Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18204A089 + (Response to IE Circular 76-01, Manufacturer of Reactor Building Crane (Whiting Corp.) Was Asked to Review Their Design for Applicability. the Crane Does Not Have the Same Type Contactor Which Caused the Problem)
- ML19095A557 + (Response to IE Circular 76-02 Concerning Safety Related Relay Failures)
- ML19031C384 + (Response to IE Circular 76-02 on Failures of Westinghouse Relays)
- ML19031C383 + (Response to IE Circular 76-02 on Failures of Westinghouse Relays)
- ML19095A555 + (Response to IE Circular 76-03 Concerning Radiation Exposures in Reactor Cavities)
- ML18348A236 + (Response to IE Circular 76-03 for Dresden, Units 1, 2 & 3; Quad-Cities, Units 1 & 2; and Zion, Units 1 & 2)
- ML19031C040 + (Response to IE Circular 76-03 on Radiation Exposures in Reactor Cavities)
- ML18204A087 + (Response to IE Circular 76-04, Switches Presently Installed on the Reactor Control Bench Board Are Manufactured by Square D Company Rather than by General Electric)
- ML19095A492 + (Response to IE Circular 76-05 Hydraulic Shock and Sway Suppressors, Advising No Snubbers of This Type Installed at Surry)
- ML19031C382 + (Response to IE Circular 76-06 on Hydraulic Shock and Sway Suppressors)
- ML19095A493 + (Response to IE Circular 76-06, Addressing Five Actions Identified in the Letter)
- ML19184A306 + (Response to IE Circular No. 76-04)
- ML19184A305 + (Response to IE Circular No. 76-05)
- ML18219C190 + (Response to IE Circular No. 76-05 & Provide Information on Action to Be Taken by Licensee)
- ML18219C195 + (Response to IE Circular No. 76-05. Re Action to Be Taken by Licensee for Items 1-3, Provide Information for Unit 1 & Request 60 Day Extension for Unit 2)
- ML18219C197 + (Response to IE Circular No. 76-06 & Provide Description of Program for Assuring Continued Integrity of Safety-Related Piping System, as Requested)
- ML19294A319 + (Response to IE Inspec Rept 50-305/78-10 During Which 2 Items of Noncompliance Were Noted:Ultra Sonic Testing Couplant Matl Used for UT Exam Was Only Couplant Matl Available & Insvc Records Were Avail)
- ML20005A987 + (Response to IE Summary of Inquiry Re Util Possible False Statement.Aslb Should Consider Matter Further or Filing Should Be Disregarded as Unwarranted.Related Correspondence)
- ML18348A238 + (Response to IEC-76-004 Re Neutron Monitor Bypass Switch Malfunctions for Quad-Cities, Units 1 & 2)
- ML18348A237 + (Response to IEC-76-004 Re Neutron Monitor Bypass Switch Malfunctions for Quad-Cities, Units 1 & 2)
- NL-03-2037, Response to IR 05000321-03-006, 05000366-03-006, with Notes + (Response to IR 05000321-03-006, 05000366-03-006, with Notes)
- RC-01-1839, Response to IR 05000395/2001-009. Provides Comments in Response to Identified Finding on Lack of Operator Training for Entry Into Fire Protection Procedures + (Response to IR 05000395/2001-009. Provides Comments in Response to Identified Finding on Lack of Operator Training for Entry Into Fire Protection Procedures)
- NL-04-0637, Response to Identified Green Non-Cited Violation (NCV) NRC Integrated Inspection Report 05000348/2003005 and 05000364/2003005 + (Response to Identified Green Non-Cited Violation (NCV) NRC Integrated Inspection Report 05000348/2003005 and 05000364/2003005)
- ML21182A107 + (Response to Illinois Emergency Management Agency on GEH-Morris DFP EA)
- ML13311A682 + (Response to Inadequate Core Cooling, Revision 0)
- ML20209E759 + (Response to Independent Overview Committee)
- ML20149M322 + (Response to Independent Safety Assessment of Myap)
- Information Notice 2008-10, Response to Indications of Potential Tampering Vandalism or Malicious Mischief + (Response to Indications of Potential Tampering Vandalism or Malicious Mischief)
- Information Notice 2008-10, Response to Indications of Potential Tampering, Vandalism, or Malicious Mischief + (Response to Indications of Potential Tampering, Vandalism, or Malicious Mischief)
