Sl-1-.2-14 RESPCNSE TO INADEQUATE CORE COOLING REV 0 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED EMERGENCY INSTRUCTION 501-1.2-14 RESPONSE TO INADEQUATE CORE COOLING The purpose of this instruction is to provide a RESPONSE TO INADEQUATE CORE COOLING to minimize possible core damage by systematically attempting to establish alternate means of core cooling.

A. The following are symptoms of inadequate core cooling:

1. Five or more core exit thermocouples greater than 1200 OP.
2. RCS hot leg RT~s greater than 700 OF.

8205240510 820520 1 of 12 PDR ADOCK 05000206 P

PDR

501-1.2-14 RESPONSE TO INADEQUATE CORE COOLING REV 0 STEP ACTION/EXPECTED

RESPONSE

C RESPONSE NOT OBTAINED CAUTION If prior to reaching step 11, RWST level decreases to 21', the actions of 501-1.2-1.13, TRANSFER TO COLD IECTION AND RECIRC ULATON must be cpleted.

NOTE:

The Check boxes in step 1 are provided as. an aid in assuring that a minimum of one SI train (A or B) is fully aligned.

2 of 12

501-1.2-14 RESPONSE TO INADEQUATE CORE COOLING REV 0 ACTION/EXPECTED

RESPONSE

RESPONSE NOT OBTAINED I

Try To Establish SI Flow To RCS:

a. Verify both SI trains
a. Manually initiate SI initiated.
b. SI pump breakers.
b. Manually start pump.

12CO5 - CLOSED.

i1C05 -

CLOSED.

E A) 12CO4 -

CLOSED.

11CD4 -

CLOSED.

II

c. Verify SI Valve Alignment.
c. Manually open or close valves as appropriate.

Feed pump valves:

A a

HV 852 A&B - CLOSED.

HV 854 A&B - CLOSE.E HV 851 A&B - OPEN.

HV 853 A&B -

OPEN.

CV 875 A&B - OPEN.

d. RCS SI injection
d. Manually open valves MOVs 850 A,B and as appropriate.

C -

OPEN.

e. IF RCS pressure is less than 1170 PSIG, THEN check SI line flow loop iindcators -

CHECK FOR FLOW.

3 of 12

STE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 2

Try To Establish Charging Flow To RCS:

a. Align charging pump suction:
a. Manually open OR close 1I MOV 1100 B AND D -

O07 OF valves as apprpriate.

AUTO AND OPE.

2) MDV 1100 C -

OUT OF ALTO AND CLOSED.

Verify both chargng Pump

b. Manuall start both breaKers -

CLOE.

puTs:

1) Man a"Iy start preselected pump.
2) Manually start standby pump:

Reset Si at SLSS surveillance Panels.

Reset non-running charging pump lockout.

Start second charging pump..

c. Align cold leg injection flow path:

MOV 356 -

OPEN.

MOV 357 - OPEN.

MOV 358 -

OPEN.

MOV 18 -

OPEN.

MOV 19 -

OPEN.

d. Throttle FC 1115 A, B AND C to establish maximum fT1w.

Do not exceed 600 gpm.

e. IF flow to RCS less than 600 gpM, THEN throttle FCV 1112 to obtain KT.tal flow of 600 gpm.

4 of 12

S01-1.2-14 RESPONSE TO INADEQUATE CORE COOLING REV 0 ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 3Establish Conditions Support For ROP Uperations:

a. RCP low CCW flow alarms
a. Manually adjust CCW RESET.

flow.

CAUTION AF pump water supply must be mntained to ensure adeuate heat sink.

4 Check CST Level:

a. CST level -

GREATER

a. IF CST level low, THAN 4 FT.

THEN' transfer to alternate AFW water supply per SCI-7-3, AUX LIARY FEEDWATER 5

Check SG L evel-s.:

a.

Narrow range level

a. IF less than 26%,

THEN

- GREATER THAN 26%.

Fiintain:

1) Total AF flow

- GREATER THAN 250 GPM.

2) AFW flow per SG LESS THAN 150 GPM.
b. Throttle AFW flow to maintain narrow range level at 50%.

5 of 12

S01-1.2-14 RESPONSE TO INADEQUATE CORE COOLING REV 0 ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION TC printouts drop off the thousands digit, therefore, 12C0 OF will appear as 200 OF.

6 Check Core Cooling:

a.

Core Exit TCs -

LESS THAN

a. IF 5 TCs or kore are 1200 F.
Lgh, THEN go to step 7.
b.

Core exit TCs - DECREASING

b. IF increasing, THEN returr to step T.
c.

RCS hot leg RTDs -

LESS

c. IF greater than THAN 700 OF.

7L 0 F, ThEN go tO step 7.

IF RC charging flow is

d. IF flow is not ablished OR IF RCS Tndicated from either pressure is less than source, THEN return 1170 psig, SI flow to step T.

indicators indicate flow.

e.

Return to S01-1.2-1.0, REACTOR TRIP OR SAFETY IJECTION, step 10.

6 of 12

ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 7

Check Pressurizer POPYs And Block Valves:

a.

