Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20043C705 + (Requests Extension to 900901 to Submit Renewal of Certificates of Compliance 5341,6357 & 5910)
- ML20058F143 + (Requests Extension to 901112 for Submittal of Response to Violations Noted in Insp Repts 50-413/90-24 & 50-414/90-24)
- PY-CEI-NRR-1307, Requests Extension to 910628 to Submit Simulation Facility Certification + (Requests Extension to 910628 to Submit Simulation Facility Certification)
- RBG-37795, Requests Extension to 930115 to Complete Summary Rept Re Replacement of Reactor Pressure Vessel N4A Feedwater Nozzle & Reactor Water Cleanup Ringheader,Due to Extensive Amount of Inservice Insp Info + (Requests Extension to 930115 to Complete Summary Rept Re Replacement of Reactor Pressure Vessel N4A Feedwater Nozzle & Reactor Water Cleanup Ringheader,Due to Extensive Amount of Inservice Insp Info)
- ML20059J219 + (Requests Extension to 940215 to Complete & Submit Response to NRC Re Disposition of Error Notices Received from Boeing Computer Svcs)
- ML20236K795 + (Requests Extension to 950825 for Rulemaking Action Involving License for Radiography & Radiation Safety Requirements for Radiographic operations,10CFR34,that Was Published as Proposed Rule on 940228)
- ML20128N142 + (Requests Extension to 961119 Re Submittal of TS Amend RAI)
- BECO-LTR-96-084, Requests Extension to 961218 to Respond to GL 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks + (Requests Extension to 961218 to Respond to GL 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks)
- E000-96-001, Requests Extension to 970331 to Submit Evaluation Re Radiological Consequence Analysis for Control Room Operators + (Requests Extension to 970331 to Submit Evaluation Re Radiological Consequence Analysis for Control Room Operators)
- ML20247A058 + (Requests Extension to Allow Util Sufficient Time for Proper & Thorough Implementation of Amend)
- ML20065R777 + (Requests Extension to Allow for Completion of Updated Stress/Fatigue Analysis Until Mar 1990,in Response to NRC Bulletin 88-011.Plant Used 2 of 10 Addl Heatup & Cooldown Cycles as Discussed in Author)
- ML20080L843 + (Requests Extension to Apr 1984 to Comply W/Final Rule Re TMI Action Item I.A.1.3, Shift Manning. Justification for Granting Request Provided)
- ML20066B266 + (Requests Extension to Commitment to Complete All Mods to Control Room,Per Suppl 1 to NUREG-0737 by 901231.Complete Schedule,Detailing Completion of All Remaining Items,Will Be Provided by 910731)
- ML20133K211 + (Requests Extension to Complete Commitments for Reg Guide 1.97 & Suppl 1 to NUREG-0737 Re Spds,In Response to 840614 Confirmatory Order.Several Items Cannot Be Completed Before Resuming Power Operation)
- ML18051A674 + (Requests Extension to Complete SEP Topic VI-4,Section 4.20.3 Until Next Scheduled Refueling Outage.Resolving Nonconformance Items Will Make Automatic Valve Unavailable for Installation During 1983 Refueling Outage)
- NOC-AE-000359, Requests Extension to Current Schedule for Implementing Updates to ISI & IST Programs to Incorporate risk-informed Criteria Into Subject Programs + (Requests Extension to Current Schedule for Implementing Updates to ISI & IST Programs to Incorporate risk-informed Criteria Into Subject Programs)
- ML20214M860 + (Requests Extension to Date of Compliance for Reg Guide 1.97 Recording Requirements from Completion of Refueling Outage 7R to Completion of Refueling Outage 8R.Existing Computer Sys at Capacity & New Sys Currently Being Installed)
- ML20059E052 + (Requests Extension to Deis (NUREG-1484).Concern Expressed Re Location of Plant)
- ML20072D018 + (Requests Extension to Due Date for Corrective Actions from Insp Repts 50-327/94-06 & 50-328/94-06 Due to Identification of Addl Environ Binders Requiring Rev)
- ML20072Q435 + (Requests Extension to Due Date for Response to Request for Addl Info on IPE Until 941213)
- ML20096E691 + (Requests Extension to Emergency Planning Zone to Cover 25 Mile Radius of Plant & Copy of Relocation Plan)
- ML19220B956 + (Requests Extension to Estimated Earliest & Latest Dates for Completion of Const.Describes Various Problems & Changes Requiring Addl Const & Engineering Time)
- ML19208D583 + (Requests Extension to Existing Certificate of Compliance on MH-1A Cask Until Review of Consolidated SAR Is Complete.Cask Currently Located at Savannah River & Not Expected to Be Used Until Summer 1980)
- ML20044B917 + (Requests Extension to Export License Expiration Date to 940731)
- GO2-89-151, Requests Extension to FSAR Amend 40 Submittal Date Until Sept 1989 + (Requests Extension to FSAR Amend 40 Submittal Date Until Sept 1989)
- LD-79-034, Requests Extension to File Addl Info Re CESSAR-F pre-docketing Amend + (Requests Extension to File Addl Info Re CESSAR-F pre-docketing Amend)
- ML19341A872 + (Requests Extension to File Motion to Compel Answers to Interrogatories or to Compel Production of Documents within 10 Days After Applicant Receives Responses to Interrogatories & Other Requests.Certificate of Svc Encl)
