ML18204A087

From kanterella
Jump to navigation Jump to search
Response to IE Circular 76-04, Switches Presently Installed on the Reactor Control Bench Board Are Manufactured by Square D Company Rather than by General Electric
ML18204A087
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/04/1976
From: Renberger D
Washington Public Power Supply System
To: Engelken R
NRC/RGN-V
References
IEC-76-04
Download: ML18204A087 (1)


Text

Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 968 3000 GEO. WASHWOTON WAY RICHl.ANO. WASHINGTON 00352 PHONE (509) 946-968$

November 4, 1976 G02-76-496 Nuclear Regulatory Commission Region V

Suite 202, Walnut Creek Plaza 1900 N. California Boulevard Walnut Creek, California 94596 Attention:

Mr. R.

H. Engelken Director

Subject:

WPPSS NUCLEAR PROJECT NO.

2 IE CIRCULAR NO. 76-04 DOCKET NUMBER 50-397

Reference:

Letter, R.

H. Engelken to J. J. Stein, same subject, dated October 1,

1976

Dear Mr. Engelken:

-In-response to IE Circular 76-04, WPPSS contacted General Electric, who is ~upplying the Nuclear Steam Supply System (NSSS),

to determine if the problem described in IE Circular 76-04 could apply to the WNP-2 Project.

General Electric reported that the switches presently installed on the R actor Control Bench Board are manufactured by Square D Company rather than by General Electric, as stipulated in IE Circular 76-04, therefore, this response concludes our action relative to the subject circular.

DLR:GLC:ho Very truly yours,

~< /~ 4~y~

D. L.

RENBERGER Assistant Director Generation and Technology cc:

Mr. D. Smithpeter Bonneville Power Administration NRC - Office of Inspection 8 Enforcement (Washington D.C.)