List of results

  • ML20070J797  + (Rev 8 to Oyster Creek Nuclear Generating Station Pump & Valve Inservice Testing Program)
  • ML20211G238  + (Rev 8 to PNPS-ODCM, Pilgrim Nuclear Power Station Odcm)
  • ML20212A026  + (Rev 8 to Prairie Island Nuclear Generating Plant Offsite Dose Calculation Manual)
  • ML20198K518  + (Rev 8 to Prerequisite Test Instruction XCP-ME-4, Sys Cleanliness Verification. Related Info Encl)
  • ML17139D234  + (Rev 8 to Preservice Insp Rept 80A2804 for 1979-1983.Insp of Class 1,2 & 3 Components & Areas Described)
  • ML20198A495  + (Rev 8 to Preventive Maint Procedure PMP 9.5-23, Preventive Maint of Reactor Trip & Isolation Breakers)
  • ML20092H055  + (Rev 8 to Procedure 00653-C, Protected Area Entry/Exit Control)
  • ML20237D691  + (Rev 8 to Procedure 1302.025, Spent Fuel Removal & Dry Storage Operations)
  • ML20100J353  + (Rev 8 to Procedure 21.004.01, Main Control Room - Conduct of Personnel)
  • ML20198J883  + (Rev 8 to Procedure 5000-ADM-7311.02 (EP-009), Design Verification)
  • ML20090L769  + (Rev 8 to Procedure 7220-C-211(Q), Tech Specs for Backfill for Midland Plant,Units 1 & 2)
  • ML20236N817  + (Rev 8 to Procedure 8.M.1-29, ATWS Functional & Trip Unit Calibr Test)
  • ML20092H042  + (Rev 8 to Procedure 90015-C, Vehicle Access)
  • ML20092G811  + (Rev 8 to Procedure 91704-C, Actions for Security During Radiological Emergency. Supporting Documentation Encl)
  • ML17254A536  + (Rev 8 to Procedure A-25.4, Reactor Post-Trip Review)
  • ML20138P349  + (Rev 8 to Procedure ACP-3, Matl Receiving,Storage & Handling)
  • ML20155H665  + (Rev 8 to Procedure AP.28, Post-Trip Transient Rept. Related Info Encl)
  • ML20140E383  + (Rev 8 to Procedure CP-EP-4.6, Final Design Change Control)
  • ML20138P353  + (Rev 8 to Procedure CP-EP-5.0, Procedure for Field Procurement)
  • ML20138P370  + (Rev 8 to Procedure CP-QAP-8.1, Receiving Insp. Supporting Documentation Encl)
  • ML20138P135  + (Rev 8 to Procedure CP-QP-11.2, Surveillance & Insp of Concrete Anchor Bolt Installation)
  • ML20211K042  + (Rev 8 to Procedure CP-QP-16.0, Nonconformances. Related Info Encl)
  • ML20206N439  + (Rev 8 to Procedure CPM-6.3, Preparation,Approval & Control of Operation Travelers)
  • ML20235R606  + (Rev 8 to Procedure CPP-010, Preparation of Deviation Repts)
  • ML20199M047  + (Rev 8 to Procedure ECP-10, Cable Tray & Hangers Installation. Related Info Encl)
  • ML20195F662  + (Rev 8 to Procedure ECP-10, Cable Tray & Hangers Installation)
  • ML18092A750  + (Rev 8 to Procedure M3Q-2, Reactor Trip & Reactor Trip Bypass Air Circuit Breaker Semiannual Insp Lubrication & Testing)
  • ML20199A639  + (Rev 8 to Procedure MCP 10, Storage & Storage Maint of Mechanical & Electrical Equipment)
  • ML20127B427  + (Rev 8 to Procedure MT-GE-008, 480 Volt & Under Circuit Breaker High Current Testing)
  • ML20202D673  + (Rev 8 to Procedure NC.NA-AP.ZZ-0006(Q), Incident Rept/ Reportable Event Program)
  • ML20204H477  + (Rev 8 to Procedure OI-21, Mixed Bed (Hoh) Demineralizer Resin Flush & Recharge,1U1A(B) & 2UIA(B))
  • ML17348B413  + (Rev 8 to Procedure PT-51, Solidification Process Control Procedure)
  • ML20195F411  + (Rev 8 to Procedure QI-QAP-11.1-28, Installation Insps of ASME Component Supports,Class 1-3)
  • ML20137H773  + (Rev 8 to Procedure QI-QP-11.0-12, Insp of Pressure Grouted Base Plates & Equipment Bases)
  • ML20199E006  + (Rev 8 to Procedure QI-QP-11.3-28.7, Verify Proper Lug or Connector/Connection Type,Size & Final Crimps)
  • ML20140F097  + (Rev 8 to Procedure QI-QP-11.4-23, Reinsp of Seal-Coated & Finish-Coated Steel Substrates for Which Documentation Is Missing or Discrepant)
  • ML20199E201  + (Rev 8 to Procedure STA-608, Control of Measuring & Test Equipment)
  • ML20236H570  + (Rev 8 to Procedure VPAP-1901, Industrial Safety & Health)
  • ML20078L649  + (Rev 8 to Procedure/Work Plan 1903.067, Emergency Response Facility-EOF)
  • ML20072P801  + (Rev 8 to Process Control Program, Installed Atcor Solidification Sys)
  • ML20199L571  + (Rev 8 to Program Plan GGNS-M-189.1, Grand Gulf Nuclear Station Pump & Valve IST Program - Safety Related)
  • ML20245G700  + (Rev 8 to Pump & Valve Inservice Testing Program)
  • ML20126M645  + (Rev 8 to Pump & Valve Inservice Testing,Unit 1)
  • ML20235T754  + (Rev 8 to QA During Operation Phase)
  • ML20203E079  + (Rev 8 to QA Manual Operations)
  • ML20134P123  + (Rev 8 to QA Program Description During Design & Const)
  • ML20133K256  + (Rev 8 to QA Program for Nuclear Fuel Design & Fabrication)
  • ML20094P291  + (Rev 8 to QA Program for Operation)
  • ML20126D725  + (Rev 8 to QC Procedure MCP-2170, Hydrostatic or Pneumatic Testing Procedure)
  • ML20205T425  + (Rev 8 to QC Procedure QC-CEA-1 for Concrete Expansion Anchor Insp)
  • ML20199M072  + (Rev 8 to QI-QAP-11.1-25, QA Review of ASME III Documentation)