Rev 8 to Procedure 8.M.1-29, ATWS Functional & Trip Unit Calibr Test
ML20236N817
Person / Time
Site: Pilgrim
Issue date: 03/17/1983
From:
BOSTON EDISON CO.
To:
Shared Package
ML20236N770 List:
References
FOIA-87-644 8.M.1-29, NUDOCS 8711170020
Download: ML20236N817 (11)


Text

-

e

.-m.,

e l J

,1 l

N t

h

\\

'O I

~

k

(

I0diSOn comy 3 "

m c?I2.A: CNS DI?iW

{

i y ::2..% 6 ?Cmit5:L20N

?;oesh::t No.

8.M.1-29 ATWS FUNCTICNAL AND TRIP UNIT CALIBRATION. TEST i

1 4

i List of Effective Paees j

,1 J

8.M.1-29-1 j

8.M.1-29-2

8. M.1 3 8.M.1-29-4 s

8.M.1-29-5 l

8.M.1-29-6

\\

l Attachmer.ts i

s 8.M.1-29A-1.

8.M.1-29A-2

.I 8.M.1-29B-1 i

8.M.1-29B-2

)

8.M.1-29B-3 i

l f

-/

1

, e

"'dbd M5e App; m a orc tw.__rs

?!:d d /}7 /d 8 9 l

u.,

l g,3,1 29-1 Rev. 8 8711170020 071112 FOIA PDR PDR SDRGIO7-644

.-,~

'1

  • * ~ *

' *. ~ -

--~~

e

<./.

.,/'

)

e

/

PURPOSF

/

I.

To provide a detailed procedure for Instrumentation Personnel to perform

'h functional tests of the ATWS Sjstem Trips.

g F

II.

DISCUSSION The ATWS System should be functionally tested once per month.

f A.

The ATWS trip units to be calibrated once 'per three months.

B.

The ATWS System provides for an addition of negative reactivity to header) in' the Core (tripping recire. pumps and letting air off scram (Hi-Hi Reactor C.

the event of a transient Water Level) without a scram having taken place.

r The ATWS System is composed of four Trip Channels which makt two trip D.

l Channel "A"

& "C" compose Trip System "A" and it is housed in_ Panel l

Channel "B"

& "D" compose Trip System "B" and it is housed in l

2277.

Panel 2278.

f Each trip system has three trip circuits, each trip circuit is ' equipped l

{

Two neon lamps are connected in series and are 1n i

During normal operation the trip relays f

vith a light system.

the series with the t:1p coil.

are de-energized (untripped) and normal voltage across each neon lamp is approximately 66V p.C.

When one trip relay energizes (half trip) the voltage across lamps connected in parallel with closed contacts will go to approximately 0 This This indicates tripped relay contacts have closed.

g voltage across lamps vill be.. measured. and. recorded on check of f sheet volts D.C.

Relay centacts'and associate 8.M.1-29A-2 and B-2 while trip is present.

lamps are listed on check of f sheets.

Recirculation Pump trip circuit are valid only when ptarps are Light vill be of f when pu=ps are off, NOTE:

a.

running.

i 4

Neon lamos are used in these circuit to minimize the current flow through the trip coil and prevent false trip.

b.

REFERENCE MATERIAL _

III. _

Rosemount Analog Trip System Manual GEK73526 A.

ATWS Gystem Prints PDCR P chage 70-25 B.

C.

NEDO 21617-A D.

P&ID eH-250, M-253 E.

Tech. Spec. Tabl e 3.2.C g'

(

l l

8.M.1-29-2 Rev. 8

~

~

'/

jn f

1 l

j PREREQUISITES

.l

?

IV.

r

~ Obtain nuclet.r watch engineer's initials to verify permission, prior t

j' to commencement of test.

A.

B.

Power to ATWS Systems.

Establish communications from rack 2205/2206 to Control Room.

f C.

Confirm that no channels within the system are in calibration, test l

D.

or alarm condition.

f V.

APTARATUS_

j Rosemount Readout Assembly and Y.xtender.

}

A.

B.

Calibrated DC Voltmeter.

VI.

PRECAUTIONS f

Only one trip channel vill be tested or calibrated at one time.

1 A.

f VI

I. PROCEDURE

l Power Supply Supervisory Circuit Test At "ATWS" Logic Panel #2277, confirm that Power Supply. PSlA and 1.

e PS2A "ON" indicating light are lit.

Depress one at a time power supply monitoring circuit test button SlA and S2A and verify that associated power supply "0N" light 2.

goes out and that "ATWS" trouble alarm annunciate on Panel 905.

~

\\ 3.

