Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 968 3000 GEO. WASHWOTON WAY RICHl.ANO. WASHINGTON 00352 PHONE (509) 946-968$
November 4, 1976 G02-76-496 Nuclear Regulatory Commission Region V
Suite 202, Walnut Creek Plaza 1900 N. California Boulevard Walnut Creek, California 94596 Attention:
Mr. R.
H. Engelken Director
Subject:
WPPSS NUCLEAR PROJECT NO.
2 IE CIRCULAR NO. 76-04 DOCKET NUMBER 50-397
Reference:
- Letter, R.
H. Engelken to J. J. Stein, same subject, dated October 1,
1976
Dear Mr. Engelken:
-In-response to IE Circular 76-04, WPPSS contacted General Electric, who is ~upplying the Nuclear Steam Supply System (NSSS),
to determine if the problem described in IE Circular 76-04 could apply to the WNP-2 Project.
General Electric reported that the switches presently installed on the R actor Control Bench Board are manufactured by Square D Company rather than by General Electric, as stipulated in IE Circular 76-04, therefore, this response concludes our action relative to the subject circular.
DLR:GLC:ho Very truly yours,
~< /~ 4~y~
D. L.
RENBERGER Assistant Director Generation and Technology cc: