Response to IE Circular 76-02 on Failures of Westinghouse Relays
ML19031C384
Person / Time
Site: Salem  
Issue date: 11/09/1976
From: Schneider F
Public Service Electric & Gas Co
To: O'Reilly J
NRC/IE, NRC Region 1
References
IEC-76-002
Download: ML19031C384 (2)


Text

Frederick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/622-7000 Production November 9, 1976 Mr. James P. O'Reilly, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. O'Reilly:

NRC IE CIRCULAR 76-02 "RELAY FAILURES -

WESTINGHOUSE BF (ac) AND BFD (de) RELAYS" NO. 1 UNIT SALEM NUCLEAR GENERATING STATION Pursuant to NRC IE Circular 76-02 received August 23, 1976 we offer the following:

BF (ac) Type Relays

1.

There are four (4) channels in the Radiation Monitoring System, Salem No. 1 Unit, which utilize BF (ac) relays.

All of these channels were initially calibrated and functionally tested during the period of July -

August,
  • 1976 respectively.

The circuit designs are such that these relays must function properly in order to perform a satisfactory test.

2.

In recognition of the subject circular, Design Change Request (DCR) No. PD-0017 was initiated by the Salem Electric Production Department on September 14, 1976, requesting that PSE&G Engineering specify an acceptable substitute for the existing BF (ac) relays.

Mr. J. P. O'Reilly 11/09/76

3.

Struthers-Dunn Type 219-DXBF relays have been selected as the replacement and are currently on order.

Completion of this replacement activity is anticipated by January, 1977.

BFD (de) Type Relays PSE&G Engineering has determined that nine (9) BFD (de) relays were supplied by the NSSS Supplier in the Liquid Waste Disposal System.

As a result, Design Change Request (DCR) No. ED-0009 was initiated to replace the BFD relays in the L.W.-D. system with Struthers-Dunn Type 219-DXBF relays which have been ordered.

It is also anticipated that this change will be completed by January, 1977.

CC:

Director, I & E Washington, D. c.

Very truly yours,