Repeat Step 1 and 2 for "ATWS" Logic Panel 2278.

,N and 8.M.1-295-1 4.

Record results on check sheet 8.M.1-29A-1 Rosemount Trip Unit functional Test / Calibration verification.

3.

At the "ATWS" Logic Panel, verify that Calibration Unit in the 1.

following condition:

Power switch in "0FF" position.

a.

1ransient current knob is pulled and fully turned counter b.

clockwise.

\\ Nc.

"P'iess to Cal." knob is pulled out and in "OFF" position.

Trip unit test selector switch in "0FF" position.

d.

Turn power on.

Plug Rosemount Readout Assembly into Calibration Unit.

2.

Rotate both Trip Unit Test Selector Switch and " Press to Cal."

l 3.

knob to the channel to be tested.

F.x : 263-121A - Position 1 263-121C - Position 2 8.M.1-29-3 Rev. B d

.ww.


___.m_

q~

, ;\\

i 1

N o

I

)

(?.

I 4\\ Push in the' (press to cal) knob and note the " gross failure" i

light and cal. lights are oc.,

a l

- g-S h Confira,ATWS trouble alarn annunciate on Panel C905.

l k

% Turn the stable current adjustment.until the meter on the master ji trip unit reads afd-scale. (12MA. or 3 VDC) j 7.

Select the desired position of the Transient Polarity switch such that current will add (+)' or subtract (-) 'vith the preset stable current:

[

.4

(-)

for level trip W

f 4

(+)

for press trip 8.

Push the transient current. knob in and adjust transient current until one of the circuit supervisory lighte goes out and the other On light that extinguishes maatter and" record voltage goes bright.

level on check-off sheet 8.M.1-29A-2 and B-2.

(See Section II f

t Discussion. Paragraph "D")

Record trip points as shown on Trip Unit Indicaror on check off she'et 9.

8.M.1-29A-2 or 8.M.1-29B-2.

Trip point for Level Instrument 263-121A-D is : 4%22%

Trip point.for Pressure Instrument 263-123A-D is:

78.5%+.5%

.75%

l Trip point volt. age value shall be as fellows:

s Level 262-121 A-D Trip + 1.16 VDC a.

J1 and ground No Adj. Lir.its 1.24 VDC to 1.08 VDC l

a.

J1 and ground Pressure 263-121 A-D Trip = 4.14 VDC.

No Adj. Limits 4.11 VDC to 4.16 VDC 10.

Record as found trip polut and analog data on check-off sheet 8.M.1-29A-2. or 8.M.1-29B 2 and on calibration data record wheet.

Proceed to Step 13 for Functional Test. If trip settings are differer than specified above, proceed to Step 11 for Trip Unit Calibration.

'- 11.

If trip set point are different than specified, proceed to calibrate the Trip Unit, as follows:

Calibrate the Trip Unit at three different points.

PRESSURE INSTRUMDTIATION INPUT OUTPUT AT J1 TO CROUNDS TRIP UNIT INDICATION 4ma 1VDC 0%

12ma 3VDC 50: -

20ma SVDC 100%

i

.\\ '

8.M.1-29-4' Rev 8

'me__-._m_m._.

___----..i-------

pg.

h.

C fft......; ~

.1. - ;

gcz w u 7,:.

m m f; n --

. (.

v,t;.

. ; J4 ;

lh.

T E'

q' b,

,y.

Lr; 1

z '.7 M..

'e p' e g af.

i, V

r t

'+

a ex 1

i.

.Q..gt F t; x K

,.av k

.t sv:..

f.

'M

^

J gA.

^# i i

s

-i

/~

L'WEl. INSTRUMENTATION 5

,g

. /

t, h

d.

INPUTJ

' 9L'1 PCT 49 J1 TO' GROUNDF,

, TRIP' UNIT INDICATION

'/

e

.ISVDC h.l

,i 100%

~4ma 4

,12ina O

3VDC 50%

0%

{

b; q',..

ji 20ma

'17DC l

h"

'- ~

6

. 1 %,-

, I; >) l U i

g

\\.

'tD.

12.

$st trip point ho values shewn'in Step 70 and reewrd as left condition d

e

,q' h'J, 'on chu.k-ofi :'abhk 8.El-294 -2 or 8.L1-29-B.-2 ln 4,

P

,o

,h q.

4 " $ f '. s.

-f'.s Confirm thatiri%' (relay moni.tcrcing-lamps have change'stata and. $ W:

4.

13.

indicate troubla half trip).. ~4 hy

. ng i

<3 j

O' 14.

Adjust transient current for mid-scale position. 12ma/3VDC;.

c.

