ML20215K632
| ML20215K632 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 03/19/1986 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20215K612 | List: |
| References | |
| PROC-860319, NUDOCS 8610280237 | |
| Download: ML20215K632 (4) | |
Text
-
... 7 1
DUKE POWER COMPANY
[
CATAWBA NUCLEAR STATION PROCESS CONTROL PROGRAM 1
1.0 PURPOSE The purpose of the Catawba Nuclear Station Process Control Program is l
to insure all ' requirements of the DPC Corporate Process Control Program have been met for each container of solidified or dewatered radioactive 4
l waste shipped for burial at a licensed burial facility. This PCP is l
applicable only to the solidification or dewatering of liquid or wet solid radioactive waste.
I i
2.0 COMPOSITION 2.1 The Catawba Nuclear Station Process Control Program shall consist of:
2.1.1 The Duke Power Company Process Control Manual Introduction (Section I).
2.1.2 The Duke Power Company Corporate Process Control Program.
/
2.1.3 A list of all station-specific procedures that implement 2
l
(,
the requirements of the Corporate Process Control Program.
2.1.4 Catawba Nuclear Station diagrams or drawings or drawing numbers showing all connections between CNS radwaste systems and solidifications and dewatering equipment.
j l
2.1.5 Documentation of NRC approval of the initial Catawba Nuclear Station Process Control Program.
l t
2.1.6 Documentation of System Radwaste Engineer, CNS Technical i
I Services Superintendent and CNS Station Manager approval l
j of all changes to the Corporate Process Control Program.
j i
2.1.7 Documentation that all changes to the Corporate and/or i
CNS Process Control Program were sent to the NRC in the Semi-Annual Radioactive Effluent Report.
4 l
l i
i 8610280237 860829 PDR ADOCK 0500 3
R C-1 Rev.
2 i
l
'l e
1
,-,,,,n..,
~
.s k
l SECTION 2.1.1 i
Implementing Procedure HP/0/B/1006/09
" Shipment of Radioactive Filters and Filter Media" l
HP/0/8/1006/10
" Shipment of Solidified Radwaste" i
HP/0/B/1006/12
" Shipment of Dewatered Resins" HP/0/B/1006/13
" Determination of the Waste Classification for Radioactive Waste Offered for Shall'w Land o
Burial" HP/0/B/1006/15
" Handling and Packaging of Radwaste Filters and i
Filter Medias" r
j OP/0/B/6500/09 "Radwaste Chem. Operating Procedure for the Control and Use of Vendor Procedures" i
OP/0/B/6500/13
" Operating Procedure for the Nuclear Solid Waste (WS) Disposal) System" I
a OP/0/B/6500/46 "Radwaste Operating Procedure for Solidification and Dewatering of Radioactive Waste" OP/0/B/6500/49 "Radwaste Chemistry Operating Procedure for l
Sampling'the ECHT, ECBT, and RBT Using In-line Samples" t
P I
)
l I
s_
C-2 Rev.
2 i
m
SECTI0ft 2.1.2 Drawing Index Plant Interfaces:
Cil-1566-1.6 l
l i
i
(
/
C-3 Rev.
2
DUKE POWER COMPANY PCP REVISION APPROVAL Revised PCP Section:
' Corporate PCP, Rev ONS PCP, Rev MNS PCP, Rev CNS PCP, Rev_2_
This revision has been reviewed against Technical Specifications and applicable NRC guidance documents and found to be acceptable.
General Office Review Review By:
h h
By:
Title:
b N8 Date:
3'/I'Ob 2 s2f-f(p a/97/84
\\
Date:
This revision is approved for use at Catawba Station.
Nuclear f2A11 System f(adwaste Engineer CNS Th6hnical Services Date:
$[/ f![5 Superituenden?U6 Date:
E
/ j IS Stdtion Manager ate:
b M~
..g
- p...~
UNITED STATES i,1....
}
NUCLEAR REGULATORY COMMISSION E
j' WASHING TON. D. C. 20555 0 ' MAY 1536 4
u Docket Nos.:
50-369, 50-370 C;$i hN4l=
ht !
50-269, 50-270 i
~~'
50-287, 50-413 and (d -
50-414 idAY l2 1500 Mr. H. B. Tucker, Vice President f
Nuclear Production Department cuke PowdA CO.
Duke Power Company LIC2WNG w
422 South Church Street Charlotte, North Carolina 28242
Dear Mr. Tucker:
SUBJECT:
CATAWBA, OCONEE, AND MCGUIRE SOLID WASTE PROCESS CONTROL PROGRAMS In your Semi-Annual Radioactive Effluent Release Report dated March 1, 1985, you submitted to the NRC for information and evaluation the latest revision to the solid waste process control programs (PCPs) for your three nuclear generation stations, Catawba 1 and 2; Oconee 1, 2, and 3; and McGuire 1 and 2.
Our staff has reviewed the submitted process control programs and has found the PCPs to be acceptable for all the above generating stations.
It is noted that the staff is de_veloping Generic PCP gi:delines that may be. issued in the future.
At that time, it may be necessary for Duke Power to rev'ise the PCPs accordingly.
The technical basis for judging that the present PCP versions are acceptable is provided in the enclosed safety evaluation report which concludes the subject PCPs provide conformance with present requirements.
If you require any clarification of this matter, please contact the Catawba Project Manager, Kahtan Jabbour, at (301) 492-7367.
Sincerely, T..._
B. J. Youngblood, Director
Enclosure:
As stated cc:
See Next Page n
~ Q($ W & O l