ML20211G238 + (Rev 8 to PNPS-ODCM, Pilgrim Nuclear Power Station Odcm)
- ML20212A026 + (Rev 8 to Prairie Island Nuclear Generating Plant Offsite Dose Calculation Manual)
- ML20198K518 + (Rev 8 to Prerequisite Test Instruction XCP-ME-4, Sys Cleanliness Verification. Related Info Encl)
- ML17139D234 + (Rev 8 to Preservice Insp Rept 80A2804 for 1979-1983.Insp of Class 1,2 & 3 Components & Areas Described)
- ML20198A495 + (Rev 8 to Preventive Maint Procedure PMP 9.5-23, Preventive Maint of Reactor Trip & Isolation Breakers)
- ML20092H055 + (Rev 8 to Procedure 00653-C, Protected Area Entry/Exit Control)
- ML20237D691 + (Rev 8 to Procedure 1302.025, Spent Fuel Removal & Dry Storage Operations)
- ML20100J353 + (Rev 8 to Procedure 21.004.01, Main Control Room - Conduct of Personnel)
- ML20198J883 + (Rev 8 to Procedure 5000-ADM-7311.02 (EP-009), Design Verification)
- ML20090L769 + (Rev 8 to Procedure 7220-C-211(Q), Tech Specs for Backfill for Midland Plant,Units 1 & 2)
- ML20236N817 + (Rev 8 to Procedure 8.M.1-29, ATWS Functional & Trip Unit Calibr Test)
- ML20092H042 + (Rev 8 to Procedure 90015-C, Vehicle Access)
- ML20092G811 + (Rev 8 to Procedure 91704-C, Actions for Security During Radiological Emergency. Supporting Documentation Encl)
- ML17254A536 + (Rev 8 to Procedure A-25.4, Reactor Post-Trip Review)
- ML20138P349 + (Rev 8 to Procedure ACP-3, Matl Receiving,Storage & Handling)
- ML20155H665 + (Rev 8 to Procedure AP.28, Post-Trip Transient Rept. Related Info Encl)
- ML20140E383 + (Rev 8 to Procedure CP-EP-4.6, Final Design Change Control)
- ML20138P353 + (Rev 8 to Procedure CP-EP-5.0, Procedure for Field Procurement)
- ML20138P370 + (Rev 8 to Procedure CP-QAP-8.1, Receiving Insp. Supporting Documentation Encl)
- ML20138P135 + (Rev 8 to Procedure CP-QP-11.2, Surveillance & Insp of Concrete Anchor Bolt Installation)
- ML20211K042 + (Rev 8 to Procedure CP-QP-16.0, Nonconformances. Related Info Encl)
- ML20206N439 + (Rev 8 to Procedure CPM-6.3, Preparation,Approval & Control of Operation Travelers)
- ML20235R606 + (Rev 8 to Procedure CPP-010, Preparation of Deviation Repts)
- ML20199M047 + (Rev 8 to Procedure ECP-10, Cable Tray & Hangers Installation. Related Info Encl)
- ML20195F662 + (Rev 8 to Procedure ECP-10, Cable Tray & Hangers Installation)
- ML18092A750 + (Rev 8 to Procedure M3Q-2, Reactor Trip & Reactor Trip Bypass Air Circuit Breaker Semiannual Insp Lubrication & Testing)
- ML20199A639 + (Rev 8 to Procedure MCP 10, Storage & Storage Maint of Mechanical & Electrical Equipment)
- ML20127B427 + (Rev 8 to Procedure MT-GE-008, 480 Volt & Under Circuit Breaker High Current Testing)
- ML20202D673 + (Rev 8 to Procedure NC.NA-AP.ZZ-0006(Q), Incident Rept/ Reportable Event Program)
- ML20204H477 + (Rev 8 to Procedure OI-21, Mixed Bed (Hoh) Demineralizer Resin Flush & Recharge,1U1A(B) & 2UIA(B))
- ML17348B413 + (Rev 8 to Procedure PT-51, Solidification Process Control Procedure)
- ML20195F411 + (Rev 8 to Procedure QI-QAP-11.1-28, Installation Insps of ASME Component Supports,Class 1-3)
- ML20137H773 + (Rev 8 to Procedure QI-QP-11.0-12, Insp of Pressure Grouted Base Plates & Equipment Bases)
- ML20199E006 + (Rev 8 to Procedure QI-QP-11.3-28.7, Verify Proper Lug or Connector/Connection Type,Size & Final Crimps)
- ML20140F097 + (Rev 8 to Procedure QI-QP-11.4-23, Reinsp of Seal-Coated & Finish-Coated Steel Substrates for Which Documentation Is Missing or Discrepant)
- ML20199E201 + (Rev 8 to Procedure STA-608, Control of Measuring & Test Equipment)
- ML20236H570 + (Rev 8 to Procedure VPAP-1901, Industrial Safety & Health)
- ML20078L649 + (Rev 8 to Procedure/Work Plan 1903.067, Emergency Response Facility-EOF)
- ML20072P801 + (Rev 8 to Process Control Program, Installed Atcor Solidification Sys)
- ML20199L571 + (Rev 8 to Program Plan GGNS-M-189.1, Grand Gulf Nuclear Station Pump & Valve IST Program - Safety Related)
- ML20245G700 + (Rev 8 to Pump & Valve Inservice Testing Program)
- ML20126M645 + (Rev 8 to Pump & Valve Inservice Testing,Unit 1)
- ML20235T754 + (Rev 8 to QA During Operation Phase)
- ML20203E079 + (Rev 8 to QA Manual Operations)
- ML20134P123 + (Rev 8 to QA Program Description During Design & Const)
- ML20133K256 + (Rev 8 to QA Program for Nuclear Fuel Design & Fabrication)
- ML20094P291 + (Rev 8 to QA Program for Operation)
- ML20126D725 + (Rev 8 to QC Procedure MCP-2170, Hydrostatic or Pneumatic Testing Procedure)
- ML20205T425 + (Rev 8 to QC Procedure QC-CEA-1 for Concrete Expansion Anchor Insp)
- ML20199M072 + (Rev 8 to QI-QAP-11.1-25, QA Review of ASME III Documentation)