MONTHYEARML20217K9011999-10-18018 October 1999 Proposed Tech Specs 3.6.2.2 Loc,Allowing Plant to Operate with Two Independent Trains of Containment Cooling, Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20211F5501999-08-24024 August 1999 Proposed Tech Specs Page Xviii, Index Administrative Controls, Originally Submitted with TS Change Request NPF-38-220 ML20211F3701999-08-24024 August 1999 Proposed Tech Specs,Revising Efas,Originally Submitted on 980702 as TS Change Request NPF-38-207 ML20210M9681999-08-0404 August 1999 Existing & Proposed marked-up TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One LPSI Train Inoperable & AOT of 72 Hours Imposed for Other Conditions ML20210M9861999-08-0404 August 1999 Existing & Proposed TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One HPSI Train Inoperable & TS 3.5.3, Changing end-state to Hot Shutdown with at Least One Operable Shutdown ML20210H1771999-07-29029 July 1999 Proposed Tech Specs 3.8.1.1 Re EDG AOT Increase from 72 H to Ten Days ML20210H2371999-07-29029 July 1999 Proposed Tech Specs 3.6.2.1 Extending Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210B3411999-07-19019 July 1999 Proposed Tech Specs 4.5.2.f.2,increasing Performance Requirement for LPSI Pumps ML20210D0521999-07-15015 July 1999 Proposed Tech Specs Creating New TS for Feedwater Isolation Valves ML20210D1071999-07-15015 July 1999 Proposed Tech Specs Adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20209H3191999-07-15015 July 1999 Proposed Tech Specs Pages Modifying TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 EFPY ML20209D4091999-07-0707 July 1999 Proposed Tech Specs,Revising Actions 19 & 20 for Table 3.3-3 for Functional Unit 7 Emergency Feedwater, Items B & C,Per 980702 TS Change Request NPF-38-207 ML20196E9971999-05-24024 May 1999 Rev 3 to NTP-203, Emergency Plan Training ML20195B1811999-05-20020 May 1999 Proposed Tech Specs Changes to Bases B 3/4.3.1 & 3/4.3.2, B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20204H2591999-03-16016 March 1999 Rev 0 to STD-100-237, Procedure for Modification of RCS Pressure Boundary for Installation of Mechanical Nozzle Seal Assemblies (Mnsa) for Waterford Nuclear Generating Station Unit 3 ML20204H2511999-03-16016 March 1999 Rev 1 to C-NOME-EP-0189, Engineering Procedure for Installation of Mechanical Nozzle Seal Assemblies for Waterford 3 ML20203C4891999-02-0505 February 1999 Proposed Revised Tech Specs Pages 3/4 3-12a & B 3/4 3-1a Re Reactor Trip Circuit Breaker Surveillance Interval Extension ML20199D9851999-01-12012 January 1999 Proposed Tech Specs,Adding Requirement That CR Intake Monitors Be Operable & SRs Be Applicable During Movement of Irradiated Fuel ML20199E0861999-01-12012 January 1999 Proposed Tech Specs Re Rev 1 for TS Change Request NPF-38-174 ML20198G2401998-12-23023 December 1998 Proposed Tech Specs,Modifying LCO for 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20196D2181998-11-30030 November 1998 Proposed Tech Specs Pages 3/4 8-8,3/4 9-8,3/4 9-9 & B 3/4 9-2,revised for Consistency Between Action Statements & NUREG-1432,Rev 1, Std Tech Specs for CE Plants ML20154E4171998-10-0606 October 1998 Proposed Tech Specs Pages Re TS Change Request NPF-38-212, Modifying Requirement to Perform Mtc Test Near End of Each Cycle ML20154E1141998-10-0101 October 1998 Proposed Tech Specs Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Sys ML20153D5771998-09-23023 September 1998 Proposed