N

),.

'f ' '

15e. 541L out " Paas-.co. Cal." hoh-to. isolate calibrators from trip u

.e, unit.

G.

,[' -

lf

'u,

< y g,. l

'D jn.

/'

. 16. Confits ATWS trone, alarry is "GFF" 'at Panel C905,.

t,, M,

.U'

.)

.f.-

17. P ess gross reset button,en trip unit..

_.Q

.t

, 1 /,.

an hat' meter 4 Confirm that, the cal and gross f ailure (lights) ci f

s 18.

indicate operating condition status (also. assure trip light 'aud logic '

wnitoring haps have riturned to their normal states).

~(.

(*

61 l

NOTE: 'If operating conditions have to be confirmed. verify that r

,s.

reading of mater un6er calibration matches the reading i. /

indicated by the three other, channels of vpe same function

/

within the ATWS syo6 m.

- ' r(a.,;y s<

\\

r 19.

Repeat Steps 1 through i9 for remaining channels.

VIII. ACCEPTANCE CRITERIA r

All channels 7esicd satisf actory.and cauhd appropkSta trip relay to A.

change state.;

y B.

For Calibration Test. ATWS Analo3 trip Units Mtuated as follovst 1

1,.

263-121 A. B. C. & D actuated aa -less than 92.65 H O increasing I

2 (greater than or equal to '.00 VDC) 26.'-123 f. B, C & D actuated - on an increasing signal between-1171 63 psa,7 and 1203.65 psig increasing which is equal to 4.09.o 4.18 colta.

NOTE: The dir m ence in pressure between. Tech.-Spec. and actual trip setting is to allow for instrument "O" suppression of 13.7 psig.

The procedure was performed as written without any unexplained C.

discrepaneit.s as indicated by PNPS Form 8.El-293.3 -

8.E l-29-5 Rev. 8

-_..m,

.I

G' d

i IX.

ATTACHMENTS Power Supply 7tmetional Test check-Of f Sheet.

A.

Functional Test Check-Off Sheet.

B.

i k

4

]

i !

I t !

?

t

-1 1 I i

I 1

i o

I 1

1 1

f I

l l

I l

j j

a I

1 i

l 1

i 1

8.M.1-29-6 Rev. 8 b e ew e

==

-==e-sa eaepee me.4m

+ = eemo =mm em,a ese w-. -

ew g.,


w

- - - - _ _ _ _ _ _ _ _ _, _3,

____......c t

-[.

/ '

q j

j CHECK-OFF SHErr PANEL 2?.78 PREREQUISITES.

Obtain Nuclear Watch Engineer's initials to verify permission to sta O

A.

testing.'

B. ' Power to "ATWAS" Systems Establish communications from Panel 2278 to Control Room.

C.

Confim that no channels are in calibration or in ~.est.

D.

l l

Procedure A.

Power Supply Supervisory Circuit Test

~~1.a. ~2S1E'"087' light'lic

.b.' PS2B "0N" light lit 2.a.

Depress Test Button S1B PS1B "0N" light goes out_

_ f Depress Test Button S2B

,/

PS2B "ON" light goes out y l

s l

l l

4 8.M.1-29B-1 Rev. 6 6

    • magne s

e.a

.m

,,+mW genee b4M*'

e w '

-n

?..rocaddra Ss'etion B.

Recc:nount Trip Unit Functienc1 Tast/ Calibration

'Verificat, ion TEST PERFORM CHECK SHEET

)

PANU, 2278 This sheet shall be check-off only when.the Test Step has been.

Note:

performd as written without deviation.

Level Pressure Instrument Trip Unit.No.

263-121B 263-121D 263-1234B 263,123 D

=

\\

Step Performed 1 2

\\

b

\\

\\

l f

i N,

N N

N

-Q-g

\\

N N

b f

f 5

{

6

\\

,,N h

\\\\

hr N

N N

7 l

1775" DIV. II 5

l Trip Units Level Relay Lamps Voltage I

263-1213 n013 DS3B n01B DS4B 1

K1013 DSSB O

O 263-121D E01D DS3D.

0 K101D DS4D K101D DSSD,

O Trip Units Pres.

Relay lamps Voltage 263-123B K2B DS3B

,O K2B DS4B

')

K2B DS5B

_Q O

263-123D '

K2D DS3D K2D DEAD R

l h%-

A\\A l

- 9 N

hk _vac "

N k vde' N b vde k h 'vde 10 0h Yb

.kh kh0 11 nib vde kb vde A}M vde N M

  • vde 1

12 N.

W N

N' 13 N

N h

14

\\

\\

NJ

\\

15 N

  • b 1

16.