Power available to block

a. Restore power to block valves.

valves.

b. P0RVs - CLOSED.
b. IF RCS pressure less than 2100 PSIG, THEN manually close PORVs.

IF any PORV cannot be Josed, THEN manually clse its blec valve.

c. lock valves -

PEN.

c. Open block valve unless it was closed to isolate a faulty P ORV.

7 of 12

501-1.2-14 RESPONSE TO IRADEQUATE CORE COOLING REV 0 0 SACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 8

Rapidly Decrease Steam Header Pressure to Atmospheric -Pressu re:

a.

Place steam dump mode

a. IF steam dumo to the selector switch to PRESSURE condenser not avail
CONTROL, CONDENSER.

able, place steam dump mode selector switch to PRESSURE CONTROL ATMOS.

b.

Place steam dump controller to MAN'AL N open steam ump valves.

c. Verify steam 'header pressure
c. IF steam header decreasing to pFessure NOT ATMCSPHEPC PRESSURE.

decreasinc, THEN go to step 1DT

d. Verify SI flow to RP0
d. Go to step 10.

GREATER THAN ZERO.

9 Check Core Co-linc:

a. Core exit TCs -

LESS THAN a

IF cbnditior NOT 1200 OF AND DECREASING.satisfied, THEN go to step TM

b. RCS hot leg RTDS - LESS
b. IF condition NOT THAN 700 OF.

satisfied, THEN go to step 71

c. IF RC charging flow is
c. IF flow is not ITtablished OR IF RCS Tidicated from either pressure is Tess than source, THEN return 1170 psig, THEN SI flow to step TT indicators inticate flow.
d. Return to 01-1.2-1.0, REACTOR sTRIP OR SAFETY INSPECTION step, 10.

8 of 12

S01-1.2-14 RESPONSE TO IkAEUATE COPE COOLING REV 0 STP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTANED CAUTION Nornial conditions for starting RCPs are desired but should not prevent RCP start.

10 Check Core Exit Trs:

a.

Temperature - LESS THAN

a. Start RPOs AND operate 1200 OF.

until core exit TCs less than 1200 aF.

1) IF core exit TCs greater than 1200 OF and all available RCPs running, THEN open all pressurizer PORVs and block valves.
2) Continue dumping steam and maintain PORV status until RCS SI flow established.
3) Go to step 11.
b. Continue dumping steam.
c. Go to step 13.

9 of 12

-- TEP.} --

ACTION/EXPECTED RESPONSERESONSE NOT OBTAINED CAUTI ON RWST level should be monitored after establishing the flow path in step 11a.

Transfer to step 12 b flow path should be initiated as RWST level approaches 12% and must be completed prior to reaching 7%.

11 Estab6Dsh Alterate Low Pressure L

nection I ow

a. RWST level - GREATER
a. Go to step 12.

TAN 12%.

b. Verify MCV 8813 -

OPEN.

b. Manually open valve.

c.

Open MOV 880

d. Verify MCV 356, MDV 357
d. Manually open valves.

AND MCV 358 -

OPEN.

e. Verify both refueling water
e. Manually start :umps.

pump breakers - CLOSED.

IF only one refueling water pump running, THEN override and 7T6-e CV 517 AND CV 518.

f.

Adjust FC 1115 A, B AND C to establish maximum total flow to RCS while maintaining spray flow.

g.

Go to step 13.

10 of 12

501-1.2-14 RESPONSE TO INADEQUATE CORE COOLING REV 0 STACTION/EXPECTED RESPONSER NOT OBTAINED 12 Establish Alternate Low Pressure RCS Recirculation And Injection Flow Path:

a.

With RWST level - LESS THAN 12% OR indicated containment sump Tevel - GREATER THAN GRADE MINUS 7 FT.

b. Start both SI recirc pumps.
c.

Verify two CC! pump breakers

c. Manually start CLOSED.

pumps.

d. Verify one salt water cooling
d. Manually start pump breaker -

CLOSED.

pump.

e. Open CV 737 A AND B.
f.

Verify CV 517

f. Override AND close AND CV 518 -

CLOSED.

CV 517 ANDMv 518.

g. Verify one refuel ing water
g. Manually start pump breaker -

CLOSED.

pump. IF two purps running, THEN stop one pump.

h. Open MOV 866 A AND B.
i.

Close MOV 883.

j. Verify MCV 880 - OPEN.
j. Manually open valve.
k. Verify MOV 356, MOV 357,
k. Manually open AND MOV 358 - OPEN.

valves.

1. Adjust FC 1115 A, B AND C to establish 3Z GPM total flow to RCS.

11 of 12

501-1.2-14 RESPONSE TO INADEQUATE CORE COOLNG REV 0 0 STP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 13 Check Core Cooling:

a. Core exit TCs -

LESS

a. IF greater than THAN LESS THAN 400 OF.

TU0 oF, THEN go to step 8 AND verify AND monitor conditions esfablished.

CAUTION Do not pr.oceed to step 14 until alternate low pressure RCS injection flow has been verified.

14 Stop Any Running RCPs:

a. Trip RCP.

15 Subsequent Action:

a.

Go to SO-1.2-1.1, LOSS OF REACTOR COOLANT, step 16.

-END H. E. MORGAN