Tech Specs Revising Description Re Reactor Power Input Used by Operating Bypass Permissive & Trip Enable of 10-4% Bistable ML20153B4441998-09-18018 September 1998 Proposed Tech Specs Modifying Notes in Tables 2.2-1 & 3.3-1 Re Reactor Protective Instrumentation ML20151W5971998-09-11011 September 1998 Proposed Tech Specs Re Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7921998-08-12012 August 1998 Proposed Tech Specs,Increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7361998-07-29029 July 1998 Proposed Tech Specs Pages Revising TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model ML20236H1501998-07-0202 July 1998 Proposed Tech Specs Section 3/4.3.2,adding Restriction on Period of Time Channel of Efas Instrumentation Can Remain in Tripped Condition ML20249C8321998-06-29029 June 1998 Proposed Tech Specs 3.7.6.1,3.7.6.2,3.7.6.3,3.7.6.4 & 3.7.6.5,revising Control Room Ventilation to Be Consistent w/NUREG-1432 ML20249C7901998-06-29029 June 1998 Proposed Tech Specs Adding Footnote to Action Statements to Allow CR Ventilation Sys to Be Unisolated Periodically Under Administrative Controls ML20249A3101998-06-12012 June 1998 Proposed Tech Specs Pages,Adding Footnote to TS Refueling Operations,Surveillance Requirements 4.9.7.2,to Effect Limited Deviation to Allow Crane Main Hook Electrical Interlocks to Be Replaced W/Administrative Controls ML20248B7611998-05-28028 May 1998 Proposed TS Pages Supporting Change to TS 3.7.1.2, Surveillance Requirement 4.7.1.2 & Bases for Emergency Feedwater Sys ML20248H7871998-05-25025 May 1998 Rev 1 to Waterford Unit 3 Second Interval ISI Plan ML20247P2431998-05-21021 May 1998 Proposed Tech Specs Re Design Feature Suppl ML20217P8411998-05-0101 May 1998 Rev TS Pages Changing Actions Required Should Channel of Recirculation Actuation Signal (RAS) Be Placed in Tripped Condition,Replacing TS Pages Submitted in 970603 Submittal ML20217L9971998-04-30030 April 1998 Small Break LOCA ECCS Performance Analysis Using Abb/Ce Suppl 2 Model ML20217D5181998-03-25025 March 1998 Proposed TS 3.9.8.1,3.9.8.2,TS Action 3.9.8.2a,3.8.1.2 & Bases 3/4.9.8 ML20198R3081998-01-21021 January 1998 Errata to Proposed TS Change Request NPF-38-196 Which Changed TS 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1.-1 by Removing Cycle Dependent B Concentration & Boration Flow Rate from Action Statements ML20198R1251998-01-21021 January 1998 Corrections to Proposed Tech Spec 3/4.1 Re Reactivity Control Sys ML20197C6431997-12-22022 December 1997 Proposed Tech Specs Page Supplementing TS Change Request NPF-38-186,by Retaining Operations Superintendent in Paragraph 6.2.2.f of Administrative Controls Section ML20202C2911997-12-0101 December 1997 Rev 0 to Pump & Valve Inservice Test Plan for Second 10-Yr Interval. Page 23 of Incoming Submittal Not Included ML20199A0011997-11-13013 November 1997 Errata to Proposed Tech Specs Change Request NPF-38-193, Replacing Pages 13 Through 21 ML20199A1101997-11-13013 November 1997 Proposed Tech Specs,Modifying 6.8.4.a, Primary Coolant Sources Outside Containment to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20217M0221997-10-28028 October 1997 Rev 8 to RW-001-210, Process Control Program ML20217H5931997-10-14014 October 1997 Revised Page of App B of FOL, Environ Protection Plan (Nonradiological) ML20217G2421997-10-0707 October 1997 Proposed Tech Specs Modifying 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8141997-09-25025 September 1997 Proposed Tech Specs Pages Modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G7131997-07-0707 July 1997 Proposed Tech Specs Expanding Applicability of TS 3.7.1.3 to Include Mode 4 Operational Requirements & Maintains 91 Percent Minimum Condensate Storage Pool Level Previously Requested for Modes 1,2 & 3 ML20141D8551997-06-26026 June 1997 Proposed Tech Specs Revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases 1999-08-04
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20196E9971999-05-24024 May 1999 Rev 3 to NTP-203, Emergency Plan Training ML20204H2591999-03-16016 March 1999 Rev 0 to STD-100-237, Procedure for Modification of RCS Pressure Boundary for Installation of Mechanical Nozzle Seal Assemblies (Mnsa) for Waterford Nuclear Generating Station Unit 3 ML20204H2511999-03-16016 March 1999 Rev 1 to C-NOME-EP-0189, Engineering Procedure for Installation of Mechanical Nozzle Seal Assemblies for Waterford 3 ML20248H7871998-05-25025 May 1998 Rev 1 to Waterford Unit 3 Second Interval ISI Plan ML20202C2911997-12-0101 December 1997 Rev 0 to Pump & Valve Inservice Test Plan for Second 10-Yr Interval. Page 23 of Incoming Submittal Not Included ML20217M0221997-10-28028 October 1997 Rev 8 to RW-001-210, Process Control Program ML20217H5931997-10-14014 October 1997 Revised Page of App B of FOL, Environ Protection Plan (Nonradiological) ML20141B0441997-05-0808 May 1997 Performance Improvement Plan ML20138D8951996-10-0606 October 1996 Rev 5 to Odcm ML20117A5681996-07-28028 July 1996 Ldcr 97-0047-Location of Cabinets C-3A(B) & C-4 Outside Cvas Boundary - Rev 1 ML20116B1441996-04-17017 April 1996 Rev 6 to Procedure NTC-216, Emergency Plan Training Initial ML20116B1531996-04-17017 April 1996 Training Course Description Emergency Plan Continuing Training ML20138D8891996-01-11011 January 1996 Rev 7 to RW-001-210, Process Control Program ML20086C0191995-05-31031 May 1995 Basement Monitoring Program Rept 6 ML20070P8701994-02-17017 February 1994 Rev 7,change 5 to Waterford III Pump & Valve IST Plan ML20056F2061993-08-19019 August 1993 Rev 7,Change 4 of Waterford Unit 3 IST Plan for Pumps & Valves ML20118A7181992-09-16016 September 1992 Rev 5 to Waterford 3 Steam Electric Station 10-Yr Inservice Insp Program,First Interval ML20114C7711992-06-12012 June 1992 Rev 2 to Administrative Procedure UNT-005-014, Odcm ML20101B8321992-05-29029 May 1992 EDG Reliability Program Description & Comparison W/Nrc Reg Guide 1.155,Section 1.2 ML20141M4281991-06-21021 June 1991 Rev 1 to Technical Procedure UNT-005-021, Safety-Related Radioactive Matl & Radioactive Sources Purchase,Receiving, Surveying,Opening & Disposal ML20058P1191991-06-14014 June 1991 Mgt Manual Vol IV to Site Policy W1.501, Quality Reporting ML20141M4271991-05-25025 May 1991 Rev 4 to Administrative Procedure UNT-005-001, Safety- Related Waste Mgt & Control ML20141M4251991-04-25025 April 1991 Rev 7 to Technical Procedure HP-001-152, Safety-Related Marking,Handling & Storage of Radioactive Matl ML20141M4241991-01-0404 January 1991 Rev 1 to Technical Procedure HP-002-223, Waste Monitoring ML20065N7561990-08-24024 August 1990 Rev 4 to Administrative Procedure RW-001-210, Process Control Program ML20059A5631990-08-13013 August 1990 Rev 4 to 10-Yr Inservice Insp Program First Interval 1985-1995 ML20065N7481990-08-0303 August 1990 Rev 0 to UNT-005-014, Odcm ML20116B1221989-12-11011 December 1989 Rev 2 to Nuclear Training Procedure NTP-203, Emergency