N d

N 17 h

18 19 8.M.1-29B-2 Rev. 8

j F

)

Panel 2277 Discrepancies 1

N\\

Date Performed.k

} ~")

'P Status /

I&C Technici Mb Date S !)

I&C Supervisor Date

'I.

ACCEPTANCE CR The Ac ptance Criteria as specified in Section VIII was met.

Watch Engineer Date Panel 2278' Discrepancies:

(N h

f,4

/

Date Performed

)7 Plant Status /

b i&C Technici Date

~7 I&C Superdiso

/

Date

/

VV

/

/ _'

I.. ACCErunpur--==~Z ~' ~

The Acceptance Criteria as specified in Section VIII was met Watch Engineer Date 8 /~) T3

- v. ;,.. _

8.M.1-29B-3.Rev. 6 i

,,pp.

e6=.5"#

"O

IM 4.(,R P >p -W1 v3 L n

i t

- i s

e i

i T

,pr%

k.ph e

BOSTON EDtSON - PlLGRtM NUCLEAR STATION

%{

MAINTENANCE REOUEST

-~

PRIORffY Fd e MR LOG NO.

[ S

i UNPLANNED-#Rt04 TTY A=WORsl O FOLLOW STATION PROCEDURE 1 A7 Runnene Repair S Syn.Outses O C ;

Z//

PREVENTIVE MAINTENANCE O p, gm g g,

p s SYSTEM NO.

R.W.P. NO

/O

$ DATE S'

P6tO NO-g/A 5 eOuieineNT'a Nof A re.</ \\

tocATioN i

)

'i P.EFERENC13 (Associated MR's, POCR's FhM'e em.)

j 172J $

l PRO 8LEM Ots R ON L t/ n J1..* A m

od a

,nce g

)

DATE A / M/# s f

I ORIGINATOR eM asoufionst? Aconeo munnator vu amo O l-

{

ts A mAcufo.woan PtmMrf mikanator yasu ocis T S adR

.ut Mamenocess pict wAs cwaczto con oueucATioN:TNG MR wAs LoooEN#GCT PRiontTV AssaGNto AN I.-

T w

coaasc7 AaccoMPteTt. A=oveo-omaAfw.osunnvrson o

f EMDftAT1oss COR PTE _ ' ' #

~

a C cMt AT C atacTuscAL C edeCSAmicA(

m R$VtEW N

- 4.uM

,TA,,o

. co.,T ou - o ef t.

- p- - -

j gQI aM

,oA T.

oeranTMtwf AL Loo No.

I intsa meov visO ns.s.c.ccMatatto Ano ATTacnto 4#L%

i asoC wear msTauevious emoceovat gI

.e.

MiA m W ec e--

a sAF(TV

' is TWs AMc13F 7we_s I, &.eu 7/

g I

l

~

nn 3 m

. 7, s

.c.7,o.,

)

a r% r 3.m

,oaTt,J//ofw 4 l

W8 Tf**

  • Poot Mst Assmmto l

PE N N atvawoy s'uft k O I N SItN~t 8

oTw d

vas a mo E AcorTionAkimectmaouintneerts oivami vas Gno CL j,(, v re E j 7 int mevtwTionermottcTion arrucasta2 Usost es3ar msucTion alausavo: vesa mo s w res.uST ATTA94eo g ntma s:enov(En -T:assjoATe / g g MoggiaAserf.asvn.g Q ff as>L/TAcosseoatouiRaoO

.I T scwnecA6 sractrication onnAAsut v ntousatMurrs - not atovento g-j7av orot surva.gw -

l atouinto a - emoc. Motsi A

monu. cos.

T AG. cos.

coton f

@ orvica no.

otseneficee

)

8 C-E

/ T %.-

AT e, e.r5 o i /

1 4

C

/

p 5

Lo e 8-w eAsas I

i b

/ F#

h/

.2. 2. ? t' r

C sai ATTacuto satrTs son AoorTout TAcsesenciAL westng

.=_s A

Na t

foATt APPPov At To ST ART tsOLAftoM WATCH kNG5ts(4 j

o

[

{l.ouf.o.cCem

.ATv/dn m.r,,p

,, gng,gy ortRATimo surtavrsonMM h 2ATamMs / W O M//c/ d D

  1. CCI R /N 5__!s)HJ3 d Atemov At to STant wont.

C

> ? >d&NJ-l tsobAflONS RivifW1ollNsrtcTto ANo APM90VtD = 8Y MAINTyR on womalms'Yb' h r**!A.'ll '.' A/ ? AL/' M T

?=+S% N M M &

otscngpito00 0* wo*K >tR9o0i%to

/'

E w?H.

