Response to Industry Comments on Branch Technical Position 7-12, Guidance on Establishing and Maintaining Setpoints.
ML072070076
Person / Time
Issue date: 08/21/2007
From: William Reckley
NRC/NRO/DNRL
To: Heymer A
Nuclear Energy Institute
Subbaratnam R, NGIF/DNRL/NRO301-415-1478
References
Download: ML072070076 (6)


Text

August 21, 2007 Mr. Adrian Heymer Senior Director, New Plant Development Nuclear Generating Division Nuclear Energy Institute 1776 I Street , NW, Suite 400 Washington, D.C. 20006-3708

SUBJECT:

RESPONSE TO INDUSTRY COMMENTS ON BRANCH TECHNICAL POSITION 7-12, GUIDANCE ON ESTABLISHING AND MAINTAINING SETPOINTS Project Number: 689

Dear Mr. Heymer:

In you letter, dated July 5, 2007, you expressed industrys concern on the Branch Technical Position 7-12 (BTP), Guidance on Establishing and Maintaining Setpoints, which staff issued in March 2007. The industry expressed the following concerns:

  • The review guidance in BTP 7-12 goes beyond that necessary to evaluate limiting safety system settings (LSSS) and that the staff did not provide justification for applying the same requirement and the degree of rigor to non-safety systems.
  • There are numerous acceptable methods for existing plants for establishing setpoints and surveillance procedures; however, the BTP is unnecessarily prescriptive in defining one acceptable setpoint methodology without acknowledging other acceptable methods.
  • In comparison to the common understandings that have been established on setpoint methodologies in recent years, the scope and level of details of information requested to be submitted on the docket is beyond that necessary for compliance with 10 Code of Federal Regulation (CFR) 50.36.

This matter was discussed at a public meeting between the industry/U.S. Nuclear Regulatory Commission (NRC) held in Rockville Maryland on August 9, 2007. The staff heard industrys proposed guidance on establishing and maintaining instrument setpoints. The staff responses to the industry letter dated July 5 are as follows.

  • The review guidance that the NRC issued in March 2007 is essentially the same that was previously issued under Revision 4, in June 1997. As the industry is aware, the Standard Review Plan (SRP) guidance is but one acceptable method to staff, as the guidance correctly points out, the SRP is not a substitute for the NRCs regulations, and compliance with it is not required. However, an applicant is required to identify differences between the design features, analytical techniques, and procedural measures proposed for its facility and the SRP acceptance criteria and evaluate how the

2 proposed alternatives to the SRP acceptance criteria provide acceptable methods of compliance with the NRC regulations. (see Section III, BTP 7-12).

  • As pointed our during August 9, 2007 discussions, the staff agrees that there are numerous acceptable methods for establishing setpoints and surveillance procedures as discussed in Regulatory Guide (RG) 1.105, Setpoints for Safety-Related Instrumentation. The staff has approved plant requests on setpoint methods that were consistent with this guidance. In addition, the methodology for the design certification for AP1000 standard design was also approved using RG 1.105. The staff encourages applicants for design certifications and combined licenses to review relevant material and follow activities such as technical specification task force (TSTF) traveler TSTF-493 to facilitate the development and NRC review of setpoint-related topics.
  • Of particular concern discussed at the August 9 meeting was criteria contained in BTP 7-12 on the topic of setpoint documentation. The NRC staff will review the wording and consider possible clarifications for a future update of the SRP. As explained at the meeting, the staff expects DC or COL applicants to provide the same level and organization of information provided in most operating plant FSARs and as described in RG 1.105. As described in RG 1.206 design specification documents, such as setpoint calculations and other more detailed information, should be avaliable for audit This letter does not address individual concerns identified in Appendix A to the July 5, 2007, letter as they follow the main concerns identified in the cover letter. The staff does not feel the need to revise the guidance as issued in March 2007, but will consider experience gained from near-term licensing reviews in developing subsequent revisions to the BTP.

Sincerely,

/RA/

William D. Reckley, Branch Chief Rulemaking, Guidance and Advanced Reactor Branch Division of New Reactor Licensing Office of New Reactors

2 proposed alternatives to the SRP acceptance criteria provide acceptable methods of compliance with the NRC regulations. (see Section III, BTP 7-12).