Plan Training ML19325E4681989-10-31031 October 1989 Summary of Change 2 to Rev 6 to Pump & Valve Inservice Test Plan. ML20246E0171989-08-0404 August 1989 Change 1 to Rev 6 of Pump & Valve Inservice Test Plan ML20245D0161989-06-19019 June 1989 Change 1 to Rev 5 of Pump & Valve Inservice Test Plan ML20082M2781989-05-0909 May 1989 Rev 3 to Administrative Procedure RW-1-210, Process Control Program ML20195H9271988-11-18018 November 1988 Rev 0 to UNT-5-013, Administrative Procedure Fire Protection Program ML20154S1941988-09-22022 September 1988 Rev 6 to Pump & Valve Inservice Test Plan ML20154B3761988-05-11011 May 1988 Rev 0 to Procedure OP-100-012, Post-Trip Review ML20238D0091987-12-0707 December 1987 Rev 2.1 to Nuclear Operations Procedure NOP-003, Records Mgt Sys ML20195G9331987-12-0101 December 1987 NSID-TB-87-11, Westinghouse Circuit Breakers Type Ds/Dsl: Welds on Breaker Pole Shaft ML20236L3341987-10-15015 October 1987 Rev 3 to 10-Yr Inservice Insp Program Waterford Steam Electric Station Unit 3 ML20082M2731987-07-10010 July 1987 Rev 2 to Administrative Procedure RW-1-210, Process Control Program ML20147D7981987-07-0707 July 1987 Rev 6 to Surveillance Procedure HP-1-230, Offsite Dose Calculation Manual ML20235G6051987-06-30030 June 1987 Functional Design Spec for SPDS Enhancement Program ML20238D0271987-06-26026 June 1987 Rev 1 to Radwaste Dept Administrative Procedure RW-1-200, Record Preparation,Filing & Storage ML20234B0171987-06-26026 June 1987 Rev 1 to Nuclear Plant Island Structure Basemat Surveillance Program ML20238D0251987-06-24024 June 1987 Rev 0 to Maint Departmental Procedure MD-1-008, Collection & Transmittal of Maint Records & Documents ML20216E8321987-06-12012 June 1987 Public Version of Emergency Plan Implementing Procedures, Including Rev 7 to EP-2-052, Protective Action Guidelines & Rev 10 to EP-2-060, Radiological Field Monitoring ML20238D0151987-01-14014 January 1987 Rev 2 to QA Procedure QAP-010, QA Records ML20114B7241986-09-20020 September 1986 Rev 5 to Technical Procedure RW-2-200, Packaging Radioactive Solid Waste (DAW) for Dispsosal ML20206D4681986-06-16016 June 1986 Rev 2 to 10-Yr Inservice Insp Program ML20151Z0521986-01-31031 January 1986 Rev 3 to CEN-39(A)-NP, CPC Protection Algorithm Software Change Procedure ML20151Z0641986-01-31031 January 1986 Rev 0 to CEN-323-NP Reload Data Block Constant Installation Guidelines 1999-05-24
[Table view] |
Text
. . . . .-. -- - . .
, 5. . .. y -
y 3 - Procedure No. W-WP-8 J. A. JONES CONSTRUCTION COMPANY CONSTRUCTION WORK PROCEDURE FOR HANDLING, INSTALL.ATION. AND FIELD REPAIR -
0F WATERSTOPS WATERFORD SES UNIT N0.3 CONTRACT NO. W3-NY l+
ENGINEERING QUALITY ASSURANCE CONSTRUCTION .
REV. DATE APPROVED BY DATE APPROVED BY DATE APPROVED BY DATE O 14l/el13 efhO /d/W7f hl/b & WMbf fe-Wk(
I gz,/rs as4:7w ,a,,,,, % Y O "_ /f,4 ffm h-p.7s -
2 s-s-n 00+ u -
spin 2 da}& .
cm, Af;4Ll -
dr4,
~ '
FREEDOM OF INFORMATION acT IMEQUEST qq-Yrf .
8506220206 850222 PDR FOIA PDR D {b GARDE 84-455
.\
. ,=,r ,
J.A. JONES CONSTRUCTION COMPANY PAGE 10F 3 PROCEDURE NO.
CONSTRUCTION WORK PROCEDURE . W-WP-8 i'f. TITLE OF PROCEDURE: Issue Date:
'M. . ,~ HANDLING, INSTALL.ATION, AND FIELD REPAIR OF WATERSTOPS 10-15-75
$. PROJECT TITLE:
,C WATERFORD SES UNIT NO. 3 CONTRACT N0. W3-NY-4 2 5-3-77
.A 3
Y I.0 PURPOSE To outline methods used by J. A. Jones and Subcontractors to handle, test R-k.C
... .g,; and install, and field repair of waterstops.