A Aec? ret 5% (*nrI/

b h

PtAsDNs PTAFofHdtsto wCRE.[# 8U LaATE 3/// 3 M/S 7 6'7J4 BMC oA7:

5g otaCMIPTaoN/PAcc.No N

  • N * / ""M MI( j wosv. clAatsTt. Ms ton mtw Masi fott wore TEST)No - esof REQS Q A809

[MODAT1171ME f-

  1. E N

fort fromet TEST CoMPtTT1 re.sartf*To SV C

TECww1oAA scATioM ort 4ASILITY TESTiko = NQ'.AAQMIAdo Q 37-

/:/7 Is. r m.

t Atogfim otscnipt AGd APPutoO 7 ** D" N ISoLAT TAGsR T1Mt/oAft Ttf719eG 5Afl88 ACToAstv coMPLETio ANo ttsT T AGa minaovto. SY VW UM ""MTA *}ioA78 }/ M l N

8 lC ALL ouAlf77 CoNTRot RGouiAtutNTs MtY = APPROYEo Sv oC Ad T ACs/isoLATloMs AtMovtO:ACCEPTAaCicmeTSRea Mtf MR log ANo flLis uPfA3EdhMO THE vtfleditousPeetwY mas ettN L7.

  • T #TA i.

'7 mi>- v' 7 /O d oeca survn.

-C1 L /.2

- oATamMt

$ attumNto to nonMAL Tast/oAft omicinaTon-wt-cot-cMt-antstcTv-easten-in-enoc pasa os 8TAThoes FILt e E.co. som as2se OmkhNATC#4 4vt-COE-cate.44/5ECTYNNL3 06 STAT 1oM FILE i

.n, r

me w.me

fb-)?

~~

3.I.Co. Fors X58o5 PN?S OFIRATIONS MANUAI.

PROCEDURE CD.NGE NOTICI Date ?" / 7-61 PCN No.

Procecure No. f.4 m /. -:2 9 Title % 7~u/ A5

'[4f ew,-7 3 Rev No '7 Design 2rocecural

!vpo Reason Ior New Temporary l PCN Procedure Procedure Change Revision Change only SRO Permanent Change Desired (exP ration date Change SRO No.

O Yes No i

Yes No Yes No

( ) (4 surveillance Test Schedule Affected [

] (( Surveillance Test Schedule Form 1.3.4.F-1 Completed.

Purcose anc Su==arv of Chances (Sum:arv to oe used veroatim for Comeany Puo11 cations)

"7~.

AM C A AL<,

A/4.w.

G./

/Er' % m_2 f

A i

.Z.< w a r d ' < -r-i/zMm.

M -t'G ry 7sv 4 s

(,

/

t u>Ww J

PC5 tictt:.ated Requested Revrsion

-f f

Otner K.nown b?,E c.irds

'h.1/ Revieued by..,n}//,1bl2

?,ocedures Affected r

6 f v) /

..D '( - /

.1.

"3

.2

!.ik oj/ I.if ectec pges with existing Rev. Nos'.

ll

$ th l

~2. ct _

s' 2

~e;

/

SA :.a EVAI.UATION (ce lete Section A or B below) f A.

V

  • Safety Evaluation base:

I rpMu -(

4 ->

_/

4 w

/J

<t./'S/

m

,, et W MrW rG we.u -

</

/

Ineref ore tce proposed procecure ;or enange:

( ) DOIS Increase the probability of occurrence or consequences of an accident or asalfunction of equipment important to safety pre-( L PD0?.S viously evaluated in the Final Safety Analysis Report.

NOT

( ) DOES Create the possibility of an accident er malfunction of a different type than any evaluated previously in the Final

(/.PDOES Safety Analysis Report.

NOT

( ) DOI.S Reduce the margin of safety as defined in the basis for

(

DOES any technical specification.

Refer e nacertal: ISC N' 3 M c.*

bd 4 tf 3 J 0-P Safete Evaluatie3n was eerfe ned ib recordance with erocedure 1.3.23 Number fi.:. ~v A :. n The above listed procedure revision, safety evaluation, and PCN have best reviewed andareacceptape ~or approval bv the OR Chairman.

Reviewed b7

/

ICRC)

Date.7 7 Reviewed by A!)/ (CRC)

Date.?/II/F3

~

A Y

M E 6M'44 Revision r/ iewed in ORC Meeting 6' 97--24

/[/c d I// d Da h

  • .N*,03 %

OR Chairman's Approval 1.3.f.A-1 Rev. 25