- ML020990358 + (Response to Individual Action IA-01-055)
- L-09-215, Response to Individual Plant Actions Pressurized-Water Reactor Owners Group Topical Report BAW-2374, Rev. 2,Risk-Informed Assessment of Once-Through Steam Generator Tube Thermal Loads Due to Breaks in Reactor Coolant System + (Response to Individual Plant Actions Pressurized-Water Reactor Owners Group Topical Report BAW-2374, Rev. 2,Risk-Informed Assessment of Once-Through Steam Generator Tube Thermal Loads Due to Breaks in Reactor Coolant System)
- ML092390118 + (Response to Individual Plant Actions Regarding Pressurized-Water Reactor Owners Group Topical Report, BAW-2374, Revision 2, Risk-informed Assessment of Once-Through Steam Generator Tube Thermal Loads Due to Breaks in Reactor)
- ML030690635 + (Response to Industrial Dynamics Company Request to Review Shipping Procedures)
- ML072070076 + (Response to Industry Comments on Branch Technical Position 7-12, Guidance on Establishing and Maintaining Setpoints)
- ML16162A209 + (Response to Industry Comments on Draft NUREG-2180 - Enclosure)
- ML081330440 + (Response to Industry Initiative on Control of Heavy Loads)
- ML21292A308 + (Response to Industry Letters on NRCs Consideration of Endorsement of IEEE Std 1819-2016)
- ML17123A391 + (Response to Industry Recommended Screening Criteria for NRC Phase 2 Close-Out for Flooding Assessments)
- ML071490315 + (Response to Informal RAI Regarding Spent Fuel Pool Expansion Amendment Request)
- ML17300A220 + (Response to Information Need Request Regarding Mitigating Strategies Assessment (MSA) Report for Flooding)
- ML17284A178 + (Response to Information Need Request Regarding Mitigating Strategies Assessment Report for Flooding)
- ML12079A180 + (Response to Information Request Pursuant to 10 CFR 50.54(f) Related to Estimated Effect on Peak Cladding Temperature Resulting from Thermal Conductivity Degradation in Westinghouse-Furnished Realistic)
- ML12079A287 + (Response to Information Request Pursuant to 10 CFR 50-54 (F) Related to the Estimated Effect on Peak Cladding Temperature Resulting from Thermal Conductivity Degradation in the Westinghouse Furnished Realistic Emergency Core.)
- ML12088A104 + (Response to Information Request Pursuant to 10 CFR 50-.54 (F) Related to the Estimated Effect on Peak Cladding Temperature Resulting from Thermal Conductivity Degradation in the Westinghouse-Furnished)
- ML043630374 + (Response to Information Request Regarding NRC Significance Determination Process Risk-Informed Notebook)
- ML050700011 + (Response to Information Request Regarding Significance Determination Process Risk-informed Inspection Notebook)
- RS-05-017, Response to Information Request Regarding Significance Determination Process Risk-Informed Inspection Notebook + (Response to Information Request Regarding Significance Determination Process Risk-Informed Inspection Notebook)
- NRC 2004-0096, Response to Information Request for Next Revision of Significance Determination Process Risk-Informed Inspection Notebook + (Response to Information Request for Next Revision of Significance Determination Process Risk-Informed Inspection Notebook)
- NRC 2005-0023, Response to Information Request for Next Revision of Significance Determination Process Risk-informed Inspection Notebook + (Response to Information Request for Next Revision of Significance Determination Process Risk-informed Inspection Notebook)
- ML051430555 + (Response to Information Request for Next Revision of Significance Determination Process Risk-informed Inspection Notebook)
- L-MT-04-060, Response to Information Request for Revision 2 of the NRC Significance Determination Process Risk-Informed Notebook + (Response to Information Request for Revision 2 of the NRC Significance Determination Process Risk-Informed Notebook)