4' g.I 2.0 SCOPE .
3 This procedure shall govern installation, field repairs, reinstallation of
' J -l
. waterstops and includes the proper references to be used by J. A. Jones and y Subcontractors to comply with specifications and drawings. The utilization U. of records necessary to provide traceability is also part of this procedure.
W* ;. . 30 REFERENCES
,11.. 3.1 Ebasco Specification No. LOU-1564.476, lates't revision, "Waterstops".
'd{. , . 3.2 Federal. Test Method Standard No. 601, Method 4111.
-9" 3.3 J. A. Jones Site Inspection and Test Procedure No. W-SITP-8, "Waterstop
,.g,,g inspection".
Rk+.e[,. 3.4 Engineering information Request 200-7, dated March 18, 1976. ,.
,y.-
g .
3'. 5 Sika Chemical Company brochure for "Sikadur Epoxy Adhesives".
f R$ 3.6 Field Change Request CH-40, dated M' arch 30, 1976.
6f 4.0 RESPONSIBILITIES
'f. : .
.4 4.1 Ebasco Services, incorporated is responsible for supplying waterstop material, certifica, tion and material testing and testing of all factory
%{F, made splices in accordance with Reference 3.1.
.k ~.
7, 4.2 J. A. Jones and Subcontractors are responsible for handling, splicer training, job made splice testing, splicing and installation of water-k' l, **. stop as required by Reference. 3.1. '
.y. . -
iS. 5.0 DEFINITIONS g j
- j. 'l.'.
.A " test unit" 'sh'all be defined as per Section 2 of Reference 3.2. '.
,j '.g
....s
.'. W
~
6.0 SPLICES -
, t.,?
- z. .
- O All splices may be job made.'
R.2 )
Js :
b,,' i FORM NO 1122 06 JUNE '74 l
-u-- -
- N +* - m .
. J.A. JONES CONSTRUCTION COMPANY PAGE 2 0F 3 PROCEDURE NO.
l CONSTRUCTION WORK PROCEDURE . W-WP-8 TITLE OF PROCEDURE: Issue Date:
HANDLING, INSTALI.ATION, AND FIELD REPAIR OF WATERSTOPS 10-15-75 -
PROJECT TITLE: . Rev. No. & Date:
WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 2 5-3-77 7.0 PERSONNEL Each craftsman making splices shall be' trained in the method of making splices. Three (3) " test unit" sample splices shall be made by the crafts-man prior to making production splices. These three " test units" shall be turned over to the Engineer for testing as required by Reference 3.1.
Additional " test unit" samples shall be made, for testing as required. ,A log of trained splicers shall be maintained, see Attachment 12. 3. .
8.0 EQUIPMENT 4
5plicing Heater tool, Vinylex No. WC-1, manufactured by Vinylex Corporation, Knoxville, Tennessee, and shall be thermostatically preset for 460 degrees F
'and operate on 11 OV A.C. .
9.0 PROCEDURE 9.1 Connect splicing heater tool to 110 A.C. outlet .approximately 10 to 15 '
minutes prior to use to allow heat-up time, to rea9h 4600F.
S.2 overlap the two pieces of waterstop material to be spliced and cut as
7 required, to ensure matching edges'. ,
e j 9.3 Pres's the straight cut edges against the pre-heated splicer heated tool blade for approximately 10 to 20 seconds or until. PVC melts.
9.4 Quickly remove the heater tool blade and press the melted edges together to form a neat splice Joint.
95 Do not stretch or move the splic'ed section for 30 seconds. To cool the
- materialJ uickly, water may_be used.
R-2. 9.6
- Repairs of cuts in P.V.C.'Waterstop may be made by completely cleaning the damaged area.
R-2 9.7 Heat the base met material and filler material using splicing heater tool.
R-2 9.8 Fuse the fi'ller material'with the base material.
R-2 9.9 Upon completion of fusing, excess fil'ler material shall be removed and repaired area shall be reshaped by heating to obtain exterior configura-
, tion as necessary.
