Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203J858 + (Rev 2 to Catawba Nuclear Station PRA Summary Rept, for Jan 1998.W/one Diskette)
- ML20215K632 + (Rev 2 to Catawba Nuclear Station Process Control Program)
- ML20069C248 + (Rev 2 to Catawba Unit 2 Cycle 7 Colr)
- ML20210A348 + (Rev 2 to Cement Solidified Waste to Meet Stability Requirements of 10CFR61)
- ML20207S163 + (Rev 2 to Certificate of Compliance 9096,Type a Radwaste Shipping Container)
- ML20133F830 + (Rev 2 to Certificate of Compliance 9133,for Model C-10)
- ML20137T980 + (Rev 2 to Certificate of Compliance GDP-2)
- ML13312A681 + (Rev 2 to Certified Fuel Handler Certification & Recertification Training Programs)
- ML20205M669 + (Rev 2 to Chapter 3.7 of ASME Section XI Pump & Valve Administrative Procedure)
- ML20147D684 + (Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2)
- ML20147D674 + (Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2)
- ML20147D666 + (Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2)
- ML13305A890 + (Rev 2 to Chemistry Procedure SO123-III-6.6, Diesel Fuel Oil Specs & Testing Requirements)
- ML13310B536 + (Rev 2 to Chemistry Procedure SO123-III-8.8, Alternate Methods of Post-Accident Parameter Sampling)
- ML20141L972 + (Rev 2 to Civil & Structural Design Criteria)
- ML20044C114 + (Rev 2 to Claiborne Enrichment Ctr Criticality Safety Engineering Rept)
- ML20056C490 + (Rev 2 to Clinton Power Station Core Operating Limits Rept for Reload 3,Cycle 4)
- ML20024B323 + (Rev 2 to Cnsi 21-300 Type a Radwaste Shipping Cask SAR, App 1)
- ML20214V455 + (Rev 2 to Cnsi 9151-S1, Type a Radwaste Shipping Cask,Cns 14-170 Series III,(USA/9151/A). Util 860930 Response to NRC Comments Re Application,Including Cask Weldment Drawings Encl)
- ML20056B378 + (Rev 2 to Code Control Program Section 1, Organization)
- ML20056B385 + (Rev 2 to Code Control Program Section 11, As-Built Verification & Final Documentation Review)
- ML20056B386 + (Rev 2 to Code Control Program Section 12, Activities in Support of N-5 Review & Processing)
- ML20056B387 + (Rev 2 to Code Control Program Section 14, Definition of Terms)
- ML20056B388 + (Rev 2 to Code Control Program Section 15, Exhibits)
- ML20056B380 + (Rev 2 to Code Control Program Section 2, Project Functional Organization)
- ML20056B381 + (Rev 2 to Code Control Program Section 6, Engineering & Design)
- ML20056B382 + (Rev 2 to Code Control Program Section 7, Control of Documents)
- ML20056B383 + (Rev 2 to Code Control Program Section 8, Overview of Installer Activities)
- ML20056B384 + (Rev 2 to Code Control Program Section 9, Nonconformance & Corrective Action)
- ML20036A461 + (Rev 2 to Colr)
- ML20080G191 + (Rev 2 to Colr,Cycle 12)
- ML20128B259 + (Rev 2 to Comanche Peak Response Team Program Plan & Issue- Specific Action Plans)
- ML20035H356 + (Rev 2 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves,First Interval)
- ML19327A752 + (Rev 2 to Combined Units 1 & 2 Inservice Testing Program for Pumps & Valves)
- ML20197J550 + (Rev 2 to Concept of Operations for Agency Wide Documents Access & Mgt Sys (Adams))
- ML20207P903 + (Rev 2 to Conduit Fittings, Final Element Rept)
- ML17286A713 + (Rev 2 to Confirmatory Action Ltr CAL-91-01 Updating Understanding of Actions Taken or to Be Taken Re Unsatisfactory Licensed Operator Requalification Training Program Per 910226-0308 Requalification Exam)
- ML20215E126 + (Rev 2 to Conformance to Reg Guide 1.97 for Yankee Rowe Generating Station, Informal Rept)
- ML20214R583 + (Rev 2 to Conformance to Reg Guide 1.97,Rancho Seco, Informal Rept)
- ML20151E087 + (Rev 2 to Conformance to Reg Guide 1.97:TMI-1, Technical Evaluation Rept)
- ML20204H736 + (Rev 2 to Conformed Spec SP-562-4549-00, Class 1E Diesel Generator Units)
- ML20137J728 + (Rev 2 to Const Procedure 35-1195-CCP-10, Concrete Batch Plant Operations. Related Info Encl)
- ML20202A708 + (Rev 2 to Const Procedure 35-1195-DCP-3, Reproduction)
- ML20138R666 + (Rev 2 to Const Procedure 35-1195-EEI-13, Repair of Electrical Cable Jacket)
- ML20138P274 + (Rev 2 to Const Procedure CCP-30A, Coating Steel Substrates Inside Reactor Bldg & Radiation Areas, Incorporating Document Change Notices 1-6)
- ML20127C269 + (Rev 2 to Const Work Procedure W-WP-7, Concrete Placing, Curing,Finishing & Repairs)
- ML20127C360 + (Rev 2 to Const Work Procedure W-WP-8, Handling,Installation & Field Repair of Waterstops)
- ML20069L365 + (Rev 2 to Containment,Annulus Concrete Design,Const & Testing for Perry Nuclear Power Plant)
- ML20083M617 + (Rev 2 to Control Room Design Review;Criteria Rept)
- ML20212G991 + (Rev 2 to Control of Design Calculations:Calculation Control & Interface Requirements)
- ML20070R019 + (Rev 2 to Control of Heavy Loads Study)