- ML19341A873 + (Requests Extension to File Motion to Compel Answers to Interrogatories or to Compel Production of Documents within 10 Days After Applicant Receives Responses to Interrogatories & Other Requests.Certificate of Svc Encl)
- ML20024E049 + (Requests Extension to File Prefiled Written Testimony.Fema Testimony Should Be Due 15 Days Prior to Hearing at Which Testimony Is to Be Presented.Fema Main Reviewer for Plant Resigned.Related Correspondence)
- ML19291A210 + (Requests Extension to File Preliminary Draft of First Chapters of Environ Statement)
- ML19246B782 + (Requests Extension to File Testimony on NRC 790601 Objection to Part of Question 3 Re Explosion or Meltdown.Seeks Extension Until 30 Days After Final Disposition on 790601 Objection.Certificate of Svc Encl)
- PM-98-017, Requests Extension to Fundamental Nuclear Matl Control Plan Commitments.Attachment Identifies Details of GE Measurement Control Program for Safeguarding Licensed Snm.Attachment Withheld,Per 10CFR2.790 + (Requests Extension to Fundamental Nuclear Matl Control Plan Commitments.Attachment Identifies Details of GE Measurement Control Program for Safeguarding Licensed Snm.Attachment Withheld,Per 10CFR2.790)
- L-96-504, Requests Extension to Interim Storage Period by Increasing Time from 5 Yrs to 10 Yrs + (Requests Extension to Interim Storage Period by Increasing Time from 5 Yrs to 10 Yrs)
- ML18089A553 + (Requests Extension to Jul 1984 for Completion of post-maint Operability Testing of safety-related Equipment Based on Revised Interpretation of Scope Identified Through Discussion W/Region I Personnel)
- ML17309A118 + (Requests Extension to June 1981 to Complete Installation of Approved Fire Protection Features.Implementation Dates for Mods & Status of Incomplete Items Provided)
- ML20039E002 + (Requests Extension to June 1986 for CP for Unit 1.CP Extension for Unit 4 Withdrawn)
- TXX-2984, Requests Extension to License Rept Due Date Until 790706 + (Requests Extension to License Rept Due Date Until 790706)
- ML20134D772 + (Requests Extension to License SNM-1461 Until 860401 in Order to Decontaminate & Decommission Facility.Effort Will Be Made to Decontaminate Advance Technology Ctr Prior to Expiration Date)
- ML20078H653 + (Requests Extension to Mar 1984 for Response to Item 2.2.2 of Generic Ltr 83-28, Required Action Based on Generic Implications of Salem ATWS Events. Response to All Other Items Will Be Submitted by 831108)
- W3P89-1574, Requests Extension to Mar 1990 for Commitment to Revise Procedure ME-003-009 Re Fire Walls,Floors & Ceilings,Per Commitment in Stated Ler.Condition Identification 264434 Evaluation to Be Completed by 891201 + (Requests Extension to Mar 1990 for Commitment to Revise Procedure ME-003-009 Re Fire Walls,Floors & Ceilings,Per Commitment in Stated Ler.Condition Identification 264434 Evaluation to Be Completed by 891201)
- ML20101F311 + (Requests Extension to Mar 1993,for Completion of IPE Per 10CFR50.54(f).Believes That Requested IPE Completion Date of Mar 1993 Would Provide for Accomplishment of Stated Goals)
- ML20070Q720 + (Requests Extension to NRC Schedule for Util Response to IE Bulletin 81-03.Extension Required to Avoid Addl Plant Outage Which Would Be Necessary to Inspect HX in Order to Respond to NRC)
- ML19309F080 + (Requests Extension to Oct 1980 for Submittal of Upgraded Emergency Plans.Almost All Util Emergency Planning Resources Utilized to Upgrade Big Rock Point & Palisades Plans.Local Counties Portion May Not Be Submitted Until Late 1980)
- ML20082N579 + (Requests Extension to One Yr Relief Applicable to Category B & Rapid Acting Valves Re Sections 4.4.1.1 & 4.1.6.1 of TER & Items 5 & 6 of App C)
- ML20215H851 + (Requests Extension to Period for Response to Generic Ltr 87-06 Re Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves Until 870710,due to Current Outage)
- ML20027D401 + (Requests Extension to Prepare Response to NRC Re Emergency Preparednes Appraisal.Expected Completion Date Is 821015)
- B13723, Requests Extension to Previously Filed & Approved Request for Relief from ASME Section Xi,To Allow Continued Use of Temporary Rubber Expansion Joint in Pipe Until Replacement Is Available + (Requests Extension to Previously Filed & Approved Request for Relief from ASME Section Xi,To Allow Continued Use of Temporary Rubber Expansion Joint in Pipe Until Replacement Is Available)
- ML20041A703 + (Requests Extension to Proposed Schedule on Fire Protection Until 820630,to Implement Mods Re Emergency Shutdown Equipment)
- ML20132B815 + (Requests Extension to Public Comment Period Until 860207 for NUREG-0956, Reassessment of Technical Basis for Estimating Source Term, Due to Highly Technical Nature of Document)
- ML20129C101 + (Requests Extension to QA Program Approval for Radioactive Matl package:0728,Rev 0,due to Expire on 961031)
- NPL-98-0001, Requests Extension to Relief Request VRR-4A for Disassembly, Insp & Manual Stroke Testing of Valve ISI-00876A.Extension Would Allow Plant to Operate Until Scheduled 1998 Unit 1 Refueling Outage + (Requests Extension to Relief Request VRR-4A for Disassembly, Insp & Manual Stroke Testing of Valve ISI-00876A.Extension Would Allow Plant to Operate Until Scheduled 1998 Unit 1 Refueling Outage)