FORM NO 1122 06 JUNE '74
> m e e.* * *
- e. e- .e.- - - -
_ .e .. _ . _ . .
i -
. . ~
. i 6
. J.A. JONES CONSTRUCTION COMPANY PAGE 3 0F 3 PROCEDURE NO.
CONSTRUCTION WORK PROCEDURE W-SP-8 TITLE OF PROCEDURE: Issue Date:
HANDLING, INSTALLATION, AND FIELD REPAlR OF WATERSTOPS 10-15-75 -
PROJECT TITLE: Rev. No. & Date: -
WATERFORD SES. UNIT NO. 3 CONTRACT NO. W3-NY-4 2 5-3-77 R-2 9.10 Repaired area shall be inspected and Inspection documented.
R-2 9.11 Repair waterstop not embeded properly. Chip concrete, straighted and support waterstop as required.
R-2 9.12 Remove all dust, laitance, and other foreign . particles.
R-2 9.13 Coat concre'te and waterstop with Sikadur-Hi-Mod Epoxy, per manufacturer's reconsnandatIons.
A-2 9.14 Void shall.be filled by one of the.following methods:
a.) Sikadur-Hi-Mod Epoxy and sand mix (one part epoxy to three parts sand) b.) Sikadur-Lo-Mod Gel and sand mix (one part epoxy to li parts sand) c.) Sikadur-Lo-Mod Epoxy and sand mix (one part epoxy to three parts sand)
'd.) Dry-pack per LOU-15%.472, Section 5.10. .
~
10.0 TEST UNITS ,
" Test units" shall be made to meet the following requirements:- -
10,;1 Three (3) " test units" shall be made by each splicer craftsman for
. qualification. In addition, one (1) " test unit" shall be made when splicer craftsman is changed or as deemed necessary by the Engineer.
10.2 One (1) " test unit" shall be made for each ten (10) field splicas.
10 3 " Test units" may be taken from splices made in waterstop in the structure or from " companion" waterstop placed alongside the actual waterstop to be used for the sole purpose of obtaining test samples.
11.0 CONDITIONS ,,
Job made " test units" shallabe made under normal job working conditi.ons. ,
1,2,.0 GENERAL .
J. A. Jones shall correct deficiencies as directe'd by the Engineer.
13.0 ATTACHMENTS .
13.1
. Waterstop Splicer's Training Record 13.2 Splicer's Training Verification Card 13.3 Trained Spilcers Log FORM NO 1122 06 JUNE '74 s m.-. . e-%
e , e eN ema m , e6- es. e e m w e e .e ek = ee F
, - - - - - ,- - .,, , , - n- . . , . _ , , , , . , , , . . _ , , _ , . ._ .
s.,
. p '
A2tachment 12.1 J. A. JONES CONSTRUCTION CCMPANY WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4
_W ATERSTOP SPLICER'S TRAINING RECORD
~
SpIIcer's Name: Badge No.:
Trained By: Date:
Witnessed By J. A. Jones Q.C.': Date:
Witnessed By Ebasco q.C.:
Date:
, Contractor's l Representative:
Date t
1 .
f e *
- : - W-.. Q
- ~',
Att:chmint 12.2 a
SPLf CER'S TRAINING VERIFICATION CARD Front J. A. JONES CONSTRUCTION COMPANY Name:
Employee No.: Stamp No.:
We certify that the otowe named individual is qualified e eG in accontence voith the Q Procedure (s) hated on the back of this eerd.
Enemmer. Does:
Form No.11271. Oct. ~75 Back' Procedure No.: Poortion(s) e f
I.
e O e
6 m
. m.,- . - - .. . . . . * -. == = * ' * * * *- *
.66 NMQM * *
4 . Attachment 12.2 SPLICER'S TRAlfiltiG VERIFICATIOff CARD ,
. Front J. A. JONES CONSTRUCTION COMPANY Name.
Employee No.: Stamp No.:
We certify that the above named individual is cualified a esas in accordance with the 2 Procedure (s) lasted on the back of this rd.
I Esaminer: Date:
Form No.11271. Oct. ~75 i .
I . o Baek Procedure No.: Positior(s) i t
e t
c e
I f