PY-CEI-NRR-1307, Requests Extension to 910628 to Submit Simulation Facility Certification

From kanterella
Jump to navigation Jump to search

Requests Extension to 910628 to Submit Simulation Facility Certification
ML20066H595
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/12/1991
From: Lyster M
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PY-CEI-NRR-1307, TAC-75335, NUDOCS 9102210201
Download: ML20066H595 (1)


Text

__ ________ _ _ _

1 CENTERf0R q

ENERGY ~

PERRY NUCLEAR POWER PLANT Mall Address; Michael D. Lyster P.O. BOX 97

'10 CENTER ROAD

' PERRY, OHIO 44081 VICE PRESIDENT - NUCLEAR PERRY, OHIO - 44081

. (216) 259-3737 -

February. 12, 1991 PY-CEI/NRR-1307 L

-U.S.

Nuclear Regulatory Commission Document' Control Desk Washington, D. C.

20555 i

Perry Nuclear Power Plant Docket No. 50-440 10 CFR 55.45(b)(2)(iii)

Exemption Request (TAC #75335)

Gentlemen:

By letters dated November 21, 1989-(PY-CEI/NRR-1072L) and January 30, 1990

-i (PY-CEI/NRR-1128L), a request for-exemption was made f rom the filing date for NRC Form 474 " Simulation Facility Certification." 10 CFR 55.45(b)(2)(iii) sets a filing,date for Form 474 of. March 26, 1991. The letters noted that

despite our accelerated production schedule, the replacement simulator will

-not be-in'a certifiable state of completion-by March 26, but that we expected

'to be able to file the certification form ontor about May 17, 1991 following

-completion of acceptance testing at the vendors facility.

'At that time, Lit was anticipated that licensed operator testing would be

-conducted in August, therefore Form 474 needed to be filed by the end of May.

.Since'that time, operator testing schedules-have been finalized, and the first operator test dates af ter March 26, 1991 will be in February _1992, thereby-lessening the.need for filing the certification form in May. A recent project status evaluation identified that the simulator factory acceptance test schedule had slipped; however, since the need for a May filing date has changed, it is requested that any_ issued exemption provide an additional time

. period before the filing is: required.

Accordingly, Lit is requested that the' expiration date of any issuedLexemption be June 28, 1991. This' requested date provides for a prompt certification filing and a recognition of unforeseen occurrences in ongoing preacceptance testing of the simulator.

tIf you have any questions, please feel free to call.