  • As pointed our during August 9, 2007 discussions, the staff agrees that there are numerous acceptable methods for establishing setpoints and surveillance procedures as discussed in Regulatory Guide (RG) 1.105, Setpoints for Safety-Related Instrumentation. The staff has approved plant requests on setpoint methods that were consistent with this guidance. In addition, the methodology for the design certification for AP1000 standard design was also approved using RG 1.105. The staff encourages applicants for design certifications and combined licenses to review relevant material and follow activities such as technical specification task force (TSTF) traveler TSTF-493 to facilitate the development and NRC review of setpoint-related topics.
  • Of particular concern discussed at the August 9 meeting was criteria contained in BTP 7-12 on the topic of setpoint documentation. The NRC staff will review the wording and consider possible clarifications for a future update of the SRP. As explained at the meeting, the staff expects DC or COL applicants to provide the same level and organization of information provided in most operating plant FSARs and as described in RG 1.105. As described in RG 1.206 design specification documents, such as setpoint calculations and other more detailed information, should be avaliable for audit This letter does not address individual concerns identified in Appendix A to the July 5, 2007, letter as they follow the main concerns identified in the cover letter. The staff does not feel the need to revise the guidance as issued in March 2007, but will consider experience gained from near-term licensing reviews in developing subsequent revisions to the BTP.

Sincerely, William D. Reckley, Branch Chief Rulemaking, Guidance and Advanced Reactor Branch Division of New Reactor Licensing Office of New Reactors Distribution:

NRCA/RF LJames SRhow HGarg CSchulten MMarshall RSubbaratnam WReckley TKobetz IJung SKoenick ADAMS Accession Number: ML072070076 OFFICE NRO/DNRL/NRCA NRO/DE/ICE1 BC: NRO/DE/ICE1 BC:NRO/DNRL/NRCA NAME RSubbaratnam SRhow LJames SKoenick for WReckley DATE 8/ 21 /2007 8/15/2007 8/20/2007 8/21/ 2007 OFFICIAL RECORD COPY

3 NEI New Reactors Mailing List List #35 cc:

Ms. Michele Boyd Mr. Ed Wallace Legislative Director General Manager Energy Program Projects Public Citizens Critical Mass Energy PBMR Pty LTD and Environmental Program P.O. Box 9396 215 Pennsylvania Avenue, SE Centurion 0046 Washington, DC 20003 Republic of South Africa Mr. Marvin Fertel Edward G. Wallace Senior Vice President Sr. General Manager and Chief Nuclear Officer U.S. Programs Nuclear Energy Institute PBMR Pty. Ltd.

1776 I Street, NW PO Box 16789 Suite 400 Chattanooga, TN 37416 Washington, DC 20006-3708 Mr. Gary Wright Ms. Leslie Compton Kass Director Senior Project Manager Division of Nuclear Facility Safety Nuclear Energy Institute Illinois Emergency Management Agency 1776 I Street, N.W. 1035 Outer Park Drive Suite 400 Springfield, IL 62704 Washington, DC 20006-3708 Dr. Gail H. Marcus U.S. Department of Energy Room 5A-143 1000 Independence Avenue, SW Washington, DC 20585 Mr. Brian Smith Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006

4 NEI New Reactors Mailing List Email APH@NEI.org (Adrian Heymer) awc@nei.org (Anne W. Cottingham) bennettS2@bv.com (Steve A. Bennett)

BrinkmCB@westinghouse.com (Charles Brinkman) chris.maslak@ge.com (Chris Maslak) cwaltman@roe.com (C. Waltman) david.lewis@pillsburylaw.com (David Lewis) dlochbaum@UCSUSA.org (David Lochbaum) frankq@hursttech.com (Frank Quinn) greshaja@westinghouse.com (James Gresham) jgutierrez@morganlewis.com (Jay M. Gutierrez) jim.riccio@wdc.greenpeace.org (James Riccio)

JJNesrsta@cpsenergy.com (James J. Nesrsta) john.o'neil@pillsburylaw.com (John O'Neil)

Joseph.savage@ge.com (Joseph Savage)

Joseph_Hegner@dom.com (Joseph Hegner)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) lynchs@gao.gov (Sarah Lynch - Meeting Notices Only) maria.webb@pillsburylaw.com (Maria Webb) mark.beaumont@wsms.com (Mark Beaumont) matias.travieso-diaz@pillsburylaw.com (Matias Travieso-Diaz) media@nei.org (Scott Peterson) mike_moran@fpl.com (Mike Moran) nirsnet@nirs.org (Michael Mariotte) patriciaL.campbell@ge.com (Patricia L. Campbell) paul.gaukler@pillsburylaw.com (Paul Gaukler)

Paul@beyondnuclear.org (Paul Gunter) phinnen@entergy.com (Paul Hinnenkamp) pshastings@duke-energy.com (Peter Hastings)

RJB@NEI.org (Russell Bell)

RKTemple@cpsenergy.com (R.K. Temple) roberta.swain@ge.com (Roberta Swain) ronald.hagen@eia.doe.gov (Ronald Hagen) sandra.sloan@areva.com (Sandra Sloan) sfrantz@morganlewis.com (Stephen P. Frantz) waraksre@westinghouse.com (Rosemarie E. Waraks)

5 C:\FileNet\ML072070076.wpd (Revised 7/31/07)